This document contains questions and answers related to a federal solicitation for renovation work at Squadron Operations Building 522 of the 128th Air Refueling Wing in Milwaukee, Wisconsin. Key details include that the project scope involves renovations including installation of new fiber optic and CAT6 cabling throughout the building, with three CAT6 and one fiber run to each location marked with a shaded triangle symbol on plans. The document also provides clarification on locations of network and communications equipment, as well as details regarding exclusion of transformer pricing from the utility provider and ability of the quality control and safety manager roles to be held by one individual after asbestos and lead abatement is complete.

View the file

Other files

File Type Posted
Questions and Answers 3.docx DOCX document
Self Supporting Tower drawing and specs.pdf PDF
Questions and Answers 2 14May2021.docx DOCX document
Incline Wheel Chair Lift Specification - Renovate B522.pdf PDF
Addendum 02_2021.05.13_ANG B522.pdf PDF
Solicitation Amendment W50S9G-21-R-00010003 Renovate B522.pdf PDF
Questions and Answers 1.docx DOCX document
Solicitation Amendment W50S9G-21-R-00010002 Renovate B522.pdf PDF
B.07. Pre-Proposal Slides - B522 28APR21.pptx PPTX presentation
60580469 - WI ANG Milwaukee Bldg 522_E - Sheet - E-102 - SECOND FLOOR LIGHTING PLAN.pdf PDF
B. 07. SiteVisitSignIn_21R0001_20210428.pdf PDF
60580469 - WI ANG Milwaukee Bldg 522_E - Sheet - E-101 - FIRST FLOOR LIGHTING PLAN.pdf PDF
Solicitation Amendment W50S9G-21-R-0001U0001 Renovate B522.pdf PDF
B.09. HTUV152005 Renovate B522 - Addendum 1.pdf PDF
ATTACHMENT 04 - Single Source Determination - Automated Logic.pdf PDF
EXHIBIT F SMALL BUSINESS PARTICIPATION PLAN FORMAT.docx DOCX document
ATTACHMENT 05 - Single Source Determination - MONACO.pdf PDF
B.08. Solicitation W50S9G-21-R-0001 Renovate B522.pdf PDF
ATTACHMENT 07 - ARW Form 11 Visitor Access.pdf PDF
ATTACHMENT 06 - PRE-PROPOSAL SITE VISIT INSTRUCTIONS.docx DOCX document
ATTACHMENT 02 PLANS AND SPECIFICATIONS Vol 2 of 2 Project HTUV152005 dated 04Dec2020.pdf PDF
EXHIBIT C PAST PERFORMANCE REFERENCE QUESTIONNAIRE.docx DOCX document
ATTACHMENT 03 DRAWINGS Project HTUV152005 dated 04Dec2020.pdf PDF
EXHIBIT B SUBCONTRACTOR TEAM KEY PERSONNEL INFORMATION AND CONSENT FORM.doc DOC document
EXHIBIT H Proposal Schedule.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE.docx DOCX document
ATTACHMENT 04 - Single Source Determination - Automated Logicv2.pdf PDF
EXHIBIT G SMALL BUSINGESS SUBCONTRACTING PLAN FORMAT.docx DOCX document
EXHIBIT D LETTER OF COMMITMENT.docx DOCX document
ATTACHMENT 01 PLANS AND SPECIFICATIONS Vol 1 of 2 Project HTUV152005 dated 04Dec2020.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers #4 Solicitation W50S9G-21-R-0001 Renovate Bldg 522

1) Does all locations with a shaded triangle symbol receive a pair of fiber to it?

Yes, each shaded triangle will get three CAT6 and one FOC.

2) Is so, what type of fiber single mode OM3 OM4 OM3, with LC connectors

3) Need a location on the CT Cabinet that is shown on the one line diagram but not shown on the electrical power plan layout. Safe to assume it goes on the West Wall (near plumbing trench coming in) Correct. On the West Wall near the trench. Location is shown by note 3 on sheet E201.

4) Also in regards to the lighting protection on the new antenna GLOBAL ASNT, the lighting protection plan calls for a new array , (assuming this means a full new system?) but we need more information on how to connect to it or how the new building will connect to the new array (note #2 on lighting protection plan) Installation on lightning protection is covered in spec section 264113. Standard installations there are defined by NFPA780 and UL96A within the spec.

5) The new utility transformer would be provided by WE Energies. WE Energies will not provide pricing for the transformer at this time until a formal request and design is completed by them. We will be excluding the WE Energy costs associated with the transformer. Please confirm and accept this exclusion.

Concur with the omission of the transformer because of utility policy.

6) Could the Quality Control Manager also serve as the Safety Manager once the asbestos/lead abatement portion of the work is complete? (since the solicitation indicates that an individual key team member may not hold more than one key role) Yes. There are oversight requirements in the specification section 02 82 00 Asbestos Remediation that should be complied with. Otherwise, the Safety Manager should be involved throughout the project to ensure that the safety plan requirements are being met.

7) Please provide information/spec for the in wall component on the east wall in Security Checkpoint 009A.

Existing command post teller window will need to be removed and reinstalled in the new command post location. Pictures of existing window attached.