Attachment 10 Material Submittals AF66.pdf
PDF 148 KB Posted
- Attached to
- WA State ANG Construct Air Support Group Operations Complex (ASOG) Solicitation Federal contract opportunity
- Solicitation number
- W50S9E23B0002
- Issued by
- Department of the Army National Guard
About this file
This document contains two schedules of material submittals and details of a related federal contract opportunity. The schedules list line items for two different construction projects and include columns for required submittals such as shop drawings, samples, warranties and certifications. One schedule is for a project to construct an Air Support Group Operations Complex and requires submittals including operations and maintenance manuals, a waste management plan, and an accident prevention plan. The other schedule is for a project to replace an energy management control system and smart meters, and requires submittals such as catalogs, operating instructions and technical descriptions for common electrical systems and lamps/ballasts/bulbs. The related federal contract opportunity is a solicitation from the Department of the Army National Guard to construct the Air Support Group Operations Complex, with a solicitation number provided but no further details on required products/services, response dates or award information included.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER
ETRD 169847
PROJECT TITLE
Construct ASOG Complex
SOLICITATION/CONTRACT
TO BE COMPLETED BY PROJECT ENGINEER
TO BE COMPLETED BY CONTRACT
ADMINISTRATION
LIN
E N
U M
B
ER
ITEM OR
DESCRIPTION
OF ITEM,
CONTRACT
REFERENCE,
TYPE OF
SUBMITTALS
C
ER
T. O F
C O
M
LIA
N C
E
SH
O
P D R
A W
IN
G
S
SA
M
PLES
C O
LO
R
SELEC
TIO
N
M A
N U
FA
C
TU
R
ER
S
R
EC
O M
M
EN
D A
N U
FA
C
TU
R
ER
S W
A R
R A
N
TY
C A
TA
LO
G D
TA
O
PER
A
TIN
G
IN
STR
U C
TIO
N
S
EQ
U
IPM
EN
T U
SED
TEC
H
N
IC
A L
D
ESC
R
IPTIO
C
ER
TIFIC
A
TIO
N
S
R
EQ
U
IR
ED
SU
B
M
ISSIO
N D
A
TE
D A
TE R
EC
EIVED
N
TR
A
C
D
TE TO
C
IVIL
EN
G
IN
EER
R
ETU
R N
SU
SPEN
SE
D
A
TE
SU
B
M
ITTA
L N U
M
DATE CONTRACTOR NOTIFIED
APPROVED DISAPPROVED
N
TR
A C
TO
ESU
B
M
ITTA
L
FIN
A
L A
PPR
O
VA
L
REMARKS
Operations and
Maintenance Manuals
X
2 Progress Schedule X
Waste
Management Plan
Waste
Management Cost
5 Close-out Submittals X
Accident
Prevention Plan
AF Form 103
Base Civil Engineer Work
Clearance
8 Quality Control Plan X
Note: Submittals required by specifications and/or drawings shall be made, regardless of whether listed or not.
AF Form 66
SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER
ETRD 202324
PROJECT TITLE
Replace EMCS and Smart Meters
SOLICITATION/CONTRACT
TO BE COMPLETED BY PROJECT ENGINEER
TO BE COMPLETED BY CONTRACT
ADMINISTRATION
LIN
E N
U M
B
ER
ITEM OR
DESCRIPTION
OF ITEM,
CONTRACT
REFERENCE,
TYPE OF
SUBMITTALS
C
ER
T. O F
C O
M
LIA
N C
E
SH
O
P D R
A W
IN
G
S
SA
M
PLES
C O
LO
R
SELEC
N U
FA
C
TU
R
ER
S
R
EC
O M
M
EN
D A
N U
FA
C
TU
R
ER
S W
A R
R A
N
TY
C A
TA
LO
G D
TA
PER
A
STR
U C
TIO
N
S
EQ
U
IPM
EN
T U
SED
TEC
H
N
IC
A L
D
ESC
R
IPTIO
TIFIC
A
TIO
N
S
R
EQ
U
IR
ED
SU
M
ISSIO
N D
A
TE
D A
TE R
EC
EIVED
N
TR
A
C
D
TE TO
C
IVIL
EN
G
IN
EER
ETU
R N
SU
SPEN
SE
D
A
TE
SU
B
M
ITTA
L N U
M
DATE CONTRACTOR NOTIFIED
APPROVED DISAPPROVED
N
TR
A C
TO
ESU
B
M
ITTA
L
FIN
A
L A
PPR
O
VA
L
REMARKS
Common
Results for Electrical Systems
X X X X
Lamps, Ballasts, and Bulbs
X X X X
Note: Submittals required by specifications and/or drawings shall be made, regardless of whether listed or not.
AF Form 66
| SCHEDULE OF MATERIAL SUBMITTALS |
| SOLICITATION/CONTRACT |
| LINE NUMBER |
| COLOR SELECTION |
| MANUFACTURERS RECOMMENDATION |
| MANUFACTURER’S WARRANTY |
| CATALOG DATA |
| OPERATING INSTRUCTIONS |
| EQUIPMENT USED |
| TECHNICAL DESCRIPTION |
| CERTIFICATIONS |
| REQUIRED SUBMISSION DATE |
| DATE RECEIVED IN CONTRACTING |
| DATE TO CIVIL ENGINEERING |
| RETURN SUSPENSE DATE |
| SUBMITTAL NUMBER |
| DISAPPROVED |
| CONTRACTOR RESUBMITTAL |
| FINAL APPROVAL |
| REMARKS |
| 1 |
| X |
| 2 |
| X |
| 3 |
| X |
| 4 |
| X |
| 5 |
| X |
| 6 |
| X |
| 7 |
| X |
| 8 |
| X |
SCHEDULE OF MATERIAL SUBMITTALS
| PROJECT TITLE |
| PROJECT NUMBER |
| SOLICITATION/CONTRACT |
| LINE NUMBER |
| COLOR SELECTION |
| MANUFACTURERS RECOMMENDATION |
| MANUFACTURER’S WARRANTY |
| CATALOG DATA |
| OPERATING INSTRUCTIONS |
| EQUIPMENT USED |
| TECHNICAL DESCRIPTION |
| CERTIFICATIONS |
| REQUIRED SUBMISSION DATE |
| DATE RECEIVED IN CONTRACTING |
| DATE TO CIVIL ENGINEERING |
| RETURN SUSPENSE DATE |
| SUBMITTAL NUMBER |
| DISAPPROVED |
| CONTRACTOR RESUBMITTAL |
| FINAL APPROVAL |
| REMARKS |
| 9 |
| X |
| X |
| X |
| X |
| 10 |
| X |
| X |
| X |
| X |
| 11 |
| 12 |
| 13 |
| 14 |
| 15 |
| 16 |
| PROJECT TITLE |
| PROJECT NUMBER |
File details come from the government source that posted it. Updated .