This document outlines a federal contract opportunity to construct an F-35 flight simulator facility. The project seeks to demolish an existing 4,646 square foot facility at Truax Field Air National Guard Base in Madison, Wisconsin and construct a new 19,000 square foot, four-ship F-35 simulator training facility. The solicitation will result in a single firm fixed-price construction contract awarded on best value. Interested offerors must register in SAM and proposals are due September 24, 2020. The contract duration is 565 days from notice to proceed. Products and services required include demolition, site work, construction, mechanical, electrical, and technology systems. Options and brand name products are also specified.

View the file

Other files

File Type Posted
Simulator_Questions and Answers_194-222.pdf PDF
Design Amendment 1 attachments.pdf PDF
W50S9F20R0001 Page 6.pdf PDF
A107r.pdf PDF
G001.pdf PDF
Design Amendment 2 attachments.pdf PDF
Attachment 16-B410 from AsbestosMgmtOpPlan_ANG_TSC_AMT_Jun06.pdf PDF
Design Amendment 3 attachments.pdf PDF
08 81 00 Glazing rev.pdf PDF
C121.pdf PDF
A302.pdf PDF
A106.pdf PDF
Exhibit H - Proposal Schedule rev.docx DOCX document
A501.pdf PDF
W50S9F20R00010006.pdf PDF
09 69 13 Rigid Grid Access Flooring.pdf PDF
M602.pdf PDF
M503.pdf PDF
S302.pdf PDF
T112.pdf PDF
E100.pdf PDF
S103.pdf PDF
M604 rev.pdf PDF
A102 rev.pdf PDF
06 20 00 Finish Carpentry.pdf PDF
M112.pdf PDF
W50S9F20R00010005.pdf PDF
C503.pdf PDF
A304.pdf PDF
M603.pdf PDF
A301.pdf PDF
S101 rev.pdf PDF
E112.pdf PDF
A601.pdf PDF
12-PRE-PROPOSAL SITE VISIT INSTRUCTIONS rev 2.pdf PDF
05 40 00 Cold-Formed Metal Framing.pdf PDF
S102.pdf PDF
23 25 00 Chemical Treatment of Water for Mechanical Systems.pdf PDF
11 31 13 Electric Kitchen Equipment.pdf PDF
E620.pdf PDF
E122.pdf PDF
A103 rev 2.pdf PDF
03 30 00 Cast-In-Place Concrete.pdf PDF
27 51 16 Radio and Public Address Systems.pdf PDF
E121.pdf PDF
07 53 23 Ethylene-Propylene-Diene-Monmer Roofing.pdf PDF
E103.pdf PDF
Simulator_Questions and Answers_47-193.pdf PDF
E113.pdf PDF
T111.pdf PDF
Show 40 more

Latest 50 of 123 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Air Force Sustainability Requirements Scoresheet HPSB COMPLIANCE (Updated Jan 2017) * required entry

General Information XGFG189001 Project ID (e.g. ABCD12345) ID0000000000000000 Real Property Unique ID (RPUID) B424 Facility Number F-35 Flight Simulator Building Name Other Installation Other City Other State Other CONUS

0 MAJCOM

BCE Construction Agent Pinnow, SMSgt Katherine AFCEC DM/CM (Last Name, First Name)

$14,000,000.00 PA

19,000 Building Size (SF) 2020 Program Year (FY####) Design Complete Project Phase 08/14/18 Design Started (MM/DD/YY)

01/28/19 BOD (MM/DD/YY)

USGBC GP Guiding Principles Compliance Certification Method

100% HPSB Compliant 14% Energy Efficiency Achieved (% below ANSI/ASHRAE/IESNA

Standard 90.1-2013) 2017V1 Scoresheet version

Color Coding: See Instructions Tab for more detail Yes or N/A No Recommended not Required

90.1-2013 HPSB I: Employ Integrated Design Principles (UFC 1-200-02 para 2-2) Total Points 2 Possible Points 2

Yes HPSB I.1 Integrated Design 1

Yes HPSB I.2 Commissioning 1 HPSB II: Optimize Energy Performance (UFC 1-200-02 para 2-3) Total Points 5 Possible Points 5

Yes HPSB II.1 Energy Efficiency 1

Yes Reduce energy use 30% below ANSI/ASHRAE/IESNA Standard 90.1- 2013 or IECC, or if not - achieve maximum energy efficiency that is lifecycle cost effective

13.7% Insert percentage below ANSI/ASHRAE/IESNA Standard 90.1-2013 or IECC, in terms of energy use (e.g. 32)

550.3 Insert building energy intensity (kBtu/yr-sqft) calculated IAW 10 CFR

Yes Roof Attributes (Recommended) 1 Select roof types (Check below)

Energy Efficient Products 1 Yes

Yes HPSB II.2 On-site Renewable Energy 1

Yes Installed renewable energy elements or projects were not lifecycle cost effective

1 Renewable energy types (check below)

0.0 Insert generation capacity (kW)

0.0% Insert percentage of total building Yes HPSB II.3 On-site Renewable Energy - Solar Hot Water Heater System 1

Yes Installed solar hot water heater system or found installation not lifecycle cost effective

0.0 Insert generation capacity (MMBtu/yr)

0.0% Insert percentage of demand Yes HPSB II.4 Metering 1

Yes Electric Metering: Select N/A if no service

Yes Natural Gas Metering: Select N/A if no service

N/A Steam Metering: Select N/A if no service

Drop-Down Box

Federal Requirements

Complete

No Entry Required Custom Entry

Solar PV

Solar CP

Solar Thermal Electric

Geothermal

GSHP Wind

Hydro Waste to Energy

Renewables were not lifecycle cost effective

04/10/20 Date Project Registered (MM/DD/YY)

Date Project Certified (MM/DD/YY)

Cool roof

Green roof

Solar electric

Solar thermal

Solar Passive

4/13/2020 1

TR010309

Line

TR010309

Line

TR010309

Line

TR010309

Line

Air Force Sustainability Requirements Scoresheet HPSB COMPLIANCE (Updated Jan 2017) * required entry

HPSB III: Protect and Conserve Water (UFC 1-200-02 para 2-4) Total Points 6 Possible Points 6

Yes HPSB III.1 Indoor Water 1

Yes Indoor Water Metering 1

Yes HPSB III.2 Outdoor Water 1

N/A Outdoor Water Metering 1

N/A HPSB III.3 Alternative Water 1

Yes HPSB III.4 Stormwater Management (LID Documentation per UFC 3-210-10) 1

14000.0 Change in Impervious Area (SF)

$12,000,000.00 Pre-Award Cost Estimate ($)

Yes Project addressed EISA 438

0 EISA Technical Constraints

70.0%

Percent Increase in Stormwater Runoff for 95 Percentile Storm (%) -or- Percent Increase in Stormwater Runoff from continuous simulation model, published data, studies, or other established tools (Reference UFC 3-210-10 Figure 2-1 Implementation of EISA Section 438)

On-Site LID Features Locations

4 Integrated Management Practices Employed

Final LID Construction Cost ($)

Post Construction Analysis (Name of DOR) HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02 para 2-5) Total Points 8 Possible Points 8

Yes HPSB IV.1 Thermal Comfort 1

Yes HPSB IV.2 Ventilation 1

Yes HPSB IV.3 Daylighting 1

Yes HPSB IV.4 1

Yes HPSB IV.5 Low Emitting Materials 1

Yes HPSB IV.6 Protect Indoor Air Quality during Construction 1

Yes HPSB IV.7 Environmental Tobacco Smoke Control 1

Yes HPSB IV.8 Occupant Health and Wellness 1 HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02 para 2-6) Total Points 5 Possible Points 5

Yes HPSB V.1 Recycled Content 1

Yes HPSB V.2 Biologically-based Products 1

Yes HPSB V.3 Ozone Depleting Substances 1

Yes HPSB V.4 Waste and Materials Management - Recycling 1

Yes HPSB V.5 Waste and Materials Management - Divert 60% from Disposal 1

Yes 60% or greater diverted

60.0% Insert percentage diverted from landfill HPSB VI: Address Climate Change Risk (UFC 1-200-02 para 2-7) Total Points 1 Possible Points 1

Yes HPSB VI.1 Address Climate Change Risk 1 Possible Points 27

27 Federal Requirements - Yes or N/A 0 Federal Requirements - No

100% Percentage of Federal Requirements Met

Moisture Control

Retaining stormwater impact receving water flow

Site too small to infiltrate significant volume

State or local restrict water harvesting

Shallow bedrock, contaminated soil, high ground water table, underground utilities

Non-potable water demand to small Structural, plumbing, and other mods not feasible

Soil infiltration capacity limited

State or local restrict use of green Other

Bio-Retention

Infiltration Trench

Soil Amendments

Dry Wells Inlet Pollution Removal Device

Permeable Pavement/Pavers

Filter Strips Grassed Swells

Rain Barrels/Cisterns

Tree Box Filters Vegetated Buffers Vegetated Roof

Other

4/13/2020 2

File details come from the government source that posted it. Updated .