Attachment 10 Material Submittals AF66.pdf

PDF 148 KB Posted

Attached to
WA State ANG Construct Air Support Group Operations Complex (ASOG) Solicitation Federal contract opportunity
Solicitation number
W50S9E23B0002
Issued by
Department of the Army National Guard

About this file

This document contains two schedules of material submittals and details of a related federal contract opportunity. The schedules list line items for two different construction projects and include columns for required submittals such as shop drawings, samples, warranties and certifications. One schedule is for a project to construct an Air Support Group Operations Complex and requires submittals including operations and maintenance manuals, a waste management plan, and an accident prevention plan. The other schedule is for a project to replace an energy management control system and smart meters, and requires submittals such as catalogs, operating instructions and technical descriptions for common electrical systems and lamps/ballasts/bulbs. The related federal contract opportunity is a solicitation from the Department of the Army National Guard to construct the Air Support Group Operations Complex, with a solicitation number provided but no further details on required products/services, response dates or award information included.

View the file

Other files for this federal contract opportunity

Other files attached to WA State ANG Construct Air Support Group Operations Complex (ASOG) Solicitation, newest first.
File Type Posted
ASOG bid opening attandance.pdf PDF
Final ABSTRACT Project ETRD 169847 ASOG Complex.pdf PDF
PRFI W50S9E23B0002 Construct ASOG Complex Questions Responses 7 28 2023.pdf PDF
PRFI W50S9E23B0002 Construct ASOG Complex Questions Responses 7 28 2023.pdf PDF
Camp Murray ASOG Type B-3 Addendum 1 28 Jul 2023.pdf PDF
Fiber Copper Drawing.pdf PDF
W50S9E23B0002 Amendment 0002.pdf PDF
PRFI W50S9E23B0002 Construct ASOG Complex Questions Responses 7 28 2023.pdf PDF
W50S9E23B0002 Amendment 0001.pdf PDF
ETRD169847 ASOG Complex Site Visit Slides.pptx PPTX presentation
ASOG Pre Bid Site Visit Sign in.pdf PDF
MAP.pdf PDF
Attachment 6 through 9 J and A.pdf PDF
Geotechnical Report.pdf PDF
Attachment 4 Vol 4 Spec Dev 21-23.pdf PDF
Attachment 1 Vol 1a Drawings Civil.pdf PDF
Attachment 3 Vol 3 Spec Div 8-13.pdf PDF
W50S9E-23-B-0002 - ASOG Solicitation.pdf PDF
Attachment 1 Vol 1d Drawings Mechanical Plumbing Fire Protection.pdf PDF
Attachment 1 Vol 1c Drawings Architectural.pdf PDF
SOW Construct ASOG Complex.pdf PDF
Attachment 1 Vol 1e Drawings Electrical Comm.pdf PDF
Attachment 1 Vol 1b Drawings Landscape Structural.pdf PDF
Attachment 2 Vol 2 Spec Div 1-7.pdf PDF
Attachment 5 Vol 5 Spec Dev 26-33.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER

ETRD 169847

PROJECT TITLE

Construct ASOG Complex

SOLICITATION/CONTRACT

TO BE COMPLETED BY PROJECT ENGINEER

TO BE COMPLETED BY CONTRACT

ADMINISTRATION

LIN

E N

U M

B

ER

ITEM OR

DESCRIPTION

OF ITEM,

CONTRACT

REFERENCE,

TYPE OF

SUBMITTALS

C

ER

T. O F

C O

M

LIA

N C

E

SH

O

P D R

A W

IN

G

S

SA

M

PLES

C O

LO

R

SELEC

TIO

N

M A

N U

FA

C

TU

R

ER

S

R

EC

O M

M

EN

D A

N U

FA

C

TU

R

ER

S W

A R

R A

N

TY

C A

TA

LO

G D

TA

O

PER

A

TIN

G

IN

STR

U C

TIO

N

S

EQ

U

IPM

EN

T U

SED

TEC

H

N

IC

A L

D

ESC

R

IPTIO

C

ER

TIFIC

A

TIO

N

S

R

EQ

U

IR

ED

SU

B

M

ISSIO

N D

A

TE

D A

TE R

EC

EIVED

N

TR

A

C

D

TE TO

C

IVIL

EN

G

IN

EER

R

ETU

R N

SU

SPEN

SE

D

A

TE

SU

B

M

ITTA

L N U

M

DATE CONTRACTOR NOTIFIED

APPROVED DISAPPROVED

N

TR

A C

TO

ESU

B

M

ITTA

L

FIN

A

L A

PPR

O

VA

L

REMARKS

Operations and

Maintenance Manuals

X

2 Progress Schedule X

Waste

Management Plan

Waste

Management Cost

5 Close-out Submittals X

Accident

Prevention Plan

AF Form 103

Base Civil Engineer Work

Clearance

8 Quality Control Plan X

Note: Submittals required by specifications and/or drawings shall be made, regardless of whether listed or not.

AF Form 66

SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER

ETRD 202324

PROJECT TITLE

Replace EMCS and Smart Meters

SOLICITATION/CONTRACT

TO BE COMPLETED BY PROJECT ENGINEER

TO BE COMPLETED BY CONTRACT

ADMINISTRATION

LIN

E N

U M

B

ER

ITEM OR

DESCRIPTION

OF ITEM,

CONTRACT

REFERENCE,

TYPE OF

SUBMITTALS

C

ER

T. O F

C O

M

LIA

N C

E

SH

O

P D R

A W

IN

G

S

SA

M

PLES

C O

LO

R

SELEC

N U

FA

C

TU

R

ER

S

R

EC

O M

M

EN

D A

N U

FA

C

TU

R

ER

S W

A R

R A

N

TY

C A

TA

LO

G D

TA

PER

A

STR

U C

TIO

N

S

EQ

U

IPM

EN

T U

SED

TEC

H

N

IC

A L

D

ESC

R

IPTIO

TIFIC

A

TIO

N

S

R

EQ

U

IR

ED

SU

M

ISSIO

N D

A

TE

D A

TE R

EC

EIVED

N

TR

A

C

D

TE TO

C

IVIL

EN

G

IN

EER

ETU

R N

SU

SPEN

SE

D

A

TE

SU

B

M

ITTA

L N U

M

DATE CONTRACTOR NOTIFIED

APPROVED DISAPPROVED

N

TR

A C

TO

ESU

B

M

ITTA

L

FIN

A

L A

PPR

O

VA

L

REMARKS

Common

Results for Electrical Systems

X X X X

Lamps, Ballasts, and Bulbs

X X X X

Note: Submittals required by specifications and/or drawings shall be made, regardless of whether listed or not.

AF Form 66

SCHEDULE OF MATERIAL SUBMITTALS
SOLICITATION/CONTRACT
LINE NUMBER
COLOR SELECTION
MANUFACTURERS RECOMMENDATION
MANUFACTURER’S WARRANTY
CATALOG DATA
OPERATING INSTRUCTIONS
EQUIPMENT USED
TECHNICAL DESCRIPTION
CERTIFICATIONS
REQUIRED SUBMISSION DATE
DATE RECEIVED IN CONTRACTING
DATE TO CIVIL ENGINEERING
RETURN SUSPENSE DATE
SUBMITTAL NUMBER
DISAPPROVED
CONTRACTOR RESUBMITTAL
FINAL APPROVAL
REMARKS
1
X
2
X
3
X
4
X
5
X
6
X
7
X
8
X

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT TITLE
PROJECT NUMBER
SOLICITATION/CONTRACT
LINE NUMBER
COLOR SELECTION
MANUFACTURERS RECOMMENDATION
MANUFACTURER’S WARRANTY
CATALOG DATA
OPERATING INSTRUCTIONS
EQUIPMENT USED
TECHNICAL DESCRIPTION
CERTIFICATIONS
REQUIRED SUBMISSION DATE
DATE RECEIVED IN CONTRACTING
DATE TO CIVIL ENGINEERING
RETURN SUSPENSE DATE
SUBMITTAL NUMBER
DISAPPROVED
CONTRACTOR RESUBMITTAL
FINAL APPROVAL
REMARKS
9
X
X
X
X
10
X
X
X
X
11
12
13
14
15
16
PROJECT TITLE
PROJECT NUMBER

File details come from the government source that posted it. Updated .