This solicitation seeks bids for a construction contract to construct a new 5,150 square foot warehouse addition and renovate approximately 20,000 square feet of existing warehouse and 8,150 square feet of administrative offices at Building 510 for the 115th Fighter Wing at Dane County Regional Airport in Madison, Wisconsin. The project aims to accommodate F-35 supply system requirements, including upgrades to lighting, HVAC, glazing, exterior finishes, fire and security systems, and other facility components. The base contract line items include renovation of the existing building, new construction, soil removal, and lead and asbestos remediation. Additional optional line items are for communication cabling, replacing existing windows, and temporary facilities. The contract duration is 365 days from notice to proceed. Interested contractors are to attend a pre-bid conference and site visit. The bid opening will be conducted according to FAR Subpart 14.4. The NAICS code is 236220 with a size standard of $39.5 million. The magnitude of construction is estimated between $5-10 million. Brand name justification is included. Award will be to the responsive, responsible lowest bidder.

View the file

Other files

File Type Posted
Bid Opening Attendance Sheet.pdf PDF
OF 1419_ABSTRACT OF OFFERS - CONSTRUCTION Signed.pdf PDF
Appendix A Base Design Guide.pdf PDF
Question and Answers 03.pdf PDF
Site Visit Attendance Sheet.pdf PDF
F35 B510 Pre-Bid Minutes 20220517.pdf PDF
Question and Answers 01.pdf PDF
Pre-Bid Slides - F-35 510.pptx PPTX presentation
ATTACHMENT 05 ADDENDUM 01 Project XGFG182011 Dated 15 January 2022.pdf PDF
ATTACHMENT 09 ADDENDUM 02 SPEC UPDATES Project XGFG182011 Dated 03 March 2022.pdf PDF
ATTACHMENT 04 LBP AND ASBESTOS RESULTS.pdf PDF
ATTACHMENT 10 ADDENDUM 02 PLAN UPDATES Project XGFG182011 Dated 03 March 2022.pdf PDF
ATTACHMENT 06 ADDENDUM 01 SECTION 11 13 19.13.pdf PDF
ATTACHMENT 16 SFS FORM 12.xlsx XLSX spreadsheet
ATTACHMENT 03 GEOTECHNICAL RESULTS Project.pdf PDF
ATTACHMENT 02 DRAWINGS Project XGFG182011 Dated September 2021 Instructions.pdf PDF
ATTACHMENT 01 PLANS AND SPECIFICATIONS Project XGFG182011 Dated September 2021.pdf PDF
ATTACHMENT 13 SINGLE SOURCE DETERMINATION ANDOVER.pdf PDF
ATTACHMENT 07 ADDENDUM 01 GC003 STAGING AND LAYDOWN PLAN.pdf PDF
W50S9F-22-B-0002.pdf PDF
ATTACHMENT 15 SINGLE SOURCE DETERMINATION MONACO.pdf PDF
ATTACHMENT 14 SINGLE SOURCE DETERMINATION MARSHALL BEST.pdf PDF
ATTACHMENT 11 ADDENDUM 03 Project XGFG182011 Dated 03 March 2022.pdf PDF
ATTACHMENT 08 ADDENDUM 02 Project XGFG182011 Dated 03 March 2022.pdf PDF
ATTACHMENT 12 ADDENDUM 03 SECTION 08 34 73 SOUND CONTROL DOOR ASSEMBLIES.pdf PDF
ATTACHMENT 17 PREBID CONFERENCE AND SITE VISIT INSTRUCTIONS.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question Answer and Comment

Drawing I-010, I-101 & I-102 Show furniture. No specifications or basis of design for furniture have been provided. Will the furniture be procured under a separate contract?

Please clarify furniture is not included in this RFP

Furniture is NOT part of this contract.