Questions and Answers 3.docx

DOCX document 17 KB Posted

Attached to
Renovate Squadron Operations Building 522, 128th Air Refueling Wing, Milwaukee, WI
Solicitation number
W50S9G-21-R-0001
Issued by

About this file

This document contains questions and answers regarding a solicitation for renovation work at Building 522 at the 128th Air Refueling Wing in Milwaukee, Wisconsin. Key details include clarification of required post sizes for fencing work, asphalt mix designs, and automatic door operators as an alternate to surface closers. Post sizes of 4.5 inches for gate posts and 6.625 inches for ends, corners and pulls are confirmed. Line posts are to be 2.875 inches. Asphalt mix designs specified are 5-LT-58-28-S for surface and intermediate courses and 3-LT-58-28-S for base courses. Hardware Set 51 is to include SCIF locks and be assigned to Door 217 if Alternate 4 for automatic door operators is selected in lieu of surface closers.

The related federal contract opportunity is for renovation work at the specified building with a NAICS code of 236220, size standard of $39.5 million, and project magnitude above $10 million. A pre-proposal site visit will be held on April 28, 2021 and bids are due by the specified date. Funding is anticipated by September 30, 2021 and award will be made based on best value criteria. The solicitation and amendments will be posted to SAM.gov.

View the file

Other files

File Type Posted
Questions and Answers 4.docx DOCX document
Self Supporting Tower drawing and specs.pdf PDF
Questions and Answers 2 14May2021.docx DOCX document
Incline Wheel Chair Lift Specification - Renovate B522.pdf PDF
Addendum 02_2021.05.13_ANG B522.pdf PDF
Solicitation Amendment W50S9G-21-R-00010003 Renovate B522.pdf PDF
Questions and Answers 1.docx DOCX document
Solicitation Amendment W50S9G-21-R-00010002 Renovate B522.pdf PDF
B.07. Pre-Proposal Slides - B522 28APR21.pptx PPTX presentation
60580469 - WI ANG Milwaukee Bldg 522_E - Sheet - E-102 - SECOND FLOOR LIGHTING PLAN.pdf PDF
B. 07. SiteVisitSignIn_21R0001_20210428.pdf PDF
60580469 - WI ANG Milwaukee Bldg 522_E - Sheet - E-101 - FIRST FLOOR LIGHTING PLAN.pdf PDF
Solicitation Amendment W50S9G-21-R-0001U0001 Renovate B522.pdf PDF
B.09. HTUV152005 Renovate B522 - Addendum 1.pdf PDF
ATTACHMENT 04 - Single Source Determination - Automated Logic.pdf PDF
EXHIBIT F SMALL BUSINESS PARTICIPATION PLAN FORMAT.docx DOCX document
ATTACHMENT 05 - Single Source Determination - MONACO.pdf PDF
B.08. Solicitation W50S9G-21-R-0001 Renovate B522.pdf PDF
ATTACHMENT 07 - ARW Form 11 Visitor Access.pdf PDF
ATTACHMENT 06 - PRE-PROPOSAL SITE VISIT INSTRUCTIONS.docx DOCX document
ATTACHMENT 02 PLANS AND SPECIFICATIONS Vol 2 of 2 Project HTUV152005 dated 04Dec2020.pdf PDF
EXHIBIT C PAST PERFORMANCE REFERENCE QUESTIONNAIRE.docx DOCX document
ATTACHMENT 03 DRAWINGS Project HTUV152005 dated 04Dec2020.pdf PDF
EXHIBIT B SUBCONTRACTOR TEAM KEY PERSONNEL INFORMATION AND CONSENT FORM.doc DOC document
EXHIBIT H Proposal Schedule.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE.docx DOCX document
ATTACHMENT 04 - Single Source Determination - Automated Logicv2.pdf PDF
EXHIBIT G SMALL BUSINGESS SUBCONTRACTING PLAN FORMAT.docx DOCX document
EXHIBIT D LETTER OF COMMITMENT.docx DOCX document
ATTACHMENT 01 PLANS AND SPECIFICATIONS Vol 1 of 2 Project HTUV152005 dated 04Dec2020.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers #3 Solicitation W50S9G-21-R-0001 Renovate Bldg 522

1) What is the purpose of the “gate post/end post foundation” diagram on C-002? It calls for a 6 5/8” & 4.5” at the same 2 top corners. The tower fence area is the area in question.

The gate post and end posts are required to be separate posts. The gate only requires a 4.5” post and the end post must be 6.625”.

2) The drawing calls for 4.5” gate posts (4” would be standard. Nobody stocks a 4.5” that I am aware of) but the spec book calls out 6.625” ends, corners and pulls.

4.5” is required.

3) The drawing calls out for 2.875” line posts (3”). The vertical outriggers for the barb wire only accommodate a 2.5” post. Outriggers would not fit unless each was modified to fit.

Line posts are required to be 2.875”. Please provide the appropriate outriggers.

4) Please clarify all posts sizes, see above questions. See above.

5) Please also clarify mix designs for the asphalt patching, there is some uncertainty in what is actually required.

Please use the aggregates as specified in the sections noted. The surface and intermediate courses shall be 5-LT-58-28-S and the base course shall be 3-LT-58-28-S.

Revised answer to Question 14) on Questions and Answers 2 14May2021

1. Alternate 4 calls for Automatic door operator in lieu of surface mounted closure for door with hardware set 51. On the hardware schedule, there are no doors called out which receive hardware set 51.

It is the intent that Set 51 be for the Alternate #4 that includes upgraded acoustical doors and Automatic openers. The SCIF locks should be included for set #51 (revised hardware set attached) Updated response, “ Hardware set #51 shall be assigned to door number 217. Please refer to Specification Section 01 2300 – Alternates for clarification regarding this hardware set.”

For Reference:

D. Alternate No. 4: Automatic Door Operator for Acoustical Door.

1. Base Bid: Provide surface closer as outlined in Door Hardware Set 51, Section 08 7100: Door Hardware.

2. Alternate: Provide an automatic door operator in lieu of the surface closer outlined in Door Hardware Set 51 if required to satisfy ADA/ABA door force opening criteria and as required by the Government.

File details come from the government source that posted it. Updated .