Attachment 0006 Appendix E - Non-Hazardous Construction and Demolition Debris Submittal Form.pdf
PDF 14 KB Posted
- Solicitation number
- W519TC-24-R-2025
About this file
This document contains a Non-Hazardous Construction and Demolition Debris Submittal Form for reporting estimated waste generation and diversion from a construction project. The form requires contractors to provide estimated weights and percentages for landfill disposal, recycling, and other diversion of various construction materials including asphalt, concrete, wood, drywall, metals, plastics, roofing, and mechanical equipment. Contractors must also track actual weights disposed of, recycled, or diverted by material type and submit weight tickets from vendors. This appears to be an attachment for tracking and reporting construction waste management from a project rather than specifying requirements for a federal contract opportunity.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Estimated Weight Estimated Percent to be Landfilled
Estimated Percent to be Recycled
Estimated Percent to be Diverted TOTAL Weight Weight landfilled Landfill Weight recycled Recycler Weight
Diverted Diversion Weight tickets received
(pounds) (%) (%) (%) (pounds) (pounds) (vendor/ company name) (pounds) (vendor/ company name) (pounds) (vendor/ company name) Y or N
CIVIL
Asphalt Concrete Gravel Soil Structural Steel Structural Wood Other Wood Other Steel/Metal Top Soil Sub Soil Trees Crushed Stone/Base
ARCHITECTURAL
Aluminum Brick Carpet Ceiling Tile
CMU
Copper Doors Drywall Glass Insulation Materials Iron Metal Studs Misc Metal Paper Plastic Roofing Materials Sheet Metal Stone Vinyl Base Vinyl Flooring Windows Wood Studs
ELECTRICAL
Ballasts Light Fixtures Transformers Wire Conduit
MECHANICAL
Cast Iron Pipe Copper Pipe Steel Pipe HVAC Equipment White Goods Plumbing Fixtures
RPZ/DCD
Insulation
PHASE II:C&D Report Data
Material
Non-Hazardous Construction and Demolition Debris Submittal Project Title:
Project Number:
Contractor Name:
Contracting Officer's Representative:
PHASE I:C&D Plan Data
File details come from the government source that posted it. Updated .