This document provides details for a federal contract solicitation to construct an addition and renovate an existing warehouse and administrative offices at Dane County Regional Airport - Truax Field in Madison, Wisconsin to accommodate F-35 supply system requirements. The solicitation will result in a single firm fixed-price construction contract, with a 365-day period of performance from notice to proceed. The base bid includes renovation of an existing warehouse and new construction, with options for communication cabling and equipment, replacing existing windows, and temporary facilities. The contract value is estimated between $5-10 million. The solicitation is unrestricted and encourages participation from small businesses, with a subcontracting plan required from the apparent low bidder. The pre-bid conference will be held on-site with the bid opening following standard FAR and DFARS procedures.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question Answer and Comment
Drawing AD-103 Detail A1 Ground Floor Demolition Plan – Area C has B5 and B6 on the detail. In the bid option keyed notes these notes are not shown.
Please provide the bid option key or the location where they may be found in the drawings
DEMOLITION BID OPTION KEYED NOTES B5 and B6 on Sheet AD103 are erroneous.
Doors 150A and 150B were moved from a BID OPTION to BASE BID during design.
We are trying to confirm the flooring finish materials as directed on A- 701 to match existing finishes. Q&A 1 calls for the posting of Appendix A of the Base Design Guide will be sent under a separate cover. I can’t seem to find the Appendix A in any of the current documents posted on Sam.gov.
Appendix A has been updloaded. Attached are the finishes within other installation facilities. The Government does not prescribe these finishes as sole source and are included for reference only.
W50S9F-22-B-0002, F-35 ADAL B510, Questions and Answers 03