Amendment 0005.pdf
PDF 365 KB Posted
- Solicitation number
- W519TC-24-R-2025
About this file
This amendment modifies a solicitation for repair work to sprinkler systems at three buildings on Rock Island Arsenal. The contractor will replace sprinkler systems in basements, first and second floors with wet pipe systems, and install dry pipe systems on third floors. The amendment provides responses to contractor questions, clarifying that only in-work area smoke detectors may be bagged, fire watch is required only during flame permit processes, and the contractor must consult its fire protection engineer to determine code-compliant design options for sprinkler system supply. It also notes the only unoccupied area is the third floor of one building. The response date remains unchanged.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2019-4399
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Mar-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W519TC24R2025
X 9B. DATED (SEE ITEM 11)
29-Jan-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Mar-2024
CODE
ARMY CONTRACTING COMMAND - ROCK ISLAND
3055 RODMAN AVE
ROCK ISLAND IL 61299
W519TC 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W519TC24R2025
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005
The purpose of W519TC-24-R-2025, Amendment 0005, is:
1. To answer the following contrator questions:
Q1. Would it be possible to do another walk through on Friday morning?
A1. A second walk through has been scheduled for this Friday, March 15, 2024 at 10:00 am CST. All contractors are to meet in front of Building 102.
Q2. Could we get as-built’s of the actual areas of work with Ceilings and Mechanicals?
A2. As-built’s do not exist for this.
2. To provide clarification on previous asked contractor questions:
Reference Amendment 0003
Original Question: Can the buildings be without fire sprinkler protection during the entirety of the project if UFC signage is posted? If so, is fire watch required?
a. Original Response: As long as the Fire Alarm System remains active, the sprinkler system may be shut down and a Fire Watch will not be required.
Revised Question: Amendment #4 states. Q20. Will a fire watch be required during the project? A20. Only during processes where a flame permit is required. The fire alarm system will not be in services as the ceiling is being removed and the detectors will be bagged to avoid harming their sensitivity.
b. Revised Response: Fire Detectors are only located at Fire Doors between buildings, elevator lobbies and Fire Alarm Control Panels. Only the smoke detectors within the work area may be bagged. All other smoke detectors shall remain in service.
Reference Amendment 0004 Original Question: Q5. Reference 1.2.1.2 Design replacement for the current Dry Pipe Sprinkler Systems in accordance with UFC 3-600-01. It is the Government’s desire that system to be designed will be a wet pipe system for the following floors in Buildings 102, 103, and 104; the Basement, First floor, and Second Floors. A dry pipe system shall be designed for the Third floor of Buildings 102, 103, and 104.
a. Can Buildings 102, 103, and 104 be revamped to all be supplied from the fire pump in 104?
b. Original Response: A5. This question will be answered during the Design Review Process.
Revised Question: The answer needs to be yes or no so we can estimate the project in the correct way. It’s can’ wait until after the project award.
c. Revised Response: Our prior response remains unchanged. As the Designer of Record, the contractor needs to consult with his Fire Protection Engineer to determine what options are within the code requirements.
W519TC24R2025
Original Question: Can Buildings 102, 103, and 104 be supplied from zone control assemblies on a wet standpipe located in a heated stair tower? In order to bring the system up to code we will need to install new wet standpipes and drain lines in the exit staircases. Will the building envelope keep enough heat in the staircase to avoid freezing?
d. Original Response: This question will be answered during the Design Review Process.
Revised Question: The answer needs to be yes or no so we can estimate the project in the correct way. It’s can’ wait until after the project award.
e. Revised Response: Our prior response remains unchanged. As the Designer of Record, the
Original Question: Reference 1.2.1.3 Due to the susceptibility of the stairwell(s) sprinkler pipes are to freezing, the stairwells may need to be evaluated for attachment to the Third-floor dry systems. If the stairwells need to be Dry, do the stairwells need to be a Manual Dry standpipe that is fully dependent on the fire department connection, or will they need to be supplied from a dry pipe valve located off city water and assisted through the fire department connection? In order to bring the system up to code we will need to install new wet standpipes and drain lines in the exit staircases. Will the building envelope keep enough heat in the staircase to avoid freezing?
f. Original Response: This question will be answered during the Design Review Process.
Revised Question: Is a manual dry standpipe acceptable yes or no? We need this answer to estimate the project the correct way. It can’t wait until after project award during the Design Review Process.
g. Revised Response: Our prior response remains unchanged. As the Designer of Record, the
Original Question: Reference 1.3.3.1.1 The project will be conducted in phases to facilitate the movement of tenants to the swing space provided in Building 104, Second floor. The swing space can accommodate 285 personnel at a time, with 270 cubicles, and 15 offices. How many total people will need to be relocated to complete this project.
h. Original Response: Assume an occupant density of 9 people per 1000 square feet.
Revised Question: In order to do this calculation, we need to know the total square feet of the occupied space of the project.
i. Revised Response: The only unoccupied area is the third floor of Building 102.
All other terms and conditions remain unchanged.
(End of Summary of Changes)