This amendment modifies a solicitation for repair work on fire sprinkler systems at three buildings on Rock Island Arsenal. The modification extends the deadline for contractor questions to March 1, 2024 and extends the proposal submission date to March 11, 2024. It also provides answers to eleven questions from prospective offerors regarding building details like floor load limits, fire protection requirements, presence of asbestos and lead paint, and types of elevators. The work includes repairing sprinkler systems at Buildings 102, 103 and 104 for the Department of the Army Materiel Command Contracting Command located at Rock Island Arsenal.

View the file

Other files

File Type Posted
Amendment 0005.pdf PDF
Attachment 0001 Revised 13 February 24 SOW PR 2019 4399 Replace Sprinkler System Building 102 103 and 104_Rev 2.pdf PDF
Amendment 0004.pdf PDF
Attachment 00014 Appendix H - Asbestos Survey.pdf PDF
Attachment 0012 Site Visit Attendee List.pdf PDF
Attachment 0013 Site Visit Photos.docx DOCX document
Amendment 0002.pdf PDF
Attachment 0001 Revised 1 Feb 2024 SOW PR 2019 4399 Replace Sprinkler System.pdf PDF
Amendment 0001.pdf PDF
Attachment 0007 Appendix F - RIA Fire Department Fire Safety and Prevention.pdf PDF
Attachment 0004 Appendix C_Preliminary Flow Data.pdf PDF
Attachment 0008 Appendix G - RIA Engineering Standards.pdf PDF
W519TC-24-R-2025.pdf PDF
Attachment 0010 DB Wage Determination.pdf PDF
Attachment 0003 Appendix B_Existing Fire Protection System.pdf PDF
Attachment 0006 Appendix E - Non-Hazardous Construction and Demolition Debris Submittal Form.pdf PDF
Attachment 0002 Appendix A_Current Floor Plan.pdf PDF
Attachment 0005 Appendix D - Engineering Graphics Standard - 07Apr20.pdf PDF
Attachment 0001 SOW PR 2019 4399 Replace Sprinkler System Building 102 - 103 and 104.pdf PDF
Attachment 0009 Site Visit Map.pdf PDF
Attachment 0011 VENDOR GUIDE Contract Opportunities All Topics.pptx PPTX presentation
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2019-4399

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Summary of Changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Feb-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W519TC24R2025

X 9B. DATED (SEE ITEM 11)

29-Jan-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Feb-2024

CODE

ARMY CONTRACTING COMMAND - ROCK ISLAND

3055 RODMAN AVE

ROCK ISLAND IL 61299

W519TC 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W519TC24R2025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003

The purpose of W519TC-24-R-2025, Amendment 0003 is the following

1. To extend the contractor questions due date from February 20,2024 to March 1, 2024.

2. To extend the proposal due date from 10:00 a.m. February 29, 2024 to 10:00 a.m. March 11, 2024.

3. To answer the following contractor questions:

Q1. Can the government provide the floor load limits for 1st, 2nd & 3rd floors of all three buildings?

A1. Basement of 102, 103 and 104: 900 PSF

First Floor of 102, 103 and 104: 126 PSF Second Floor of 102, 103 and 104: 180 PSF Third Floor of 102, 103 and 104: 50 PSF

Q2. Can the buildings be without fire sprinkler protection during the entirety of the project if UFC signage is posted? If so, is fire watch required?

A2. As long as the Fire Alarm System remains active, the sprinkler system may be shut down and a Fire

Watch will not be required.

Q3. Does the lead foreman on the project need to be NICET II certified and does the contractor have a NICET III supervising?

A3. Based upon Paragraph 9-6.3.2 in UFC 3-600-01, “For new or modified systems, working (shop) drawings and calculations must be prepared by an individual that has obtained National Institute for Certification in Engineering Technologies, Automatic Sprinkler Systems, Level III certification or Special Hazards Suppression Systems, Level IV certification, as applicable to the project.”

In addition, Paragraph 9-6.3.2 in UFC 3-600-1 also requires: “For Army projects, construction (shop) drawings and calculations must be prepared by, or prepared under the immediate supervision of, the QFPE. The QFPE must affix their professional engineering stamp with signature to the shop drawings, calculations and material data sheets, indicating approval prior to submitting the fire extinguishing system shop drawings to the DFPE. The QFPE must monitor the installation of the fire protection systems and certify in writing that the fire protection systems have been constructed and operate as intended in the design plans and specifications.”

From Paragraph 2-1.16.2 in UFC 3-600-1: “Qualified Fire Protection Engineer (QFPE): An individual who is a registered professional engineer (P.E.) who has passed the fire protection engineering examination administered by the National Council of Examiners for Engineering and Surveying (NCEES) and has relevant fire protection engineering experience.”

Also, the contractor is responsible for performing a “. . . a Fire Protection Design Analysis in accordance with UFC 3- 600-01, Section 1-7.2 and UFC 3-600-01, Section 1-7.2.3.” Refer to Paragraph 1.2.1.1 in the

SOW.

Q4. Can the government provide and average distance above the ceiling to the underside of the deck on 1st &

2nd floors of all three buildings?

A4. Average Ceiling Height:

Basement: 8 ft.

First, Second Floor and Third Floor: 10 ft.

Floor to Floor Height:

Basement to First: 12’-11-1/2”.

First Floor to Second Floor: 16’-10-1/2”.

Second Floor to Third Floor: 15’-8-1/2”.

Q5. The SOW states that there are 9 rooms that require escorted access. Can the government identify the location of these rooms on a floor plan?

A5. The locations of the nine (9) rooms is considered sensitive information and may not be shown on the drawings.

Q6. Have all three buildings been tested for asbestos and lead paint? If so, is there any present?

If so, can locations be specified?

A6. LEAD: we do not have a Lead-Based Paint Survey for anything other than the Quarters. However, all interior paint applied to the original structure (stone & columns) shall be assumed by the Contractor to be lead-containing unless proven otherwise. Typically, these are painted with lead-based paint. Interior partition walls typically are not.

ASBESTOS: Refer to the Survey Drawings, Attachment 00014, Appendix H, Asbestos Survey. Contractor is responsible for identifying suspect materials within their work areas and performing sampling if necessary.

Q7. Can the exterior of the building be penetrated for Fire Department Connection, Main Drain, Inspectors Test, Auxiliary Drains, etc.? UFC 9-7.10.4.2 requires discharge to the exterior.

A7. Yes, there are already some penetrations through the exterior walls. If new locations are required, the location will need to be coordinated with the Contracting Officer’s Representative and DPW during the Design Review Process.

Q8. Can the government provide the location and rating of any fire walls in all three buildings?

A8. The only identified Fire Walls are between the Buildings on each floor at the double doors. The rating appears to be three (3) hour.

Q9. Is this facility considered a DLA facility?

A9. No, the facility is not considered a DLA facility.

Q10. Can the government provide the type of elevators all three buildings have? (i.e. Electric Traction, Direct

Plunger Hydraulic, Holeless Hydraulic, Roped Hydraulic, etc.)

A10. The Passenger Elevators in Building 102 and 104 are Direct Plunger Hydraulic. The Freight Elevator in

Building 102 is Traction.

Q11. Does the water source also provide domestic water? If so, what type of backflow preventer is required?

(DC, DCDA, RPZ, etc.)

A11. There is a separate fire main that serves these three buildings. A separate backflow preventer at each building is not required.

4. The Government is aware there are still outstanding contractor questions to be answered and is currently working to obtain proper answers.

5. All other terms and conditions remain unchanged.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 29-Feb-2024 10:00 AM to 11-Mar-2024 10:00 AM.