Attachment 0003 - 2025-0083 Appendix B - Repair Roof B222 Annex.pdf
PDF 4 MB Posted
- Solicitation number
- W519TC-25-R-A015
About this file
This document is a detailed architectural and engineering set of drawings for the Roof Repair Project for Building 222 at Rock Island Arsenal, project number 2025-0083, dated 05/30/2025. The comprehensive drawing set includes multiple sheets covering general notes, location maps, architectural plans, roof details, existing roof pictures, and mechanical/plumbing specifications for the roof repair project.
Key technical details include replacing the existing roof system with a new fully adhered 90 mil EPDM roof system in black color, with a 25-year manufacturer warranty. The project requires removing existing roof drains, installing new roof drains, replacing roof insulation to a minimum R-39 value, adding saddles for positive drainage, and replacing exhaust fans. The contractor must field verify existing conditions, remove the current roof system according to manufacturer instructions, and ensure proper installation of all roofing components to meet wind uplift requirements of 90 mph peak gust speed. The work will be performed by the Rock Island Arsenal Directorate of Public Works Engineering & Services Division, with design and oversight by S. Bach (Chief of Engineering) and G. Koski (Director of Public Works).
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-001
C O
VE
R
S H
EE
T
ROCK ISLAND ARSENAL
FY: 2025
PR NO: 2025-0083
BUILDING 222 ROOF REPAIR
DPW-SOW - APPENDIX B
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-0
/3
0/
D
ES
IG
N
ED
B Y:
D R
AW
N
B Y:
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
IN
G
R O
C K
IS
LA
N D
A R
SE
N
AL
BU
IL
D
IN
G
R O
O F
R
EP
AI
R
PR
O
JE
C
T-
-0
A
B
C
D
E
F
G
D
ES
IG
N
ED
IN
-H O
U
SE
B Y
R
IA
-D
PW
E N
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
IV
IS
IO
N
C H
EC
KE
D B
Y:
C
BS
PRELIMINARY2
2-
J.
F
AV
EL
A
J.
F
AV
EL
A
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text M
AutoCAD SHX Text Y
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text K
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text G
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text B
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text M
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text K
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
PROJECT LOCATION BUILDING 222
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING PARKING
PARKING
PARKING
PA
R
KI
N
G
PA
R
KI
N
G
PARKING PA
R
KI
N
G
PARKING
PARKING
PA
RK
IN
G
PARKING
PARKING
PARKING
PARKING
PA
R
KI
N
G
PARKING
PARKING
PARKING 234
13A
7-G
108 150
362363
T186
9B
SUBSB
SUBSC
246CPY
81320
SWITA
215B
92G1
92G2
93G2 93G1
47C
24B
47B
47CPY
22 30
30-G
15P
11P
14A
68SN
150P
70-G
686661
2-G
4-G 3-G
6-G
68GN
312FL
20FL
52A
212 216
81-G
333 129
SHED
TOWER
(MEC)
2442 2464
2406 2428 2450
2425 2447
2504 2530 2548 2566
26282490
26422527
2543 2571
2611 2635
320SN
275SN
TOWER
(MEC)
TOWER
(MEC)
TOWER
(MEC)
48SN
SOUTH
W
ES
T D
R
IV
E
FR
EE
DOM
D R
IV
E
BECK AVENUE
KINGSBURY AVE
DRIVE
NORTH
ST
R
EE
T
BENET AVENUE
AVENUE
CHESTNUT AVENUE
ST
R
EE
T
G O
LF
SE
C
O N
D
TH
IR
D
WITEK ROAD
FO
RT ARM
STRO
NG
AVE.
RODMAN AVENUE
NORTH AVENUE
EAST
NORTH AVENUE
R O
C K
IS
LA
N D
AVENUE
RODMAN
DAVENPORT
DRIVE
G
IL
LE
SP
IE
DRIVE
KING
SOUTH
AVENUE
EA
ST
DRIVE
BECK
SYLVAN
DRIVE
AVENUE
DRIVE
BLUNT
ROAD
DYKE ROAD
RODMAN
ROAD
RANGE
PRACTICE
S Y
L V
A N
D R
I V
E
TANK TRACK
GOLF
CEMETERY
NATIONAL
NORTH AVENUE
NORTH AVENUE
NORTH AVENUE
DYKE R
OAD
S Y
L V
A N
D R
I V
E
H
IL
LM
AN
S T.
R.
I.
VI
AD
UC
T
C
IR
C
LE
DAVENPORT
C
IR
C
LE
LANE
BUTLER
LANE
FARLEY
WILLIE
LA
NE
LANE
SYLVAN
ISLAND
LOCK AND DAM
NO. 15
BETTENDORFDAVENPORT
MOLINEROCK ISLAND
E. RIVER DR.
GRANT ST.
4TH AVE
1ST AVE
4TH ST.
STATE ST.
DURNIN AVENUE
W H
IT
TE
M O
R E
ST
EA
ST
D R
IV
E
NORTH
DRIVE
PROSPECT
CIRCLE
PROSPECT
COURT
ROSTRUM D
RIVE
DR
IV
E
CEMETERY
MOLINE BRIDGE
G O
ET
SC
H
D
IV
E
DRIVE
CEMETERY
POST
KI
N
G D
R
IV
E
PROSPECT
DRIVE
KING
CHAMBERLAIN DRIVE
WALKER DRIVE
CONFEDERATE
CEMETERY
DURNIN
AVENUE
BAKER
AVENUE
H O
W
AR
D S
T.
AMERICAN
DISCOVERY
TRAIL
FO
RT
A
RM
ST
RO
NG
A
VE
BECK AVENUE
H O
BB
S
ST
ST
R
EE
T
ST
R
EE
T
STR
EET EAST
ST
R
EE
T
W
ES
T PERSHING
PE
RS
HI
NG
AVENUE
RODMAN
FIELD
MEMORIAL
MEMORIAL
PARK
RAMSEY ROAD
TERRACE
LA
N
E
MOSKALA
CEMETERY
NATIONAL
2ND ST.
3RD ST.
ST
R
EE
T
KINGSBURY
FL
AG
LE
R
AVE
RIA
FITNESS
TRAIL
BAUMBECK AVENUE
H
IL
LM
AN
S T.
RODMAN AVE
301FL
311SN
301301-G
BLUNT
Pr op os ed
G en er at or
R el oc at io n
Proposed Switches
15-L1
BM 100
7L
RI Astronomical Stone - Pool 15
BM 102
Arsenal Bridge
BM 103
TBM 104
TBM 105
TBM 106
TBM 107
TBM 108
TBM 109
TBM 110
BM 111
09-77-15 Eisenbraun Point
PID BBBR62
L2
L4
R.I.A.
MOLINE POOL RESET
(OCT. 2001)
Elev. 574.1
ADDITION TO
2ND
CEMETERY
NATIONAL
ADDITION TO
1ST
ROCK ISLAND
M I S S I S S I P P I R I V E
R
SE
C
O N
S
TR
EE
T
TH
IR
S
TR
EE
T
117152
RIAPRIMITIVE
CAMPING
TANK TRACK
SY
LV
AN
IV
E
ACP SHELTER
BU
FF
IN
G
TO
N
S T.
BASE MAP REVISED MAR. 2023
P.O.B.
355356
346FL
2315 2337
2320 2340
2318 2342 2362 2384
2357 2381 2403
BM 101
2400.00
G-002
LO
C
AT
IO
N M
AP
IN
D
EX
O F
D R
AW
IN
G S
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-0
/3
0/
D
ES
IG
N
ED
B Y:
D R
AW
N
B Y:
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
C K
IS
LA
N D
A R
SE
N
AL
BU
IL
D
IN
G
R O
O F
R
EP
AI
R
PR
O
JE
C
T-
-0
A
B
C
D
E
F
G
D
ES
IG
N
ED
IN
-H O
U
SE
B Y
R
IA
-D
PW
E N
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
IV
IS
IO
N
C H
EC
KE
D B
Y:
C
BS
2-
SHEET
ID. TITLE OF DRAWING
G-001 COVER SHEET
GENERAL
G-002 LOCATION MAP & INDEX OF DRAWINGS
G-003
ARCHITECTURAL
PARTIAL ROOF PLANA-101
ROOF DETAILSA-501
EXISTING ROOF PICTURESA-901
MECHANICAL & PLUMBING NOTES AND SCHEDULESM-001
MECHANICAL DEMOLITION AND NEW WORK, PARTIAL FLOOR PLANM-101
J.
F
AV
EL
A
J.
F
AV
EL
A
SCALE: NOT TO SCALE
VICINITY MAPD1
SCALE: NOT TO SCALE
INDEX OF DRAWINGSA8
SCALE: NOT TO SCALE
BUILDING 222 LOCATION MAPA1
NORTH
SCALE: 1'= 800'
AERIAL MAP OF ROCK ISLAND ARSENALD4
NORTH
ABBREVIATIONS & GENERAL NOTES
MECHANICAL
PLUMBING & MECHANICAL DEMOLITION & NEW WORK, PARTIAL FLOOR PLANM-102
BUILDING ADDITION SECTION, DETAILSA7
RECORD DRAWINGS
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text M
AutoCAD SHX Text Y
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text K
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text G
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text B
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text M
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text K
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
L
G-003
AB
BR
EV
IA
TI
O
N S
G
EN
ER
AL
N O
TE
S
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-0
/3
0/
D
ES
IG
N
ED
B Y:
D R
AW
N
B Y:
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
C K
IS
LA
N D
A R
SE
N
AL
BU
IL
D
IN
G
R O
O F
R
EP
AI
R
PR
O
JE
C
T-
-0
A
B
C
D
E
F
G
D
ES
IG
N
ED
IN
-H O
U
SE
B Y
R
IA
-D
PW
E N
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
IV
IS
IO
N
C H
EC
KE
D B
Y:
C
BS
PRELIMINARY2
2-
A-000
XX
SECTION NUMBER
DWG. NO. WHERE
SECTION IS DRAWN
SECTION MARK
A-000
ELEVATION NUMBER
DWG. NO. WHERE
ELEVATION IS DRAWN
BUILDING ELEVATION MARK
ELEVATION
NUMBER (TYP.)
DWG. NO. WHERE
ELEVATION IS DRAWN
INTERIOR ELEVATION MARK
DWG. NO. WHERE
DETAIL IS DRAWN
CALLOUT HEAD
DETAIL
NUMBER (TYP.)
AREA COVERED BY DETAIL
WINDOW TAG PARTITION TYPE KEYNOTE
TAG
DOOR TAG
0'-0" A.F.F.X
CEILING TAG
(TYPE & HEIGHT)
CEILING HEIGHT
CEILING TYPE
DETAIL IDENTIFIER (MODULE LETTER AND NUMBER)
NORTH ARROW
PLAN, ELEVATION, SECTION, OR DETAIL VIEW TITLE
PLAN SYMBOLS
SYMBOLS
WALL/PARTITION
TYPE
ARCHITECTURAL ABBREVIATIONS GENERAL NOTES
1. NOTES FOUND ON G-SHEETS, ARE GENERAL NOTES AND APPLY TO THE ENTIRE PROJECT TO INCLUDE THE COMPLETE PLAN SET AND SPECIFICATIONS, UNLESS NOTED OTHERWISE. SHEET NOTES APPLY TO ALL PLANS, ELEVATIONS, SECTIONS, AND DETAILS FOR THAT SHEET, UNLESS NOTED OTHERWISE.
KEYNOTES APPLY TO ELEMENTS ON THE SHEET AS INDICATED, UNLESS NOTED OTHERWISE.
2. THE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE DRAWINGS ARE NOT INTENDED TO INDICATE OR DESCRIBE ALL WORK REQUIRED FOR THE
FULL PERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.
3. THE ENUMERATION OF PARTICULAR ITEMS OF WORK IN ONE PORTION OF THE CONTRACT DOCUMENTS SHALL NOT BE CONSTRUED TO EXCLUDE OTHER
ITEMS NECESSARY OR IMPLIED THEREFROM.
4. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL PARTS OF THE WORK SO THAT NO WORK SHALL BE LEFT IN AN UNFINISHED OR INCOMPLETE CONDITION. THE CONTRACTOR SHALL PROVIDE A COMPLETE AND USABLE PRODUCT.
5. THE CONTRACTOR SHALL PROTECT ANY EXISTING, IN-PLACE, AND/OR NEW WORK.
6. ALL WORK NOTED "N.I.C." IS NOT MEANT TO BE PART OF THE CONSTRUCTION SCOPE OF WORK AGREEMENT.
7. THE CONTRACTOR SHALL PAY FOR AND COORDINATE THE REMOVAL AND LEGAL DISPOSAL OF MATERIALS AND RUBBISH.
8. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS. DIMENSIONS AND PLANS ARE NOT WARRANTED AS ACCURATE. VERIFY EXISTING CONDITIONS
THAT MAY AFFECT THE WORK PRIOR TO BID.
9. DO NOT SCALE DRAWINGS; LARGE SCALE DETAILS GOVERN OVER SMALL SCALE DETAILS.
10. NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION, AND ALTERATION OPERATIONS SHALL BE APPLIED.
11. PROVIDE THE MINIMUM EXPANSION, CONTRACTION, AND CONTROL JOINTS IN ALL WORK PER THE PRODUCT MANUFACTURER'S STANDARDS OR THE
APPLICABLE INDUSTRY STANDARDS.
12. ALL DISSIMILAR METALS SHALL BE ISOLATED FROM EACH OTHER TO AVOID GALVANIC CORROSION.
13. DO NOT CUT INTO, REMOVE, OR ALTER ANY STRUCTURAL MEMBER OR FLOOR SYSTEM UNLESS IT IS SPECIFICALLY NOTED OR SHOWN ON DRAWINGS.
14. THE CONTRACTOR SHALL PLAN THEIR WORK TO PROVIDE ADEQUATE PROTECTION FOR PERSONS AND PROPERTY AT ALL TIMES, AND EXECUTE THE WORK IN
SUCH A MANNER TO AVOID ANY HAZARD TO PERSONS AND PROPERTY AS NECESSARY.
15. PROVIDE CODE COMPLIANT, ANTI-STATIC, ANTI-MICROBIAL, FLAME RESISTANT AND HEAT REACTIVE TEMPORARY SUSPENDED POLYETHYLENE CEILING USED BELOW THE ROOF TO CAPTURE DUST AND DEBRIS THAT MIGHT DROP DURING CONSTRUCTION THAT OPENS QUICKLY IN THE EVENT OF A FIRE ALLOWING
SPRINKLERS TO ACTIVATE.
16. ALL PRODUCTS LISTED ON DRAWINGS AND NOT INDICATED IN SPECIFICATIONS SHALL BE SUBMITTED FOR GOVERNMENT APPROVAL. CONTRACTOR SHALL
ADD THESE TO THEIR SUBMITTAL REGISTER.
17. DEMOLITION OR NEW WORK MAY NOT BE SOLELY INDICATED ON THEIR CORRESPONDING SHEETS.
18. CONTRACTOR SHALL REQUEST PARKING, JOB TRAILER, STAGING AND OTHER NECESSARY SPACES.
19. DISPOSE OF DEMOLISHED AND WASTE MATERIALS OFF SITE UNLESS OTHERWISE NOTED.
20. TO PERFORM THE WORK AS AWARDED BY THE BASE BID OPTION, OR CONTRACT MODIFICATION, THE CONTRACTOR SHALL EITHER PROTECT OR RELOCATE
ADJACENT ITEMS, EQUIPMENT, AND STRUCTURES AS NECESSARY TO FACILITATE THE WORK.
21. IN ORDER TO MORE CLEARLY DEPICT WORK BEING IDENTIFIED ON A DRAWING, ITEMS NOTED AS BEING INCLUDED IN THE WORK ARE GENERALLY SHOWN IN HEAVY (BOLD) LINE WEIGHT AND BLACK LINE WORK. GRAY SCALE LINE WORK DENOTES EXISTING CONDITIONS. NOTE: THERE ARE EXCEPTIONS TO THIS RULE AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO THOROUGHLY REVIEW DRAWINGS AND REQUEST ADDITIONAL INFORMATION PRIOR TO BIDDING.
22. NORMAL INSTALLATION WORKING HOURS WILL BE BETWEEN 0600-1700, MONDAY THROUGH FRIDAY. HOURS OUTSIDE THE NORMAL RANGE REQUIRES COORDINATION AND APPROVAL FROM THE CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.) TWO WEEKS PRIOR. THE FACILITY WILL BE CLOSED ON
GOVERNMENT HOLIDAYS. CONTACT THE C.O.R. FOR A LIST OF GOVERNMENT HOLIDAYS.
23. THE CONTRACTOR SHALL MAKE REQUESTS TO DISCONNECT POWER OR UTILITIES PER SPECIFICATIONS. ALL WORK REQUIRING POWER REMOVAL SHALL BE DONE IN A TIMELY MANNER AND OUTSIDE NORMAL INSTALLATION WORKING HOURS WHEN POSSIBLE. IF SAFE WORKING CONDITIONS EXIST FOR BOTH THE CONTRACTOR AND BUILDING OCCUPANTS, THEN POWER SHALL BE RESTORED FOR BUILDING OCCUPANTS DURING NORMAL WORKING HOURS. THE CONTRACTOR SHALL IMMEDIATELY RESTORE POWER ONCE WORK IS COMPLETE AND SAFE CONDITIONS EXIST.
24. THE CONTRACTOR SHALL OBTAIN NECESSARY BUILDING AND FIRE PERMITS FROM THE INSTALLATION AUTHORITIES HAVING JURISDICTION.
25. THE CONTRACTOR SHALL COMPLY WITH INSTALLATION POLICIES AND PROCEDURES.
26. THE CONTRACTOR SHALL PERFORM WORK IN ACCORDANCE WITH APPLICABLE CODES, ORDINANCES, AND REGULATORY AGENCIES.
27. NOTES APPEAR ON VARIOUS SHEETS FOR DIFFERENT SYSTEMS AND MATERIALS. SHEETS ARE TO BE REVIEWED AND NOTES ON INDIVIDUAL SHEETS SHALL
BE APPLIED TO RELATED DRAWINGS AND DETAILS.
28. A FINISH INDICATION ON A WALL SHALL MEAN THE ENTIRE LENGTH AND HEIGHT OF WALL INDICATED.
29. PROVIDE ACCESS PANELS AS REQUIRED BY APPLICABLE CODES AND AS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK. ALL ACCESS PANELS SHALL BE CONCEALED AND LOCATIONS SHALL BE REVIEWED WITH THE ARCHITECT PRIOR TO PROCEEDING.
30. ALL MECHANICAL, ELECTRICAL AND PLUMBING WORK THAT PENETRATES FLOORS, WALLS, OR ROOFING SHALL BE INSTALLED IN A MANNER THAT WILL PRESERVE THE MOISTURE RESISTIVENESS, FIRE RATING, AND STRUCTURAL INTEGRITY OF THE BUILDING.
31. ALL WORK SHALL BE DONE IN A WORKMAN LIKE MANNER. WORK SHALL CONFORM TO APPLICABLE INDUSTRY OR MANUFACTURER'S PUBLISHED STANDARDS FOR QUALITY OF MATERIALS AND WORKMANSHIP, AS WELL AS, ALL REQUIREMENTS IN THESE DRAWINGS AND SPECIFICATIONS. ANY CONFLICTING REQUIREMENTS OF THE SOURCES LISTED ABOVE SHALL BE BROUGHT TO THE ATTENTION OF THE C.O.R. PRIOR TO PROCEEDING WITH THE WORK.
GENERAL DEMOLITION AND NEW WORK
1. GENERAL NOTES ARE APPLICABLE TO THE BASE BID ALONG WITH ANY AWARDED BID
OPTIONS.
2. CONTRACTOR SHALL PROTECT ASPHALT AND DISTRIBUTE HEAVY POINT LOADS. IF THE
CONTRACTOR DAMAGES THE ASPHALT REPAIRS WILL BE PERFORMED IN ACCORDANCE
WITH UFC 3-270-01 ASPHALT MAINTENANCE AND REPAIR. DEPENDING UPON SEVERITY OF
DAMAGE REPAIRS WILL BE IN ACCORDANCE WITH FULL DEPTH, PARTIAL DEPTH, AND/OR
PATCHING.
3. THE CONTRACTOR MAY INSTALL A CHUTE ON THE SIDE OF THE BUILDING TO FACILITATE
DEMOLITION. THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR THE STRUCTURAL
SUPPORT AND INTEGRITY OF THE CHUTE.
4. DUMPSTERS MUST COMPLY WITH UFC 4-010-01 DoD MINIMUM ANTI-TERRORISM STANDARDS
FOR BUILDINGS. DUMPSTERS CAN BE LOCATED ALONG THE BUILDING DURING WORKING
HOURS UPON REQUEST. THE CONTRACTOR WILL MAKE REQUESTS IN WRITING TO THE C.O.R.
AT LEAST TWO WEEKS PRIOR TO THE REQUIREMENT. DUMPSTERS WILL BE EMPTY EACH
TIME THEY ARE PLACED NEAR BUILDINGS AT THE START OF THE WORKING DAY. DUMPSTERS
WILL BE MOVED AWAY FROM THE BUILDING AT THE END OF EACH WORKING DAY. THE C.O.R.
WILL DETERMINED THE DUMPSTER STORAGE LOCATION AT THE END OF THE WORK DAY.
5. THE CONTRACTOR WILL BE GRANTED ACCESS THROUGH THE GATE NEAR THE SOUTHWEST
CORNER OF BUILDING 230. CRANES MAY BE SETUP TEMPORARILY FOR THE DELIVERY
MATERIALS, EQUIPMENT, AND/OR DEMOLITION. CRANES MUST BE MOVED AFTER THE
DELIVERY OF MATERIALS OR REMOVAL OF DEMOLISHED ITEMS.
6. THE CONTRACTOR SHALL COORDINATE CRANE USAGE 2 WEEKS IN ADVANCE WITH THE
C.O.R.
7. JMTC WILL REQUIRE ACCESS TO BUILDING 222. THE CONTRACTOR SHALL MOVE MATERIALS
AND/OR EQUIPMENT UPON CUSTOMER REQUEST.THE CONTRACTOR SHALL NOT BLOCK
DOORS OR ENTRY POINTS.
8. THE CONTRACTOR CAN MAKE REQUESTS IN ADVANCE TO BLOCK ENTRANCES, BUT THESE
MAY NOT BE GRANTED.
9. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING THE JOB SITE. SEE SPECIFICATIONS
FOR DETAILS. THIS INCLUDES INTERIOR AREAS SUBJECT TO FALLING DEBRIS FROM
ROOFING ACTIVITIES.
10. THE CONTRACTOR SHALL REPLACE ALL ROOFING INSULATION. PROVIDE ADDITIONAL
INSULATION AS REQUIRED TO INSTALL SADDLES FOR POSITIVE DRAINAGE AND MEET THE
NRCA NO ROOF PONDING DEFINITION.
11. CONTRACTOR SHALL DISABLE THE EXISTING ROOF SYSTEM ACCORDING TO THE
MANUFACTURER'S INSTRUCTIONS.
12. UNLESS INDICATED OTHERWISE IN PLANS OR SPECIFICATIONS THE CONTRACTOR SHALL
USE MANUFACTURER'S STANDARD DETAILS AND PRODUCTS ACCEPTABLE FOR USE WITH A
25 YEAR WARRANTY SYSTEM.
13. THE CONTRACTOR'S CONSTRUCTION WARRANTY FOR LABOR AND MATERIALS SHALL BE NO
LESS THAN 3 YEARS FROM DATE OF PROJECT COMPLETION.
14. PROVIDE A MINIMUM 4" FACE FOR GENERAL METAL FLASHING AND COUNTER FLASHING.
15. SEAM TAPE SHALL BE A MINIMUM OF 6" WIDE.
16. DETAILS OUTLINE GENERAL REQUIREMENTS OF THE PROJECT. THE PLANS DO NOT INDICATE
ALL DETAILS REQUIRED TO PRODUCE A WATER TIGHT SYSTEM. ALL DETAILS USED ON THIS
PROJECT SHALL BE SUBMITTED FOR REVIEW.
AFF ABOVE FINISHED FLOOR
ACC DR ACCESS DOOR / PANEL
ADAAG AMERICAN WITH DISABILITIES
ACCESSIBILITY GUIDELINES
ACCESS ACCESSORIES
ADJ ADJUST/ ADJUSTABLE
ACOUST. ACOUSTICAL
AB ANCHOR BOLT
ANOD ANODIZED
AC AIR CONDITIONING
AL / ALUM ALUMINUM
& AND
L ANGLE
APP APPROVED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
@ AT
ATFP ANTI TERRORISM / FORCE PROTECTION
AVG AVERAGE
AWI ARCHITECTURAL WOODWORK INSTITUTE
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION, INC.
BM BEAM
BLKG BLOCKING
BD BOARD
BTM BOTTOM
BLDG BUILDING
CFCI CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CH CHANNEL
CPT CARPET
CLG CEILING
CLG HT CEILING HEIGHT
CTR CENTER
℄ CENTER LINE
C TO C CENTER TO CENTER
CT CERAMIC TILE
CLR CLEAR
CO CLEANOUT
CLOS CLOSET
CO COMPANY
COL COLUMN
CONC CONCRETE
CORR CORRIDOR
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CMU CONCRETE MASONRY UNIT
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CJ CONTROL JOINT
CY CUBIC YARD
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DR DOOR
DN DOWN
DS DOWNSPOUT
DESC DESCRIPTION
DWG DRAWING
EA EACH
EF EXHAUST FAN
EL ELEVATION
ERD EMERGENCY ROOF DRAIN
EP EPOXY PAINT
ENGR ENGINEER
EQUIP EQUIPMENT
EQ EQUAL
EXIST EXISTING
EXP EXPANSION / EXPOSED
EJ (EXP JT) EXPANSION JOINT
EXP TO EXPOSED TO STRUCTURE
STRUCT
EXT EXTERIOR
ETD ESTIMATED TRAVEL DISTANCE
FAC FACTORY
FDC FIRE DEPARTMENT CONNECTION
FT FEET
FE FIRE EXTINGUISHER
FIN FINISH
FP FLAT PAINT
FF FINISHED FLOOR
FLR FLOOR
FD FLOOR DRAIN
FLUOR FLUORESCENT
FTG FOOTING
FDN FOUNDATION
FV FIELD VERIFY
GA GAGE OR GAUGE
GALV GALVANIZED
GBF GYPSUM BOARD FURRING
GFCI GOVERNMENT FURNISHED
CONTRACTOR INSTALLED
GFGI GOVERNMENT FURNISHED
GOVERNMENT INSTALLED
GP GLOSSY PAINT
GL GLASS
GOVT GOVERNMENT
GYP GYPSUM
GYP BD GYPSUM BOARD
(GWB)
HKS HOOKS
HR HANDRAIL
HDW HARDWARE
HT HEIGHT
H HIGH
HP HIGH POINT
HM HOLLOW METAL
HORIZ HORIZONTAL
HB HOSE BIBB
HVAC HEATING VENTILATION & AIR
CONDITIONING
IBC INTERNATIONAL BUILDING
CODE
ID INSIDE DIAMETER
IN INCH
INSUL INSULATION
INT INTERIOR
IRC INTERNATIONAL RESIDENTIAL
CODE
JT JOINT
JST JOIST
KP KICK PLATE
LAM LAMINATE
LDG LANDING
LAV LAVATORY
LH LEFT HAND
LHR LEFT HAND REVERSE
LT LIGHT
LTG LIGHTING
LONG LONGITUDINAL
LVR LOUVER
LP LOW POINT
MAS MASONRY
MO MASONRY OPENING
MGR MANAGER
MFR MANUFACTURER
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MWP METAL WALL PANEL
MIN MINIMUM
MISC MISCELLANEOUS
N.I.C. NOT IN CONTRACT
No. (#) NUMBER
NTS NOT TO SCALE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
OC ON CENTER
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFGI OWNER FURNISHED
GOVERNMENT INSTALLED
OH OPPOSITE HAND
OPNG OPENING
OW OPEN WEB
OPP OPPOSITE
OD OUTSIDE DIAMETER
OSHA OCCUPATIONAL SAFETY AND
HEALTH ACT
OVHD OVERHEAD
PDU POWER DISTRIBUTION UNIT
PT PAINT OR PRESSURE TREATED
PR PAIR
PNL PANEL
PART PARTITION
PLAS PLASTER OR PLASTIC
PL PLATE
PLYWD PLYWOOD
LBS OR # POUNDS
PSF POUNDS / SQUARE FOOT
PSI POUNDS / SQUARE INCH
PMJF PRE-MOLDED JOINT FILLER
PRE-FAB PREFABRICATED
QT QUARRY TILE
REF REFERENCE
REINF REINFORCEMENT
REQ'D REQUIRED
REV REVISIONS / REVISED
RD ROOF DRAIN
RDO ROOF DRAIN OVERFLOW
RHR RIGHT HAND REVERSE
RM ROOM
RO ROUGH OPENING
RB RUBBER BASE
SC SEALED CONCRETE
SCW SOLID CORE WOOD
SCHED SCHEDULE
SECT SECTION
SGP SEMI-GLOSS PAINT
SHT MET SHEET METAL
SIM SIMILAR
STC SOUND TRANSMISSION CLASS
SPEC(S) SPECIFICATION
SFRM SPRAYED FIRE RESISTIVE MATERIAL
SQ SQUARE
ST STORM
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
TIOL / TLT TOILET
TEL TELEPHONE
THK THICK
T'HOLD THRESHOLD
TG TEMPERED GLASS
T/ TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE
T/C TOP OF CURB
TOS TOP OF STEEL
T/W TOP OF WALL
TU TOUCH-UP
TYP. TYPICAL
UFC UNIFIED FACILITIES CRITERIA
UL UNDERWRITERS LABORATORIES
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VEST VESTIBULE
VCT VINYL COMPOSITION TILE
VCB VINYL COVE BASE
VTR VENT THRU ROOF
W WIDTH
W/ WITH
WC WATER CLOSET
WCO WALL CLEAN OUT
WD WOOD
WNDO WINDOW
W/O WITHOUT
WRGB WATER RESISTANT GYPSUM BOARD
WS WEATHERSTRIPPING
WRO WINDOW ROUGH OPENING
YR YARD
VIEW TITLES
TRUE N
PLAN
NORTH
XXXX
X# X-###
SCALE
VIEW TITLEA3
X# X-###
J.
F
AV
EL
A
J.
F
AV
EL
A
R
ID
G E
R
ID
G E
R
ID
G E
EF-222-R-10
SLOPE
D N
D N
D N
D N
D N
D N
D N
SLOPE
0.5:12
EF-222-R-11
OAI-1
OAI-2
R
ID
G E
SLOPESLOPE
0.5:12
NOT IN CONTRACT
18'-8" 18'-8" 18'-8" 18'-8"
±80'-6"
3'-6"2'-4" 2"
2'
-0
'-2
'-0
'-0
'-0
'-0
'-2
1' -1
0" 1'
-1 0"
E7 A-901
C7 A-901
C7 A-903
E1 A-901
A7 A-901
A4 A-901
B1 A-901
B3 A-901
E5 A-901
C4 A-903
2 9
NOT IN CONTRACT FOR ROOF REPAIR
PA
R
TI
AL
R O
O F
PL
AN
BL
D
G
R
O O
F
A-101
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-0
/3
0/
D
ES
IG
N
ED
B Y:
D R
AW
N
B Y:
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
C K
IS
LA
N D
A R
SE
N
AL
BU
IL
D
IN
G
R O
O F
R
EP
AI
R
PR
O
JE
C
T-
-0
A
B
C
D
E
F
G
D
ES
IG
N
ED
IN
-H O
U
SE
B Y
R
IA
-D
PW
E N
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
IV
IS
IO
N
C H
EC
KE
D B
Y:
C
BS
2-
0 5' 10' 20' 1/8" = 1'-0"
KEYNOTES
REMOVE EXISTING ROOF DRAINS AND OVERFLOW DRAINS, FURNISH AND
INSTALL NEW ROOF DRAINS, CAST IRON DOME, OVERFLOW DRAINS AND
PIPES TO MEET CURRENT PLUMBING CODE. SEE PLUMBING DRAWING FOR
MORE DETAILS.
EXISTING EQUIPMENT TO REMAIN, DISCONNECT UTILITIES AND CONTROLS
AS REQUIRED TO ALLOW THE UNIT TO BE RAISED FOR THE INSTALLATION OF
THE NEW ROOFING. RECONNECT AFTER ROOFING IS COMPLETED. FLASH
AND COUNTER FLASH AS REQUIRED.
REMOVE AND DISPOSED EXISTING UNUSED VENTS (2-5" STD WPB AND ± 1/2"
STD) PATCH METAL ROOF DECK. APPLY ROOFING SYSTEM OVER THE
PATCHED AREA.
EXISTING PLUMBING VENT TO REMAIN, EXTEND AS REQUIRED. FLASH
ACCORDING TO THE ROOF MANUFACTURER. PROVIDE SUPPORT BRACKET.
REMOVE AND REPLACE ROOF SCUTTLE WITH ALUMINUM INSULATED ROOF
CAP, PROVIDE SAFETY RAILS AS REQUIRED PER OSHA. SIZE
APPROXIMATELY 30"x36".
REMOVE AND DISPOSE EXISTING UNUSED EXHAUST VENT, MOUNTING
FRAME, AND CURB. DISCONNECT AND REMOVE ALL ±24" Ø PIPING BELOW
THE ROOF DECK AND UTILITIES BACK TO THE SOURCE. PATCH EXISTING
OPENINGS AFTER EQUIPMENT REMOVAL. PATCH WALL 8" CONCRETE
MASONRY UNITS, 2-HRS FIRE RATING WITH ALIKE MATERIAL, PAINT. APPLY
NEW ROOF SYSTEM OVER ROOF DECK. COORDINATE WITH THE C.O.R. PRIOR
TO ANY UTILITY AND EQUIPMENT REMOVAL UNDER THE ROOF DECK.
DEMOLISH EXISTING AND FURNISH NEW RUBBER ROOF WALK PADS ±30"x30"
ACCORDING TO THE ROOF MANUFACTURER.
REMOVE AND REPLACE EXISTING PARAPET METAL COPING. SYSTEM TO BE
LIGHT GAUGE GALVANIZED OR STAINLESS STEEL TO MATCH EXISTING.
PROVIDE NEW DISCONNECT FOR ROOF MOUNTED EXHAUST EQUIPMENT
ACCORDING TO THE NATIONAL ELECTRICAL CODE. COOK EQUIPMENT,
MODEL 490R11B 490 ACRU. ELECTRICAL INFO: INPUT VOLTAGE: 460v/3/60, 50Hp
NORTH
BLDG 222 ROOF KEY PLAN
SCALE: N.T.S.SCALE:1/8"=1'-0"
PARTIAL ROOF PLAN - BLDG 222 ANNEXA1
NORTH
GENERAL NOTES
1. THE GENERAL CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS AND DIMENSIONS PRIOR TO ANY WORK. THE CONTRACTOR
SHALL NOTIFY THE CONTRACTING OFFICER OF ANY DISCREPANCIES FOR
CLARIFICATIONS PRIOR TO ANY WORK.
2. CONTRACTOR SHALL REMOVE THE EXISTING ROOF SYSTEM ACCORDING TO
THE MANUFACTURER'S INSTRUCTIONS DOWN TO EXISTING METAL DECK.
3. REMOVE AND REINSTALL ROOFTOP UTILITIES AS NEEDED TO
ACCOMMODATE ROOF REPLACEMENT.
4. REMOVE ROOF DRAINS AND REPLACE WITH NEW.
5. SLOPE CRICKET AT 1/8" PER INCH MIN. TOWARD ROOF DRAINS.
6. PROVIDE A MINIMUM 4" FACE FOR GENERAL METAL FLASHING AND COUNTER
FLASHING.
7. SEAM TAPE SHALL BE A MINIMUM OF 6" WIDE.
8. SEAL ALL ROOF PENETRATIONS WITH ELECTROMETRIC SEALANT IF CANNOT
BE FLASHED.
9. THE CONTRACTOR SHALL REPLACE THE EXISTING ROOF SYSTEM WITH A
NEW FULLY ADHERE 90 MIL EPDM ROOF SYSTEM BLACK COLOR WITH
MANUFACTURER'S 25 YEARS WARRANTY. THE ROOFING SYSTEM SHALL
INCLUDE ALL THE NECESSARY MANUFACTURER APPROVED COMPONENTS
FOR A COMPLETE AND USABLE WATERPROOF ROOFING SYSTEM.
10. APPLY MANUFACTURER'S APPROVED FASTENING SYSTEM TO INSULATION
BOARD AND COVER BOARD TO WARRANTY THE ROOF SYSTEM FOR WINDS
OF PEAK GUST SPEED AT 90 MPH CALCULATED AT TEN METERS ABOVE
GROUND. BASE WIND UPLIFT MEASUREMENTS ON A DESIGN WIND SPEED OF
115 MPH IN ACCORDANCE WITH ASCE 7-16.
11. THE CONTRACTOR SHALL REPLACE ALL ROOFING INSULATION WITH R-39
MINIMUM VALUE, POLYISOCYANURATE (POLYISO) INSULATION BOARD WITH
MINIMUM OF 25 PSI COMPRESSIVE STRENGTH. PROVIDE ADDITIONAL
INSULATION AS REQUIRED TO INSTALL SADDLES FOR POSITIVE DRAINAGE
AND MEET THE NRCA NO ROOF PONDING DEFINITION.
17 18 19 20 21 22
F9
F
D9
D
C1
B
A1
WORK LOCATION
J.
F
AV
EL
A
J.
F
AV
TAPERED DRAIN
SINGLE PLY SEALING MASTIC
INSULATION TAPERED 18" Ø
(457 mm) AROUND DRAIN
EPDM NON REINFORCED
MEMBRANE ADHERED
CUT HOLE THROUGH MEMBRANE
AT LEAST THE SAME DIAMETER
AS THE ROOF DRAIN PIPE-TYP.
1/2" ( 13 mm) MIN.
NTS
ROOF DRAIN A1
MANUFACTURER APPROVED FASTENER
AND PLATE 12" (304 mm)
O.C. MAX. PENETRATION
DEPENDANT ON DECK
MATERIAL(S). SEE SPECS FOR
FURTHER INFORMATION
EPDM MEMBRANE
ADHERED MECHANICALLY FASTENED
EPDM MEMBRANE
ADHESIVE (FOR ADHERED
SPECIFICATIONS ONLY)
NEW INSULATION / COVER BOARD
APPROPRIATE FASTENERS AT 12" (304 mm) O.C.
EXISITNG DECK
EQUIPMENT FLASHING
APPROPRIATE GROMMETED
FASTENERS THROUGH COUNTER
FLASHING APPROXIMATELY 12" (304 mm) O.C. (IF REQUIRED)
2 X 4 WOOD NAILER
APPROVED SUBSTRATE
COUNTERFLASHING SKIRT
PREFABRICATED METAL CURB
EPDM MEMBRANE ADHERED TO
CURB WITH APPROVED MEMBRANE
ADHESIVE.
8" M
IN
NOTES:
1. PLEASE SEE SINGLE PLY FLASHING SPECIFICATIONS FOR A FULL DESCRIPTION OF INSTALLATION
INSTRUCTIONS AND REQUIREMENTS WHICH ARE CONSIDERED A PART OF THIS DETAIL.
2. EPDM TAPE PRIMER OR SINGLE PLY MEMBRANE PRIME (LOW VOC) MUST BE APPLIED ON ALL SURFACES COMING INTO CONTACT WITH EPDM PEEL & STICK PRODUCTS. ROLL MEMBRANE WITH HAND ROLLER UNDER PRESSURE
AT SEAM IN ACCORDANCE WITH THE EPDM INSTALLATION GUIDE.
3. 1/8" TO 1/4" OF EPDM SEAM TAPE MUST BE EXPOSED ALONG ENTIRE LENGTH OF ALL SEAMS.
4. HEIGHT OF CURB TO BE ADJUSTED WITH NAILERS. IT IS PREFERRED TO RAISE CURB ONTO NAILERS TO EXTEND
FLASHING HEIGHT.
EPDM 3" SEAM TAPE
WITH 1/8" TO 1/4" EXPOSED
EPDM TAPE PRIMER
SEE NOTE 2
ALTERNATE CURB FLASHING
METHOD IS TO USE EPDM
PRE-TAPED CURB FLASHING 18" & 24"
NTS
PARAPET COPING A6
NOTES:
1. ALL BOLTS OR CLAMPS MUST BE IN PLACE
TO PROVIDE CONSTANT COMPRESSION
ON WATER CUT-OFF MASTIC.
2. REMOVE EXISTING LEAD, FLASHING
MATERIAL & ENSURE THE DRAIN RING IS
COMPLETELY CLEAN DOWN TO BARE
METAL.
3. HPX FASTENERS AND POLYMER SEAM
PLATES ARE REQUIRED OVER STEEL
DECKS.
4. THE HOLE IN THE MEMBRANE SHALL
EXCEED THE DIAMETER OF THE DRAIN
PIPE, BUT SHALL BE NO LESS THAN 1/2"
(1.5cm) FROM THE ATTACHMENT POINTS
OF THE DRAIN CLAMPING RING.
5. ROOF DRAIN SIZE AND NUMBER OF
DRAINS SHALL BE IN ACCORDANCE WITH
THE LOCAL CODES.
6. PLEASE SEE SINGLE PLY FLASHING
SPECIFICATIONS FOR A FULL
DESCRIPTION OF INSTALLATION
INSTRUCTIONS AND REQUIREMENTS
WHICH ARE CONSIDERED A PART OF THIS
DETAIL.
7. NO SEAMS OR FOLDS UNDER THE
CLAMPING RING.
NOTE:
1. MEMBRANE MUST BE EXTENDED AT CORNERS TO
PROVIDE COMPLETE COVERAGE OF THE TOP WALL
SURFACE.
COPING COVER -
12'-0" MAX LENGTHS
20 GA OR 24 GA GALVANIZED
ANCHOR CLIPS
6 ' O.C. OR SPACING
DETERMINATE BY MANUFACTURER
CONCEALED SPLICE PLATE
AT EACH JOINT OF COPING
HEX-HEAD FASTENERS
EPDM ROOF MEMBRANE
EPDM MEMBRANE ADHESIVE O
U
TS
ID
E
FA
C E
M
IN
M
AX
. 1 2"
M
AX
. T
ES
TE
D
8"
IN
SI
D E
FA
C
E M
IN
. 2
1 4" M
AX
. 1
2" M
AX
. T
ES
TE
D
PI
PE
P
EN
ET
R
AT
IO
N 3" (76 mm)
MIN.
3" (76 mm)
MIN.
EXISTING DECK
INSULATION / COVER BOARD
EXISTING DECK
INSULATION / COVER BOARD
APPROVED FASTENER AND PLATE
MINIMUM OF (4) FASTENERS AROUND
VENT PIPE PENETRATION DEPENDANT
ON DECK MATERIAL(S). SEE
SPECIFICATIONS FOR FURTHER
INFORMATION
SINGLE PLY LVOC CAULK
(AT TOP OF CLAMP)
SHEET METAL RAIN COLLAR PER SMACNA OR
NRCA FASTENED TIGHT AROUND PIPE WITH PIPE STRAP
SINGLE PLY SEALING MASTIC
SINGLE PLY LVOC CAULK (AT TOP OF
CLAMP (SLOPED TO SHED WATER)
SINGLE PLY SEALING MASTIC
(BETWEEN PIPE AND NECK OF BOOT)
EPDM PEEL & STICK PIPE BOOT
S.S. CLAMP AND SCREW
EPDM MEMBRANE ADHERED
EPDM TAPE PRIMER
SEE NOTE 4
EPDM 6" PEEL & STICK
FLASHING TARGET PATCH
EPDM MEMBRANE ADHESIVE
SINGLE PLY LVOC CAULK
1. EPDM MEMBRANE MUST BE CLEANED, THEN PRIMED ON TOP OF MEMBRANE AT SEAM
TAPE WITH JM EPDM TAPE PRIMER. ROLL MEMBRANE WITH ROLLER UNDER PRESSURE
AT PEEL & STICK SEAM TAPE OVER EPDM FLASHING.
2. EPDM TAPE PRIMER OR SINGLE PLY MEMBRANE PRIMER (LOW VOC) MUST BE APPLIED
ON ALL SURFACES COMING INTO CONTACT WITH PEEL & STICK FLASHING ROLL
MEMBRANE WITH HAND ROLLER UNDER PRESSURE AT FLASHING.
3. PLEASE SEE SINGLE PLY FLASHING SPECIFICATIONS FOR A FULL DESCRIPTION OF
INSTALLATION INSTRUCTIONS AND REQUIREMENTS WHICH ARE CONSIDERED A PART
OF THIS DETAIL.
NOTES:
3" 3"
PIPE BOOT PLAN VIEW
PEEL & STICK PIPE BOOT
BOTTOM FLANGE UNDER
TARGET PATCH
M
IN
SINGLE PLY LVOC CAULK
AROUND ALL EDGES OF EPDM
PEEL & STICK FLASHING
TARGET PATCH
3"
MIN.
RADIUS
CORNERS
EPDM PEEL & STICK TARGET
PATCH INSTALLED
USING TWO PIECES OF 12" EPDM
PEEL & STICK FLASHING CUT A
ROUND PIPE BOOT AND
OVERLAPPED 3" AS SHOWN
NTS
PIPE FLASHINGD5
NOTES:
1. REFER TO JOHNS MANVILLE WEBSITE (www.jm.com) FOR THE MOST
CURRENT INFORMATION.
2. EPDM MEMBRANE MUST BE CLEANED, THEN PRIMED ON TOP OF
MEMBRANE AT SEAM TAPE WITH JM EPDM TAPE PRIMER. ROLL
MEMBRANE WITH ROLLER UNDER PRESSURE AT PEEL & STICK
SEAM TAPE OVER EPDM FLASHING.
3. EPDM TAPE PRIMER OR SINGLE PLY MEMBRANE PRIMER (LOW
VOC) MUST BE APPLIED ON ALL SURFACES COMING INTO
CONTACT WITH PEEL & STICK FLASHINGS. ROLL MEMBRANE WITH
HAND ROLLER UNDER PRESSURE AT FLASHING.
3" (7 6 mm)
PIPE PENETRATION
EPDM PRE-MOLDED PIPE FLASHING
ROOF SLOPE
12" EPDM PEEL & STICK
FLASHING TARGET PATCH
12" EPDM PEEL & STICK
FLASHING TARGET PATCH
CONTINUOUS BEAD OF
SINGLE PLY LVOC CAULK
NTS
CURB FLASHING D1
EPDM MEMBRANE
ADHESIVE
STRAINER
CLAMP RING
DRAIN PIPE
R O
O F
D
ET
AI
LS
A-501
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-0
/3
0/
D
ES
IG
N
ED
B Y:
D R
AW
N
B Y:
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
C K
IS
LA
N D
A R
SE
N
AL
BU
IL
D
IN
G
R O
O F
R
EP
AI
R
PR
O
JE
C
T-
-0
A
B
C
D
E
F
G
D
ES
IG
N
ED
IN
-H O
U
SE
B Y
R
IA
-D
PW
E N
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
IV
IS
IO
N
C H
EC
KE
D B
Y:
C
BS
PRELIMINARY2
2-
J.
F
AV
EL
A
J.
F
AV
EX
IS
TI
N
G R
O O
F
PI
C
TU
R
ES
BL
D
G . 2
A-901
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-0
/3
0/
D
ES
IG
N
ED
B Y:
D R
AW
N
B Y:
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
C K
IS
LA
N D
A R
SE
N
AL
BU
IL
D
IN
G
R O
O F
R
EP
AI
R
PR
O
JE
C
T-
-0
A
B
C
D
E
F
G
D
ES
IG
N
ED
IN
-H O
U
SE
B Y
R
IA
-D
PW
E N
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
IV
IS
IO
N
C H
EC
KE
D B
Y:
C
BS
2-
SCALE: N.T.S.
EAST FACADE - BLDG 222 ANNEXE7
SCALE: N.T.S.
SOUTH FACADE - BLDG 222 E1
NOT IN CONTRACT FOR ROOF MEMBRANE WORK LOCATION
ANNEX
SCALE: N.T.S.
SOUTH VIEW - ROOF EQUIPMENTC7
SCALE: N.T.S.
WEST VIEW - ROOF EQUIPMENTA7
SCALE: N.T.S.
VENTSB3SCALE: N.T.S.
EXHAUST VENTB1
SCALE: N.T.S.
EXHAUST VENTE5
SCALE: N.T.S.
ROOF SCUTTER - SOUTHWESTA4
SCALE: N.T.S.
EAST VIEW- ROOF EQUIPMENTC4
J.
F
AV
EL
A
J.
F
AV
M-001
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-0
/3
0/
D
ES
IG
N
ED
B Y:
G
JS
II
I, P.
E.
D R
AW
N
B Y:
G
JS
II
I, P.
E.
AP
PR
O
VE
D B
Y:
G
.K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
BA
C H
, C H
IE
F
O F
EN
G
IN
EE
R
IN
G
R O
C K
IS
LA
N D
A R
SE
AL
BU
IL
D
IN
G
R
O O
F R
EP
AI
R
PR
O
JE
C T-
-0
M
EC
H
AN
IC
AL
A
PL
U
M
BI
N G
N O
TE
S
AN
SC
H
ED
U
LE
S
A
B
C
D
E
F
G
D
ES
IG
N
ED
IN
-H O
U
SE
B Y
R
IA
-D
PW
E N
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
IV
IS
IO
N
C H
EC
KE
D B
Y:
C
BS
2-
KEYNOTES
1 REPLACE THE EXISTING EXHAUST FAN. REFER TO THE EXHAUST FAN SCHEDULE.
CONTRACTOR SHALL FIELD VERIFY THE SIZE OF THE EXISTING ROOF CURB PRIOR TO
ORDERING THE REPLACEMENT FAN. EXTEND POWER WIRING AS REQUIRED TO THE
DISCONNECT SWITCH ON THE NEW FAN. BOLT THE FAN TO THE EXISTING CURB.
REPLACE EXISTING ROOF DRAIN. REFER TO THE PLUMBING FIXTURE SCHEDULE.
CONTRACTOR SHALL FIELD VERIFY THE SIZE OF THE EXISTING STORM PIPING PRIOR TO
ODERING THE REPLACEMENT ROOF DRAIN. CONNECT THE NEW ROOF DRAIN TO THE
EXISTING PIPING.
REMOVE THE EXISTING ROOF DRAIN AND PIPING TO THE LAST CONNECTION POINT TO THE
MAIN STORM PIPING. CAP THE EXISTING PIPING. INSTALL A NEW OVERFLOW ROOF DRAIN AND
CONNECT TO THE NEW STORM PIPING.
NEW OVERFLOW STORM PIPING THROUGH THE ROOF TRUSSES.
EXISTING FLOOR ELEVATION IS 102'0".
PLUMBING EQUIPMENT SCHEDULE
PLAN TAG DESCRIPTION BASIS OF DESIGN
MANUFACTURER
DSO-1
DOWNSPOUT COVER WITH HINGED PERFORATED
COVER, FABRICATED POLISHED BRASS. REFER TO
THE DRAWINGS FOR SIZING.
SMITH MFG CO. 1775
RD-1
ROOF DRAIN: CAST IRON BODY WITH ADJUSTABLE
EXTENSION SLEEVE, REVERSIBLE COLLAR,
FLASHING CLAMP, AND CAST IRON DOME. REFER
TO THE DRAWINGS FOR SIZING.
SMITH MFG CO. 1010
RD-2
WATER DAM TYPE ROOF DRAIN: CAST IRON BODY
WITH ADJUSTABLE EXTENSION SLEEVE,
REVERSIBLE COLLAR, COMBINED FLASHING
CLAMP AND WATER DAM, AND CAST IRON DOME.
REFER TO THE DRAWINGS FOR SIZING.
SMITH MFG CO. 1045
POWER ROOF EXHAUSTER (PRE) SCHEDULE
PLAN MARK BASIS OF DESIGN MODEL CFM ESP (IN WC) MOTOR DRIVE /
SPEEDS USAGE REMARKS
HP VOLTS PHASE CYCLE
EF-222-R-1
EF-222-R-2
EF-222-R-3
EF-222-R-4
COOK ACRU-B
330R6B 6400 0.25 0.75 480 3 60 BELT GENERAL
EXHAUST 1,2
EF-222-R-7
EF-222-R-8
EF-222-R-9
COOK ACRU-B
490R9B 12,950 0.25 2 480 3 60 BELT GENERAL
EXHAUST
1,2
POWER ROOF EXHAUSTER SCHEDULE NOTES:
1. PROVIDE WITH GRAVITY BACKDRAFT DAMPER.
2. PROVIDE WITH INTEGRAL DISCONNECT SWITCH.
M-101
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N
AN
D M
EC
H
AN
IC
AL
N
EW
W
O R
K
PA
R
TI
AL
F
LO
O
R P
LA
N
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-0
/3
0/
D
ES
IG
N
ED
B Y:
G
JS
II
I, P.
E.
D R
AW
N
B Y:
G
JS
II
I, P.
E.
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
C K
IS
LA
N D
A R
SE
N
AL
BU
IL
D
IN
G
R O
O F
R
EP
AI
R
PR
O
JE
C
T-
-0
A
B
C
D
E
F
G
D
ES
IG
N
ED
IN
-H O
U
SE
B Y
R
IA
-D
PW
E N
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
IV
IS
IO
N
C H
EC
KE
D B
Y:
C
BS
2-
1 2 3 4 5 6 7 8 9 10 11
G
F
E
D
C
B
A
EF-222-R-1
SEE KEYNOTE 1
EF-222-R-2
SEE KEYNOTE 1
EF-222-R-3
SEE KEYNOTE 1
EF-222-R-4
SEE KEYNOTE 1
EF-222-R-7
SEE KEYNOTE 1
EF-222-R-8
SEE KEYNOTE 1
C O
N
TI
N U
ED
O
N S
H
ET
M -1
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1/8" = 1'0"
M-102
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N
AN
D M
EC
H
AN
IC
AL
N
EW
W
O R
K
PA
R
TI
AL
F
LO
O
R P
LA
N
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-0
/3
0/
D
ES
IG
N
ED
B Y:
G
JS
II
I, P.
E.
D R
AW
N
B Y:
G
JS
II
I, P.
E.
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
C K
IS
LA
N D
A R
SE
N
AL
BU
IL
D
IN
G
R O
O F
R
EP
AI
R
PR
O
JE
C
T-
-0
A
B
C
D
E
F
G
D
ES
IG
N
ED
IN
-H O
U
SE
B Y
R
IA
-D
PW
E N
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
IV
IS
IO
N
C H
EC
KE
D B
Y:
C
BS
2-
12 13 14 15 16 17 18 19 20 21 22
F9
F
D9
C1
B
A1
D
EF-222-R-9
SEE KEYNOTE 1
RD-1 - SEE
KEYNOTE 2
RD-1 - SEE
KEYNOTE 2
RD-2 - SEE
KEYNOTE 3
RD-2 - SEE
KEYNOTE 3
RD-2 - SEE
KEYNOTE 3
RD-2 - SEE
KEYNOTE 3 RD-1 - SEE
KEYNOTE 2
RD-1 - SEE
KEYNOTE 2
4" ST PIPE AT 1/4" PER FT
THROUGH TRUSSES
6" ST PIPE AT 1/4" PER FT
THROUGH TRUSSES
4" ST PIPE AT 1/4" PER FT
THROUGH TRUSSES
6" DSO-1
ELEV. ± 147'3"
4" DSO-1
ELEV. ± 147'3"
4" DSO-1
ELEV. ± 147'3"
4" ST PIPING AT 1/4" PER FT
THROUGH TRUSSES
4" ST PIPING AT 1/4" PER FT
THROUGH TRUSSES
SEE KEYNOTE 5
FOR FLOOR ELEVATION
C O
N
TI
N U
ED
O
N S
H
ET
M -1
AutoCAD SHX Text 147'3"
AutoCAD SHX Text 147'3"
AutoCAD SHX Text 147'3"
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1/8" = 1'0"
| Sheets and Views |
| G-001 |
| 2025-0083 G-002.pdf |
| Sheets and Views |
| G-002 |
| 2025-0083 G-003.pdf |
| Sheets and Views |
| G-003 |
| 2025-0083 A-101.pdf |
| Sheets and Views |
| A-101 |
| 2025-0083 A-501.pdf |
| Sheets and Views |
| A-501 |
| 2025-0083 A-901.pdf |
| Sheets and Views |
| A-901 |
| M-001.pdf |
| Sheets and Views |
| Model |
| M-101.pdf |
| Sheets and Views |
| Model |
| M-102.pdf |
| Sheets and Views |
| Model |
| 2025-0083 G-001.pdf |
| Sheets and Views |
| G-001 |
File details come from the government source that posted it. Updated .