Bid Opening Attendance Sheet.pdf

PDF 94 KB Posted

Attached to
F-35 Add/Alter Building 510 Base Warehouse and Supply
Solicitation number
W50S9F-22-B-0002
Issued by

About this file

This solicitation is seeking bids for the construction of a new 5,150 square foot warehouse addition and renovation of approximately 20,000 square feet of an existing warehouse and 8,150 square feet of administrative offices at Dane County Regional Airport-Truax Field in Madison, Wisconsin. The project aims to accommodate F-35 supply system requirements, including upgrades to lighting, HVAC, glazing, exterior finishes, fire detection and suppression systems, security systems, and other facility components.

The solicitation will result in a single firm fixed-price construction contract, with a period of performance of 365 days from issuance of the notice to proceed. The contract has a magnitude between $5-10 million. The solicitation includes options for communication cabling/equipment, replacing existing windows, and temporary facilities. Interested contractors must register in the System for Award Management and attend the pre-bid conference and site visit. The bid opening will follow FAR Subpart 14.4. The solicitation is available on SAM.GOV and inquiries must be submitted in writing. The Department of the Army National Guard is the issuing agency.

View the file

Other files

File Type Posted
OF 1419_ABSTRACT OF OFFERS - CONSTRUCTION Signed.pdf PDF
Appendix A Base Design Guide.pdf PDF
Question and Answers 03.pdf PDF
Question and Answers 02.pdf PDF
Site Visit Attendance Sheet.pdf PDF
F35 B510 Pre-Bid Minutes 20220517.pdf PDF
Question and Answers 01.pdf PDF
Pre-Bid Slides - F-35 510.pptx PPTX presentation
ATTACHMENT 05 ADDENDUM 01 Project XGFG182011 Dated 15 January 2022.pdf PDF
ATTACHMENT 09 ADDENDUM 02 SPEC UPDATES Project XGFG182011 Dated 03 March 2022.pdf PDF
ATTACHMENT 04 LBP AND ASBESTOS RESULTS.pdf PDF
ATTACHMENT 10 ADDENDUM 02 PLAN UPDATES Project XGFG182011 Dated 03 March 2022.pdf PDF
ATTACHMENT 06 ADDENDUM 01 SECTION 11 13 19.13.pdf PDF
ATTACHMENT 16 SFS FORM 12.xlsx XLSX spreadsheet
ATTACHMENT 03 GEOTECHNICAL RESULTS Project.pdf PDF
ATTACHMENT 02 DRAWINGS Project XGFG182011 Dated September 2021 Instructions.pdf PDF
ATTACHMENT 01 PLANS AND SPECIFICATIONS Project XGFG182011 Dated September 2021.pdf PDF
ATTACHMENT 13 SINGLE SOURCE DETERMINATION ANDOVER.pdf PDF
ATTACHMENT 07 ADDENDUM 01 GC003 STAGING AND LAYDOWN PLAN.pdf PDF
W50S9F-22-B-0002.pdf PDF
ATTACHMENT 15 SINGLE SOURCE DETERMINATION MONACO.pdf PDF
ATTACHMENT 14 SINGLE SOURCE DETERMINATION MARSHALL BEST.pdf PDF
ATTACHMENT 11 ADDENDUM 03 Project XGFG182011 Dated 03 March 2022.pdf PDF
ATTACHMENT 08 ADDENDUM 02 Project XGFG182011 Dated 03 March 2022.pdf PDF
ATTACHMENT 12 ADDENDUM 03 SECTION 08 34 73 SOUND CONTROL DOOR ASSEMBLIES.pdf PDF
ATTACHMENT 17 PREBID CONFERENCE AND SITE VISIT INSTRUCTIONS.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file