Attachment 0014 - PWS 14 - ACO STAFF SUPPORT (ON-SITE GOVERNMENT STAFF).pdf

PDF 686 KB Posted

Attached to
Radford Army Ammunition Plant - DRAFT Solicitation
Solicitation number
W519TC-25-R-0045
Issued by

About this file

This document is a Performance Work Statement (PWS) for ACO Staff Support at the Radford Army Ammunition Plant (RFAAP), detailing contractor requirements for providing workspace, maintenance, and support services for government staff. The PWS covers office space allocation across multiple buildings and two village houses, specifying exact office numbers for various government personnel including the Commander, Administrative Contracting Office (ACO) staff, Defense Contract Audit Agency (DCAA), and Defense Contract Management Agency (DCMA) staff.

The contractor's responsibilities include maintaining and servicing government offices through comprehensive maintenance, custodial services, and equipment provisions. Specific requirements include repairing and replacing office infrastructure, providing grounds maintenance, performing weekly cleaning, stripping and waxing floors every six months, and professionally cleaning carpeted areas twice annually. The contractor must also supply safety equipment, centralized printing, mail services, and purchasing support. The performance period spans five consecutive one-year ordering periods from January 24, 2022, through December 31, 2026, with each period running a full calendar year.

View the file

Other files

File Type Posted
Draft RFP Q and A - W519TC-25-R-0045 RFAAP 22Dec2025.pdf PDF
Attachment 0003 - PWS 03 RFAAP Fire Protection and ES.pdf PDF
Attachment 0013 - PWS 13 RFAAP Technology and Cyber Security.pdf PDF
Attachment 0018 - PWS 18 - GROUND WATER MONITORING AND INSTALLATION RESTORATION PROGRAM SUPPORT.pdf PDF
Attachment 0004 - PWS 04 RFAAP Gov Property.pdf PDF
Attachment 0009 - PWS 09 RFAAP Safety.pdf PDF
Attachment 0010 - PWS 10 RFAAP Energy and Utilities.pdf PDF
Attachment 0016 - PWS 16 - AMMUNITION MATERIEL MANAGEMENT.pdf PDF
Attachment 0012 - PWS 12 RFAAP ARMS.pdf PDF
Attachment 0011 - PWS 11 RFAAP Facility Ops and Production Reporting.pdf PDF
Attachment 0006 - PWS 06 RFAAP Security and Antiterrorism.pdf PDF
Attachment 0001 - PWS 01 RFAAP Environmental.pdf PDF
Attachment 0005 - PWS 05 RFAAP Occupational Health.pdf PDF
Attachment 0002 - PWS 02 Facility Planning.pdf PDF
Attachment 0015 - PWS 15 - ACQUISITION LOGISTICS AND TECHNOLOGY ENTERPRISE SYSTEMS AND SERVICES SUPPORT SERVICES.pdf PDF
Attachment 0007 - PWS 07 RFAAP Maintenance.pdf PDF
Attachment 0003 - PWS 03 RFAAP Fire Protection and ES.docx DOCX document
Attachment 0015 - PWS 15 - ACQUISITION LOGISTICS AND TECHNOLOGY ENTERPRISE SYSTEMS AND SERVICES SUPPORT SERVICES.docx DOCX document
Attachment 0006 - PWS 06 RFAAP Security and Antiterrorism.docx DOCX document
Attachment 0011 - PWS 11 RFAAP Facility Ops and Production Reporting.docx DOCX document
Attachment 0004 - PWS 04 RFAAP Gov Property.docx DOCX document
Exhibit B - PWS 7 - RFAAP Maintenance FI and E -- Clean DEC 2024 V1.docx DOCX document
Attachment 0023 - DD254 Contract Security Classification Specification.pdf PDF
Attachment 0009 - PWS 09 RFAAP Safety.docx DOCX document
Attachment 0002 - PWS 02 Facility Planning.docx DOCX document
Attachment 0025 - CDRL Instructions.pdf PDF
Attachment 0014 - PWS 14 - ACO STAFF SUPPORT (ON-SITE GOVERNMENT STAFF).docx DOCX document
Attachment 0016 - PWS 16 - AMMUNITION MATERIEL MANAGEMENT.docx DOCX document
Exhibit C - PWS 7 Att B JMC BUILDER Sustainment Guide.pdf PDF
Attachment 0005 - PWS 05 RFAAP Occupational Health.docx DOCX document
Attachment 0021 - OPSEC SOW.docx DOCX document
Attachment 0018 - PWS 18 - GROUND WATER MONITORING AND INSTALLATION RESTORATION PROGRAM SUPPORT.docx DOCX document
Attachment 0012 - PWS 12 RFAAP ARMS.docx DOCX document
Exhibit A - CDRLs.pdf PDF
Attachment 0026 - Hazardous Material Classification Specification.xlsx XLSX spreadsheet
Attachment 0019 - Price Matrix 2Jul2025.xlsx XLSX spreadsheet
Attachment 0010 - PWS 10 RFAAP Energy and Utilities.docx DOCX document
Attachment 0007 - PWS 07 RFAAP Maintenance.docx DOCX document
Attachment 0022 - SAMPLE OPSEC ACQUISITIONS PLAN.pdf PDF
Attachment 0028 - COCO SECURITY STATEMENT OF WORK 2025.docx DOCX document
Attachment 0001 - PWS 01 RFAAP Environmental.docx DOCX document
W519TC25R0045 RFAAP Draft RFP.pdf PDF
Attachment 0013 - PWS 13 RFAAP Technology and Cyber Security.docx DOCX document
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

Radford Army Ammunition Plant (RFAAP)

PWS 14 - ACO STAFF SUPPORT (ON-SITE GOVERNMENT STAFF)

GENERAL - This section defines the requirements for the facility use contractor to provide support to the Government Staff located at Radford Army Ammunition Plant (RFAAP).

The Government staff includes the Commander of RFAAP, his or her Staff, the Administrative Contracting Office (ACO) Staff, the Defense Contract Audit Agency (DCAA), and the Defense Contract Management Agency (DCMA through a continuous

ISSA).

SPACE RESERVED FOR GOVERNMENT USE

The contractor shall continue to make available the current space on the first floor of Building 220 for the Commander and ACO Staff, and two (2) village houses, which consists of:

ACO STAFF OFFICE NUMBERS

COMMANDER’S OFFICE & RECEPTION AREA 1101

COMMANDER’S ADMINISTRATIVE ASSISTANT 1103

SAFETY MANAGER 1105

EMERGENCY MANAGEMENT SPECIALIST 1107

ADMINISTRATIVE CONTRACTING OFFICER 1109

CONTRACT SPECIALIST 1111

DEPUTY TO THE COMMANDER 1113

STAFF ACTION SPECIALIST 1115

SECURITY MANAGER 1117

COMMANDER’S CONFERENCE ROOM 1118A

SAFETY INTERN 1119

COPIER ROOM/PROPERTY FILES 1120

PROPERTY SPECIALIST 1121

SAFETY STORAGE ROOM (PPE) 1122

VACANT 1123

OPERATIONS AREA OFFICES (INCLUDES

CONFERENCE ROOM AND 2 STORAGE CLOSETS)

1305/1307/1309/1311/ 1312/1313/1314

KITCHENETTE (SMALL – OPS HALLWAY **

MAIN CONFERENCE ROOM (BY ELEVATORS) **

QUALITY AREA OFFICES (INCLUDES HALLWAY,

CONFERENCE ROOM, AND KITCHENETTE AREA)

1401/1402/1403/1404/ 1405/1406

PD-JS (2 OFFICES) 1408/1409

VACANT 1404A

COMMAND STORAGE ROOM (SUPPLIES) 1413

FILE ROOM ** (GROUND FLOOR)

DCAA OFFICES 3124

EMERGENCY FAMILY ASSISTANCE CENTER Village 22 DACP Village 23

** Indicates office with no office number assigned/designated.

The contractor shall provide space in Building 207 or other location as deemed acceptable by the ACO, for storage of ACO Staff archived records.

The contractor shall provide for use of cafeteria space, conference rooms, audio, video, and projection equipment for meetings and/or presentations as required.

MAINTENANCE AND SERVICE

ACO Staff

The contractor shall provide maintenance and general upkeep of the Government offices including, but not limited to: Repair or replacement of all requirements for the Government space, such as electrical, plumbing, mechanical, architectural, painting, and structural.

The contractor shall provide grounds maintenance services at the administrative spaces occupied in the Village (two (2) houses).

Custodial

The contractor shall provide for trash removal (including curbside trash pick-up for the two

(2) Army occupied houses at “The Village”), dusting of furniture and window sills, vacuuming of offices with carpet or dust moping offices without carpet, including necessary supplies, on the same day, one time per week for offices located in building 220 and the two houses at “The Village”.

All tiled floors in spaces occupied by ACO/ DCAA Staff shall be stripped and waxed every six months.

All carpeted areas occupied by ACO/ DCAA Staff shall be professionally cleaned at least two times per year.

All Army conference rooms shall be visually inspected each weekday and cleaned if necessary to ensure cleanliness.

There may be special custodial services requested but should be no more than a couple times per year.

Equipment - ACO Staff

The contractor shall provide the following for use by the Government staff and visitors:

Safety equipment (including, but not limited to, acid coveralls, raincoats, safety shoes, hard hats, head covers (caps), ear plugs, safety glasses and chore coats) for entry into every area of the plant.

Other

The contractor shall provide for centralized printing, duplication, priority mail, mail pick-up and delivery, and shredding services as required for ACO Staff only.

The contractor shall provide purchasing support for materials, equipment and services required by the Government staff for direct funded efforts.

PERIOD OF PERFORMANCE: The period of performance for PWS 14 is as follows:

• Ordering Period 1: 24 Jan 2022 – 31 Dec 2022

• Ordering Period 2: 01 Jan 2023 – 31 Dec 2023

• Ordering Period 3: 01 Jan 2024 – 31 Dec 2024

• Ordering Period 4: 01 Jan 2025 – 31 Dec 2025

• Ordering Period 5: 01 Jan 2026 – 31 Dec 2026

Radford Army Ammunition Plant (RFAAP)

File details come from the government source that posted it. Updated .