This document summarizes the minutes from a pre-bid conference and site visit for an invitation for bids to construct project XGFG182011 at Building 510 on Truax Field in Madison, Wisconsin. The project seeks to construct a new 5,150 square foot warehouse addition, renovate approximately 20,000 square feet of existing warehouse and approximately 8,150 square feet of administrative offices to accommodate F-35 supply system requirements.

The solicitation includes a base bid for renovations, new construction, soil remediation and asbestos/lead remediation. There are also three option bids for communication cabling/equipment, replacing existing windows, and temporary facilities. The contract period is 365 days from notice to proceed. Questions must be submitted in writing by the deadline to the contracting office. The award will be made to the responsive and responsible lowest bidder. The pre-bid conference included a project presentation and site visit.

View the file

Other files

File Type Posted
Bid Opening Attendance Sheet.pdf PDF
OF 1419_ABSTRACT OF OFFERS - CONSTRUCTION Signed.pdf PDF
Appendix A Base Design Guide.pdf PDF
Question and Answers 03.pdf PDF
Question and Answers 02.pdf PDF
Site Visit Attendance Sheet.pdf PDF
Question and Answers 01.pdf PDF
Pre-Bid Slides - F-35 510.pptx PPTX presentation
ATTACHMENT 05 ADDENDUM 01 Project XGFG182011 Dated 15 January 2022.pdf PDF
ATTACHMENT 09 ADDENDUM 02 SPEC UPDATES Project XGFG182011 Dated 03 March 2022.pdf PDF
ATTACHMENT 04 LBP AND ASBESTOS RESULTS.pdf PDF
ATTACHMENT 10 ADDENDUM 02 PLAN UPDATES Project XGFG182011 Dated 03 March 2022.pdf PDF
ATTACHMENT 06 ADDENDUM 01 SECTION 11 13 19.13.pdf PDF
ATTACHMENT 16 SFS FORM 12.xlsx XLSX spreadsheet
ATTACHMENT 03 GEOTECHNICAL RESULTS Project.pdf PDF
ATTACHMENT 02 DRAWINGS Project XGFG182011 Dated September 2021 Instructions.pdf PDF
ATTACHMENT 01 PLANS AND SPECIFICATIONS Project XGFG182011 Dated September 2021.pdf PDF
ATTACHMENT 13 SINGLE SOURCE DETERMINATION ANDOVER.pdf PDF
ATTACHMENT 07 ADDENDUM 01 GC003 STAGING AND LAYDOWN PLAN.pdf PDF
W50S9F-22-B-0002.pdf PDF
ATTACHMENT 15 SINGLE SOURCE DETERMINATION MONACO.pdf PDF
ATTACHMENT 14 SINGLE SOURCE DETERMINATION MARSHALL BEST.pdf PDF
ATTACHMENT 11 ADDENDUM 03 Project XGFG182011 Dated 03 March 2022.pdf PDF
ATTACHMENT 08 ADDENDUM 02 Project XGFG182011 Dated 03 March 2022.pdf PDF
ATTACHMENT 12 ADDENDUM 03 SECTION 08 34 73 SOUND CONTROL DOOR ASSEMBLIES.pdf PDF
ATTACHMENT 17 PREBID CONFERENCE AND SITE VISIT INSTRUCTIONS.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-bid Conference Minutes

MEMORANDUM FOR RECORD

SUBJECT: MINUTES OF PRE-BID CONFERENCE AND SITE VISIT, SOLICITATION W5S09F-22-B-0002, F-35 ADD ALTER BUILDING 510

17 May 2022/1412 CST/63 MINUTES

1. The list of contractors attending the meeting is shown on the attached sign-in sheet. The following Government representatives attended the subject meeting:

MSgt Kate Fox, Contracting Officer MSgt Scott Homner, Contract Specialist 1st LT Cory Corson, Contracting Officer Representative

2. The following items were discussed during the Pre-proposal Conference:

a. The Contract period is 365 days. This includes all work to include cleanup and punch list.

Following receipt and approval of bonds we will hold a pre-construction conference and issue NTP.

b. Interested bidders must be registered in SAM. To register go to: https://www.sam.gov

3. A power point slide presentation on the project specifics and the selection process was provided to all attendees. (Attached)

4. Questions must be submitted in writing via email, especially technical questions to: katherine.fox@us.af.mil. DO NOT CONTACT the Design Engineers or the Government Engineers. All questions must be routed through the Contracting Office. All Contractor questions when answered will be posted to the website. If a question arises that will result in a change to the plans or specifications, an official amendment will be issued. All correspondence, questions and answers, amendments etc. will be issued or posted at SAM.gov.

5. KO and COR with the attendees walked to building 510 for a walk through of the facility.

6. Questions: No questions were asked or answered.

7. Any amendments that are issued will be posted to the web site. Contractors were advised to check the website frequently.

12. The pre-bid conference and site visit concluded at 1515 hours.