This addendum provides additional details for solicitation number W50S9E23B0002 to construct an Air Support Group Operations Complex for the Washington State Army National Guard. The solicitation seeks a contractor to build a new complex at Camp Murray that includes administrative offices, training facilities, maintenance shops, and storage areas. Proposals are due by September 15, 2023, with the contract to be awarded by November 30, 2023. The estimated value of the contract is between $15-20 million. The solicitation is unrestricted and open to all qualified small and large businesses. The construction work must be completed within 24 months of the award date.

View the file

Other files for this federal contract opportunity

Other files attached to WA State ANG Construct Air Support Group Operations Complex (ASOG) Solicitation, newest first.
File Type Posted
ASOG bid opening attandance.pdf PDF
Final ABSTRACT Project ETRD 169847 ASOG Complex.pdf PDF
PRFI W50S9E23B0002 Construct ASOG Complex Questions Responses 7 28 2023.pdf PDF
PRFI W50S9E23B0002 Construct ASOG Complex Questions Responses 7 28 2023.pdf PDF
Fiber Copper Drawing.pdf PDF
W50S9E23B0002 Amendment 0002.pdf PDF
PRFI W50S9E23B0002 Construct ASOG Complex Questions Responses 7 28 2023.pdf PDF
W50S9E23B0002 Amendment 0001.pdf PDF
ETRD169847 ASOG Complex Site Visit Slides.pptx PPTX presentation
ASOG Pre Bid Site Visit Sign in.pdf PDF
Attachment 6 through 9 J and A.pdf PDF
MAP.pdf PDF
Geotechnical Report.pdf PDF
Attachment 1 Vol 1d Drawings Mechanical Plumbing Fire Protection.pdf PDF
Attachment 1 Vol 1c Drawings Architectural.pdf PDF
SOW Construct ASOG Complex.pdf PDF
Attachment 4 Vol 4 Spec Dev 21-23.pdf PDF
Attachment 10 Material Submittals AF66.pdf PDF
Attachment 1 Vol 1a Drawings Civil.pdf PDF
Attachment 3 Vol 3 Spec Div 8-13.pdf PDF
W50S9E-23-B-0002 - ASOG Solicitation.pdf PDF
Attachment 1 Vol 1e Drawings Electrical Comm.pdf PDF
Attachment 1 Vol 1b Drawings Landscape Structural.pdf PDF
Attachment 2 Vol 2 Spec Div 1-7.pdf PDF
Attachment 5 Vol 5 Spec Dev 26-33.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T Y P E B - 3 A D D E N D U M

Construct ASOG Complex Project Number ETRD169847

Addendum #1

Prepared for

Washington Air National Guard

Camp Murray ANG Base

July 2023

CH2M HILL – HDR JV

241 Taylor Street, Suite 100

Dayton, Ohio, 45402

Drawings

F

/2

/2

18'-0" 11'-5 3/4" 26'-5" 16'-10" 11'-6"

/4

/4

10'-0" 12'-11 1/4" 2'-0" 20'-8 3/4"

46'-3 1/2" 5'-0" 33'-1 3/4"

7'-3 1/2" 3'-5"

15'-11 3/4"

/4

/4

2'-1" 5'-4" 5'-1" 17'-3"

TYP

3'-0"

T Y

P

/2

/4

/2

6'-2 1/4" 3'-4" 9'-9" 3'-4" 23'-8 1/4"

/2

3'-0"

A

A

B

B

LAUNDRY

MEN'S

SHOWER

MEN'S

WOMEN'S

FITNESS

OFFICE

WOMEN'S

SHOWER

CORRIDOR

/4

A4034 A403 5

A4036

A403 7

A4038

TA-9

TA-9

TA-9

TA-9

TA-9

TA-9

TA-7

TA-9

TA-7

TA-2

TA-1

TA-9

TA-9

TA-9

TA-4

TA-8

TA-4

TA-4

TA-8

TA-4

TA-7

TA-7

TA-14

TA-3

TA-8

TA-8

TA-8

TA-8

TA-4

TA-4

TA-4

TA-4

TA-4

TA-4

TA-4

TA-9

STORAGE

TA-2

TA-1

TA-1

TA-5

TA-6

TA-17

TA-6

TA-5

TA-17

TA-5

TA-6

TA-17

TA-6

TA-5

TA-17 TA-17

TA-13TA-13 TA-13

TA-12

TA-13 TA-13

TA-13

SPAN

TA-13

TA-12TA-12

TA-12 TA-12

TA-13 TA-13

TA-12

TA-13

TA-13TA-13 TA-13

TA-12

TA-13 TA-13

TA-13 TA-13

TA-12TA-12

TA-12 TA-12

TA-13 TA-13

TA-12

TA-13

TA-14

TA-3

TA-14

TA-3

TA-13

TA-12

TA-13TA-13

TA-12

TA-16

TA-16

TA-16

TA-16

TA-16TA-16

TA-16

TA-16

TA-11

TA-15

TA-15

TA-15

TA-15

TA-15 TA-15

TA-15

TA-15

D

A .2

A.2

A.2 A

.2A.2

A.2

A .2

SPAN

D

SIM

A .4

S

IM

A .4

S

IM

D

SIM

D

D

SIM

A.2

A .2 A.2

A.2

A .2 A .2

A .2

A .2

D

SIM

A .2

A .2

SPAN

A.2

A .4

S

IM

A .2

D

A401 3

A4012

36" GRAB BAR

42" GRAB BAR

ABA SHOWER GRAB BAR

MIRROR W/ METAL FRAME

PAPER TOWEL DISPENSER

PAPER TOWEL DISPOSAL

SANITARY NAPKIN DISPOSAL

SOAP DISPENSER

TOILET TISSUE DISPENSER

MOP AND BROOM HOLDER

HEAVY DUTY METAL SHELF

SHOWER CURTAIN ROD

SHOWER CURTAIN

ABA SHOWER SEAT

HOOKS

FULL HEIGHT MIRROR

ELECTRIC HAND DRYER

TOILET ACCESSORY LEGEND

TA-1

TA-2

TA-3

TA-4

TA-5

TA-6

TA-7

TA-8

TA-9

TA-10

TA-11

TA-12

TA-13

TA-14

TA-15

TA-16

TA-17

METAL STUD WITH GYPSUM BOARD

MASONRY VENEER WALL W/ CMU BACK-

UP & INTERIOR METAL STUD FURRING

METAL STUD CHASE WALL

DEMOUNTABLE SYSTEM, (PARTITIONS &

DOORS). BY GOVERNMENT

BID OPTION 7 - IN LIEU OF

DEMOUNTABLE WALL SYSTEM, PROVIDE

PERMANENT PAINTED GYP BD / MTL

STUD FRAMED WALLS (WALL TYPE A.2)

WITH RUBBER BASE. AT WALLS WITH

DOOR LOCATIONS PROVIDE SOLID CORE

WOOD DOORS WITH HARDWARE SET 07.

RAISED ACCESS FLOOR

PLAN LEGEND

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

SCALE

FILENAME

CIVIL

STRUCTURAL

ARCHITECTURAL

ELECTRICAL

MECHANICAL

FIRE PROTECTION

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

C. STATSER

C. GIPSON

D. HOGAN

M. OSSANNA

T. PRICE

J. CAMPBELL

COMMUNICATIONS M. ADKISON

As indicatedB

IM

/1

J V

C

H M

C a m p M u rr a y A

S O

G F a c ili ty /1

-S

A .r v t

/2

/2

:2

:3

P M

A401

AIR SUPPORT OPERATIONS CENTER

10078627

CHRIS MANZ

HDRE_ALL_DISCIPLINES.rte

ENLARGED PLAN

CAMP MURRAY

ASOG FACILITY

AIR SUPPORT

OPERATIONS CENTER

1/4" = 1'-0"

ENLARGED PLAN - AREA B - RESTROOM & LOCKER

KEYNOTES

1 1/2 HEIGHT LOCKERS, SEE BASE DETAIL

3/A503

2 ADA BENCH

3 DRINKING FOUNTAIN

4 NOMINAL 8" STANDARD GREY CMU

5 NOMINAL 10" STANDARD GREY CMU

2 4 84

SCALE: 1/4"=1'-0"

04/30/2023 ISSUED FOR CONSTRUCTION

1 07/27/2023 ADDENDUM #1

- 1/4" = 1'-0"

3 MEN'S SHOWER 1224

- 1/4" = 1'-0"

2 WOMEN'S SHOWER 1221

4/30/2023

PREFINISHED

METAL COPING

EXTERIOR

SHEATHING

ROOFING MEMBRANE

LAP OVER PARAPET

CAP/METAL

PRE-FINISHED

INSULATED METAL

PANEL

TREATED WOOD

BLOCKING AS

REQ'D

2" RIGID

INSULATION

2" RIGID

INSULATION

ROOFING MEMBRANE

LAP OVER PARAPET

CAP/METAL

NOM 10" CMU

METAL DECK (REFER STRUCTURAL)

STEEL JOIST (REFER STRUCTURAL)

LOW SLOPE SINGLE-PLY ROOFING MEMBRANE (AIR MEMBRANE)

OVER COVER BOARD SLOPED TO 1/2"/FT &

(2) 2"(NOM) LAYERS POLYISO BOARD INSULATION (R-11 EA = R-22)

(2) 1" LAYERS MINERAL WOOL BOARD (R-4 EA = R-8)

(STC 45 MIN. ROOF ASSEMBLY)

PRE-FINISHED STANDING SEAM GALV METAL

ROOF (WITH MIN. R-30 RIGID INSULATION)

PRE-FINISHED METAL FASCIA & SEALANT

W/ 1" DRIP EDGE OVER CONT CLEAT

6" METAL STUD FRAMING 20GA, 24" OC

WRAP ICE/WATER SHIELD ( AIR BARRIER)

OVER BOTTOM OF SOFFIT PANEL

M

IN

O V

E R

L A

P

PRE-FINISHED METAL HIGH EAVE TRIM

1/2" THERMAL BREAK SHEATHING BOARD

TREATED WOOD BLOCKING AS REQ'D

BRICK VENEER

1" AIR SPACE

2" RIGID

INSULATION

(AIR BARRIER)

3'-4" TYP

TOP OF BRICK

8" OR 10" CMU,

SEE PLANS FOR LOCATIONS

FURRED WALL WHERE NOTED

ON PLANS & SCHEDULED

ACCENT BRICK

(1 ROW)

FINISHED

GRADE/PAVING

REFER CIVIL

BRICK VENEER

1" AIR SPACE

2" RIGID

INSULATION

(AIR BARRIER) 8" OR 10" CMU,

SEE PLANS FOR LOCATIONS

BASE WALL FLASHING

WEEPS AS SPEC'D

FOUNDATION & LUG

REFER STRUCTURAL

REFER TO STRUCTURAL DRAWINGS FOR MASONRY REQUIREMENTS

FURRED WALL WHERE NOTED

ON PLANS & SCHEDULED

PERIMETER FOUNDATION

INSULATION & PROTECTION

BOARD (MIN R-15 FOR 24")

FINISHED

GRADE/PAVING

REFER CIVIL

BASE WALL

FLASHING

WEEPS AS

SPEC'D

SOLID GROUT AT

CONDITIONS WHERE

BRICK IS BELOW GRADE

ADJUST THE WEEPS AND STEP FLASHING ABOVE

THE FINISHED GRADE AS REQUIRED IN AREAS

WHERE PAVING IS ABOVE THE LUG

BRICK VENEER

1" AIR SPACE

2" RIGID

INSULATION

(AIR BARRIER)

FLASH AND SEAL

PRE-FINISHED INSULATED

METAL PANEL

(AIR BARRIER)

10'-0" TYP

14'-0" AT VEHICLE MAINTENANCE

TOP OF BRICK

8" OR 10" CMU,

SEE PLANS FOR LOCATIONS

FURRED WALL WHERE NOTED

ON PLANS & SCHEDULED

ACCENT BRICK

(2 ROWS)

PRE-FINISHED

METAL RAKE TRIM

3" METAL DECK & BENT PLATE REFER

TO STRUCTURAL

PRE-FINISHED METAL

FLASHING & SEALANT W/ 1"

DRIP EDGE OVER CONT CLEAT

6" METAL STUD FRAMING

20GA, 24" OC

PRE-FINISHED STANDING SEAM GALV METAL

ROOF (WITH MIN. R-30 RIGID INSULATION)

CONT ICE/WATER SHIELD (AIR

BARRIER)OVER RECIEVER BD

O V

E R

L A

P

M

IN

1/2" THERMAL BREAK SHEATHING BOARD

TREATED WOOD BLOCKING AS REQ'D

NOM 8" CMU

POLY-ISO RIGID INSULATION (MIN R-9.5 AT WALLS)

PRE-FINISHED INSULATED METAL WALL PANEL (MIN. R-9.5)

METAL DECK (REFER STRUCTURAL)

"J" CLIP & SEALANT

PRE-FIINISHED GALV METAL SOFFIT PANEL,

PROVIDE SUB-FRAMING AS REQ'D

PRE-FINISHED GALV METAL FASCIA

PRE-FINISHED GALV METAL GUTTER

PRE-FINISHED STANDING SEAM GALV

METAL ROOF (WITH MIN. R-30 RIGID

INSULATION)

1/2" THERMAL BREAK SHEATHING BOARD

F A

S C

IA

"6

6"

CONT ICE/WATER SHIELD

PRE-FINISHED METAL FASCIA & SEALANT

W/ 1" DRIP EDGE OVER CONT CLEAT

STEEL JOIST,

REFER STRUCTURAL

MTL STUD

SUBFRAMING AS

REQUIRED

SEAL GAPS AS REQ'D

SPRAY FOAM INSULATION

COPE CMU AROUND STRUCTURAL FRAMING

TREATED WOOD BLOCKING AS REQ'D

PRE-FINISHED STANDING SEAM

GALV METAL ROOF (WITH MIN. R-30

RIGID INSULATION)

PRE-FINISHED INSULATED

METAL WALL PANEL

STEEL JOIST,

REFER STRUCTURAL

PAN END OF PANEL AS REQUIRED

PRE-FINISHED METAL Z-

CLOSURE AND FLASHING

BASE FLASHING

METAL DECK (REFER

STRUCTURAL)

1/2" THERMAL BREAK

SHEATHING BOARD

CONT ICE/WATER SHIELD

NOM 10" CMU

POLY-ISO RIGID INSULATION

(MIN R-9.5 AT WALLS)

TREATED WOOD

BLOCKING AS REQ'D

1. REFER TO ELECTRICAL & MECHANICAL DRAWINGS

FOR EQUIPMENT NOT SHOWN ON THIS SHEET.

2. SEE STRUCTURAL FOR STEEL LINTEL & MASONRY

BOND BEAM / WALL REINFORCEMENT LOCATION /

INFORMATION.

GENERAL NOTES:

WALL TO ROOF

FLASHINGPRE-FINISHED STANDING SEAM

GALV METAL ROOF (WITH MIN.

R-30 RIGID INSULATION)

PRE-FINISHED INSULATED

METAL WALL PANEL

PRE-FINISHED METAL Z-

CLOSURE AND FLASHING

BASE FLASHING

CONT ICE/WATER SHIELD

NOM 10" CMU

POLY-ISO RIGID INSULATION

(MIN R-9.5 AT WALLS)

METAL DECK

1/2" THERMAL BREAK

SHEATHING BOARD

TREATED WOOD BLOCKING AS REQ'D

D.6

EXTERIOR SHEATHING

2" RIGID

INSULATION

ROOFING MEMBRANE

NOM 10" CMU

METAL DECK (REFER STRUCTURAL)

COPE CMU AROUND

STRUCTURAL FRAMING

METAL DECK (REFER STRUCTURAL)

PRE-FINISHED STANDING SEAM GALV METAL ROOF (WITH MIN. R-30 RIGID INSULATION)

1/2" THERMAL BREAK SHEATHING BOARD

CONT ICE/WATER SHIELD

SEAL GAPS AS REQ'D

SPRAY FOAM INSULATION

LOW SLOPE SINGLE-PLY ROOFING MEMBRANE (AIR MEMBRANE)

OVER COVER BOARD SLOPED TO 1/2"/FT &

(2) 2"(NOM) LAYERS POLYISO BOARD INSULATION (R-11 EA = R-22)

(2) 1" LAYERS MINERAL WOOL BOARD (R-4 EA = R-8)

(STC 45 MIN. ROOF ASSEMBLY)

TREATED WOOD BLOCKING AS REQ'D

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

SCALE

FILENAME

CIVIL

STRUCTURAL

ARCHITECTURAL

ELECTRICAL

MECHANICAL

FIRE PROTECTION

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

C. STATSER

C. GIPSON

D. HOGAN

M. OSSANNA

T. PRICE

J. CAMPBELL

COMMUNICATIONS M. ADKISON

As indicatedB

IM

/1

J V

C

H M

C a m p M u rr a y A

S O

G F a c ili ty /1

-S

A .r v t

/2

/2

:2

:3

P M

A501

AIR SUPPORT OPERATIONS CENTER

10078627

CHRIS MANZ

HDRE_ALL_DISCIPLINES.rte

ARCHITECTURAL DETAILS

CAMP MURRAY

ASOG FACILITY

AIR SUPPORT

OPERATIONS CENTER

A303 1 1/2" = 1'-0"

PARAPET COPING4

A303 1 1/2" = 1'-0"

HIGH EAVE TRIM3

A303 1 1/2" = 1'-0"

CMU SILL AT CMU BACKUP8

A303 1 1/2" = 1'-0"

WALL BASE DETAIL10

A303 1 1/2" = 1'-0"

CMU TO MTL PANEL7

1 1/2" = 1'-0"

RAKE TRIM6

A303 1 1/2" = 1'-0"

DETAIL1

A303 1 1/2" = 1'-0"

ROOF DETAIL5

A304 1 1/2" = 1'-0"

ROOF DETAIL9

A305 1 1/2" = 1'-0"

ROOF DETAIL2

04/30/2023 ISSUED FOR CONSTRUCTION

1 07/27/2023 ADDENDUM #1

R

R R

R

SECONDARY

ENTRY

SECONDARY

ENTRY

PRIMARY

ENTRY

VEST

LOBBY

COMMANDER

COFFEE

BAR / WAIT

METEOROLOGICAL

TECH

WEATHER

SUPER

ADMIN

VEST

ASOC SIM

BREAK 2

COMM

CORRIDOR

OPEN

OFFICE

(SUPPORT)

C4

SUPPLY

MAINTENANCE

SUPER

WAIT

FIRST

SERGEANT

COMMANDER

OPEN

OFFICE

111TH PPE

111TH

FLIGHT 2

CORRIDOR

MECH

LAUNDRY

MEN'S

WOMEN'S

CORRIDOR

CORRIDOR

PORTABLE

RADIO

STORAGE

MISSION

PLANNING

MISSION

BRIEFING

VEST

WAIT

EXEC.

OFFICER

COMMANDER

OFFICE

OPEN

OFFICES

116TH

FLIGHT 1

116TH

FLIGHT 2

116TH

FLIGHT 3

BREAK 1

116TH

OFFICE 1

116TH PPE

116TH PPE

116TH

OFFICE 2

116TH PPE

116TH

OFFICE 3

COMM

E L E

C

1ST

SERGEANT

WEATHER

ELEMENT

CORRIDOR

WOMEN'S

MEN'S

111TH

OFFICE 2

DETACHMENT

COMMANDER

SQUADRON

SUPER

INTENDENT

VEST

FIRE SUPP

JAN

VEHICLE

BAY

BENCH

STOCK,

SUPPLY

RADIO

MAINTENANCE

WORK CTR

CORRIDOR

SUPER

INTENDENT

BATTERY

CORRIDOR

AGE / VEH

MX

BRIEF 1

BRIEF 2

INTEL

DOME SIM

ASOC PPE

STORAGE

111TH PPE

111TH

FLIGHT 1

111TH

OFFICE 1

ELEC

BUSINESS

AREA

OPEN

OFFICES

MGMT

OFFICER

MAINT

SUPER

DIRECTOR

OPS

OPS

1110A

VICE

COMMANDER

CEM

ALO

OFFICE

AUDITORIUM/MULTI-PURPOSE

OPEN

OFFICE

TRAINING

CONFERENCE

TIER 1

ELEC

CORRIDOR

COMMANDER

WAREHOUSE

JAN

CLOSET

CLOSET

FITNESS

OFFICE

WHITE

CELL

MEN'S

SHOWER

WOMEN'S

SHOWER

FITNESS

ASOG /

WEATHER

PPE

CORRIDOR

CORRIDOR

COMM

CMS

1110B

CORRIDOR

3 3

CORRIDOR

44 44 44

6 6

SIPR

COMM

8 8 8

EVACUATION PLAN

ROOM ID

RESTROOM

TACTILE EXIT

NO SMOKING

BUILDING NAME SIGN

MAX OCCUPANCY (ROOM)

BUILDING DIRECTORY

A B C D E F G H

SIGNAGE LEGEND:

CORNER GUARD LOCATION

PAINTED ACCENT WALL

PLAN LEGEND

KEY PLAN

A

C

D

B

E

MATCHLINE

MATCHLINE

M A

T C

H L

IN

E

M A

T C

H L

IN

E

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

SCALE

FILENAME

CIVIL

STRUCTURAL

ARCHITECTURAL

ELECTRICAL

MECHANICAL

FIRE PROTECTION

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

C. STATSER

C. GIPSON

D. HOGAN

M. OSSANNA

T. PRICE

J. CAMPBELL

COMMUNICATIONS M. ADKISON

As indicatedB

IM

/1

J V

C

H M

C a m p M u rr a y A

S O

G F a c ili ty /1

-S

A .r v t

/2

/2

:2

:3

P M

A604

AIR SUPPORT OPERATIONS CENTER

10078627

CHRIS MANZ

HDRE_ALL_DISCIPLINES.rte

SIGNAGE & ACCENT WALL COLOR PLAN

CAMP MURRAY

ASOG FACILITY

AIR SUPPORT

OPERATIONS CENTER

1" = 20'-0"

SIGNAGE & ACCENT WALL COLOR PLAN

E

A D

D

D

D

D

D D D

D

D

D

D

D

C

C

CC

E E E

E

E E

D E

E

E

E E E E

E

E

E

E

E

E

E

H

H

H

H

HA

A

A

A H

A

A A A

A

A

A

A

A

D

G

G G

B

B B A B B

B

B

B

B

B

B

B B

B

B

B

B B B

B

B

B

B

B

B

B B B B B B

GENERAL NOTES

1. ALL INTERIOR SIGNAGE SHALL MEET

REQUIREMENTS OF THE UFC 3-120-1 AND ABA

FOR DOD FACILITIES

2. COLOR SCHEDULE REFER TO SPEC SEC 09 06 00

3. ALL ROOMS SHALL HAVE ROOM ID

4. REFER TO LIFE SAFETY PLAN FOR MAX.

OCCUPANCY QUANTITY

5. REFER TO SHEET A004 FOR SIGNAGE DETAILS

6. ALL WALLS TO BE PAINTED P-1 UNLESS NOTED

OTHERWISE, TYP

7. REFER TO SHEET A002 FOR ABA TACTILE SIGN

INSTALLATION & REQUIREMENTS.

KEYNOTES

1 PAINT ACCENT WALL COLOR P-2

2 PAINT ACCENT WALL COLOR P-6

3 PAINT ACCENT WALL COLOR P-3

4 PAINT ACCENT WALL COLOR P-5

5 PAINT ACCENT WALL COLOR P-9

6 PAINT ACCENT WALL COLOR P-4

7 PAINT ACCENT WALL COLOR P-7 (FLAT

FINISH) TO 1'-0" ABOVE FINISHED CEILING.

WALL COLOR P-1 FOR REST OF WALL ABOVE

CEILING

8 PROVIDE 3" WIDE PAINTED STRIP AT 12'-0"

A.F.F. WITH STENCILED SIGNAGE READING

"NO STORAGE ABOVE 12'-0" AT EACH WALL.

(NOM 3" LETTER)

F

D

A

04/30/2023 ISSUED FOR CONSTRUCTION

1 07/27/2023 ADDENDUM #1

HVAC

EQUIPMENT

AHU-1

24"x24" RA

2 2.5 2.9 3 4 5 6 7 87.8

G

F.6

F

E

D

SA-1A

ERV-1

ERV-2

ERV-3

MC-1A

MC-1C

AHU-2

MC-1D

EF-5

MC-1B

HC-1

CC-1

24"x20" EA

48"x48" EA

48"x48" OA

D8-10

TYP 8

RG24

TYP 4

14"ø SA

24"x20" SA

20"x24" SA

10"ø RA

M302

M302

M301 5

M301

14"ø SA

10"x10" RA DOWN 12"x12" SA DOWN

12"x12" RA DOWN

12"x12" SA DOWN

12"x12" RA DOWN

12"x12" SA

DOWN

18"x18" SA

DOWN

20"x20" SA

DOWN

20"x20" RA

DOWN

8"ø EA

6"ø EA

6"ø SA

10"ø EA

24"x14" EA

16"x16" EA

36"x14" EA

10"ø OA

10"ø EA

6"ø EA

6"ø OA

AHU-3

FC-6

12"x12" RA

DOWN

FC-11

FC-10

FC-9

FC-2

FC-8

FC-4

FC-12

4"ø EA

4"ø OA

10"ø OA

16"ø OA

32"x24" OA

20"ø SA

20"ø EA

18"ø OA

32"x24" RA

4"ø RA

4"ø OA

4"ø OA

4"ø EA

22"ø OA

20"ø EA

14"ø OA

14"ø EA

22"ø OA 20"ø EA

24"x24" RA

6"ø EA

6"ø OA

FC-5

FC-3

12"x12" SA DOWN

12"x12" RA DOWN

16"ø EA

24"x24" RA

24"x24" OA

12"x12" SA

DOWN

12"x12" RA

DOWN

HCP-1

HCP-2

HCP-3

16"ø OA

12"x16" OA

14"x24" EA

32"x32" SAFC-1

16"ø SA

16"ø EA

FC-7

6"ø OA

6"ø EA

SA-1B

24"x20" SA

24"x24" SA

30"x30" SA

30"ø RA

28"x28" RA

16"ø SA

18"ø EA

ROOF ACCESS HATCH

SEE ARCH PLANS

OUTLINE OF

IH-2 INTAKE HOOD

OUTLINE OF

RELIEF RH-1 HOOD

T

16"x16" RA

TO BATTERY AREA FROM BATTERY AREA

16"x16" RETURN AND 16"ø

SUPPLY TO WAREHOUSE

16"ø EA FROM MECH ROOM

DUCT UP

16"ø OA

50"x24" RA

14"x14" EA

14"x14" EA

EF-4

16"x16" OPENING THRU WALL WITH

BIRD SCREEN ON PLATFORM SIDE

14"x14" WITH 1"X1" BIRD

SCREEN ON DUCT INLET

DIRECT OPENING AT A

45 DEGREE ANGLE DOWN

SG-10 TYP 5

BALANCE TO A

TOTAL OF 1960 CFM

32"x24" EA

30"x20" RA

32"x24" OA UP

16"ø DUCT TO RESTROOM BELOW

6M

MD-1 6

T

KEY PLAN

A

C

D

B

E

MATCHLINE

MATCHLINE

M A

T C

H L

IN

E

M A

T C

H L

IN

E

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

SCALE

FILENAME

CIVIL

STRUCTURAL

ARCHITECTURAL

ELECTRICAL

MECHANICAL

FIRE PROTECTION

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

C. STATSER

C. GIPSON

D. HOGAN

M. OSSANNA

T. PRICE

J. CAMPBELL

COMMUNICATIONS M. ADKISON

3/16" = 1'-0"B

IM

/1

J V

C

H M

C a m p M u rr a y A

S O

G F a c ili ty /1

-M

F E

C .r v t

/2

/2

:1

:1

P M

M402 10078627

CHRIS MANZ

HDRE_ALL_DISCIPLINES.rte

HVAC ENLARGED PLANS

CAMP MURRAY

ASOG FACILITY

AIR SUPPORT

OPERATIONS CENTER

3/16" = 1'-0"

FLOOR PLAN - MECHANICAL PLATFORM

GENERAL NOTES

1. ALL DIFFUSERS AND GRILLS WITH AN INDICATED AIR FLOW

SHALL BE PROVIDED WITH A BALANCING DAMPER IN THE

DUCTWORK. LOCATE THE DAMPER AS REMOTE FROM THE

OUTLET/INLET AS POSSIBLE.

2. REFER TO HYDRONIC SHEETS FOR LOCATION OF THE

THERMOSTATS.

3. REFER TO OTHER DRAWINGS, SECTIONS, DETAILS AND

EQUIPMENT SCHEDULES FOR ADDITIONAL INFORMATION

FOR THE BUILDING CONSTRUCTION.

4. FOR VAV BOX INLET AND OUTLET SIZES NOT INDICATED

REFER TO VAV BOX SCHEDULE.

5. SECURED SPACES:

a. DUCT OPENINGS IN THE SECURE PERIMETER

EXCEEDING 96 SQ IN SHALL BE PROTECTED WITH

PERMANENTLY AFFIXED STEEL BARS THAT ARE 1/2

INCH DIAMETER WELDED VERTICALLY AND

HORIZONTALLY 6 INCHES ON CENTER. PROVIDE

ACCESSIBLE INSPECTION ACCESS PANEL IN DUCT

INSIDE THE SECURE PERIMETER OF THE SECURED

WALL. IF ONE DIMENSION OF PENETRATION

MEASURES LESS THAN 6 INCHES OR ONE DIMESION

OF AN ADJACENT SOUND ATTENUATOR HAS

PASSAGEWAYS LESS THAN 6”, BAR PROTECTION IS

NOT REQUIRED.

b. HVAC DUCT PENETRATING THE SECURE PERIMETER

SHALL BE PROVIDED WITH A NONCONDUCTIVE FLEX

CONNECTION FOR A 6 INCH SECTION OF THE DUCT

INSIDE THE SECURED PERIMETER ADJACENT TO

PENETRATION.

c. SECURE PERIMETER PENETRATIONS SHALL BE

SEALED ON BOTH SIDES OF PERIMETER

PENETRATION WITH AN ACOUSTICAL FOAM OR

SEALANT PER ARCHITECTURAL DRAWINGS.

d. METALLIC PIPE PENETRATING THE SECURE

PERIMETER SHALL BE PROVIDED WITH DIELECTRIC

UNION ADJACENT TO THE PIPE PENETRATION THRU

THE SECURE WALL, OR GROUND THE PIPE USING A

NO. 4 WIRE (0.2043 DIAMETER COPPER WIRE) TO THE

BUILDING GROUND.

04/30/2023 ISSUED FOR CONSTRUCTION

1 07/27/2023 ADDENDUM #1

AIAI

PUMP

FAILURE

PUMP

ON/OFF

PUMP

FAILURE

PUMP

ON/OFF

PUMP

FAILURE

PUMP

ON/OFF

AI

AI

FLOW

RATE

AI

HANDHOLE

PUMP-2B

SIGHT GLASS

UNION

3/4" DRAIN VALVE

WITH HOSE BIBB

FLEXIBLE

CONNECTOR,

TYP

BUTTERFLY

VALVE, TYP

PRESSURE

GAUGE

3/4"

3/4"

CHEMICAL

BY-PASS

TANK

BUTTERFLY

VALVE, TYP

DIGITAL THERMOMETER, TYP

ET-2

FROM CHILLED

WATER SYSTEM

DRAIN WITH

HOSE END

3/4" DRAIN WITH

HOSE THREAD

DIFFERENTIAL PRESSURE

TRANSMITTER

CHILLED WATER SUPPLY

CHILLED WATER RETURN

LOCATE DIFFERENTIAL

PRESSURE TRANSMITTER

NEAR FAN COIL FC-2

ON MECH PLATFORM

HIGH CAPACITY

AIR VENT

TO CHILLED

WATER SYSTEMPRESSURE

GAUGE

TYPICAL

PUMP-2A

GLYCOL TO HEATING WATER SYSTEM

GMU-1

FLOW METER

LCD DISPLAY

VFD

VFD

W A

T E

R T

E M

P

P R

E S

S U

R E

S E

N S

O R

L

IN

E V

O L

T A

G E

N E

T W

O R

K C

O N

N E

C T

IO

N

L

IN

E V

O L

T A

G E

N E

T W

O R

K C

O N

N E

C T

IO

N

CH-2

CHILLERCHILLER

CH-1

S T

R A

IN

E

R

S T

R A

IN

E

R

N E

T W

O R

K C

O N

N E

C T

IO

N

N E

T W

O R

K C

O N

N E

C T

IO

N

M

C

DO

AI

M

C

DO

AI

AI

T E

M P

EQUIPMENT

AT CHILLERS

CT

CT

S T

R A

IN

E

R

N E

T W

O R

K C

O N

N E

C T

IO

N

M

C

DO

AI

CT

DRY BED

COOLER

DB-1

P U

M P

-3

P U

M P

-4

P U

M P

-5

CWS CWS

CWR

CWR

CWR

AS-2

AI

S U

C T

IO

N

P R

E S

S U

R E

PT

W A

T E

R T

E M

P

P R

E S

S U

R E

S E

N S

O R

T P

EQUIPMENT

AT CHILLERS

F L O

W M

E T

E R

CWR

AI

F

P U

M P

E N

A B

L E

P U

M P

S P

E E

D

C H

IL

L

E R

A L A

R M

DO AO DI

P U

M P

E N

A B

L E

P U

M P

S P

E E

D

P U

M P

A L A

R M

DO AO DI

C H

IL

L

E R

A L A

R M

DI

C H

IL

L E

R E

N A

B L E

DO

C H

IL

L

E R

A L A

R M

DI

C H

IL

L E

R E

N A

B L E

DO

C H

IL

L

E R

A L A

R M

DI

C H

IL

L E

R E

N A

B L E

DO

CURRENT SENSOR

PUMP ENABLE

ON PUMP

DO

AI

CURRENT SENSOR

PUMP ENABLE

ON PUMP

DO

AI CURRENT SENSOR

PUMP ENABLE

ON PUMP

DO

AI

SEQUENCE OF OPERATION

CHILLER CH-1, CH-2

CHILLER PIPING DIAGRAM

NTS

6" BYPASS

PT

OFF/AUTO: WHEN THE SWITCH IS IN THE AUTO POSITION THE CHILLERS SHALL BE ENABLED TO RUN WITH A SIGNAL FROM THE

DDC SYSTEM. WHEN THE SWITCH IS OFF THE CHILLER SHALL BE OFF.

AUTOMATIC MODE: THE CHILLERS SHALL BE ENABLED WITH COMMUNICATION FROM THE BUILDING DDC SYSTEM. THE CHILLER

INTERNAL CONTROLS SHALL MODULATE THE CHILLER AS REQUIRED TO MAINTAIN THE PRIMARY CHILLED WATER TEMPERATURE

SET-POINT. THE CHILLERS SHALL BE ENABLED AND DISABLED AND SHALL LEAD AND LAG OPERATION BASED ON HOURS THRU

THE DDC SYSTEM. CHILLERS AND ASSOCIATED PUMPS SHALL BE ENABLED ON A CALL FOR COOLING FROM ANY ONE ZONE FOR

MORE THAN 30 MINUTES (ADJUSTABLE).

LEAD AND LAG STATUS SHALL BE ALTERNATED WEEKLY. THE LEAD CHILLER SHALL OPERATE WHEN COOLING IS ENABLED.

FAILURE OF THE LEAD CHILLER TO PROVIDE FLOW WHEN ON SHALL INITIATE AN ALARM AND ALTERNATE THE LEAD CHILLER TO

BACKUP STATUS AND THE BACKUP CHILLER TO LEAD STATUS.

THE NEW LEAD CHILLER SHALL THEN BE ENABLED ON. THE LEAD CHILLER SHALL THEN REMAIN IN THE LEAD STATUS UNTIL THE

ALARM STATUS FOR THE FAILED CHILLER IS MANUALLY RESET. CHILLER CAPACITY SHALL VARY USING INTERNAL CONTROLS

TO MEET LEAVING WATER SETPOINT. THE DDC SYSTEM SHALL MONITOR THE AMP DRAW OF THE CHILLER(S) AND THE LEAVING

WATER TEMPERATURE TO STAGE THE LAG CHILLER ON/OFF AS REQUIRED TO MEET THE BUILDING LOAD. STAGE THE LAG

CHILLER ON WHEN THE LEAD CHILLER IS AT APPROXIMATELY 90% OF FULL CAPACITY AND CYCLE THE LAG CHILLER OFF WHEN

EACH CHILLER IS AT APPROXIMATELY 40% OF FULL CAPACITY.

IF A CHILLER GOES INTO ALARM WHEN ENABLED THE OFFLINE CHILLER SHALL BE ENABLED AND AN ALARM INITIATED. THE

FAILED CHILLER SHALL REMAIN LOCKED OUT UNTIL MANUALLY RESET. WHEN A CHILLER IS COMMANDED TO BE ON THE

ASSOCIATED PRIMARY PUMP SHALL BE ENABLED AND RUN. PRIMARY CHILLED WATER FLOW SHALL BE MONITORED BY THE

FLOW SWITCH INTERNAL TO EACH CHILLER.

DRY BED COOLER DB-1

OFF/AUTO: WHEN THE SWITCH IS IN THE AUTO POSITION THE DRY BED COOLER SHALL BE ENABLED TO RUN WITH A SIGNAL

FROM THE DDC SYSTEM. WHEN THE SWITCH IS OFF THE DRY BED COOLER SHALL BE OFF.

AUTOMATIC MODE: THE DRY BED COOLER SHALL BE CONTROLLED WITH COMMUNICATION FROM THE BUILDING DDC SYSTEM.

WHEN THE AMBIENT TEMPERATURE IS 30°F OR LESS THE MOTORIZED ISOLATION VALVE ASSOCIATED WITH THE COOLER SHALL

BE OPENED, THE PRIMARY PUMP-5 SHALL RUN. THE DRY BED COOLER SHALL UTILIZE INTERNAL CONTROLS TO MAINTAIN A

LEAVING WATER TEMPERATURE OF 42°F BY STAGING OR MODULATING FANS OFF/ON.

CHILLED WATER SECONDARY PUMPS, PUMP-2A AND 2B

CHILLED WATER SECONDARY PUMP MANUAL MODE SHALL BE CONTROLLED THRU THE VFD.

CHILLED WATER SECONDARY PUMP AUTOMATIC CONTROL: THE TWO SECONDARY CHILLED WATER PUMPS SHALL OPERATE

ALTERNATELY TO MAINTAIN SYSTEM DIFFERENTIAL PRESSURE WITH ONE PUMP AS THE LEAD PUMP AND THE OTHER PUMP AS

THE LAG PUMP. ONLY ONE PUMP SHALL RUN AT A TIME.

LEAD AND LAG STATUS SHALL BE ALTERNATED WEEKLY. THE LEAD PUMP SHALL OPERATE WHEN COOLING IS ENABLED. FAILURE

OF THE LEAD PUMP TO PROVIDE FLOW WHEN ON SHALL INITIATE AN ALARM AND ALTERNATE THE LEAD PUMP TO BACKUP

STATUS AND THE BACKUP PUMP TO LEAD STATUS.

THE NEW LEAD PUMP SHALL THEN BE ENABLED ON. THE LEAD PUMP SHALL THEN REMAIN IN THE LEAD STATUS UNTIL THE

ALARM STATUS FOR THE FAILED PUMP IS MANUALLY RESET. WHEN ON, THE SPEED OF THE LEAD PUMP SHALL BE VARIED TO

MAINTAIN THE SECONDARY CHILLED WATER PRESSURE SET-POINT OF 15 PSI (ADJUSTABLE).

PT AI

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

SCALE

FILENAME

CIVIL

STRUCTURAL

ARCHITECTURAL

ELECTRICAL

MECHANICAL

FIRE PROTECTION

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

C. STATSER

C. GIPSON

D. HOGAN

M. OSSANNA

T. PRICE

J. CAMPBELL

COMMUNICATIONS M. ADKISON

B

IM

/1

J V

C

H M

C a m p M u rr a y A

S O

G F a c ili ty /1

-M

F E

C .r v t

/2

/2

:3

:3

P M

M601 10078627

CHRIS MANZ

HDRE_ALL_DISCIPLINES.rte

CHILLER PIPING DIAGRAM

CAMP MURRAY

ASOG FACILITY

AIR SUPPORT

OPERATIONS CENTER

04/30/2023 ISSUED FOR CONSTRUCTION

1 07/27/2023 ADDENDUM #1

1 1

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

SCALE

FILENAME

CIVIL

STRUCTURAL

ARCHITECTURAL

ELECTRICAL

MECHANICAL

FIRE PROTECTION

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

C. STATSER

C. GIPSON

D. HOGAN

M. OSSANNA

T. PRICE

J. CAMPBELL

COMMUNICATIONS M. ADKISON

B

IM

/1

J V

C

H M

C a m p M u rr a y A

S O

G F a c ili ty /1

-M

F E

C .r v t

/2

/2

:3

:3

P M

M602 10078627

CHRIS MANZ

HDRE_ALL_DISCIPLINES.rte

HVAC DETAILS

CAMP MURRAY

ASOG FACILITY

AIR SUPPORT

OPERATIONS CENTER

ALL UNITS: DDC SHALL MONITOR HEATING WATER CONTROL VALVE POSITION FOR HW TEMP RESET, REFER TO BOILER

SEQUENCE OF OPERATION.

AIR HANDLER CONTROL:

AUTO/OFF: WHEN THE SWITCH IS IN THE OFF POSITION THE FANS SHALL BE OFF. WHEN THE SWITCH IS IN THE AUTO POSITION THE

UNIT SHALL BE CONTROLLED AS DESCRIBED BELOW.

OCCUPIED MODE:

THE SUPPLY FANS SHALL BE ON. FAN SHALL START AND SHALL ACCELERATE WITH A 30 SECOND RAMP TIME.

THE SUPPLY FANS SPEED SHALL BE CONTROLLED TO MAINTAIN SUPPLY DUCT PRESSURE SETPOINT OF 1.25" (ADJUSTABLE, TO BE

VERIFIED BY THE BALANCE CONTRACTOR).

NORMAL OPERATION IS TO PROVIDE 55 DEG AIR WHEN THE UNIT IS OPERATIONAL. COIL SHALL MODULATE AS REQUIRED TO

MAINTAIN REQUIRED LEAVING AIR TEMPERATURE.

DIRTY FILTER ALARM: WHEN THE DIFFERENTIAL ACROSS THE FILTER IS GREATER THAN 0.9 INCHES(ADJUSTABLE) INITIATE A DIRTY

FILTER ALARM. THE DIRTY FILTER ALARM SHALL REMAIN ACTIVE UNTIL MANUALLY REST. PROVIDE A DIRTY FILTER ALARM INDICATOR

LIGHT AND RESET BUTTON ON THE FACE OF THE HCP PANEL FOR EACH AIR HANDLER.

OUTSIDE AIR:

THE OUTSIDE AIR SHALL BE PROVIDED BY ERV-3 DURING OCCUPIED HOURS AND CLOSED DURING UNOCCUPIED HOURS.

SAFETY CONTROL: UPON DETECTION OF SMOKE IN THE AIRSTREAM THE SUPPLY AND EXHAUST FANS SHALL BE TURNED OFF AND

AN ALARM INITIATED. ALL DAMPERS AND VALVES SHALL RETURN TO THE SAME POSITION AS FOR THE UNOCCUPIED MODE. THE

UNIT SHALL NOT START AGAIN UNTIL MANUALLY RESET. UPON RESET THE UNIT SHALL GO INTO THE MODE CURRENTLY SCHEDULED

FOR THAT TIME.

T P

F A

N

P R

E -F

IL

T

E R

(M E

R V

/3

C O

O L

IN

G

V A

L V

E

F A

N S

P E

E D

D

IS

C H

A R

G E

A

IR

S E

N S

O R

F

IL

T E

R D

IF

F

E R

E N

T

IA

L P

R E

S S

U R

E

AIAOAOAI

SPEED

CONTROL

P

AI

D U

C T

S T

A T

IC

P

R E

S S

U R

E S

E N

S O

R

SUPPLY TO

VAV BOXES

C W

C O

ILE

C

M

T

AI

M

IX

E D

A

IR

T E

M P

E R

A T

U R

E

T

DISCHARGE AIR SENSOR

MOTOR CONTROL PANEL

FURNISHED WITH FCU

TO SPACE

FAN

PRE-FILTER

(30%)

HW COIL

CW COIL

P

FILTER DIFFERENTIAL PRESSURE

AI

COOLING VALVE

AO

POSITION

HEATING VALVEAO

AI

T

AI

D

IS

C H

A R

G E

P R

E S

S U

R E

AI

P

AI

F A

N E

N A

B L

E

DO

A

IR

F L O

W

AI

P

AI

P L E

N U

M P

R E

S S

U R

E

R E

T U

R N

A

IR

TYPICAL FAN COIL UNITS:

AUTO: FAN COIL UNIT SHALL BE AUTOMATICALLY ENABLED

DURING OCCUPIED TIMES AND SHALL RUN CONTINUOUSLY.

AS DESCRIBED BELOW.

SET-POINTS:

OCCUPIED TEMPERATURE: 68°F HEATING MINIMUM TO 78°F

COOLING MAXIMUM UNOCCUPIED TEMPERATURE: 60°F

MINIMUM TO 80'F MAXIMUM OCCUPIED TIME:

SHALL COORDINATE WITH END USER.

OCCUPIED MODE TEMPERATURE:

COOLING MODE: COOLING WATER VALVE AND HEATING WATER

VALVE SHALL MODULATE WITHOUT OVERLAPPING TO MAINTAIN

DESIRED ROOM SETPOINT.

OUTSIDE AIR (FC-5,6,7,8,9,10,11,12,13):

THE OUTSIDE AIR SHALL BE PROVIDED BY ERV-2 DURING

OCCUPIED HOURS AND CLOSED DURING UNOCCUPIED HOURS.

OUTSIDE AIR (FC-3):

THE OUTSIDE AIR SHALL BE PROVIDED BY ERV-1 DURING

OCCUPIED HOURS AND CLOSED DURING UNOCCUPIED HOURS.

OUTSIDE AIR (FC-2):

THE OUTSIDE AIR SHALL BE PROVIDED BY ERV-3 DURING

OCCUPIED HOURS AND CLOSED DURING UNOCCUPIED HOURS.

S T

A T

U S

DI

R E

T U

R N

F R

O M

V A

V B

O X

E S

F A

N F

A N

S P

E E

D

AO

SPEED

CONTROL

F A

N E

N A

B L

E

DO

S T

A T

U S

DI

A

IR

F L O

W

AI

E C

M

P

F

IN

A L

-F

IL

T E

R (M

E R

V

/8

F

IL

T

E R

D

IF

F E

R E

N T

IA

L

P R

E S

S U

R E

AI

RELIEF/EXHAUST TO ERV-3

VENTILATION AIR FROM ERV-3

RELIEF/EXHAUST TO ERV UNIT

VENTILATION AIR FROM ERV UNIT

T

DISCHARGE AIR SENSOR

MOTOR CONTROL PANEL

FURNISHED WITH FCU

TO SPACE

FAN

PRE-FILTER

(30%)

HW COIL

CW COIL

P

FILTER DIFFERENTIAL PRESSURE

AI

COOLING VALVE

AO

POSITION

HEATING VALVEAO

AI

FAN START

DO

R E

T U

R N

A

IR

FAN COIL UNITS (FC-1 AND EF-2):

AUTO: FAN COIL FC-1 AND EF-2 SHALL BE AUTOMATICALLY

ENABLED AND SHALL RUN CONTINUOUSLY AS DESCRIBED

BELOW.

ASSOCIATED MOTORIZED DAMPERS SHALL BE OPEN WHEN FAN

IS IN OPERATION.

SET-POINTS:

OCCUPIED TEMPERATURE: 68°F HEATING MINIMUM TO 78°F

COOLING MAXIMUM UNOCCUPIED TEMPERATURE:

COOLING MODE: COOLING WATER VALVE AND HEATING WATER

VALVE SHALL MODULATE WITHOUT OVERLAPPING TO MAINTAIN

DESIRED ROOM SETPOINT.

OUTSIDE AIR:

THE OUTSIDE AIR SHALL BE DELIVERED DIRECTLY TO THE UNIT.

AN ALARM SHALL BE ISSUED IF EITHER FC-1 OR EF-2 FAIL TO

OPERATE AS EXPECTED.VENTILATION AIR

M

DO

D A

M P

E R

O P

E N

FAN

STARTER

WHERE

REQUIREDM

AIAI

CURRENT SENSOR ON FAN

AI

FAN START

DO

CURRENT SENSOR ON FAN

AI

SEQUENCE OF OPERATION

SEQUENCE OF OPERATION

SEQUENCE OF OPERATION

CONSTANT VOLUME VERTICAL OR HORIZONTAL FAN COIL CONTROL DIAGRAM

NTS

AIR HANDLER CONTROL DIAGRAM (AHU-1,2,3)

NTS

FAN COIL AND EXHAUST FAN CONTROL DIAGRAM (FC-1, EF-2)

NTS

EXHAUST

AIR

FAN START

DO

DAMPER OPEN

DO

CURRENT SENSOR ON FAN

AI

04/30/2023 ISSUED FOR CONSTRUCTION

1 07/27/2023 ADDENDUM #1

FAN COIL UNIT FC-2:

DDC SHALL MONITOR AUXILIARY THERMOSTAT

AND SHALL OVERRIDE PRIMARY THERMOSTAT

AS REQUIRED TO MAINTAIN SPACE WITHIN SET-POINTS.

AUXILIARY THERMOSTAT SHALL BE PROVIDED WITH A PUSH

BUTTON TO OVER-RIDE/DISABLE THE PRIMARY

THERMOSTAT. AUXILIARY THERMOSTAT SHALL BE

PROVIDED WITH A PUSH BUTTON TO ALLOW UP TO TWO

HOURS OF OVERRIDE IN 20 MINUTE INCREMENTS. THE

FUNCTION OF THE HEATING AND COOLING CONTROL

VALVES BY THE ENABLED THERMOSTAT.

T

SPACE TEMPERATURE

AI

SENSOR (SEE PLANS)

T

SPACE TEMPERATURE

AI

SENSOR (SEE PLANS)

HEATING WATER SECONDARY

PUMPS, PUMP-1A AND PUMP-1B

BOILERS BOIL-1, BOIL-2 AND

BOIL-3 SEQUENCE OF OPERATION:

BOILER SOO CONT'D BOILER SOO CONT'D

ADDITIONAL POINTS TO MONITOR

HEATING WATER CONTROL DIAGRAM

BOIL-1 BOIL-2 BOIL-3

FM

P U

M P

A L A

R M

P U

M P

E N

A B

L E

D I

D O

S T

R A

IN

E

R

3/4"

CHEMICAL

BYPASS

TANK

PRESSURE

GAUGE

F L O

W M

E T

E R

-2

M

A S

IG

N

A L

A I

TO SYSTEM

CONDENSATE

NEUTRALIZING

TANK, TYP OF 3

NOTE 4

FSFSFS

NOTES 2, 5

NOTES

2, 5

PRESSURE

SENSOR

TEMPRATURE

SENSOR

AI

AI

P U

M P

S P

E E

D A

O

2 PSI NAT GAS

A O

B O

IL

E

R A

L A

R M

D I

D O

B O

IL

E

R T

E M

P R

E S

E T

B O

IL

E

R E

N A

B L

E

A O

B O

IL

E

R A

L A

R M

D I

D O

B O

IL

E

R T

E M

P R

E S

E T

B O

IL

E

R E

N A

B L

E

A O

B O

IL

E

R A

L A

R M

D I

D O

B O

IL

E

R T

E M

P R

E S

E T

B O

IL

E

R E

N A

B L

E

ET-1

GMU-1

PUMP

1A

PUMP

1B

DP

DIFFERENTIAL

PRESSURE

TRANSMITTER SET

TO HOLD 12 PSI

LOCATED NEAR FAN

COIL FC-12 ON MECH.

PLATFORM

H W

R

H W

S

3" HWR

3" HWS

NTS

NC

HOT WATER SUPPLY

HOT WATER

RETURN

AS-1

TO SYSTEM

HIGH

CAPACITY

AIR VENT

VALVE & CAP

WITH HOSE

TREAD

EXTEND AIR INTAKE AND EXHAUST

THRU ROOF, TERMINATE WITH A

CONCENTRIC FLUE OUTLET.

TYP 3 BOILERS

PRIMARY HOT WATER PUMP CONTROL:

PUMPS ARE POWERED AND CONTROLED BY THE

RESPECTIVE BOILER. NO CONNECTION TO THE DDC

SYSTEM OR EXTERNAL CONTROLS REQUIRED.

1. GAS METER: COORDINATE WITH INSTALLATION

OF NEW METER TO GET A PULSED SIGNAL TO

MONITOR GAS CONSUMPTION.

2. WATER METER: COORDINATE TYPE WITH WATER

SHOP.

3. ELECTRICAL METER: COORDINATE WITH

ELECTRICAL SHOP.

4. GLOBAL OUTSIDE AIR TEMPERATURE.

5. EMERGENCY HVAC SHUTDOWN SWITCH. UPON

ACTIVATION OF ANY SHUTDOWN SWITCH,

LOCATED AS SHOWN IN THE PLANS, ALL HVAC

SUPPLY, EXHAUST AND OUTSIDE AIR FANS SHALL

SHUT DOWN AND ALL CONTROL DAMPERS SHALL

CLOSE. SHUTDOWN SHALL REMAIN IN EFFECT

UNTIL MANUALLY RESET.

FLOW

METER

DISPLAY

2" TYP

3/4" DRAIN TYP

GAS REGULATOR

AS REQUIRED, TYP

3/4" G

1-1/4" G

3" BYPASS

NETWORK

CONNECTION

NETWORK

CONNECTION

BALANCING

VALVE SET

TO HOLD

10 GPM

UNION

DIGITAL

THERMOMETER,

TYP

PRESSURE

SENSOR

TEMPERATURE

SENSOR

AI

AI

FROM SYSTEM

3/4", COORDINATE THE

CONNECTION TO THE

CHILLED WATER SYSTEM

ALSO

DRAIN WITH

HOSE END

BOILER CONTROL:

THIS SYSTEM CONSISTS OF THREE BOILERS. THE

BURNERS SHALL BE CONTROLLED VIA THEIR OWN

INTERNAL CONTROLS. THE BOILER CONTROLS

SHALL PROVIDE THE BOILER WITH COMPLETE

OPERATION AND SAFETY CONTROLS INCLUDING

INDIVIDUAL FIRING RATE MODULATION AS REQUIRED

TO MAINTAIN HEATING WATER TEMPERATURE

SETPOINT. FAILURE OF BOILER SHALL INITIATE AN

ALARM.

STAGING OF BOILERS:

INCREASE IN HEATING LOAD: LEAD BOILER AND

ASSOCIATED CIRCULATION PUMP SHALL BE

ENABLED TO MEET HEATING LOAD. IF HEATING LOAD

DEMAND IS NOT MET WITH LEAD BOILER, NEXT

BOILER AND ASSOCIATED CIRCULATION PUMP SHALL

BE ENABLED. IF THE LOAD CONTINUES TO BE UNMET

THE NEXT BOILER SHALL BE ENABLED. AS THE LOAD

DECREASES THE LAST BOILER ON SHALL BE THE

FIRST BOILER OFF.

BOILERS SHALL UTILIZE A LEAD LAG FUNCTION TO

INSURE EQUAL RUN TIME ON ALL BOILERS. BOIL-1

SHALL BE THE LEAD BOILER FOLLOWED BY BOIL-2

AND BOIL-3. ROTATE THE LEAD BOILER ON A

WEEKLY BASIS.

TEMPERATURE RESET:

THE DDC SYSTEM SHALL PROVIDE A TEMPERATURE

SETPOINT FOR THE BOILERS. RESET THE

TEMPERATURE DOWN TO MINIMIZE ENERGY

CONSUMPTION. RESET IN 10 DEGREE INCREMENTS

SO THERE IS AT LEAST ONE HEATING WATER VALVE

THAT IS 80%-90% OPEN.

NOTES:

1. ALL SET POINTS SHALL BE USER ADJUSTABLE.

2. BOILER CIRCULATION PUMP FURNISHED BY BOILER MANUFACTURER.

3. NOT USED

4. SUPPLY AND RETURN WATER TEMPERATURE SENSORS AND FLOW SWITCH FURNISHED AS PART OF

BOILER CONTROLS.

5. CIRCULATION PUMP POWER TO BE FED FROM BOILER. PROVIDE A RELAY AND CONNECT TO POWER

AS REQUIRED IF UNABLE TO POWER FROM BOILER.

6. MECHANICAL CONTRACTOR SHALL COORDINATE THE CONNECTIONS TO THE DDC SYSTEM TO

ENSURE CORRECT VOLTAGE REQUIREMENTS.

7. COORDINATE THE POWER REQUIREMENTS FOR THE FLOW METER. BEFORE INSTALLATION OF FLOW

METER VERIFY PIPING REQUIREMENTS FOR THE FLOW METER.

8. 3/4" CPVC CONDENSATE LINE TO FLOOR DRAIN, TYP 3.

ISOLATION BUTTERFLY

VALVE, BEFORE PIPING

SPLITS TO SERVE

BUILDING, TYP

P R

E S

S U

R E

S E

N S

O R

A I

FLOW

SWITCH,

TYP 3

NOTE 4

NOTE 4

NOTE 8 NOTE 4

HEATING WATER SECONDARY PUMP MANUAL MODE:

PUMP MAY BE CONTROLLED MANUALLY FROM THE

ASSOCIATED VFD.

HEATING WATER SECONDARY PUMP AUTOMATIC

CONTROL: THE TWO SECONDARY HEATING WATER

PUMPS SHALL OPERATE ALTERNATELY WITH ONE

PUMP AS THE LEAD PUMP AND THE OTHER PUMP AS

THE LAG PUMP. ONLY ONE PUMP SHALL RUN AT A

TIME. LEAD AND LAG STATUS SHALL BE ALTERNATED

WEEKLY. THE LEAD PUMP SHALL OPERATE WHEN

HEATING IS ENABLED. FAILURE OF THE LEAD PUMP

TO PROVIDE FLOW WHEN ON SHALL INITIATE AN

ALARM AND ALTERNATE THE LEAD PUMP TO BACKUP

STATUS AND THE BACKUP PUMP TO LEAD STATUS.

THE NEW LEAD PUMP SHALL THEN BE ENABLED ON.

THE LEAD PUMP SHALL THEN REMAIN IN THE LEAD

STATUS UNTIL THE ALARM STATUS FOR THE FAILED

PUMP IS MANUALLY RESET. WHEN ON, THE SPEED OF

THE LEAD PUMP SHALL BE VARIED TO MAINTAIN THE

SECONDARY HEATING WATER PRESSURE SET-POINT

OF 10 PSI (ADJUSTABLE).

FLOW SHALL BE VERIFIED BY THE FLOW METER.

NORMAL MODE: OFF, BOILERS OFF, PUMPS OFF

HEATING WATER SYSTEM ENABLE: THE HEATING

SYSTEM WILL AUTOMATICALLY START WHEN THE

AMBIENT TEMPERATURE IS BELOW 60°F

(ADJUSTABLE) OR WHEN THERE IS A CALL FOR

HEAT BY ANY ONE FAN COIL OR VAV BOX FOR

MORE THAN 30 MINUTES (ADJUSTABLE).

SETPOINT: 140° F LEAVING WATER TEMPERATURE.

T

P P

T

P

DRAIN WITH

HOSE END

NC

TTT

S T

R A

IN

E

R

S T

R A

IN

E

R

NETWORK

CONNECTION

T

NOTE 4NOTE 8

2" HWR

NOTE 4NOTE 8

NOTE 4

TT

3/4" G2" HWSNOTE 41" G

AIR SEPARATOR

ON MECHANICAL

PLATFORM LEVEL

VFD

P U

M P

A L A

R M

P U

M P

E N

A B

L E

D I

D O

P U

M P

S P

E E

D A

O

VFD

BOILER ENABLE

BOILER ALARM

DO

DI

BOILER ENABLE

BOILER ALARM

DO

DI

BOILER ENABLE

BOILER ALARM

DO

DI

NOTES

2, 5

NOTE 4

N E

T W

O R

K D

O C

O N

N E

C T

IO

N

N E

T W

O R

K D

O C

O N

N E

C T

IO

N

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

SCALE

FILENAME

CIVIL

STRUCTURAL

ARCHITECTURAL

ELECTRICAL

MECHANICAL

FIRE PROTECTION

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

C. STATSER

C. GIPSON

D. HOGAN

M. OSSANNA

T. PRICE

J. CAMPBELL

COMMUNICATIONS M. ADKISON

B

IM

/1

J V

C

H M

C a m p M u rr a y A

S O

G F a c ili ty /1

-M

F E

C .r v t

/2

/2

:3

:3

P M

M603 10078627

CHRIS MANZ

HDRE_ALL_DISCIPLINES.rte

HVAC DIAGRAMS AND SEQUENCE OF OPERATIONS

CAMP MURRAY

ASOG FACILITY

AIR SUPPORT

OPERATIONS CENTER

04/30/2023 ISSUED FOR CONSTRUCTION

1 07/27/2023 ADDENDUM #1

1 1

0 1" 2"

SCALE

FILENAME

CIVIL

STRUCTURAL

ARCHITECTURAL

ELECTRICAL

MECHANICAL

FIRE PROTECTION

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

C. STATSER

C. GIPSON

D. HOGAN

M. OSSANNA

T. PRICE

J. CAMPBELL

COMMUNICATIONS M. ADKISON

B

IM

/1

J V

C

H M

C a m p M u rr a y A

S O

G F a c ili ty /1

-M

F E

C .r v t

/2

/2

:3

:3

P M

M604 10078627

CHRIS MANZ

HDRE_ALL_DISCIPLINES.rte

HVAC DIAGRAMS AND SEQUENCE OF OPERATIONS

CAMP MURRAY

ASOG FACILITY

AIR SUPPORT

OPERATIONS CENTER

HEATING

COIL

VAV

M

F AI

M

AI T T AI

TO SPACE

T AI

FAN

STARTER

WHERE

REQUIRED

FAN

STARTER

F A

N S

T A

R T

S

IG

N A

L

S P

A C

E T

E M

P R

E T

U R

N A

IR

P O

S

IT

IO

N

C O

N T

R O

L V

A L V

E

M

T

M

FAN

STARTER

WHERE

REQUIRED

TYPICAL VAV W/REHEAT COIL CONTROL DIAGRAM CABINET HEATER AND UNIT HEATER CONTROL

EXHAUST FAN CONTROL

MAN COOLER FAN CONTROL

HEAT PUMP CONTROL

NTS

SEQUENCE OF OPERATION

EXHAUST FAN CONTROL FOR (EF-1):

THE FAN SHALL BE STARTED AND STOPPED BASED ON TEMPERATURE OR THE DETECTION OF

CARBON MONOXIDE. .

1. WHEN THE TEMPERATURE RISES ABOVE 85 DEG F OR CARBON MONOXIDE LEVELS RISE ABOVE

25 PPM THE MOTORIZED DAMPER MD-7A, 7B AND MD-8 SHALL OPEN AND EF-1 SHALL BE

ENABLE TO RUN CONTINUOUSLY.

2. WHEN THE TEMPERATURE FALLS BELOW 85 DEG F OR CARBON MONOXIDE FALLS BELOW

25PPM THE FAN SHALL CYCLE OFF AND MD-7A, 7B AND MD-8 SHALL CLOSE.

CURRENT TRANSMITTER TO MONITOR FAN MOTOR TO CONFIRM FAN FUNCTION IS

AS EXPECTED IN THE CONTROL SYSTEM. IF THE FAN FAILS TO START AND RUN OR

IF THE FAN RUNS WHEN COMMANDED OFF AN ALARM WILL BE ISSUED.

SA

TO

OTHER

VAV'S

HWR

HWS

AIRFLOW

TRACKING

TWO OR THREE WAY VALVE

ZONE

TEMP

DISCHARGE AIR

TEMP SENSOR

AO

SEQUENCE OF OPERATION VAV BOX

FROM

FC-23

DAMPER MODULATION

PROVIDE INDEPENDENT

VALVE POSITION SENSOR

AOHEATING COIL MODULATION

COOLING MODE: MODULATE INLET DAMPER TO

MAINTAIN ROOM COOLING SETPOINT.

HEATING MODE: VOLUME CONTROL DAMPER AT

MINIMUM CFM. MODULATE REHEAT COIL CONTROL

VALVE TO MAINTAIN ZONE TEMPERATURE SETPOINT.

LIMIT THE LEAVING AIR TEMPERATURE TO NO

GREATER THAN 85°F. IF ADDITIONAL HEAT IS NEEDED

THEN INCREASE THE PRIMARY AIR VOLUME WHILE

MAINTAINING A LEAVING AIR tEMPERATURE OF 85°F.

DDC SHALL MONITOR HEATING WATER CONTROL

VALVE POSITION FOR HW TEMP RESET. REFER TO

BOILER SEQUENCE OF OPERATION.

ZONE

TEMP

EXHAUST

AIR

FAN START

DO

DAMPER OPEN

DO

CURRENT SENSOR ON FAN

AI

EXHAUST FAN CONTROL FOR:

EF-3, MD-9 AND MD-10

EF-5, MD-1 AND MD-12

THE FANS SHALL BE CONTROLLED BY A WALL THERMOSTAT TO MAINTAIN A ZONE

TEMPERATURE COOLING SETPOINT OF 85° F (ADJ).

WHEN THE ROOM TEMPERATURE RISES ABOVE 85° F THE ASSOCIATED MOTORIZED DAMPERS SHALL

OPEN AND THE FAN SHALL RUN CONTINUOUSLY.

WHEN THE TEMPERATURE DROPS BELOW 85° F THE FAN SHALL CYCLE OFF AND THE DAMPERS

SHALL CLOSE.

CURRENT TRANSMITTER TO MONITOR FAN MOTOR TO CONFIRM FAN FUNCTION IS AS EXPECTED IN

THE CONTROL SYSTEM. IF THE FAN FAILS TO START AND RUN OR IF THE FAN RUNS WHEN

COMMANDED OFF AN ALARM WILL BE ISSUED.

NTS

HWR

HWS

SEQUENCE OF OPERATION

HOT WATER UNIT HEATER NORMAL MODE: FAN OFF AND CONTROL VALVE TO UNIT IS CLOSED.

HOT WATER UNIT HEATER AUTOMATIC CONTROL: ON CALL FOR HEATING FROM THE SPACE

TEMPERATURE SENSOR SHALL OPEN HEATING WATER CONTROL VALVE AND START FAN

TO MAINTAIN SPACE TEMPERATURE SET-POINT. WHEN SPACE HEATING REQUIREMENTS

ARE SATISFIED REVERSE THE PROCEDURE.

CABINET HEATER ADDITIONAL REQUIREMENTS:

WHEN THE AMBIENT TEMPERATURE IS LESS THAN 30° THE FANS SHALL RUN CONTINUOUSLY.

CONTROL VALVES SHALL CYCLE AS REQUIRED TO MAINTAIN THE SPACE AT 55°F (ADJUSTABLE).

DO DO AI

EXHAUST FAN CONTROL FOR:

THE FAN SHALL BE CONTROLLED BY A WALL THERMOSTAT TO MAINTAIN A ZONE

TEMPERATURE COOLING SETPOINT OF 85° F (ADJ) AND HEATING SETPOINT OF 50°F.

CYCLE FAN AS REQUIRED TO MAINTAIN THE SETPOINT BETWEEN 85°F AND 50°F.

WHEN THE ROOM TEMPERATURE RISES ABOVE 85° F MD-1 AND MD-5 SHALL OPEN AND

FAN EF-5 SHALL START AND THE FAN SHALL RUN CONTINUOUSLY.

WHEN THE TEMPERATURE DROPS BELOW 85° F THE FAN SHALL CYCLE OFF AND THE DAMPERS

SHALL CLOSE.

CURRENT TRANSMITTER TO MONITOR FAN MOTOR TO CONFIRM FAN FUNCTION IS AS EXPECTED IN

THE CONTROL SYSTEM. IF THE FAN FAILS TO START AND RUN OR IF THE FAN RUNS WHEN

COMMANDED OFF AN ALARM WILL BE ISSUED.

DAMPER OPEN

DO

MOTOR RATED SWITCH

TO START FAN SEE

ELECTRICALS

CURRENT SENSOR ON FAN

AI

NTS

NTS

SEQUENCE OF OPERATION

FANS SHALL BE MANUALLY STARTED AS STOPPED AS REQUIRED FOR COMFORT OR AIR

CIRCULATION.

DDC SYSTEM SHALL MONITOR FAN FUNCTION. IF A FAN IS LEFT IN THE ON POSITION

FOR MORE THAN 12 HOURS AN ALARM SHALL BE ISSUED.

NTS

SEQUENCE OF OPERATION

HEAT PUMP UNIT SHALL CYCLE AND STAGE CAPACITY UP OR DOWN AS REQUIRED TO MAINTAIN

ROOM SET POINT.

DDC SYSTEM SHALL MONITOR ROOM TEMPERATURE. IF THE ROOM TEMPERATURE RISES ABOVE OR

FALLS BELOW ROOM SET POINT FOR MORE THAN 30 MINUTES AN ALARM SHALL BE ISSUED. .

OUTDOOR UNIT

INDOOR UNIT

INTERCONNECTING

WIRING AND REFERIGERAT

PIPING

CO

CARBON MONOXIDE PANEL (EF-1 ONLY)

DI

04/30/2023 ISSUED FOR CONSTRUCTION

1 07/27/2023 ADDENDUM #1

BOILERS

B-1, 2, 3

CHILLERS

CH-1, 2

DB-1

AHU-1 AHU-2 AHU-3 ERV-1 ERV-2 ERV-3

CH-1

CH-2

DB-1

B-1

B-2

B-3

VAV

100'S

VAV

200'S

VAV

300'S

VAV

FC-4

FC-3 TO 12 FC-1, 2

DDC IT ETHERNET SWITCH - LEVEL 2

DDC NETWORK CONTROLLER - LEVEL 2

IT SWITCH FPOC - LEVEL 3

COMMUNICATION ROOM 1502

REFER TO UFC4-010-06 FOR LEVEL

OF CYBER SECURITY

DDC NETWORK AND

PANEL ARCHITECTURE

TYPICAL TYPICAL TYPICAL TYPICAL TYPICAL

REFER TO ASHRAE STANDARD 135-2020 FOR

DEFINITIONS AND MINIMUM CAPABILITIES

OF CONTROLLERS AND PICS STATEMENTS

2C22 BACNET MS/TP

BACNET/IP CAT6E

DDC NETWORK AND PANEL ARCHITECTURE

NTS

NOTES

1. CONTRACTOR SHALL COORDINATE THE LOACTION OF EQUIPMENT AND

REQUIRED PANELS WITH OTHER TRADES AND EXISTING CONDITIONS

TO INSHURE A COMPLETE AND OPERATIONAL SYSTEM.

LEGEND

BACnet - Building Controler

BACnet - Advance Application Controler

BACnet - Application Specific Controler

Third Party Equipment

EF-4:

EF-5, MD-1, MD-12:

M

SPACE TEMPERATURE

AI

SENSOR

T

M

DAMPER OPEN

SIGNAL (EF-5 ONLY)

DO

DAMPER OPEN

SIGNAL (EF-5 ONLY)

DO

MOTOR

STARTER

FAN START

DO

FAN CURRENT

AI

SIGNAL

T

P

P

T

T

M M

M

M

T

P

T

T

M M

T

P

T

T

M M

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

SCALE

FILENAME

CIVIL

STRUCTURAL

ARCHITECTURAL

ELECTRICAL

MECHANICAL

FIRE PROTECTION

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

C. STATSER

C. GIPSON

D. HOGAN

M. OSSANNA

T. PRICE

J. CAMPBELL

COMMUNICATIONS M. ADKISON

B

IM

/1

J V

C

H M

C a m p M u rr a y A

S O

G F a c ili ty /1

-M

F E

C .r v t

/2

/2

:3

:3

P M

M605 10078627

CHRIS MANZ

HDRE_ALL_DISCIPLINES.rte

ERU CONTROL DIAGRAM

CAMP MURRAY

ASOG FACILITY

AIR SUPPORT

OPERATIONS CENTER

T AITEMP

AO

AO

COOLING

VALVE

NETWORK

CONNECTION

NETWORK

CONNECTION

TO DIFFERENT

FAN COIL UNITS

REFER TO PLANS

TO DIFFERENT

FAN COIL UNITS

REFER TO PLANS

TO DIFFERENT

FAN COIL UNITS

REFER TO PLANS

TO DIFFERENT

FAN COIL UNITS

REFER TO PLANS

NETWORK

CONNECTION

FROM DIFFERENT

AIR HANDLING UNITS

REFER TO PLANS

TO DIFFERENT

AIR HANDLING UNITS

REFER TO PLANS

ERV-1 CONTROL DIAGRAM

ERV-2 CONTROL DIAGRAM ERV-3 CONTROL DIAGRAM

NTS

D U

C T

P R

E S

S U

R E

T R

A N

S M

IT

T

E R

E X

H A

U S

T A

IR

T

E M

P E

R A

T U

R E

A I

A I

A I

A I

A I

A I

NTS

D U

C T

P R

E S

S U

R E

T R

A N

S M

IT

T

E R

E X

H A

U S

T A

IR

T

E M

P E

R A

T U

R E

A I

A I

A I

A I

A I

NTS

D U

C T

P R

E S

S U

R E

T R

A N

S M

IT

T

E R

E X

H A

U S

T A

IR

T

E M

P E

R A

T U

R E

A I

A I

A I

A I

A I

AUTO/OFF: FANS SHALL BE AUTOMATICALLY ENABLED DURING OCCUPIED

TIMES AND SHALL RUN CONTINUOUSLY AS DESCRIBED BELOW WITH

DAMPERS OPEN. WHEN IN OFF POSITION FANS SHALL SHUT DOWN AND

EXHAUST AND OUTSIDE AIR DAMPER SHALL CLOSE. DAMPERS AND

ACTUATORS PROVIDED WITH UNIT.

SET-POINTS:

OCCUPIED SUPPLY AIR PRESSURE: 0.75” WC (ADJUSTABLE).

OCCUPIED VENTILATION EXHAUST PRESSURE: 1.0” WC (ADJUSTABLE).

DURING OCCUPIED TIMES THE EXHAUST FAN AND THE SUPPLY FAN SHALL RUN AT A FIXED

RPM.

CONTROL SYSTEM SHALL MONITOR THE FOLLOWING POINT:

1. DIRTY FILTER ALARM FOR OUTSIDE AIR AND EXHAUST AIR

SET AT 0.5” WC (ADJUSTABLE).

2. DDC SYSTEM SHALL PROVIDE AN ACTIVE DISPLAY OF THE

OUTSIDE AIR AND EXHAUST AIR FLOW RATES.

3. CONTRACTOR SHALL COORDINATE NUMBER AND TYPE OF POINTS

SHOWN IN THE DDC SYSTEM WITH THE CONTRACTING OFFICER.

HEATING COIL (HC-1) AND COOLING COIL (CC-1)

DDC SHALL MONITOR HEATING WATER CONTROL VALVE POSITION FOR HW TEMP RESET.

REFER TO BOILER SEQUENCE OF OPERATION.

THE HEATING AND COOLING COILS SHALL WORK TOGETHER WITHOUT

OVERLAPING (REHEATING) TO MAINTAIN ROOM SETPOINT FOR THE FITNESS AREA.

AUTO/OFF: FANS SHALL BE AUTOMATICALLY ENABLED DURING OCCUPIED

TIMES AND SHALL RUN CONTINUOUSLY AS DESCRIBED BELOW WITH

DAMPERS OPEN. WHEN IN OFF POSITION FANS SHALL SHUT DOWN AND

EXHAUST AND OUTSIDE AIR DAMPER SHALL CLOSE. DAMPERS AND

ACTUATORS PROVIDED WITH UNIT.

DURING OCCUPIED TIMES THE ERV EXHAUST FAN AND THE SUPPLY FAN SHALL

RUN TO PROVIDE VENTILATION AIR.

OCCUPIED TIME: CONTRACTOR SHALL COORDINATE WITH END USER.

CONTROL SYSTEM SHALL MONITOR THE FOLLOWING POINT:

1. DIRTY FILTER ALARM FOR OUTSIDE AIR AND EXHAUST AIR

SET AT 0.5” WC (ADJUSTABLE).

2. DDC SYSTEM SHALL PROVIDE AN ACTIVE DISPLAY OF THE

OUTSIDE AIR AND EXHAUST AIR FLOW RATES.

3. CONTRACTOR SHALL COORDINATE THE NUMBER AND TYPE OF POINTS

SHOWN WITH THE CONTRACTING OFFICER.

AUTO/OFF: FANS SHALL BE AUTOMATICALLY ENABLED DURING OCCUPIED

TIMES AND SHALL RUN CONTINUOUSLY AS DESCRIBED BELOW WITH

DAMPERS OPEN. WHEN IN OFF POSITION FANS SHALL SHUT DOWN AND

EXHAUST AND OUTSIDE AIR DAMPER SHALL CLOSE. DAMPERS AND

ACTUATORS PROVIDED WITH UNIT.

DURING OCCUPIED TIMES THE ERV EXHAUST FAN AND THE SUPPLY FAN SHALL

RUN TO PROVIDE VENTILATION AIR.

OCCUPIED TIME: CONTRACTOR SHALL COORDINATE WITH END USER.

CONTROL SYSTEM SHALL MONITOR THE FOLLOWING POINT:

1. DIRTY FILTER ALARM FOR OUTSIDE AIR AND EXHAUST AIR

SET AT 0.5” WC (ADJUSTABLE).

2. DDC SYSTEM SHALL PROVIDE AN ACTIVE DISPLAY OF THE

OUTSIDE AIR AND EXHAUST AIR FLOW RATES.

3. CONTRACTOR SHALL COORDINATE THE NUMBER AND TYPE OF POINTS

SHOWN WITH THE CONTRACTING OFFICER.

ENERGY RECOVERY UNIT ERV-1

ENERGY RECOVERY UNIT ERV-2

ENERGY RECOVERY UNIT ERV-3

SUPPLY/RETURN

AIRFLOW

SUPPLY/

EXHAUST

FILTER

PRESSURE

O A

E X

H A

U S

T A

IR

T

E M

P E

R A

T U

R E

S U

P P

L Y

A

IR

P R

E S

S U

R E

S U

P P

L Y

A

IR

T E

M P

E R

A T

U R

E

SUPPLY AIR TO

FAN COIL UNITS

E X

H A

U S

T F

R O

M R

E S

T R

O O

M S

A N

D B

R E

A K

R O

O M

FACTORY

DAMPER

HC-1

CC-1

TO FAN COIL FC-3

TO THE FITNESS AREA

D A

M P

E R

P O

S

IT

IO

N

FIL

TE

R

FILTER

SUPPLY/RETURN

AIRFLOW

SUPPLY/

EXHAUST

FILTER

PRESSURE

O A

E X

H A

U S

T A

IR

T

E M

P E

R A

T U

R E

E X

H A

U S

T

S U

P P

L Y

A

IR

T E

M P

E R

A T

U R

E

ROOF

OUTSIDE AIR

INTAKE HOOD

FACTORY

DAMPER

D A

M P

E R

P O

S

IT

IO

N

FIL

TE

R

FILTER

SUPPLY/RETURN

AIRFLOW

SUPPLY/

EXHAUST

FILTER

PRESSURE

O A

E X

H A

U S

T A

IR

T

E M

P E

R A

T U

R E

E X

H A

U S

T S

U P

P L Y

A

IR

T E

M P

E R

A T

U R

E

FACTORY

DAMPER

D A

M P

E R

P O

S

IT

IO

N

FIL

TE

R

FILTER

EXHAUST FROM REST ROOMS

AND BREAK ROOM 1

ROOF

RELIEF AIR

INTAKE HOOD

ROOF

OUTSIDE AIR

INTAKE HOOD

E X

H A

U S

T

RELIEF AIR

INTAKE HOOD

ROOF

TO FAN COIL FC-2

ROOF

OUTSIDE AIR

INTAKE HOOD

ROOF

RELIEF AIR

INTAKE HOOD

AIVALVE

POSITION

HEATING

VALVE

04/30/2023 ISSUED FOR CONSTRUCTION

1 07/27/2023 ADDENDUM #1

3. VIRTUAL METER VALUES SHALL BE CALCULATED USING STANDARD THERMODYNAMIC EQUATIONS FROM MEASURED DDC POINTS SUCH AS

AMPERAGES, AIR & WATER FLOW MEASUREMENT, SPEED SIGNALS, VFD FEEDBACKS, TEMPERATURE SENSORS, AND BALANCING INFORMATION FOR

CONSTANT VOLUME FANS AND PUMPS

2. REFER TO SPECIFICATION 230923.02 1.5 FOR SOFTWARE LICENSING

1. REFER TO SPECIFICATION 230900 1.4.11 ENERGY METERING FOR OVERALL REQUIREMENTS OF THE VIRTUAL METERING SYSTEM

NOTES:

UNIT HEATER UH-1,2,3 3 1 1

CABINET UNIT HEATER CUH-1,2,3 3 1 1

MAN COOLER MC-1A, B, C, D 4 1 1

EXHAUST FANS EF-1 TO 5 5 1 1

VAV TERMINAL UNITS VAV-100'S, 200'S, 300'S 49 1 1

FAN COILS UNITS FC-1 TO 12 12 3 1 1 1

ENERGY RECOVERY VENTILATOR ERV-1,2,3 3 3 1 1 1

COIL SCHEDULE CC-1, HC-1 2 2 1 1

AIR HANDLING UNITS AHU-1,2,3 3 3 1 1 1

PUMPS PUMPS 1A,B, 2A,B, 3,4,5 7 1 1

CHILLED WATER SECONDARY LOOP 1 1 1

DRY BED COOLER DB-1 1 1 1

CHILLERS CH-1,2 2 1 1

BOILER SECONDARY LOOP 1 1 1

BOILER B-1,2 BOIL-1,2 2 1 1

MECHANICAL EQUIPMENT DESIGNATION

QUANTITY OF

EQUIPMENT

QUANTITY OF

VIRTUAL

METERS

SUPPLY FAN

KWH

RETURN /

EXHAUST

FAN KWH

HEATING

BTU/HR

COOLING

BTU/HR

VFD

FEEDBACK

KWH

VIRTUAL METERS

THE FOLLOWING LISTS THE DIFFERENT VIRTUAL METERS THAT WILL BE CREATED FOR EACH TYPE OF EQUIPMENT

VIRTUAL ENERGY METERS

0 1" 2"

SCALE

FILENAME

CIVIL

STRUCTURAL

ARCHITECTURAL

ELECTRICAL

MECHANICAL

FIRE PROTECTION

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

C. STATSER

C. GIPSON

D. HOGAN

M. OSSANNA

T. PRICE

J. CAMPBELL

COMMUNICATIONS M. ADKISON

B

IM

/1

J V

C

H M

C a m p M u rr a y A

S O

G F a c ili ty /1

-M

F E

C .r v t

/2

/2

:3

:3

P M

M706 10078627

CHRIS MANZ

HDRE_ALL_DISCIPLINES.rte

HVAC SCHEDULES

CAMP MURRAY

ASOG FACILITY

AIR SUPPORT

OPERATIONS CENTER

4. ALL CONTROL VALVES SHALL BE 2-POSITION ON/OFF VALVES

3. CONTACTOR AND DISCONNECT BY ELECTRICAL.

FLOW PATTERN TO MAXIMIZE AIR DISTRIBUTION AT FLOOR.

2. PROVIDE WITH LOUVER CONE TO DIRECT AIR DOWN. ADJUST TO MAXIMIZE AIR

1. UNIT HEATERS SHALL BE MOUNTED APPROXIMATELY 10' ABOVE THE FINISHED FLOOR.

NOTES:

NOTES 1,2,3 1,2,3 1,3,4,5

MANUFACTURER STERLING STERLING STERLING

MODEL VS-40* VS-40* HS-108

AREA/LOCATION SERVED 1407 FIRE SUPPLY 1227 MECH 1408 VEHICLE BAY

WEIGHT 35 LBS 35 LBS 50 LBS

DIMENSIONS (IN) 18"X18"X7" 18"X18"X7" 24"X18"X14"

CONTROL VALVE FAILURE... OPEN OPEN OPEN

CONTROL VALVE ARRANGEMENT 2-WAY 2-WAY NOTE 5

CONTROL VALVE Cv 0.8 0.8 1.9

CONTROL VALVE SIZE 1/2" 1/2" 1/2"

RUNOUT PIPE SIZE 3/4" NPT 3/4" NPT 3/4" NPT

FLUID 140⁰ @ 30% PG 140⁰ @ 30% PG 140⁰ @ 30% PG

FLOW RATE 1 GPM 1 GPM 3 GPM

MBH 16.7 16.7 16.7

H E

A T

IN

G

EAT DEG F 60 60 60

VOLTS / PHASE 110/1 110/1 110/1

HP 1/40 1/40 1/12

RPM 1,550 1,550 1,000

DISCHARGE ORIENTATION DOWNFLOW DOWNFLOW HORIZONTAL

OUTLET VELOCITY (FPM) 877 877 1,000

G E

N E

R A

L

CFM 600 600 1,800

DESIGNATION UH-1 UH-2 UH-3A & 3B

UNIT HEATER SCHEDULE

B. ACTUATOR TO BE OUTSIDE OF AIR STREAM.

A. FRAME TYPE TO BE COORDINATED WITH CONTRACTOR.

GENERAL NOTES (APPLY TO ALL DAMPERS):

4. DAMPER SHALL MEET AMCA STANDARD 511 1A OF NOT GREATER THAN 3 CFM AT 1" W.C.

3. PROVIDE ACTUATOR EQUIVALENT TO BELIMO AFB24 WITH 180 INCH POUNDS OF TORQUE WITH SPRING RETURN.

2. PROVIDE ACTUATOR EQUIVALENT TO BELIMO NFB24-MFT WITH 90 INCH POUNDS OF TORQUE WITH SPRING RETURN.

1. PROVIDE ACTUATOR EQUIVALENT TO BELIMO LF24 WITH 35 INCH POUNDS OF TORQUE AND SPRING RETURN.

KEY NOTES:

NOTES: 1, 4 NOT USED NOT USED NOT USED NOT USED NOT USED 2,4 2,4 2,4 2,4 2,4 2,4

MANUFACTURER RUSKIN NOT USED NOT USED NOT USED NOT USED NOT USED RUSKIN RUSKIN RUSKIN RUSKIN RUSKIN RUSKIN

MODEL CD36 NOT USED NOT USED NOT USED NOT USED NOT USED CD36 CD36 CD36 CD36 CD36 CD36

LOCATION EF-5 MECH PLATFORM NOT USED NOT USED NOT USED NOT USED NOT USED 1408 VEHICLE BAY 1408 VEHICLE BAY 1408 VEHICLE BAY 1407 FIRE SUPP 1407 FIRE SUPP 1227 MECH

REQUIRED TORQUE FOR DAMPER... 25 IN-LBS NOT USED NOT USED NOT USED NOT USED NOT USED 45 IN-LBS 25 IN-LBS 25 IN-LBS 25 IN-LBS 25 IN-LBS 45 IN-LBS

FAIL POSITION CLOSED NOT USED NOT USED NOT USED NOT USED NOT USED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED

OPERATION 2-POSTION NOT USED NOT USED NOT USED NOT USED NOT USED 2-POSTION 2-POSTION 2-POSTION 2-POSTION 2-POSTION 2-POSTION

BLADES ALUMINUM WITH SEALS NOT USED NOT USED NOT USED NOT USED NOT USED ALUMINUM WITH SEALS ALUMINUM WITH SEALS ALUMINUM WITH SEALS ALUMINUM WITH SEALS ALUMINUM WITH SEALS ALUMINUM WITH SEALS

LINKAGE CONCEALED IN FRAME NOT USED NOT USED NOT USED NOT USED NOT USED CONCEALED IN FRAME CONCEALED IN FRAME CONCEALED IN FRAME CONCEALED IN FRAME CONCEALED IN FRAME CONCEALED IN FRAME

FRAME AND BLADE MATERIAL ALUMINUM NOT USED NOT USED NOT USED NOT USED NOT USED ALUMINUM ALUMINUM ALUMINUM ALUMINUM ALUMINUM ALUMINUM

BLADE ACTION PARALLEL BLADE NOT USED NOT USED NOT USED NOT USED NOT USED PARALLEL BLADE PARALLEL BLADE PARALLEL BLADE PARALLEL BLADE PARALLEL BLADE PARALLEL BLADE

PRESSURE LOSS ACROSS DAMPER 0.06' NOT USED NOT USED NOT USED NOT USED NOT USED 0.1" 0.06' 0.06' 0.06' 0.06' 0.09"

FACE VELOCITY (FEET/MIN) 675 NOT USED NOT USED NOT USED NOT USED NOT USED 213 675 675 675 675 300

CFM MAX. 1,200 NOT USED NOT USED NOT USED NOT USED NOT USED 850 1,700 235 235 235 1,200

FACE AREA (SQUARE FEET) 1.8 NOT USED NOT USED NOT USED NOT USED NOT USED 4.0 1.8 0.4 0.4 2.3 4.0

DAMPER HEIGHT (INCHES) 16 NOT USED NOT USED NOT USED NOT USED NOT USED 24 16 8 8 18 24

DAMPER WIDTH (INCHES) 16 NOT USED NOT USED NOT USED NOT USED NOT USED 24 16 8 8 18 24

SERVICE EXHAUST NOT USED NOT USED NOT USED NOT USED NOT USED INTAKE EXHAUST EXHAUST EXHAUST INTAKE INTAKE

DESIGNATION MD-1 MD-2 MD-3 MD-4 MD-5 MD-6 MD-7A, 7B MD-8 MD-9 MD-10 MD-11 MD-12

MOTORIZED DAMPER SCHEDULE

FC-2 = 1080 CFM

AHU-3 = 2900 CFM

AHU-2 = 2100 CFM

AHU-1 = 1300 CFM

5. SUPPLY RATE IS AS FOLLOWS:

FC-2 = 865 CFM

AHU-3 = 2320 CFM

AHU-2 = 1680 CFM

AHU-1 = 1040 CFM

4. EXHAUST RATE IS AS FOLLOWS:

3. SUPPLY AIR IS SUM OF OA TO AHU-1,2,3 AND FC-2.

2. BALANCE ERV-2 TO SO THE RETURN AIR TOTAL IS AS SHOWN.

1. EXHAUST AIR FLOW IS THE SUM OF THE RESTROOM AREA + BREAK ROOM 2.

NOTES:

5. ALL UNITS SHALL BE FURNISHED WITH DOUBLE WALL CONSTRUCTION.

4. PROVIDE UNITS WITH INTEGRAL LOW LEAKAGE DAMPERS (3 CFM AT 1" WC MAX) AND ACTUATOR ON ALL OUTSIDE AND EXHAUST

AIR DUCTS.

3. CONTROLS SHALL BE COMPATIBLE WITH BUILDING DDC SYSTEM.

2. PROVIDE WITH SINGLE POINT ELECTRICAL CONNECTION, WITH STARTER AND DISCONNECT.

1. UNITS SHALL BE CONSTANT VOLUME.

APPLIES TO ALL:

NOTES: 1 2 3,4

MANUFACTURER RENEWAIRE RENEWAIRE RENEWAIRE

MODEL HE-3X HE-2X HE2XINV

AREA SERVED

FITNESS

AREA/RESTROOMS

FC-3

SECURE FAN COILS AHU-1,2,3

FC-2

PRE-FILTER EFF MERV 8 MERV 8 MERV 8

WEIGHT LBS. 900 600 2,600

LENGTH INCHES 72" 59" 81"

WIDTH INCHES 63" 42" 125"

HEIGHT INCHES 44" 35" 71''

VOLTAGE 460/3 460/3 460/3

RETURN FAN MOTOR HP 3 HP WITH BELT DRIVE 2 HP WITH BELT DRIVE 5 HP WITH BELT DRIVE

SUPPLY FAN MOTOR HP 3 HP WITH BELT DRIVE 2 HP WITH BELT DRIVE 5 HP WITH BELT DRIVE

OUTSIDE AIR ENTERING AIR TEMP (DB/WB) - SUMMER 85/65 85/65 85/65

OUTSIDE AIR ENTERING AIR TEMP (DB/WB) - WINTER 29/21 29/21 29/21

RETURN ENTERING AIR TEMP (DB/WB) - SUMMER 78/63 78/63 78/63

RETURN ENTERING AIR TEMP (DB/WB) - WINTER 70/54 70/54 70/54

EXTERNAL STATIC PRESSURE (EXHAUST) 1.25" 1" 1

EXHAUST CFM MAX 2,880 600 5,905

SUPPLY LEAVING AIR TEMP (DB/WB) - SUMMER 79/63 79/63 79/63

SUPPLY LEAVING AIR TEMP (DB) - WINTER 55/42 58/44 53/41

EXTERNAL STATIC PRESSURE (SUPPLY) 1.0" 1" 1"

SUPPLY CFM MAX 3,070 715 7,380

DESIGNATION ERV-1 ERV-2 ERV-3

DEDICATED ENERGY RECOVERY VENTILATOR UNIT SCHEDULE

04/30/2023 ISSUED FOR CONSTRUCTION

1 07/27/2023 ADDENDUM #1

Specifications

Construct ASOG Complex Contract Number: ETRD169847 Type B-3 Final 30 September 2021

SECTION 01 33 00

SUBMITTAL PROCEDURES

08/18

PART 1 GENERAL

1.1 SUMMARY

1.1.1 Submittal Information

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.

1.1.2 Project Type

The Contractor's Quality Control (CQC) System Manager are to check and approve all items before submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:

Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.

The Contractor and the Designer of Record (DOR), if applicable, are to check and approve all items before submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified.