Attachment 0006 Appendix E - Non-Hazardous Construction and Demolition Debris Submittal Form.pdf

PDF 14 KB Posted

Attached to
Repair Sprinkler Systems Building 102, 103 and 104
Solicitation number
W519TC-24-R-2025
Issued by

About this file

This document contains a Non-Hazardous Construction and Demolition Debris Submittal Form for reporting estimated waste generation and diversion from a construction project. The form requires contractors to provide estimated weights and percentages for landfill disposal, recycling, and other diversion of various construction materials including asphalt, concrete, wood, drywall, metals, plastics, roofing, and mechanical equipment. Contractors must also track actual weights disposed of, recycled, or diverted by material type and submit weight tickets from vendors. This appears to be an attachment for tracking and reporting construction waste management from a project rather than specifying requirements for a federal contract opportunity.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Estimated Weight Estimated Percent to be Landfilled

Estimated Percent to be Recycled

Estimated Percent to be Diverted TOTAL Weight Weight landfilled Landfill Weight recycled Recycler Weight

Diverted Diversion Weight tickets received

(pounds) (%) (%) (%) (pounds) (pounds) (vendor/ company name) (pounds) (vendor/ company name) (pounds) (vendor/ company name) Y or N

CIVIL

Asphalt Concrete Gravel Soil Structural Steel Structural Wood Other Wood Other Steel/Metal Top Soil Sub Soil Trees Crushed Stone/Base

ARCHITECTURAL

Aluminum Brick Carpet Ceiling Tile

CMU

Copper Doors Drywall Glass Insulation Materials Iron Metal Studs Misc Metal Paper Plastic Roofing Materials Sheet Metal Stone Vinyl Base Vinyl Flooring Windows Wood Studs

ELECTRICAL

Ballasts Light Fixtures Transformers Wire Conduit

MECHANICAL

Cast Iron Pipe Copper Pipe Steel Pipe HVAC Equipment White Goods Plumbing Fixtures

RPZ/DCD

Insulation

PHASE II:C&D Report Data

Material

Non-Hazardous Construction and Demolition Debris Submittal Project Title:

Project Number:

Contractor Name:

Contracting Officer's Representative:

PHASE I:C&D Plan Data

File details come from the government source that posted it. Updated .