C121.pdf
PDF 3 MB Posted
- Attached to
- Construct F‐35 Flight Simulator, Wisconsin Air National Guard Truax Field Air National Guard Base
- Solicitation number
- W50S9F-20-R-0001
- Issued by
-
Department of the Army National Guard
About this file
This solicitation is for the construction of an F-35 flight simulator facility at Truax Field Air National Guard Base in Madison, Wisconsin. The project involves demolishing an existing 4,646 square foot building and constructing a new 19,000 square foot, four-simulator facility that will include independent mechanical, plumbing, electrical, and technology systems. Work must adhere strictly to construction plans and specifications to ensure Lockheed Martin simulators can be installed, with any deviations requiring government and Lockheed Martin approval. Asbestos removal and communications/security systems work are also included. The solicitation will result in a single fixed-price contract with a 565-day performance period. Five option items are included related to security windows, exterior finishes, canopies, and interior walls. Brand name justification is provided for various security, HVAC, communications, and facility components. The response due date is September 24, 2020. The solicitation is designated as unrestricted and encourages participation from all responsible offerors, including application of a Hubzone preference.
View the file
Other files
Show 40 more
Latest 50 of 123 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S T
O
STO
STO
STO
STO
S
S
S
S
S
W
W
W
W
W
W
W
W
E
E
E
E
E
E
G
G
G
G
G
G
G
G
G
G
ST
B
W
W
W
W
W
W
C C
C
C
C
C
C
C
C C C C C
C C
C C
C
T
G
E
W
C
E
G
G
G
G
W
W
B
C C
C C
C C
C C
C
C C
E
E
E
E
E
E
W
W
W
S
S
S
S
S
S T
O
C C
E
S T
O
S T
O
S T
O
W
E
E
E
T
T
T
T
T
T
S
S
S
S
S
S
E
E
E
S
S
V
ST
B
B
MITCHELL STREET
H O
F F
M A
N
S
T R
E E
T
X
X
X
XXXXXXXXXX
X
X
X
X
X
X X
XXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X
X
XXXXXXXXXXXXXXX
X X X X X X X X X X X X X X X X X X X X X
XXXXXX
X X X X X X X X X X X X X X X X X X
X
X
X
X
X
X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X
X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X
X X X X
X
XXXXXXXXXXXXX
X
X
X
X
X
X
X
XX
X
X
X
XXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
XXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXX
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X X X X X
X
C121
1" = 20'
10126384-C121_DM.DWG
1 4/25/2019 B-1 SUBMITTAL
MATCHLINE - SEE SHEET C122
A. CONTRACTOR TO RETAIN AND PROTECT ALL EXISTING
UTILITIES AND SURFACES NOT SCHEDULED FOR
DEMOLITION.
B. CONCRETE DEMOLITION TO OCCUR AT NEAREST EXISTING
JOINT.
C. ELECTRICAL AND COMMUNICATIONS UTILITIES WITHIN THE
SITE WILL BE DEMOLISHED BY OTHERS PRIOR TO
CONSTRUCTION. COORDINATE EXTENT OF DEMOLITION
WITH CONTRACTING OFFICER'S REPRESENTATIVE.
D. RETAIN AND PROTECT AGGREGATE BASE COURSES BELOW
CONCRETE AND ASPHALT PAVEMENT IN PARKING LOT TO
RECEIVE NEW PAVEMENT. IN AREAS WHERE FURTHER
IMPROVEMENT IS PLANNED, REMOVE AND STOCKPILE
AGGREGATE BASE COURSES FOR REUSE ON SITE.
E. PAVEMENT IN MITCHELL STREET INCLUDES REMOVING AND
REPLACING EXISTING AGGREGATE BASE COURSES.
F. 115TH CES PERSONNEL (FIRE AND EOD) WILL POTENTIALLY
CONDUCT TRAINING (DEMOLITION) ON B410 PRIOR TO
CONTRACTOR TAKING OVER CONSTRUCTION SITE. NO
MATERIALS FROM B410 WILL BE REMOVED, BUT HOLES IN
WALLS/DOORS AND BLOWN OUT HOLES IN CEILINGS CAN BE
EXPECTED.
GENERAL SHEET NOTES
SHEET KEYNOTES
1. SAWCUT AND DEMOLISH ASPHALT PAVEMENT
2. SAWCUT AND DEMOLISH CONCRETE PAVEMENT
3. SAWCUT AND DEMOLISH CONCRETE SIDEWALK
4. SAWCUT AND DEMOLISH CURB AND GUTTER
5. DEMOLISH
6. BUILDING 410 TO BE DEMOLISHED AND EXISTING UTILITY
SERVICES TO BE CAPPED. DEMOLISH ALL MATERIALS TO
A DEPTH OF 1 FOOT BELOW THE FOUNDATION
7. RETAIN AND PROTECT EXISTING GARAGE DOORS AND
BOLLARDS FOR BUILDING 409
8. COMMUNICATIONS DEMOLISHED PRIOR TO
CONSTRUCTION BY BASE COMMUNICATIONS
9. TELEPHONE SERVICE TO BE DEMOLISHED AND
RELOCATED PRIOR TO CONSTRUCTION BY BASE
COMMUNICATIONS
10. ELECTRICAL DEMOLISHED PRIOR TO CONSTRUCTION BY
OTHERS
11. DEMOLISH WATER SERVICE BACK TO MAIN
12. DEMOLISH SANITARY SEWER SERVICE BACK TO MAIN,
PLUG AT MANHOLE
13. CAP GAS SERVICE, DEMOLISH PIPE
14. RETAIN AND PROTECT
15. DEMOLISH PLANTER/PLANTINGS
16. DEMOLISH WATER MAIN
4 10/23/2019 B-2 SUBMITTAL
SIGN
8"SS
TREE
TREE
CURB
INLET
12"SD
UTILITIES
12"SD
4"SD
CATCH
BASIN
4"SD
CATCH BASIN
SPLASH
BLOCK
CONC WALL
CONC WALL
SPLASH
BLOCK
TREE
CONC WALL
X
X
X
XXXXXX
X
X
SIGN
SHRUB
TREE
PROJECT MANAGER
PROJECT NUMBER
SCALE
FILENAME
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MECHANICAL
FIRE PROTECTION
COMMUNICATIONS
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
A. THOMPSON (CH2M)
B. BRADLEY (HDR)
S. HEANEY (HDR)
M. OSSANNA (CH2M)
T. PRICE (CH2M)
R. RICHTER (HDR)
M. ADKISON (CH2M)
XGFG189001
CHRIS MANZ (CH2M)
TRUAX F-35 FLIGHT
SIMULATOR
(BUILDING B424)
0 20
DEMOLITION SITE
PLAN - AREA A
N
5 12/20/2019 B-2 RESUBMITTAL
LIGHT
POLE
6 1/31/2020 B-2 RESUBMITTAL #2
7 4/14/2020 B-3 FINAL
04/13/2020 cmanz Text Box
17. Contractor to complete asbestos survey of the building according to regulations in Ch. NR 447, Wis. Adm. Code.
| · | the inspection for the presence of asbestos and lead based paint will be completed by a Wisconsin certified asbestos and lead based paint building inspector |
| · | The use of an XRF will not be permitted |
| · | Inspection will follow all applicable state and federal guidelines for detection of asbestos and lead |
| · | NIST/NAVLAP certified laboratory will be used for analysis of all asbestos samples collected |
| · | Positive stop on asbestos samples is allowed |
| · | Contractor to also survey fluorescent lights for any PCB containing ballasts |
File details come from the government source that posted it. Updated .