B.07. Pre-Proposal Slides - B522 28APR21.pptx

PPTX presentation 9 MB Posted

Attached to
Renovate Squadron Operations Building 522, 128th Air Refueling Wing, Milwaukee, WI
Solicitation number
W50S9G-21-R-0001
Issued by

About this file

This document provides details for a solicitation to renovate Squadron Operations Building 522 at the 128th Air Refueling Wing in Milwaukee, Wisconsin. The project magnitude is over $10 million and will be awarded as a firm-fixed price contract through a tradeoff best value procurement. Proposals are due May 19, 2021 and the period of performance is 365 days from notice to proceed. Evaluation criteria include technical merit, past/present performance, small business participation, and price. Technical factors relating to experience, quality control, and schedule are weighted approximately equal to past/performance and small business participation, with all non-price factors together equal to price. The solicitation, questions and answers, and any amendments are accessible at https://beta.sam.gov under solicitation number W50S9G-21-R-0001. The Department of the Army Wisconsin Army National Guard is the contracting agency.

View the file

Other files

File Type Posted
Questions and Answers 4.docx DOCX document
Questions and Answers 3.docx DOCX document
Self Supporting Tower drawing and specs.pdf PDF
Questions and Answers 2 14May2021.docx DOCX document
Incline Wheel Chair Lift Specification - Renovate B522.pdf PDF
Addendum 02_2021.05.13_ANG B522.pdf PDF
Solicitation Amendment W50S9G-21-R-00010003 Renovate B522.pdf PDF
Questions and Answers 1.docx DOCX document
Solicitation Amendment W50S9G-21-R-00010002 Renovate B522.pdf PDF
60580469 - WI ANG Milwaukee Bldg 522_E - Sheet - E-102 - SECOND FLOOR LIGHTING PLAN.pdf PDF
B. 07. SiteVisitSignIn_21R0001_20210428.pdf PDF
60580469 - WI ANG Milwaukee Bldg 522_E - Sheet - E-101 - FIRST FLOOR LIGHTING PLAN.pdf PDF
Solicitation Amendment W50S9G-21-R-0001U0001 Renovate B522.pdf PDF
B.09. HTUV152005 Renovate B522 - Addendum 1.pdf PDF
ATTACHMENT 04 - Single Source Determination - Automated Logic.pdf PDF
EXHIBIT F SMALL BUSINESS PARTICIPATION PLAN FORMAT.docx DOCX document
ATTACHMENT 05 - Single Source Determination - MONACO.pdf PDF
B.08. Solicitation W50S9G-21-R-0001 Renovate B522.pdf PDF
ATTACHMENT 07 - ARW Form 11 Visitor Access.pdf PDF
ATTACHMENT 06 - PRE-PROPOSAL SITE VISIT INSTRUCTIONS.docx DOCX document
ATTACHMENT 02 PLANS AND SPECIFICATIONS Vol 2 of 2 Project HTUV152005 dated 04Dec2020.pdf PDF
EXHIBIT C PAST PERFORMANCE REFERENCE QUESTIONNAIRE.docx DOCX document
ATTACHMENT 03 DRAWINGS Project HTUV152005 dated 04Dec2020.pdf PDF
EXHIBIT B SUBCONTRACTOR TEAM KEY PERSONNEL INFORMATION AND CONSENT FORM.doc DOC document
EXHIBIT H Proposal Schedule.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE.docx DOCX document
ATTACHMENT 04 - Single Source Determination - Automated Logicv2.pdf PDF
EXHIBIT G SMALL BUSINGESS SUBCONTRACTING PLAN FORMAT.docx DOCX document
EXHIBIT D LETTER OF COMMITMENT.docx DOCX document
ATTACHMENT 01 PLANS AND SPECIFICATIONS Vol 1 of 2 Project HTUV152005 dated 04Dec2020.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Renovate Building 522, Squadron Operations Solicitation No. W50S9G-21-R-0001 Project No. HTUV152005 1000 hours, 28 April 2021

PRE-PROPOSAL CONFERENCE

128th Air Refueling Wing

Always Ready

Page ‹#›

Construction Location 128th Air Refueling Wing General Mitchell International Airport Milwaukee, Wisconsin

INTRODUCTION

Zachary R. Tevis, Procuring Contracting Officer (WI USPFO) Matthew Lee, Base Civil Engineer, Contracting Officer Representative (128th ARW) Dionne Holloway, Base Contracting Officer (128th ARW) John Stribling, Deputy Base Civil Engineer (128th ARW)

Page ‹#›

Scope (work) of Contract Renovate Building 522, Squadron Operations Magnitude – greater than $10M A Firm-Fixed Price Contract will be awarded Project is being solicited as an Unrestricted action The Contract will be awarded using Tradeoff Source Selection Procedures resulting in the Best Value to the Government Evaluation Factors – Technical, Past/Present Performance, Small Business Participation and Price

Page ‹#›

Period of Performance Base + Options 1 thru 8 365 Days after Notice to Proceed (NTP) Contract Line Item Number (CLIN) Structure:

Base = CLIN 0001 – 0003 Option = CLIN 1001 – 1008

Page ‹#›

SOLICITATION, PLANS & SPECIFICATIONS

Website – https://beta.sam.gov Solicitation Exhibits Questions & Answers (Q&A) Document Amendments Check Regularly Specifications & Plans/Drawings – must be registered and have password on beta.Sam

Page ‹#›

IMPORTANT REMINDER

The following is a brief overview of the proposal requirements

The Government intends to award without discussions and there may not be a chance for discussions, corrections, or revised proposals.

DISCLAIMER

Offerors are strongly cautioned to carefully read ALL requirements of the solicitation and comply accordingly Give only the information being requested Understand ALL requirements Have a clear and organized proposal

Proposal Evaluation Evaluation Factors for Award is detailed in RFP section 00120

Carefully review section 00120 when preparing proposal

Comply with section 00100 and 00110 requirements

Failure to furnish a complete proposal may result in elimination from consideration

BEST VALUE

Best value is defined as an award based on the greatest overall benefit in response to the requirement. Award is based on price and other non-cost related factors.

Award in this process does not necessarily mean the lowest price wins

Evaluation Factors and Relative Importance Factors 1, 2 and 3 are approximately equal.

When combined, the non-cost factors are approximately equal to the Price Factor.

Factor 1: Technical Merit Listed in descending order of importance Sub-Factor 1, Demonstrated Experience and Key Personnel Sub-Factor 2, Quality Control Sub-Factor 3, Construction Schedule and commissioning approach/timeline Factor 2: Past/Present Performance Factor 3: Small Business Participation Factor 4: Price Not rated Price evaluation will determine if the proposed prices are fair and reasonable

I KNOW YOU ARE ALL ANXIOUS TO GET TO THE SITE, HOWEVER, KNOWING HOW YOUR PROPOSALS ARE GOING TO BE EVALUATED AND KNOWING WHAT TO SUBMIT IS JUST AS IMPORTANT. YOUR PROPOSAL CAN BE ELIMINATED IF YOU DO NOT FOLLOW THE PROPOSAL INSTRUCTIONS. SO PLEASE STICK WITH ME IN THE COMING SLIDES.

Page ‹#›

SUBMISSION REQUIREMENTS

Section 00110 of the RFP Details the Required Information and Format of the Proposal Proposal 3 Volumes (Electronic copies shall be submitted on CD/DVD saved in Microsoft Word format or Adobe Acrobat or dropped to DoD Safe)

Volume 1 – Price Proposal (to include bid schedule) & Pro forma

Volume 2 – Part 1: Technical Proposal Part 2: Past/Present Performance Info

Volume 3 – Small Business Participation Plan

READ THROUGH THOROUGHLY FOR SUBMISSION REQUIREMENTS. ONLY GIVING SUMMARY OF REQUIREMENTS IN THIS SLIDE PRESENTATION, YOU MUST FOLLOW THE PROPOSAL. THIS SLIDE SHOW IS NOT BINDING. THE SUBMISSIONS DO NOT HAVE TO BE FANCY. WE ARE NOT EVALUATING ON HOW MANY GRAPHICS YOU INCLUDE OR HOW FANCY YOUR BINDERS ARE.

Page ‹#›

Volume 1 Cost/Price Info & Pro Forma Docs Basis of Estimate

Section 00110-Introductory Page. Refer to paragraph 4.1.1.2 for details.

Offer-SF 1442, Offeror portion, Blocks 14 to 20c

Put pricing in CLINs in Section 00010 & Exhibit H, Proposal Schedule

Original Bid Bond & Power of Attorney

Section 00600 – Representations & Certifications Complete Reps & certs on sam.gov Complete & return Reps & Certs in Section 00600

Executed Joint Venture Agreement (if applicable)

Subcontracting Plan (large business only)

Volume 2 Part 1 – TECHNICAL

NO PRICES/COST IN THIS VOLUME

Sub-Factor 1Max No. of Pages
Experience & Capability Proposal10 single pages and resumes to 2 pages each, exclusive of table of contents, tabs, and dividers. If more than 10 submitted, only first 10 pages will be evaluated.
Sub-Factor 3Max No. of Pages
Construction Schedule and commissioning approach/timeline2 pages per topic (items a through h). Schedule itself is not subject to page limits; however any narrative accompanying the schedule submission is limited to 5 pages, excluding tabs and indexes
Sub-Factor 2Max No. of Pages
Quality Control5 single pages. If more than 5 submitted, only first 5 pages will be evaluated.

Volume 2 Part 1 – TECHNICAL

NO PRICES/COST IN THIS VOLUME

Submission Requirements

Demonstrated Experience

Min of 2 max of 3 completed or currently well underway projects.

Turn over no more than 6 years preceding this solicitation

Letters of Commitments from subcontractors, Exhibit D

Exhibit A-Performance Relevancy Questionnaire

Key Personnel

Project Manager, Site Superintendent, Quality Control Manager and Safety Manager

Section 01000 for min qualifications

Exhibit B-Subcontractor/Team/ Key Personnel Info and Consent Form

Letter of commitments from subcontractors, Exhibit D

Technical Approach Plan

Will be incorporated into the contract

Complete all topics listed (a – h)

Construction Schedule

Gantt chart

Estimated NTP date

Within period of performance in 52.211-10

Volume 2 Part 1 – TECHNICAL

Technical Ratings (Section 00120):

Utilizes combined technical/risk rating method descriptions

VOLUME 2

PAST/PRESENT PERFROMANCE INFORMATION

Past/Present Performance

Current/on-going performance complete to 50% or greater

Within 6 years preceding this solicitation

Performance Relevancy Questionnaire, Exhibit A. No more than 3

Reference Package, Exhibit C

JVs and Formal Teaming Agreements: each company shall complete Exhibit A and obtain Exhibit C

Consider the currency and the relevancy

Final CPARS in lieu of references packages for a project

Key Personnel may be evaluated

Gov may use: PPIRS, FAPIIS, eSRS, interviews or personal business experience

Volume 2 Part II – PAST/PRESENT PERFORMANCE INFORMATION

Exhibit A – Part 1 – Performance Relevancy Questionnaire Use Exhibit Format Complete no more than five (3) forms for Relevant Contracts Quality > Quantity Completed or Substantially Completed (50%) in the last six (6) years Send Questionnaires for the Exhibit A Projects to your references Do this Early! – Must be received by the Contracting office by the solicitation close date

Exhibit A - Part 2 –Provide the following one (1) time:

Describe compliance with FAR 52.219-8, Utilization of Small Businesses (2A) 2B problems/corrective actions 2C assessed Liq Dam in last 6yrs 2D terminated projects in last 6yrs 2E compliance with safety standards Exhibit C – Reference Questionnaire Package “Prepare & submit to the owners of the projects listed in Exhibit A”

Volume 2 Past/Present Performance (cont.)

If you do not have relevant past/present performance and are using the experience of key personnel, predecessor companies or subcontractors, ensure you clearly state this in the proposal.

In order to consider the work of subs and teaming partners not currently employed by proposing contractor, the subcontractor must complete Exhibit B – Information and Consent form.

Volume 2 – Part II Past/Present Performance Information

Past/Present Performance Ratings (Section 00120):

Volume 3 Small Business Participation Plan

Offerors shall use Exhibit F

Offerors shall identify the extent to which all listed SB categories in the solicitation will be utilized

Goals are an estimated percentage of total contract dollars (total proposed amount including options)

This is not a subcontracting plan and it is required from both, small businesses and large businesses.

Min goals for each category are identified in Section 00120 of the solicitation

Volume 3

Small Business Participation Plan Ratings (Section 00120):

Important Reminders Award is contemplated to be made without discussions. Do not anticipate a chance to make corrections or changes.

Your first proposal will probably be your ONLY proposal.

Read the solicitation requirements carefully and then read them again. Read through all the exhibits.

Consider using Sections 001100 and 00120 to “rate” yourself before submitting the proposal. Is it complete?

Important Reminders When using a subcontractor to obtain/enhance relevancy provide Subcontractor Information and Consent Form (Exhibit B) and provide a Letter of Commitment (Exhibit D) or it will NOT be considered.

The subcontractors you submit with your proposal have to be used for the project after award.

Important Reminders Submit a complete proposal in accordance with instructions-use formats provided.

Prime Contractors are responsible for coordination among the divisions with subcontractors.

All amendments will be posted on beta.sam.gov-only OFFICIAL site where information will be disseminated.

After closing, no information will be available until award.

Award will be posted to beta.sam.gov.

PLEASE DO NOT CONTACT THE CONTRACTING OFFICE REGARDING AWARD. WE CANNOT GIVE RESULTS OVER THE PHONE NOR GIVE A TIME FRAME FOR AWARD. YOU WILL HAVE TO CHACK BETA.SAM.

Page ‹#›

Important Reminders Page 2 of SF 1442, acknowledge all amendments.

IF DO NOT ACKNOWLEDGE AMENDMENTS, CAN BE ELIMINATED.

Page ‹#›

How Questions Will be Handled See Section 00100 paragraph 3 for details.

Questions and RFIs are due NLT fifth day prior to closing (COB May 16th).

Answers to questions should be posted not later than two working days prior to closing (COB May 17th).

DO NOT call technical personnel or AE directly.

Amendments will only be issued if there is a change in the solicitation, specifications, or plans.

How Questions Will be Handled

TODAY

We will not be answering any questions today. You must submit them in writing following the process in the solicitation. This gives everyone, even those who are not attending this conference, an opportunity to see the Q&A’s.

PLEASE, read through everything first before submitting questions. Do not read through a section, send a question, read through another section, and send a question….

Answers to Questions All questions and answers will be posted on beta.sam.gov.

Will not be answering directly to emailed questions. Check beta.sam.gov regularly for Q&A’s.

If there are necessary addendums, they will be posted.

Helpful Websites https://beta.sam.gov Solicitation posting, amendments, Q&A’s Wage determination https://www.acquisition.gov FAR/DFAR/AFAR-Clauses https://sam.gov Must be registered prior to submitting proposal or will be disqualified

Proposal Due Dates Proposal Due 2:00PM CDT on Wednesday, May 19, 2021 Don’t forget to have references sent in by this time

Proposal MUST be signed by Officer of your Company

No Facsimile

Address in proposal if sending. If mailing, please email me the tracking number

Instructions for drop off are in Attachment 7. Must contact me by 3:00PM on May 17th if dropping off via DoD Safe.