Final ABSTRACT Project ETRD 169847 ASOG Complex.pdf

PDF 182 KB Posted

Attached to
WA State ANG Construct Air Support Group Operations Complex (ASOG) Solicitation Federal contract opportunity
Solicitation number
W50S9E23B0002
Issued by
Department of the Army National Guard

About this file

This document is an abstract of offers for a construction project solicitation to construct an Air Support Group Operations Complex for the Washington State Army National Guard. The solicitation seeks offers for the base project to construct the complex with a job completion date, as well as ten options that include site work, additional construction, parking, and landscaping. Five contractors submitted proposals by the August 18th deadline. Offer amounts ranged from $28 million to $41.8 million for the base project, with option amounts varying between the contractors. The government estimate for the base project was $37.3 million. The solicitation was issued by the 194th Wing Contracting Office on behalf of the Department of the Army National Guard.

View the file

Other files for this federal contract opportunity

Other files attached to WA State ANG Construct Air Support Group Operations Complex (ASOG) Solicitation, newest first.
File Type Posted
ASOG bid opening attandance.pdf PDF
PRFI W50S9E23B0002 Construct ASOG Complex Questions Responses 7 28 2023.pdf PDF
PRFI W50S9E23B0002 Construct ASOG Complex Questions Responses 7 28 2023.pdf PDF
Fiber Copper Drawing.pdf PDF
W50S9E23B0002 Amendment 0002.pdf PDF
Camp Murray ASOG Type B-3 Addendum 1 28 Jul 2023.pdf PDF
PRFI W50S9E23B0002 Construct ASOG Complex Questions Responses 7 28 2023.pdf PDF
W50S9E23B0002 Amendment 0001.pdf PDF
ETRD169847 ASOG Complex Site Visit Slides.pptx PPTX presentation
ASOG Pre Bid Site Visit Sign in.pdf PDF
MAP.pdf PDF
Attachment 6 through 9 J and A.pdf PDF
Geotechnical Report.pdf PDF
Attachment 1 Vol 1a Drawings Civil.pdf PDF
Attachment 3 Vol 3 Spec Div 8-13.pdf PDF
W50S9E-23-B-0002 - ASOG Solicitation.pdf PDF
Attachment 4 Vol 4 Spec Dev 21-23.pdf PDF
Attachment 10 Material Submittals AF66.pdf PDF
Attachment 1 Vol 1d Drawings Mechanical Plumbing Fire Protection.pdf PDF
Attachment 1 Vol 1c Drawings Architectural.pdf PDF
SOW Construct ASOG Complex.pdf PDF
Attachment 1 Vol 1e Drawings Electrical Comm.pdf PDF
Attachment 1 Vol 1b Drawings Landscape Structural.pdf PDF
Attachment 2 Vol 2 Spec Div 1-7.pdf PDF
Attachment 5 Vol 5 Spec Dev 26-33.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page

ISSUING OFFICE

OFFEROR 1

Jody Miller

ITEM

NO. DESCRIPTION OF OFFERED ITEM QUANTITY UNIT

ESTIMATED

AMOUNT

TECHNICAL -

ACCEPTABLE/

UNACCEPTABLE

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

PRIME

PAST PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

SUBCONTRACTOR

PROPOSAL

AMOUNT

TECHNICAL -

ACCEPTABLE/

UNACCEPTABLE

PRIME

PAST PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

SUBCONTRACTOR

PAST PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

1 Construct ASOG Complex 1 Job $22,471,935.15 N/A N/A N/A $34,615,000.00 N/A N/A N/A 2 Option 1 - Grub + Retaining Wall 1 Job $1,508,701.95 $125,000.00

Option 2 - Paved POV Parking Lot and Infantry Dr in front of Building 1 Job $430,321.50 $1,100,000.00

4 Option 3 - Paving - Infantry Dr. South of Building 1 Job $199,238.55 $34,000.00 5 Option 4 - Full Landscaping 1 Job $146,342.70 $675,000.00 6 Option 5 - Paving - Infantry Dr. Front of Building 1 Job $213,995.25 235,000.00$ 7 Options 6 - Paving - Armor Drive 1 Job $243,930.75 205,000.00$ 8 Options 7 - Fixed Constructed Building Walls 1 Job $315,571.20 $178,000.00 9 Option 8 - Include Installation of Parking Shelters 1 Job $863,505.34 127,000.00$ 10 Option 9 - Paved GOV Parking Lot 1 Job $1,636,505.85 200,000.00$ 11 Option 10 - Fence to Enclose GOV Parking 1 Job $42,917.70 1,400,000.00$

Total $28,072,965.94 Total $38,894,000.00 Total

NO. OF AMENDMENTS ISSUED: Two 0001 - 26 July 2023 0002 - 02 Aug 2023

OFFEROR 2

Doyon

BID SECURITY- Yes B. BID SECURITY - Yes

AMENDMENT 0001 - 0002 ACKNOWLEDGED - Yes

ABSTRACT OF OFFERS - CONSTRUCTION

IFB Construct ASOG Complex

SOLICITATION NO.

W50S9E-23-B-0002

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

Kirk M. Swiantek, Contracting Officer

SIGNATURE DATE SIGNED

Date 8/17/2023

$41,832,766.00

$ 223,570.00 $ 1,348,800.00

$111,222.00

$ 74,254.00 $ 189,233.00 $ 127,172.00

$330,570.00 $207,650.00

$722,467.00

$1,160,145.00

AMENDMENT 0001 - 0002 ACKNOWLEDGED - Yes

194 WG CONTRACTING OFFICE

109 ENGINEER DR

CAMP MURRAY WA 98430

Project No: ETRD 169847 Project Title: ASOG Complex

8. GOVERNMENT ESTIMATE

(Check A, B, or C and complete D, E, and F)

OFFERS

NO. 1 NO. 2

PROPOSAL

AMOUNT

$37,337,683.00

B. BID SECURITY - Yes

CONTRACT ITEMS

PROPOSAL

AMOUNT

PROPOSAL

AMOUNT

PROPOSAL

AMOUNT

1 1 Job N/A N/A N/A $34,657,343.00 N/A N/A N/A $38,974,357.00 N/A N/A N/A

2 1 Job $1,007,517.00 $585,760.00 3 1 Job $1,020,302.00 $771,885.00

4 1 Job $9,825.00 $80,293.00

5 1 Job $656,559.00 $441,622.00

6 1 Job $306,568.00 $189,302.00

7 1 Job $108,990.00 $79,895.00

8 1 Job $152,936.00 $125,151.00

9 1 Job $365,859.00 $133,737.00

10 1 Job $212,667.00 $654,067.00

11 1 Job $1,256,570.00 $995,805.00

$39,755,136.00 Total $43,031,874.00 Total

TECHNICAL -

ACCEPTABLE/

UNACCEPTABLE

NO. 3 NO. 5

AMENDMENTS ACKNOWLEDGED

0001 - 0002

B. BID SECURITY:

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

PRIME

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

PRIME

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

TECHNICAL -

ACCEPTABLE/

UNACCEPTABLE

OFFEROR # 4 AlutiiqPROJECT TITLE TARC Renovations - Ground West and One West

ITEM

NO.

OFFEROR # 5

B. BID SECURITY- Yes

OFFEROR # 3 Nisqually

AMENDMENTS ACKNOWLEDGED- Yes 0001-0002

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

SUBCONTRACTOR

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

SUBCONTRACTOR

PAST

PERFORMANCE

ACCEPTABLE/

UNACCEPTABLE

SUBCONTRACTOR

TECHNICAL -

ACCEPTABLE/

UNACCEPTABLE

Total

SOLICITATION NUMBER: W9133L-21-B-4000 Page 2 of 2 INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project.

AMENDMENTS ACKNOWLEDGED - Yes 0001 - 0002

NO. 4

ABSTRACT OF OFFERS - CONSTRUCTION

IFB TARC Visitor's Center

CONTINUATION SHEET

QTY UNIT

1419 offeror 3-5
1419 offeror 1-2
2023-08-18T07:27:06-0400
SWIANTEK.KIRK.MATTHEW.1098659702

File details come from the government source that posted it. Updated .