This document contains questions and answers related to a federal solicitation for renovation work at Squadron Operations Building 522 of the 128th Air Refueling Wing in Milwaukee, Wisconsin. Key details include that the project scope involves renovations including installation of new fiber optic and CAT6 cabling throughout the building, with three CAT6 and one fiber run to each location marked with a shaded triangle symbol on plans. The document also provides clarification on locations of network and communications equipment, as well as details regarding exclusion of transformer pricing from the utility provider and ability of the quality control and safety manager roles to be held by one individual after asbestos and lead abatement is complete.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers #4 Solicitation W50S9G-21-R-0001 Renovate Bldg 522
1) Does all locations with a shaded triangle symbol receive a pair of fiber to it?
Yes, each shaded triangle will get three CAT6 and one FOC.
2) Is so, what type of fiber single mode OM3 OM4 OM3, with LC connectors
3) Need a location on the CT Cabinet that is shown on the one line diagram but not shown on the electrical power plan layout. Safe to assume it goes on the West Wall (near plumbing trench coming in) Correct. On the West Wall near the trench. Location is shown by note 3 on sheet E201.
4) Also in regards to the lighting protection on the new antenna GLOBAL ASNT, the lighting protection plan calls for a new array , (assuming this means a full new system?) but we need more information on how to connect to it or how the new building will connect to the new array (note #2 on lighting protection plan) Installation on lightning protection is covered in spec section 264113. Standard installations there are defined by NFPA780 and UL96A within the spec.
5) The new utility transformer would be provided by WE Energies. WE Energies will not provide pricing for the transformer at this time until a formal request and design is completed by them. We will be excluding the WE Energy costs associated with the transformer. Please confirm and accept this exclusion.
Concur with the omission of the transformer because of utility policy.
6) Could the Quality Control Manager also serve as the Safety Manager once the asbestos/lead abatement portion of the work is complete? (since the solicitation indicates that an individual key team member may not hold more than one key role) Yes. There are oversight requirements in the specification section 02 82 00 Asbestos Remediation that should be complied with. Otherwise, the Safety Manager should be involved throughout the project to ensure that the safety plan requirements are being met.
7) Please provide information/spec for the in wall component on the east wall in Security Checkpoint 009A.
Existing command post teller window will need to be removed and reinstalled in the new command post location. Pictures of existing window attached.
image1.jpeg image2.jpeg image3.jpeg