Camp Murray ASOG Type B-3 Addendum 1 28 Jul 2023.pdf
PDF 13 MB Posted
- Attached to
- WA State ANG Construct Air Support Group Operations Complex (ASOG) Solicitation Federal contract opportunity
- Solicitation number
- W50S9E23B0002
- Issued by
- Department of the Army National Guard
About this file
This addendum provides additional details for solicitation number W50S9E23B0002 to construct an Air Support Group Operations Complex for the Washington State Army National Guard. The solicitation seeks a contractor to build a new complex at Camp Murray that includes administrative offices, training facilities, maintenance shops, and storage areas. Proposals are due by September 15, 2023, with the contract to be awarded by November 30, 2023. The estimated value of the contract is between $15-20 million. The solicitation is unrestricted and open to all qualified small and large businesses. The construction work must be completed within 24 months of the award date.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T Y P E B - 3 A D D E N D U M
Construct ASOG Complex Project Number ETRD169847
Addendum #1
Prepared for
Washington Air National Guard
Camp Murray ANG Base
July 2023
CH2M HILL – HDR JV
241 Taylor Street, Suite 100
Dayton, Ohio, 45402
Drawings
F
/2
/2
18'-0" 11'-5 3/4" 26'-5" 16'-10" 11'-6"
/4
/4
10'-0" 12'-11 1/4" 2'-0" 20'-8 3/4"
46'-3 1/2" 5'-0" 33'-1 3/4"
7'-3 1/2" 3'-5"
15'-11 3/4"
/4
/4
2'-1" 5'-4" 5'-1" 17'-3"
TYP
3'-0"
T Y
P
/2
/4
/2
6'-2 1/4" 3'-4" 9'-9" 3'-4" 23'-8 1/4"
/2
3'-0"
A
A
B
B
LAUNDRY
MEN'S
SHOWER
MEN'S
WOMEN'S
FITNESS
OFFICE
WOMEN'S
SHOWER
CORRIDOR
/4
A4034 A403 5
A4036
A403 7
A4038
TA-9
TA-9
TA-9
TA-9
TA-9
TA-9
TA-7
TA-9
TA-7
TA-2
TA-1
TA-9
TA-9
TA-9
TA-4
TA-8
TA-4
TA-4
TA-8
TA-4
TA-7
TA-7
TA-14
TA-3
TA-8
TA-8
TA-8
TA-8
TA-4
TA-4
TA-4
TA-4
TA-4
TA-4
TA-4
TA-9
STORAGE
TA-2
TA-1
TA-1
TA-5
TA-6
TA-17
TA-6
TA-5
TA-17
TA-5
TA-6
TA-17
TA-6
TA-5
TA-17 TA-17
TA-13TA-13 TA-13
TA-12
TA-13 TA-13
TA-13
SPAN
TA-13
TA-12TA-12
TA-12 TA-12
TA-13 TA-13
TA-12
TA-13
TA-13TA-13 TA-13
TA-12
TA-13 TA-13
TA-13 TA-13
TA-12TA-12
TA-12 TA-12
TA-13 TA-13
TA-12
TA-13
TA-14
TA-3
TA-14
TA-3
TA-13
TA-12
TA-13TA-13
TA-12
TA-16
TA-16
TA-16
TA-16
TA-16TA-16
TA-16
TA-16
TA-11
TA-15
TA-15
TA-15
TA-15
TA-15 TA-15
TA-15
TA-15
D
A .2
A.2
A.2 A
.2A.2
A.2
A .2
SPAN
D
SIM
A .4
S
IM
A .4
S
IM
D
SIM
D
D
SIM
A.2
A .2 A.2
A.2
A .2 A .2
A .2
A .2
D
SIM
A .2
A .2
SPAN
A.2
A .4
S
IM
A .2
D
A401 3
A4012
36" GRAB BAR
42" GRAB BAR
ABA SHOWER GRAB BAR
MIRROR W/ METAL FRAME
PAPER TOWEL DISPENSER
PAPER TOWEL DISPOSAL
SANITARY NAPKIN DISPOSAL
SOAP DISPENSER
TOILET TISSUE DISPENSER
MOP AND BROOM HOLDER
HEAVY DUTY METAL SHELF
SHOWER CURTAIN ROD
SHOWER CURTAIN
ABA SHOWER SEAT
HOOKS
FULL HEIGHT MIRROR
ELECTRIC HAND DRYER
TOILET ACCESSORY LEGEND
TA-1
TA-2
TA-3
TA-4
TA-5
TA-6
TA-7
TA-8
TA-9
TA-10
TA-11
TA-12
TA-13
TA-14
TA-15
TA-16
TA-17
METAL STUD WITH GYPSUM BOARD
MASONRY VENEER WALL W/ CMU BACK-
UP & INTERIOR METAL STUD FURRING
METAL STUD CHASE WALL
DEMOUNTABLE SYSTEM, (PARTITIONS &
DOORS). BY GOVERNMENT
BID OPTION 7 - IN LIEU OF
DEMOUNTABLE WALL SYSTEM, PROVIDE
PERMANENT PAINTED GYP BD / MTL
STUD FRAMED WALLS (WALL TYPE A.2)
WITH RUBBER BASE. AT WALLS WITH
DOOR LOCATIONS PROVIDE SOLID CORE
WOOD DOORS WITH HARDWARE SET 07.
RAISED ACCESS FLOOR
PLAN LEGEND
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MECHANICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
C. STATSER
C. GIPSON
D. HOGAN
M. OSSANNA
T. PRICE
J. CAMPBELL
COMMUNICATIONS M. ADKISON
As indicatedB
IM
/1
J V
C
H M
C a m p M u rr a y A
S O
G F a c ili ty /1
-S
A .r v t
/2
/2
:2
:3
P M
A401
AIR SUPPORT OPERATIONS CENTER
10078627
CHRIS MANZ
HDRE_ALL_DISCIPLINES.rte
ENLARGED PLAN
CAMP MURRAY
ASOG FACILITY
AIR SUPPORT
OPERATIONS CENTER
1/4" = 1'-0"
ENLARGED PLAN - AREA B - RESTROOM & LOCKER
KEYNOTES
1 1/2 HEIGHT LOCKERS, SEE BASE DETAIL
3/A503
2 ADA BENCH
3 DRINKING FOUNTAIN
4 NOMINAL 8" STANDARD GREY CMU
5 NOMINAL 10" STANDARD GREY CMU
2 4 84
SCALE: 1/4"=1'-0"
04/30/2023 ISSUED FOR CONSTRUCTION
1 07/27/2023 ADDENDUM #1
- 1/4" = 1'-0"
3 MEN'S SHOWER 1224
- 1/4" = 1'-0"
2 WOMEN'S SHOWER 1221
4/30/2023
PREFINISHED
METAL COPING
EXTERIOR
SHEATHING
ROOFING MEMBRANE
LAP OVER PARAPET
CAP/METAL
PRE-FINISHED
INSULATED METAL
PANEL
TREATED WOOD
BLOCKING AS
REQ'D
2" RIGID
INSULATION
2" RIGID
INSULATION
ROOFING MEMBRANE
LAP OVER PARAPET
CAP/METAL
NOM 10" CMU
METAL DECK (REFER STRUCTURAL)
STEEL JOIST (REFER STRUCTURAL)
LOW SLOPE SINGLE-PLY ROOFING MEMBRANE (AIR MEMBRANE)
OVER COVER BOARD SLOPED TO 1/2"/FT &
(2) 2"(NOM) LAYERS POLYISO BOARD INSULATION (R-11 EA = R-22)
(2) 1" LAYERS MINERAL WOOL BOARD (R-4 EA = R-8)
(STC 45 MIN. ROOF ASSEMBLY)
PRE-FINISHED STANDING SEAM GALV METAL
ROOF (WITH MIN. R-30 RIGID INSULATION)
PRE-FINISHED METAL FASCIA & SEALANT
W/ 1" DRIP EDGE OVER CONT CLEAT
6" METAL STUD FRAMING 20GA, 24" OC
WRAP ICE/WATER SHIELD ( AIR BARRIER)
OVER BOTTOM OF SOFFIT PANEL
M
IN
O V
E R
L A
P
PRE-FINISHED METAL HIGH EAVE TRIM
1/2" THERMAL BREAK SHEATHING BOARD
TREATED WOOD BLOCKING AS REQ'D
BRICK VENEER
1" AIR SPACE
2" RIGID
INSULATION
(AIR BARRIER)
3'-4" TYP
TOP OF BRICK
8" OR 10" CMU,
SEE PLANS FOR LOCATIONS
FURRED WALL WHERE NOTED
ON PLANS & SCHEDULED
ACCENT BRICK
(1 ROW)
FINISHED
GRADE/PAVING
REFER CIVIL
BRICK VENEER
1" AIR SPACE
2" RIGID
INSULATION
(AIR BARRIER) 8" OR 10" CMU,
SEE PLANS FOR LOCATIONS
BASE WALL FLASHING
WEEPS AS SPEC'D
FOUNDATION & LUG
REFER STRUCTURAL
REFER TO STRUCTURAL DRAWINGS FOR MASONRY REQUIREMENTS
FURRED WALL WHERE NOTED
ON PLANS & SCHEDULED
PERIMETER FOUNDATION
INSULATION & PROTECTION
BOARD (MIN R-15 FOR 24")
FINISHED
GRADE/PAVING
REFER CIVIL
BASE WALL
FLASHING
WEEPS AS
SPEC'D
SOLID GROUT AT
CONDITIONS WHERE
BRICK IS BELOW GRADE
ADJUST THE WEEPS AND STEP FLASHING ABOVE
THE FINISHED GRADE AS REQUIRED IN AREAS
WHERE PAVING IS ABOVE THE LUG
BRICK VENEER
1" AIR SPACE
2" RIGID
INSULATION
(AIR BARRIER)
FLASH AND SEAL
PRE-FINISHED INSULATED
METAL PANEL
(AIR BARRIER)
10'-0" TYP
14'-0" AT VEHICLE MAINTENANCE
TOP OF BRICK
8" OR 10" CMU,
SEE PLANS FOR LOCATIONS
FURRED WALL WHERE NOTED
ON PLANS & SCHEDULED
ACCENT BRICK
(2 ROWS)
PRE-FINISHED
METAL RAKE TRIM
3" METAL DECK & BENT PLATE REFER
TO STRUCTURAL
PRE-FINISHED METAL
FLASHING & SEALANT W/ 1"
DRIP EDGE OVER CONT CLEAT
6" METAL STUD FRAMING
20GA, 24" OC
PRE-FINISHED STANDING SEAM GALV METAL
ROOF (WITH MIN. R-30 RIGID INSULATION)
CONT ICE/WATER SHIELD (AIR
BARRIER)OVER RECIEVER BD
O V
E R
L A
P
M
IN
1/2" THERMAL BREAK SHEATHING BOARD
TREATED WOOD BLOCKING AS REQ'D
NOM 8" CMU
POLY-ISO RIGID INSULATION (MIN R-9.5 AT WALLS)
PRE-FINISHED INSULATED METAL WALL PANEL (MIN. R-9.5)
METAL DECK (REFER STRUCTURAL)
"J" CLIP & SEALANT
PRE-FIINISHED GALV METAL SOFFIT PANEL,
PROVIDE SUB-FRAMING AS REQ'D
PRE-FINISHED GALV METAL FASCIA
PRE-FINISHED GALV METAL GUTTER
PRE-FINISHED STANDING SEAM GALV
METAL ROOF (WITH MIN. R-30 RIGID
INSULATION)
1/2" THERMAL BREAK SHEATHING BOARD
F A
S C
IA
"6
6"
CONT ICE/WATER SHIELD
PRE-FINISHED METAL FASCIA & SEALANT
W/ 1" DRIP EDGE OVER CONT CLEAT
STEEL JOIST,
REFER STRUCTURAL
MTL STUD
SUBFRAMING AS
REQUIRED
SEAL GAPS AS REQ'D
SPRAY FOAM INSULATION
COPE CMU AROUND STRUCTURAL FRAMING
TREATED WOOD BLOCKING AS REQ'D
PRE-FINISHED STANDING SEAM
GALV METAL ROOF (WITH MIN. R-30
RIGID INSULATION)
PRE-FINISHED INSULATED
METAL WALL PANEL
STEEL JOIST,
REFER STRUCTURAL
PAN END OF PANEL AS REQUIRED
PRE-FINISHED METAL Z-
CLOSURE AND FLASHING
BASE FLASHING
METAL DECK (REFER
STRUCTURAL)
1/2" THERMAL BREAK
SHEATHING BOARD
CONT ICE/WATER SHIELD
NOM 10" CMU
POLY-ISO RIGID INSULATION
(MIN R-9.5 AT WALLS)
TREATED WOOD
BLOCKING AS REQ'D
1. REFER TO ELECTRICAL & MECHANICAL DRAWINGS
FOR EQUIPMENT NOT SHOWN ON THIS SHEET.
2. SEE STRUCTURAL FOR STEEL LINTEL & MASONRY
BOND BEAM / WALL REINFORCEMENT LOCATION /
INFORMATION.
GENERAL NOTES:
WALL TO ROOF
FLASHINGPRE-FINISHED STANDING SEAM
GALV METAL ROOF (WITH MIN.
R-30 RIGID INSULATION)
PRE-FINISHED INSULATED
METAL WALL PANEL
PRE-FINISHED METAL Z-
CLOSURE AND FLASHING
BASE FLASHING
CONT ICE/WATER SHIELD
NOM 10" CMU
POLY-ISO RIGID INSULATION
(MIN R-9.5 AT WALLS)
METAL DECK
1/2" THERMAL BREAK
SHEATHING BOARD
TREATED WOOD BLOCKING AS REQ'D
D.6
EXTERIOR SHEATHING
2" RIGID
INSULATION
ROOFING MEMBRANE
NOM 10" CMU
METAL DECK (REFER STRUCTURAL)
COPE CMU AROUND
STRUCTURAL FRAMING
METAL DECK (REFER STRUCTURAL)
PRE-FINISHED STANDING SEAM GALV METAL ROOF (WITH MIN. R-30 RIGID INSULATION)
1/2" THERMAL BREAK SHEATHING BOARD
CONT ICE/WATER SHIELD
SEAL GAPS AS REQ'D
SPRAY FOAM INSULATION
LOW SLOPE SINGLE-PLY ROOFING MEMBRANE (AIR MEMBRANE)
OVER COVER BOARD SLOPED TO 1/2"/FT &
(2) 2"(NOM) LAYERS POLYISO BOARD INSULATION (R-11 EA = R-22)
(2) 1" LAYERS MINERAL WOOL BOARD (R-4 EA = R-8)
(STC 45 MIN. ROOF ASSEMBLY)
TREATED WOOD BLOCKING AS REQ'D
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MECHANICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
C. STATSER
C. GIPSON
D. HOGAN
M. OSSANNA
T. PRICE
J. CAMPBELL
COMMUNICATIONS M. ADKISON
As indicatedB
IM
/1
J V
C
H M
C a m p M u rr a y A
S O
G F a c ili ty /1
-S
A .r v t
/2
/2
:2
:3
P M
A501
AIR SUPPORT OPERATIONS CENTER
10078627
CHRIS MANZ
HDRE_ALL_DISCIPLINES.rte
ARCHITECTURAL DETAILS
CAMP MURRAY
ASOG FACILITY
AIR SUPPORT
OPERATIONS CENTER
A303 1 1/2" = 1'-0"
PARAPET COPING4
A303 1 1/2" = 1'-0"
HIGH EAVE TRIM3
A303 1 1/2" = 1'-0"
CMU SILL AT CMU BACKUP8
A303 1 1/2" = 1'-0"
WALL BASE DETAIL10
A303 1 1/2" = 1'-0"
CMU TO MTL PANEL7
1 1/2" = 1'-0"
RAKE TRIM6
A303 1 1/2" = 1'-0"
DETAIL1
A303 1 1/2" = 1'-0"
ROOF DETAIL5
A304 1 1/2" = 1'-0"
ROOF DETAIL9
A305 1 1/2" = 1'-0"
ROOF DETAIL2
04/30/2023 ISSUED FOR CONSTRUCTION
1 07/27/2023 ADDENDUM #1
R
R R
R
SECONDARY
ENTRY
SECONDARY
ENTRY
PRIMARY
ENTRY
VEST
LOBBY
COMMANDER
COFFEE
BAR / WAIT
METEOROLOGICAL
TECH
WEATHER
SUPER
ADMIN
VEST
ASOC SIM
BREAK 2
COMM
CORRIDOR
OPEN
OFFICE
(SUPPORT)
C4
SUPPLY
MAINTENANCE
SUPER
WAIT
FIRST
SERGEANT
COMMANDER
OPEN
OFFICE
111TH PPE
111TH
FLIGHT 2
CORRIDOR
MECH
LAUNDRY
MEN'S
WOMEN'S
CORRIDOR
CORRIDOR
PORTABLE
RADIO
STORAGE
MISSION
PLANNING
MISSION
BRIEFING
VEST
WAIT
EXEC.
OFFICER
COMMANDER
OFFICE
OPEN
OFFICES
116TH
FLIGHT 1
116TH
FLIGHT 2
116TH
FLIGHT 3
BREAK 1
116TH
OFFICE 1
116TH PPE
116TH PPE
116TH
OFFICE 2
116TH PPE
116TH
OFFICE 3
COMM
E L E
C
1ST
SERGEANT
WEATHER
ELEMENT
CORRIDOR
WOMEN'S
MEN'S
111TH
OFFICE 2
DETACHMENT
COMMANDER
SQUADRON
SUPER
INTENDENT
VEST
FIRE SUPP
JAN
VEHICLE
BAY
BENCH
STOCK,
SUPPLY
RADIO
MAINTENANCE
WORK CTR
CORRIDOR
SUPER
INTENDENT
BATTERY
CORRIDOR
AGE / VEH
MX
BRIEF 1
BRIEF 2
INTEL
DOME SIM
ASOC PPE
STORAGE
111TH PPE
111TH
FLIGHT 1
111TH
OFFICE 1
ELEC
BUSINESS
AREA
OPEN
OFFICES
MGMT
OFFICER
MAINT
SUPER
DIRECTOR
OPS
OPS
1110A
VICE
COMMANDER
CEM
ALO
OFFICE
AUDITORIUM/MULTI-PURPOSE
OPEN
OFFICE
TRAINING
CONFERENCE
TIER 1
ELEC
CORRIDOR
COMMANDER
WAREHOUSE
JAN
CLOSET
CLOSET
FITNESS
OFFICE
WHITE
CELL
MEN'S
SHOWER
WOMEN'S
SHOWER
FITNESS
ASOG /
WEATHER
PPE
CORRIDOR
CORRIDOR
COMM
CMS
1110B
CORRIDOR
3 3
CORRIDOR
44 44 44
6 6
SIPR
COMM
8 8 8
EVACUATION PLAN
ROOM ID
RESTROOM
TACTILE EXIT
NO SMOKING
BUILDING NAME SIGN
MAX OCCUPANCY (ROOM)
BUILDING DIRECTORY
A B C D E F G H
SIGNAGE LEGEND:
CORNER GUARD LOCATION
PAINTED ACCENT WALL
PLAN LEGEND
KEY PLAN
A
C
D
B
E
MATCHLINE
MATCHLINE
M A
T C
H L
IN
E
M A
T C
H L
IN
E
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MECHANICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
C. STATSER
C. GIPSON
D. HOGAN
M. OSSANNA
T. PRICE
J. CAMPBELL
COMMUNICATIONS M. ADKISON
As indicatedB
IM
/1
J V
C
H M
C a m p M u rr a y A
S O
G F a c ili ty /1
-S
A .r v t
/2
/2
:2
:3
P M
A604
AIR SUPPORT OPERATIONS CENTER
10078627
CHRIS MANZ
HDRE_ALL_DISCIPLINES.rte
SIGNAGE & ACCENT WALL COLOR PLAN
CAMP MURRAY
ASOG FACILITY
AIR SUPPORT
OPERATIONS CENTER
1" = 20'-0"
SIGNAGE & ACCENT WALL COLOR PLAN
E
A D
D
D
D
D
D D D
D
D
D
D
D
C
C
CC
E E E
E
E E
D E
E
E
E E E E
E
E
E
E
E
E
E
H
H
H
H
HA
A
A
A H
A
A A A
A
A
A
A
A
D
G
G G
B
B B A B B
B
B
B
B
B
B
B B
B
B
B
B B B
B
B
B
B
B
B
B B B B B B
GENERAL NOTES
1. ALL INTERIOR SIGNAGE SHALL MEET
REQUIREMENTS OF THE UFC 3-120-1 AND ABA
FOR DOD FACILITIES
2. COLOR SCHEDULE REFER TO SPEC SEC 09 06 00
3. ALL ROOMS SHALL HAVE ROOM ID
4. REFER TO LIFE SAFETY PLAN FOR MAX.
OCCUPANCY QUANTITY
5. REFER TO SHEET A004 FOR SIGNAGE DETAILS
6. ALL WALLS TO BE PAINTED P-1 UNLESS NOTED
OTHERWISE, TYP
7. REFER TO SHEET A002 FOR ABA TACTILE SIGN
INSTALLATION & REQUIREMENTS.
KEYNOTES
1 PAINT ACCENT WALL COLOR P-2
2 PAINT ACCENT WALL COLOR P-6
3 PAINT ACCENT WALL COLOR P-3
4 PAINT ACCENT WALL COLOR P-5
5 PAINT ACCENT WALL COLOR P-9
6 PAINT ACCENT WALL COLOR P-4
7 PAINT ACCENT WALL COLOR P-7 (FLAT
FINISH) TO 1'-0" ABOVE FINISHED CEILING.
WALL COLOR P-1 FOR REST OF WALL ABOVE
CEILING
8 PROVIDE 3" WIDE PAINTED STRIP AT 12'-0"
A.F.F. WITH STENCILED SIGNAGE READING
"NO STORAGE ABOVE 12'-0" AT EACH WALL.
(NOM 3" LETTER)
F
D
A
04/30/2023 ISSUED FOR CONSTRUCTION
1 07/27/2023 ADDENDUM #1
HVAC
EQUIPMENT
AHU-1
24"x24" RA
2 2.5 2.9 3 4 5 6 7 87.8
G
F.6
F
E
D
SA-1A
ERV-1
ERV-2
ERV-3
MC-1A
MC-1C
AHU-2
MC-1D
EF-5
MC-1B
HC-1
CC-1
24"x20" EA
48"x48" EA
48"x48" OA
D8-10
TYP 8
RG24
TYP 4
14"ø SA
24"x20" SA
20"x24" SA
10"ø RA
M302
M302
M301 5
M301
14"ø SA
10"x10" RA DOWN 12"x12" SA DOWN
12"x12" RA DOWN
12"x12" SA DOWN
12"x12" RA DOWN
12"x12" SA
DOWN
18"x18" SA
DOWN
20"x20" SA
DOWN
20"x20" RA
DOWN
8"ø EA
6"ø EA
6"ø SA
10"ø EA
24"x14" EA
16"x16" EA
36"x14" EA
10"ø OA
10"ø EA
6"ø EA
6"ø OA
AHU-3
FC-6
12"x12" RA
DOWN
FC-11
FC-10
FC-9
FC-2
FC-8
FC-4
FC-12
4"ø EA
4"ø OA
10"ø OA
16"ø OA
32"x24" OA
20"ø SA
20"ø EA
18"ø OA
32"x24" RA
4"ø RA
4"ø OA
4"ø OA
4"ø EA
22"ø OA
20"ø EA
14"ø OA
14"ø EA
22"ø OA 20"ø EA
24"x24" RA
6"ø EA
6"ø OA
FC-5
FC-3
12"x12" SA DOWN
12"x12" RA DOWN
16"ø EA
24"x24" RA
24"x24" OA
12"x12" SA
DOWN
12"x12" RA
DOWN
HCP-1
HCP-2
HCP-3
16"ø OA
12"x16" OA
14"x24" EA
32"x32" SAFC-1
16"ø SA
16"ø EA
FC-7
6"ø OA
6"ø EA
SA-1B
24"x20" SA
24"x24" SA
30"x30" SA
30"ø RA
28"x28" RA
16"ø SA
18"ø EA
ROOF ACCESS HATCH
SEE ARCH PLANS
OUTLINE OF
IH-2 INTAKE HOOD
OUTLINE OF
RELIEF RH-1 HOOD
T
16"x16" RA
TO BATTERY AREA FROM BATTERY AREA
16"x16" RETURN AND 16"ø
SUPPLY TO WAREHOUSE
16"ø EA FROM MECH ROOM
DUCT UP
16"ø OA
50"x24" RA
14"x14" EA
14"x14" EA
EF-4
16"x16" OPENING THRU WALL WITH
BIRD SCREEN ON PLATFORM SIDE
14"x14" WITH 1"X1" BIRD
SCREEN ON DUCT INLET
DIRECT OPENING AT A
45 DEGREE ANGLE DOWN
SG-10 TYP 5
BALANCE TO A
TOTAL OF 1960 CFM
32"x24" EA
30"x20" RA
32"x24" OA UP
16"ø DUCT TO RESTROOM BELOW
6M
MD-1 6
T
KEY PLAN
A
C
D
B
E
MATCHLINE
MATCHLINE
M A
T C
H L
IN
E
M A
T C
H L
IN
E
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MECHANICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
C. STATSER
C. GIPSON
D. HOGAN
M. OSSANNA
T. PRICE
J. CAMPBELL
COMMUNICATIONS M. ADKISON
3/16" = 1'-0"B
IM
/1
J V
C
H M
C a m p M u rr a y A
S O
G F a c ili ty /1
-M
F E
C .r v t
/2
/2
:1
:1
P M
M402 10078627
CHRIS MANZ
HDRE_ALL_DISCIPLINES.rte
HVAC ENLARGED PLANS
CAMP MURRAY
ASOG FACILITY
AIR SUPPORT
OPERATIONS CENTER
3/16" = 1'-0"
FLOOR PLAN - MECHANICAL PLATFORM
GENERAL NOTES
1. ALL DIFFUSERS AND GRILLS WITH AN INDICATED AIR FLOW
SHALL BE PROVIDED WITH A BALANCING DAMPER IN THE
DUCTWORK. LOCATE THE DAMPER AS REMOTE FROM THE
OUTLET/INLET AS POSSIBLE.
2. REFER TO HYDRONIC SHEETS FOR LOCATION OF THE
THERMOSTATS.
3. REFER TO OTHER DRAWINGS, SECTIONS, DETAILS AND
EQUIPMENT SCHEDULES FOR ADDITIONAL INFORMATION
FOR THE BUILDING CONSTRUCTION.
4. FOR VAV BOX INLET AND OUTLET SIZES NOT INDICATED
REFER TO VAV BOX SCHEDULE.
5. SECURED SPACES:
a. DUCT OPENINGS IN THE SECURE PERIMETER
EXCEEDING 96 SQ IN SHALL BE PROTECTED WITH
PERMANENTLY AFFIXED STEEL BARS THAT ARE 1/2
INCH DIAMETER WELDED VERTICALLY AND
HORIZONTALLY 6 INCHES ON CENTER. PROVIDE
ACCESSIBLE INSPECTION ACCESS PANEL IN DUCT
INSIDE THE SECURE PERIMETER OF THE SECURED
WALL. IF ONE DIMENSION OF PENETRATION
MEASURES LESS THAN 6 INCHES OR ONE DIMESION
OF AN ADJACENT SOUND ATTENUATOR HAS
PASSAGEWAYS LESS THAN 6”, BAR PROTECTION IS
NOT REQUIRED.
b. HVAC DUCT PENETRATING THE SECURE PERIMETER
SHALL BE PROVIDED WITH A NONCONDUCTIVE FLEX
CONNECTION FOR A 6 INCH SECTION OF THE DUCT
INSIDE THE SECURED PERIMETER ADJACENT TO
PENETRATION.
c. SECURE PERIMETER PENETRATIONS SHALL BE
SEALED ON BOTH SIDES OF PERIMETER
PENETRATION WITH AN ACOUSTICAL FOAM OR
SEALANT PER ARCHITECTURAL DRAWINGS.
d. METALLIC PIPE PENETRATING THE SECURE
PERIMETER SHALL BE PROVIDED WITH DIELECTRIC
UNION ADJACENT TO THE PIPE PENETRATION THRU
THE SECURE WALL, OR GROUND THE PIPE USING A
NO. 4 WIRE (0.2043 DIAMETER COPPER WIRE) TO THE
BUILDING GROUND.
04/30/2023 ISSUED FOR CONSTRUCTION
1 07/27/2023 ADDENDUM #1
AIAI
PUMP
FAILURE
PUMP
ON/OFF
PUMP
FAILURE
PUMP
ON/OFF
PUMP
FAILURE
PUMP
ON/OFF
AI
AI
FLOW
RATE
AI
HANDHOLE
PUMP-2B
SIGHT GLASS
UNION
3/4" DRAIN VALVE
WITH HOSE BIBB
FLEXIBLE
CONNECTOR,
TYP
BUTTERFLY
VALVE, TYP
PRESSURE
GAUGE
3/4"
3/4"
CHEMICAL
BY-PASS
TANK
BUTTERFLY
VALVE, TYP
DIGITAL THERMOMETER, TYP
ET-2
FROM CHILLED
WATER SYSTEM
DRAIN WITH
HOSE END
3/4" DRAIN WITH
HOSE THREAD
DIFFERENTIAL PRESSURE
TRANSMITTER
CHILLED WATER SUPPLY
CHILLED WATER RETURN
LOCATE DIFFERENTIAL
PRESSURE TRANSMITTER
NEAR FAN COIL FC-2
ON MECH PLATFORM
HIGH CAPACITY
AIR VENT
TO CHILLED
WATER SYSTEMPRESSURE
GAUGE
TYPICAL
PUMP-2A
GLYCOL TO HEATING WATER SYSTEM
GMU-1
FLOW METER
LCD DISPLAY
VFD
VFD
W A
T E
R T
E M
P
P R
E S
S U
R E
S E
N S
O R
L
IN
E V
O L
T A
G E
N E
T W
O R
K C
O N
N E
C T
IO
N
L
IN
E V
O L
T A
G E
N E
T W
O R
K C
O N
N E
C T
IO
N
CH-2
CHILLERCHILLER
CH-1
S T
R A
IN
E
R
S T
R A
IN
E
R
N E
T W
O R
K C
O N
N E
C T
IO
N
N E
T W
O R
K C
O N
N E
C T
IO
N
M
C
DO
AI
M
C
DO
AI
AI
T E
M P
EQUIPMENT
AT CHILLERS
CT
CT
S T
R A
IN
E
R
N E
T W
O R
K C
O N
N E
C T
IO
N
M
C
DO
AI
CT
DRY BED
COOLER
DB-1
P U
M P
-3
P U
M P
-4
P U
M P
-5
CWS CWS
CWR
CWR
CWR
AS-2
AI
S U
C T
IO
N
P R
E S
S U
R E
PT
W A
T E
R T
E M
P
P R
E S
S U
R E
S E
N S
O R
T P
EQUIPMENT
AT CHILLERS
F L O
W M
E T
E R
CWR
AI
F
P U
M P
E N
A B
L E
P U
M P
S P
E E
D
C H
IL
L
E R
A L A
R M
DO AO DI
P U
M P
E N
A B
L E
P U
M P
S P
E E
D
P U
M P
A L A
R M
DO AO DI
C H
IL
L
E R
A L A
R M
DI
C H
IL
L E
R E
N A
B L E
DO
C H
IL
L
E R
A L A
R M
DI
C H
IL
L E
R E
N A
B L E
DO
C H
IL
L
E R
A L A
R M
DI
C H
IL
L E
R E
N A
B L E
DO
CURRENT SENSOR
PUMP ENABLE
ON PUMP
DO
AI
CURRENT SENSOR
PUMP ENABLE
ON PUMP
DO
AI CURRENT SENSOR
PUMP ENABLE
ON PUMP
DO
AI
SEQUENCE OF OPERATION
CHILLER CH-1, CH-2
CHILLER PIPING DIAGRAM
NTS
6" BYPASS
PT
OFF/AUTO: WHEN THE SWITCH IS IN THE AUTO POSITION THE CHILLERS SHALL BE ENABLED TO RUN WITH A SIGNAL FROM THE
DDC SYSTEM. WHEN THE SWITCH IS OFF THE CHILLER SHALL BE OFF.
AUTOMATIC MODE: THE CHILLERS SHALL BE ENABLED WITH COMMUNICATION FROM THE BUILDING DDC SYSTEM. THE CHILLER
INTERNAL CONTROLS SHALL MODULATE THE CHILLER AS REQUIRED TO MAINTAIN THE PRIMARY CHILLED WATER TEMPERATURE
SET-POINT. THE CHILLERS SHALL BE ENABLED AND DISABLED AND SHALL LEAD AND LAG OPERATION BASED ON HOURS THRU
THE DDC SYSTEM. CHILLERS AND ASSOCIATED PUMPS SHALL BE ENABLED ON A CALL FOR COOLING FROM ANY ONE ZONE FOR
MORE THAN 30 MINUTES (ADJUSTABLE).
LEAD AND LAG STATUS SHALL BE ALTERNATED WEEKLY. THE LEAD CHILLER SHALL OPERATE WHEN COOLING IS ENABLED.
FAILURE OF THE LEAD CHILLER TO PROVIDE FLOW WHEN ON SHALL INITIATE AN ALARM AND ALTERNATE THE LEAD CHILLER TO
BACKUP STATUS AND THE BACKUP CHILLER TO LEAD STATUS.
THE NEW LEAD CHILLER SHALL THEN BE ENABLED ON. THE LEAD CHILLER SHALL THEN REMAIN IN THE LEAD STATUS UNTIL THE
ALARM STATUS FOR THE FAILED CHILLER IS MANUALLY RESET. CHILLER CAPACITY SHALL VARY USING INTERNAL CONTROLS
TO MEET LEAVING WATER SETPOINT. THE DDC SYSTEM SHALL MONITOR THE AMP DRAW OF THE CHILLER(S) AND THE LEAVING
WATER TEMPERATURE TO STAGE THE LAG CHILLER ON/OFF AS REQUIRED TO MEET THE BUILDING LOAD. STAGE THE LAG
CHILLER ON WHEN THE LEAD CHILLER IS AT APPROXIMATELY 90% OF FULL CAPACITY AND CYCLE THE LAG CHILLER OFF WHEN
EACH CHILLER IS AT APPROXIMATELY 40% OF FULL CAPACITY.
IF A CHILLER GOES INTO ALARM WHEN ENABLED THE OFFLINE CHILLER SHALL BE ENABLED AND AN ALARM INITIATED. THE
FAILED CHILLER SHALL REMAIN LOCKED OUT UNTIL MANUALLY RESET. WHEN A CHILLER IS COMMANDED TO BE ON THE
ASSOCIATED PRIMARY PUMP SHALL BE ENABLED AND RUN. PRIMARY CHILLED WATER FLOW SHALL BE MONITORED BY THE
FLOW SWITCH INTERNAL TO EACH CHILLER.
DRY BED COOLER DB-1
OFF/AUTO: WHEN THE SWITCH IS IN THE AUTO POSITION THE DRY BED COOLER SHALL BE ENABLED TO RUN WITH A SIGNAL
FROM THE DDC SYSTEM. WHEN THE SWITCH IS OFF THE DRY BED COOLER SHALL BE OFF.
AUTOMATIC MODE: THE DRY BED COOLER SHALL BE CONTROLLED WITH COMMUNICATION FROM THE BUILDING DDC SYSTEM.
WHEN THE AMBIENT TEMPERATURE IS 30°F OR LESS THE MOTORIZED ISOLATION VALVE ASSOCIATED WITH THE COOLER SHALL
BE OPENED, THE PRIMARY PUMP-5 SHALL RUN. THE DRY BED COOLER SHALL UTILIZE INTERNAL CONTROLS TO MAINTAIN A
LEAVING WATER TEMPERATURE OF 42°F BY STAGING OR MODULATING FANS OFF/ON.
CHILLED WATER SECONDARY PUMPS, PUMP-2A AND 2B
CHILLED WATER SECONDARY PUMP MANUAL MODE SHALL BE CONTROLLED THRU THE VFD.
CHILLED WATER SECONDARY PUMP AUTOMATIC CONTROL: THE TWO SECONDARY CHILLED WATER PUMPS SHALL OPERATE
ALTERNATELY TO MAINTAIN SYSTEM DIFFERENTIAL PRESSURE WITH ONE PUMP AS THE LEAD PUMP AND THE OTHER PUMP AS
THE LAG PUMP. ONLY ONE PUMP SHALL RUN AT A TIME.
LEAD AND LAG STATUS SHALL BE ALTERNATED WEEKLY. THE LEAD PUMP SHALL OPERATE WHEN COOLING IS ENABLED. FAILURE
OF THE LEAD PUMP TO PROVIDE FLOW WHEN ON SHALL INITIATE AN ALARM AND ALTERNATE THE LEAD PUMP TO BACKUP
STATUS AND THE BACKUP PUMP TO LEAD STATUS.
THE NEW LEAD PUMP SHALL THEN BE ENABLED ON. THE LEAD PUMP SHALL THEN REMAIN IN THE LEAD STATUS UNTIL THE
ALARM STATUS FOR THE FAILED PUMP IS MANUALLY RESET. WHEN ON, THE SPEED OF THE LEAD PUMP SHALL BE VARIED TO
MAINTAIN THE SECONDARY CHILLED WATER PRESSURE SET-POINT OF 15 PSI (ADJUSTABLE).
PT AI
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MECHANICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
C. STATSER
C. GIPSON
D. HOGAN
M. OSSANNA
T. PRICE
J. CAMPBELL
COMMUNICATIONS M. ADKISON
B
IM
/1
J V
C
H M
C a m p M u rr a y A
S O
G F a c ili ty /1
-M
F E
C .r v t
/2
/2
:3
:3
P M
M601 10078627
CHRIS MANZ
HDRE_ALL_DISCIPLINES.rte
CHILLER PIPING DIAGRAM
CAMP MURRAY
ASOG FACILITY
AIR SUPPORT
OPERATIONS CENTER
04/30/2023 ISSUED FOR CONSTRUCTION
1 07/27/2023 ADDENDUM #1
1 1
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MECHANICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
C. STATSER
C. GIPSON
D. HOGAN
M. OSSANNA
T. PRICE
J. CAMPBELL
COMMUNICATIONS M. ADKISON
B
IM
/1
J V
C
H M
C a m p M u rr a y A
S O
G F a c ili ty /1
-M
F E
C .r v t
/2
/2
:3
:3
P M
M602 10078627
CHRIS MANZ
HDRE_ALL_DISCIPLINES.rte
HVAC DETAILS
CAMP MURRAY
ASOG FACILITY
AIR SUPPORT
OPERATIONS CENTER
ALL UNITS: DDC SHALL MONITOR HEATING WATER CONTROL VALVE POSITION FOR HW TEMP RESET, REFER TO BOILER
SEQUENCE OF OPERATION.
AIR HANDLER CONTROL:
AUTO/OFF: WHEN THE SWITCH IS IN THE OFF POSITION THE FANS SHALL BE OFF. WHEN THE SWITCH IS IN THE AUTO POSITION THE
UNIT SHALL BE CONTROLLED AS DESCRIBED BELOW.
OCCUPIED MODE:
THE SUPPLY FANS SHALL BE ON. FAN SHALL START AND SHALL ACCELERATE WITH A 30 SECOND RAMP TIME.
THE SUPPLY FANS SPEED SHALL BE CONTROLLED TO MAINTAIN SUPPLY DUCT PRESSURE SETPOINT OF 1.25" (ADJUSTABLE, TO BE
VERIFIED BY THE BALANCE CONTRACTOR).
NORMAL OPERATION IS TO PROVIDE 55 DEG AIR WHEN THE UNIT IS OPERATIONAL. COIL SHALL MODULATE AS REQUIRED TO
MAINTAIN REQUIRED LEAVING AIR TEMPERATURE.
DIRTY FILTER ALARM: WHEN THE DIFFERENTIAL ACROSS THE FILTER IS GREATER THAN 0.9 INCHES(ADJUSTABLE) INITIATE A DIRTY
FILTER ALARM. THE DIRTY FILTER ALARM SHALL REMAIN ACTIVE UNTIL MANUALLY REST. PROVIDE A DIRTY FILTER ALARM INDICATOR
LIGHT AND RESET BUTTON ON THE FACE OF THE HCP PANEL FOR EACH AIR HANDLER.
OUTSIDE AIR:
THE OUTSIDE AIR SHALL BE PROVIDED BY ERV-3 DURING OCCUPIED HOURS AND CLOSED DURING UNOCCUPIED HOURS.
SAFETY CONTROL: UPON DETECTION OF SMOKE IN THE AIRSTREAM THE SUPPLY AND EXHAUST FANS SHALL BE TURNED OFF AND
AN ALARM INITIATED. ALL DAMPERS AND VALVES SHALL RETURN TO THE SAME POSITION AS FOR THE UNOCCUPIED MODE. THE
UNIT SHALL NOT START AGAIN UNTIL MANUALLY RESET. UPON RESET THE UNIT SHALL GO INTO THE MODE CURRENTLY SCHEDULED
FOR THAT TIME.
T P
F A
N
P R
E -F
IL
T
E R
(M E
R V
/3
C O
O L
IN
G
V A
L V
E
F A
N S
P E
E D
D
IS
C H
A R
G E
A
IR
S E
N S
O R
F
IL
T E
R D
IF
F
E R
E N
T
IA
L P
R E
S S
U R
E
AIAOAOAI
SPEED
CONTROL
P
AI
D U
C T
S T
A T
IC
P
R E
S S
U R
E S
E N
S O
R
SUPPLY TO
VAV BOXES
C W
C O
ILE
C
M
T
AI
M
IX
E D
A
IR
T E
M P
E R
A T
U R
E
T
DISCHARGE AIR SENSOR
MOTOR CONTROL PANEL
FURNISHED WITH FCU
TO SPACE
FAN
PRE-FILTER
(30%)
HW COIL
CW COIL
P
FILTER DIFFERENTIAL PRESSURE
AI
COOLING VALVE
AO
POSITION
HEATING VALVEAO
AI
T
AI
D
IS
C H
A R
G E
P R
E S
S U
R E
AI
P
AI
F A
N E
N A
B L
E
DO
A
IR
F L O
W
AI
P
AI
P L E
N U
M P
R E
S S
U R
E
R E
T U
R N
A
IR
TYPICAL FAN COIL UNITS:
AUTO: FAN COIL UNIT SHALL BE AUTOMATICALLY ENABLED
DURING OCCUPIED TIMES AND SHALL RUN CONTINUOUSLY.
AS DESCRIBED BELOW.
SET-POINTS:
OCCUPIED TEMPERATURE: 68°F HEATING MINIMUM TO 78°F
COOLING MAXIMUM UNOCCUPIED TEMPERATURE: 60°F
MINIMUM TO 80'F MAXIMUM OCCUPIED TIME:
SHALL COORDINATE WITH END USER.
OCCUPIED MODE TEMPERATURE:
COOLING MODE: COOLING WATER VALVE AND HEATING WATER
VALVE SHALL MODULATE WITHOUT OVERLAPPING TO MAINTAIN
DESIRED ROOM SETPOINT.
OUTSIDE AIR (FC-5,6,7,8,9,10,11,12,13):
THE OUTSIDE AIR SHALL BE PROVIDED BY ERV-2 DURING
OCCUPIED HOURS AND CLOSED DURING UNOCCUPIED HOURS.
OUTSIDE AIR (FC-3):
THE OUTSIDE AIR SHALL BE PROVIDED BY ERV-1 DURING
OCCUPIED HOURS AND CLOSED DURING UNOCCUPIED HOURS.
OUTSIDE AIR (FC-2):
THE OUTSIDE AIR SHALL BE PROVIDED BY ERV-3 DURING
OCCUPIED HOURS AND CLOSED DURING UNOCCUPIED HOURS.
S T
A T
U S
DI
R E
T U
R N
F R
O M
V A
V B
O X
E S
F A
N F
A N
S P
E E
D
AO
SPEED
CONTROL
F A
N E
N A
B L
E
DO
S T
A T
U S
DI
A
IR
F L O
W
AI
E C
M
P
F
IN
A L
-F
IL
T E
R (M
E R
V
/8
F
IL
T
E R
D
IF
F E
R E
N T
IA
L
P R
E S
S U
R E
AI
RELIEF/EXHAUST TO ERV-3
VENTILATION AIR FROM ERV-3
RELIEF/EXHAUST TO ERV UNIT
VENTILATION AIR FROM ERV UNIT
T
DISCHARGE AIR SENSOR
MOTOR CONTROL PANEL
FURNISHED WITH FCU
TO SPACE
FAN
PRE-FILTER
(30%)
HW COIL
CW COIL
P
FILTER DIFFERENTIAL PRESSURE
AI
COOLING VALVE
AO
POSITION
HEATING VALVEAO
AI
FAN START
DO
R E
T U
R N
A
IR
FAN COIL UNITS (FC-1 AND EF-2):
AUTO: FAN COIL FC-1 AND EF-2 SHALL BE AUTOMATICALLY
ENABLED AND SHALL RUN CONTINUOUSLY AS DESCRIBED
BELOW.
ASSOCIATED MOTORIZED DAMPERS SHALL BE OPEN WHEN FAN
IS IN OPERATION.
SET-POINTS:
OCCUPIED TEMPERATURE: 68°F HEATING MINIMUM TO 78°F
COOLING MAXIMUM UNOCCUPIED TEMPERATURE:
COOLING MODE: COOLING WATER VALVE AND HEATING WATER
VALVE SHALL MODULATE WITHOUT OVERLAPPING TO MAINTAIN
DESIRED ROOM SETPOINT.
OUTSIDE AIR:
THE OUTSIDE AIR SHALL BE DELIVERED DIRECTLY TO THE UNIT.
AN ALARM SHALL BE ISSUED IF EITHER FC-1 OR EF-2 FAIL TO
OPERATE AS EXPECTED.VENTILATION AIR
M
DO
D A
M P
E R
O P
E N
FAN
STARTER
WHERE
REQUIREDM
AIAI
CURRENT SENSOR ON FAN
AI
FAN START
DO
CURRENT SENSOR ON FAN
AI
SEQUENCE OF OPERATION
SEQUENCE OF OPERATION
SEQUENCE OF OPERATION
CONSTANT VOLUME VERTICAL OR HORIZONTAL FAN COIL CONTROL DIAGRAM
NTS
AIR HANDLER CONTROL DIAGRAM (AHU-1,2,3)
NTS
FAN COIL AND EXHAUST FAN CONTROL DIAGRAM (FC-1, EF-2)
NTS
EXHAUST
AIR
FAN START
DO
DAMPER OPEN
DO
CURRENT SENSOR ON FAN
AI
04/30/2023 ISSUED FOR CONSTRUCTION
1 07/27/2023 ADDENDUM #1
FAN COIL UNIT FC-2:
DDC SHALL MONITOR AUXILIARY THERMOSTAT
AND SHALL OVERRIDE PRIMARY THERMOSTAT
AS REQUIRED TO MAINTAIN SPACE WITHIN SET-POINTS.
AUXILIARY THERMOSTAT SHALL BE PROVIDED WITH A PUSH
BUTTON TO OVER-RIDE/DISABLE THE PRIMARY
THERMOSTAT. AUXILIARY THERMOSTAT SHALL BE
PROVIDED WITH A PUSH BUTTON TO ALLOW UP TO TWO
HOURS OF OVERRIDE IN 20 MINUTE INCREMENTS. THE
FUNCTION OF THE HEATING AND COOLING CONTROL
VALVES BY THE ENABLED THERMOSTAT.
T
SPACE TEMPERATURE
AI
SENSOR (SEE PLANS)
T
SPACE TEMPERATURE
AI
SENSOR (SEE PLANS)
HEATING WATER SECONDARY
PUMPS, PUMP-1A AND PUMP-1B
BOILERS BOIL-1, BOIL-2 AND
BOIL-3 SEQUENCE OF OPERATION:
BOILER SOO CONT'D BOILER SOO CONT'D
ADDITIONAL POINTS TO MONITOR
HEATING WATER CONTROL DIAGRAM
BOIL-1 BOIL-2 BOIL-3
FM
P U
M P
A L A
R M
P U
M P
E N
A B
L E
D I
D O
S T
R A
IN
E
R
3/4"
CHEMICAL
BYPASS
TANK
PRESSURE
GAUGE
F L O
W M
E T
E R
-2
M
A S
IG
N
A L
A I
TO SYSTEM
CONDENSATE
NEUTRALIZING
TANK, TYP OF 3
NOTE 4
FSFSFS
NOTES 2, 5
NOTES
2, 5
PRESSURE
SENSOR
TEMPRATURE
SENSOR
AI
AI
P U
M P
S P
E E
D A
O
2 PSI NAT GAS
A O
B O
IL
E
R A
L A
R M
D I
D O
B O
IL
E
R T
E M
P R
E S
E T
B O
IL
E
R E
N A
B L
E
A O
B O
IL
E
R A
L A
R M
D I
D O
B O
IL
E
R T
E M
P R
E S
E T
B O
IL
E
R E
N A
B L
E
A O
B O
IL
E
R A
L A
R M
D I
D O
B O
IL
E
R T
E M
P R
E S
E T
B O
IL
E
R E
N A
B L
E
ET-1
GMU-1
PUMP
1A
PUMP
1B
DP
DIFFERENTIAL
PRESSURE
TRANSMITTER SET
TO HOLD 12 PSI
LOCATED NEAR FAN
COIL FC-12 ON MECH.
PLATFORM
H W
R
H W
S
3" HWR
3" HWS
NTS
NC
HOT WATER SUPPLY
HOT WATER
RETURN
AS-1
TO SYSTEM
HIGH
CAPACITY
AIR VENT
VALVE & CAP
WITH HOSE
TREAD
EXTEND AIR INTAKE AND EXHAUST
THRU ROOF, TERMINATE WITH A
CONCENTRIC FLUE OUTLET.
TYP 3 BOILERS
PRIMARY HOT WATER PUMP CONTROL:
PUMPS ARE POWERED AND CONTROLED BY THE
RESPECTIVE BOILER. NO CONNECTION TO THE DDC
SYSTEM OR EXTERNAL CONTROLS REQUIRED.
1. GAS METER: COORDINATE WITH INSTALLATION
OF NEW METER TO GET A PULSED SIGNAL TO
MONITOR GAS CONSUMPTION.
2. WATER METER: COORDINATE TYPE WITH WATER
SHOP.
3. ELECTRICAL METER: COORDINATE WITH
ELECTRICAL SHOP.
4. GLOBAL OUTSIDE AIR TEMPERATURE.
5. EMERGENCY HVAC SHUTDOWN SWITCH. UPON
ACTIVATION OF ANY SHUTDOWN SWITCH,
LOCATED AS SHOWN IN THE PLANS, ALL HVAC
SUPPLY, EXHAUST AND OUTSIDE AIR FANS SHALL
SHUT DOWN AND ALL CONTROL DAMPERS SHALL
CLOSE. SHUTDOWN SHALL REMAIN IN EFFECT
UNTIL MANUALLY RESET.
FLOW
METER
DISPLAY
2" TYP
3/4" DRAIN TYP
GAS REGULATOR
AS REQUIRED, TYP
3/4" G
1-1/4" G
3" BYPASS
NETWORK
CONNECTION
NETWORK
CONNECTION
BALANCING
VALVE SET
TO HOLD
10 GPM
UNION
DIGITAL
THERMOMETER,
TYP
PRESSURE
SENSOR
TEMPERATURE
SENSOR
AI
AI
FROM SYSTEM
3/4", COORDINATE THE
CONNECTION TO THE
CHILLED WATER SYSTEM
ALSO
DRAIN WITH
HOSE END
BOILER CONTROL:
THIS SYSTEM CONSISTS OF THREE BOILERS. THE
BURNERS SHALL BE CONTROLLED VIA THEIR OWN
INTERNAL CONTROLS. THE BOILER CONTROLS
SHALL PROVIDE THE BOILER WITH COMPLETE
OPERATION AND SAFETY CONTROLS INCLUDING
INDIVIDUAL FIRING RATE MODULATION AS REQUIRED
TO MAINTAIN HEATING WATER TEMPERATURE
SETPOINT. FAILURE OF BOILER SHALL INITIATE AN
ALARM.
STAGING OF BOILERS:
INCREASE IN HEATING LOAD: LEAD BOILER AND
ASSOCIATED CIRCULATION PUMP SHALL BE
ENABLED TO MEET HEATING LOAD. IF HEATING LOAD
DEMAND IS NOT MET WITH LEAD BOILER, NEXT
BOILER AND ASSOCIATED CIRCULATION PUMP SHALL
BE ENABLED. IF THE LOAD CONTINUES TO BE UNMET
THE NEXT BOILER SHALL BE ENABLED. AS THE LOAD
DECREASES THE LAST BOILER ON SHALL BE THE
FIRST BOILER OFF.
BOILERS SHALL UTILIZE A LEAD LAG FUNCTION TO
INSURE EQUAL RUN TIME ON ALL BOILERS. BOIL-1
SHALL BE THE LEAD BOILER FOLLOWED BY BOIL-2
AND BOIL-3. ROTATE THE LEAD BOILER ON A
WEEKLY BASIS.
TEMPERATURE RESET:
THE DDC SYSTEM SHALL PROVIDE A TEMPERATURE
SETPOINT FOR THE BOILERS. RESET THE
TEMPERATURE DOWN TO MINIMIZE ENERGY
CONSUMPTION. RESET IN 10 DEGREE INCREMENTS
SO THERE IS AT LEAST ONE HEATING WATER VALVE
THAT IS 80%-90% OPEN.
NOTES:
1. ALL SET POINTS SHALL BE USER ADJUSTABLE.
2. BOILER CIRCULATION PUMP FURNISHED BY BOILER MANUFACTURER.
3. NOT USED
4. SUPPLY AND RETURN WATER TEMPERATURE SENSORS AND FLOW SWITCH FURNISHED AS PART OF
BOILER CONTROLS.
5. CIRCULATION PUMP POWER TO BE FED FROM BOILER. PROVIDE A RELAY AND CONNECT TO POWER
AS REQUIRED IF UNABLE TO POWER FROM BOILER.
6. MECHANICAL CONTRACTOR SHALL COORDINATE THE CONNECTIONS TO THE DDC SYSTEM TO
ENSURE CORRECT VOLTAGE REQUIREMENTS.
7. COORDINATE THE POWER REQUIREMENTS FOR THE FLOW METER. BEFORE INSTALLATION OF FLOW
METER VERIFY PIPING REQUIREMENTS FOR THE FLOW METER.
8. 3/4" CPVC CONDENSATE LINE TO FLOOR DRAIN, TYP 3.
ISOLATION BUTTERFLY
VALVE, BEFORE PIPING
SPLITS TO SERVE
BUILDING, TYP
P R
E S
S U
R E
S E
N S
O R
A I
FLOW
SWITCH,
TYP 3
NOTE 4
NOTE 4
NOTE 8 NOTE 4
HEATING WATER SECONDARY PUMP MANUAL MODE:
PUMP MAY BE CONTROLLED MANUALLY FROM THE
ASSOCIATED VFD.
HEATING WATER SECONDARY PUMP AUTOMATIC
CONTROL: THE TWO SECONDARY HEATING WATER
PUMPS SHALL OPERATE ALTERNATELY WITH ONE
PUMP AS THE LEAD PUMP AND THE OTHER PUMP AS
THE LAG PUMP. ONLY ONE PUMP SHALL RUN AT A
TIME. LEAD AND LAG STATUS SHALL BE ALTERNATED
WEEKLY. THE LEAD PUMP SHALL OPERATE WHEN
HEATING IS ENABLED. FAILURE OF THE LEAD PUMP
TO PROVIDE FLOW WHEN ON SHALL INITIATE AN
ALARM AND ALTERNATE THE LEAD PUMP TO BACKUP
STATUS AND THE BACKUP PUMP TO LEAD STATUS.
THE NEW LEAD PUMP SHALL THEN BE ENABLED ON.
THE LEAD PUMP SHALL THEN REMAIN IN THE LEAD
STATUS UNTIL THE ALARM STATUS FOR THE FAILED
PUMP IS MANUALLY RESET. WHEN ON, THE SPEED OF
THE LEAD PUMP SHALL BE VARIED TO MAINTAIN THE
SECONDARY HEATING WATER PRESSURE SET-POINT
OF 10 PSI (ADJUSTABLE).
FLOW SHALL BE VERIFIED BY THE FLOW METER.
NORMAL MODE: OFF, BOILERS OFF, PUMPS OFF
HEATING WATER SYSTEM ENABLE: THE HEATING
SYSTEM WILL AUTOMATICALLY START WHEN THE
AMBIENT TEMPERATURE IS BELOW 60°F
(ADJUSTABLE) OR WHEN THERE IS A CALL FOR
HEAT BY ANY ONE FAN COIL OR VAV BOX FOR
MORE THAN 30 MINUTES (ADJUSTABLE).
SETPOINT: 140° F LEAVING WATER TEMPERATURE.
T
P P
T
P
DRAIN WITH
HOSE END
NC
TTT
S T
R A
IN
E
R
S T
R A
IN
E
R
NETWORK
CONNECTION
T
NOTE 4NOTE 8
2" HWR
NOTE 4NOTE 8
NOTE 4
TT
3/4" G2" HWSNOTE 41" G
AIR SEPARATOR
ON MECHANICAL
PLATFORM LEVEL
VFD
P U
M P
A L A
R M
P U
M P
E N
A B
L E
D I
D O
P U
M P
S P
E E
D A
O
VFD
BOILER ENABLE
BOILER ALARM
DO
DI
BOILER ENABLE
BOILER ALARM
DO
DI
BOILER ENABLE
BOILER ALARM
DO
DI
NOTES
2, 5
NOTE 4
N E
T W
O R
K D
O C
O N
N E
C T
IO
N
N E
T W
O R
K D
O C
O N
N E
C T
IO
N
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MECHANICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
C. STATSER
C. GIPSON
D. HOGAN
M. OSSANNA
T. PRICE
J. CAMPBELL
COMMUNICATIONS M. ADKISON
B
IM
/1
J V
C
H M
C a m p M u rr a y A
S O
G F a c ili ty /1
-M
F E
C .r v t
/2
/2
:3
:3
P M
M603 10078627
CHRIS MANZ
HDRE_ALL_DISCIPLINES.rte
HVAC DIAGRAMS AND SEQUENCE OF OPERATIONS
CAMP MURRAY
ASOG FACILITY
AIR SUPPORT
OPERATIONS CENTER
04/30/2023 ISSUED FOR CONSTRUCTION
1 07/27/2023 ADDENDUM #1
1 1
0 1" 2"
SCALE
FILENAME
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MECHANICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
C. STATSER
C. GIPSON
D. HOGAN
M. OSSANNA
T. PRICE
J. CAMPBELL
COMMUNICATIONS M. ADKISON
B
IM
/1
J V
C
H M
C a m p M u rr a y A
S O
G F a c ili ty /1
-M
F E
C .r v t
/2
/2
:3
:3
P M
M604 10078627
CHRIS MANZ
HDRE_ALL_DISCIPLINES.rte
HVAC DIAGRAMS AND SEQUENCE OF OPERATIONS
CAMP MURRAY
ASOG FACILITY
AIR SUPPORT
OPERATIONS CENTER
HEATING
COIL
VAV
M
F AI
M
AI T T AI
TO SPACE
T AI
FAN
STARTER
WHERE
REQUIRED
FAN
STARTER
F A
N S
T A
R T
S
IG
N A
L
S P
A C
E T
E M
P R
E T
U R
N A
IR
P O
S
IT
IO
N
C O
N T
R O
L V
A L V
E
M
T
M
FAN
STARTER
WHERE
REQUIRED
TYPICAL VAV W/REHEAT COIL CONTROL DIAGRAM CABINET HEATER AND UNIT HEATER CONTROL
EXHAUST FAN CONTROL
MAN COOLER FAN CONTROL
HEAT PUMP CONTROL
NTS
SEQUENCE OF OPERATION
EXHAUST FAN CONTROL FOR (EF-1):
THE FAN SHALL BE STARTED AND STOPPED BASED ON TEMPERATURE OR THE DETECTION OF
CARBON MONOXIDE. .
1. WHEN THE TEMPERATURE RISES ABOVE 85 DEG F OR CARBON MONOXIDE LEVELS RISE ABOVE
25 PPM THE MOTORIZED DAMPER MD-7A, 7B AND MD-8 SHALL OPEN AND EF-1 SHALL BE
ENABLE TO RUN CONTINUOUSLY.
2. WHEN THE TEMPERATURE FALLS BELOW 85 DEG F OR CARBON MONOXIDE FALLS BELOW
25PPM THE FAN SHALL CYCLE OFF AND MD-7A, 7B AND MD-8 SHALL CLOSE.
CURRENT TRANSMITTER TO MONITOR FAN MOTOR TO CONFIRM FAN FUNCTION IS
AS EXPECTED IN THE CONTROL SYSTEM. IF THE FAN FAILS TO START AND RUN OR
IF THE FAN RUNS WHEN COMMANDED OFF AN ALARM WILL BE ISSUED.
SA
TO
OTHER
VAV'S
HWR
HWS
AIRFLOW
TRACKING
TWO OR THREE WAY VALVE
ZONE
TEMP
DISCHARGE AIR
TEMP SENSOR
AO
SEQUENCE OF OPERATION VAV BOX
FROM
FC-23
DAMPER MODULATION
PROVIDE INDEPENDENT
VALVE POSITION SENSOR
AOHEATING COIL MODULATION
COOLING MODE: MODULATE INLET DAMPER TO
MAINTAIN ROOM COOLING SETPOINT.
HEATING MODE: VOLUME CONTROL DAMPER AT
MINIMUM CFM. MODULATE REHEAT COIL CONTROL
VALVE TO MAINTAIN ZONE TEMPERATURE SETPOINT.
LIMIT THE LEAVING AIR TEMPERATURE TO NO
GREATER THAN 85°F. IF ADDITIONAL HEAT IS NEEDED
THEN INCREASE THE PRIMARY AIR VOLUME WHILE
MAINTAINING A LEAVING AIR tEMPERATURE OF 85°F.
DDC SHALL MONITOR HEATING WATER CONTROL
VALVE POSITION FOR HW TEMP RESET. REFER TO
BOILER SEQUENCE OF OPERATION.
ZONE
TEMP
EXHAUST
AIR
FAN START
DO
DAMPER OPEN
DO
CURRENT SENSOR ON FAN
AI
EXHAUST FAN CONTROL FOR:
EF-3, MD-9 AND MD-10
EF-5, MD-1 AND MD-12
THE FANS SHALL BE CONTROLLED BY A WALL THERMOSTAT TO MAINTAIN A ZONE
TEMPERATURE COOLING SETPOINT OF 85° F (ADJ).
WHEN THE ROOM TEMPERATURE RISES ABOVE 85° F THE ASSOCIATED MOTORIZED DAMPERS SHALL
OPEN AND THE FAN SHALL RUN CONTINUOUSLY.
WHEN THE TEMPERATURE DROPS BELOW 85° F THE FAN SHALL CYCLE OFF AND THE DAMPERS
SHALL CLOSE.
CURRENT TRANSMITTER TO MONITOR FAN MOTOR TO CONFIRM FAN FUNCTION IS AS EXPECTED IN
THE CONTROL SYSTEM. IF THE FAN FAILS TO START AND RUN OR IF THE FAN RUNS WHEN
COMMANDED OFF AN ALARM WILL BE ISSUED.
NTS
HWR
HWS
SEQUENCE OF OPERATION
HOT WATER UNIT HEATER NORMAL MODE: FAN OFF AND CONTROL VALVE TO UNIT IS CLOSED.
HOT WATER UNIT HEATER AUTOMATIC CONTROL: ON CALL FOR HEATING FROM THE SPACE
TEMPERATURE SENSOR SHALL OPEN HEATING WATER CONTROL VALVE AND START FAN
TO MAINTAIN SPACE TEMPERATURE SET-POINT. WHEN SPACE HEATING REQUIREMENTS
ARE SATISFIED REVERSE THE PROCEDURE.
CABINET HEATER ADDITIONAL REQUIREMENTS:
WHEN THE AMBIENT TEMPERATURE IS LESS THAN 30° THE FANS SHALL RUN CONTINUOUSLY.
CONTROL VALVES SHALL CYCLE AS REQUIRED TO MAINTAIN THE SPACE AT 55°F (ADJUSTABLE).
DO DO AI
EXHAUST FAN CONTROL FOR:
THE FAN SHALL BE CONTROLLED BY A WALL THERMOSTAT TO MAINTAIN A ZONE
TEMPERATURE COOLING SETPOINT OF 85° F (ADJ) AND HEATING SETPOINT OF 50°F.
CYCLE FAN AS REQUIRED TO MAINTAIN THE SETPOINT BETWEEN 85°F AND 50°F.
WHEN THE ROOM TEMPERATURE RISES ABOVE 85° F MD-1 AND MD-5 SHALL OPEN AND
FAN EF-5 SHALL START AND THE FAN SHALL RUN CONTINUOUSLY.
WHEN THE TEMPERATURE DROPS BELOW 85° F THE FAN SHALL CYCLE OFF AND THE DAMPERS
SHALL CLOSE.
CURRENT TRANSMITTER TO MONITOR FAN MOTOR TO CONFIRM FAN FUNCTION IS AS EXPECTED IN
THE CONTROL SYSTEM. IF THE FAN FAILS TO START AND RUN OR IF THE FAN RUNS WHEN
COMMANDED OFF AN ALARM WILL BE ISSUED.
DAMPER OPEN
DO
MOTOR RATED SWITCH
TO START FAN SEE
ELECTRICALS
CURRENT SENSOR ON FAN
AI
NTS
NTS
SEQUENCE OF OPERATION
FANS SHALL BE MANUALLY STARTED AS STOPPED AS REQUIRED FOR COMFORT OR AIR
CIRCULATION.
DDC SYSTEM SHALL MONITOR FAN FUNCTION. IF A FAN IS LEFT IN THE ON POSITION
FOR MORE THAN 12 HOURS AN ALARM SHALL BE ISSUED.
NTS
SEQUENCE OF OPERATION
HEAT PUMP UNIT SHALL CYCLE AND STAGE CAPACITY UP OR DOWN AS REQUIRED TO MAINTAIN
ROOM SET POINT.
DDC SYSTEM SHALL MONITOR ROOM TEMPERATURE. IF THE ROOM TEMPERATURE RISES ABOVE OR
FALLS BELOW ROOM SET POINT FOR MORE THAN 30 MINUTES AN ALARM SHALL BE ISSUED. .
OUTDOOR UNIT
INDOOR UNIT
INTERCONNECTING
WIRING AND REFERIGERAT
PIPING
CO
CARBON MONOXIDE PANEL (EF-1 ONLY)
DI
04/30/2023 ISSUED FOR CONSTRUCTION
1 07/27/2023 ADDENDUM #1
BOILERS
B-1, 2, 3
CHILLERS
CH-1, 2
DB-1
AHU-1 AHU-2 AHU-3 ERV-1 ERV-2 ERV-3
CH-1
CH-2
DB-1
B-1
B-2
B-3
VAV
100'S
VAV
200'S
VAV
300'S
VAV
FC-4
FC-3 TO 12 FC-1, 2
DDC IT ETHERNET SWITCH - LEVEL 2
DDC NETWORK CONTROLLER - LEVEL 2
IT SWITCH FPOC - LEVEL 3
COMMUNICATION ROOM 1502
REFER TO UFC4-010-06 FOR LEVEL
OF CYBER SECURITY
DDC NETWORK AND
PANEL ARCHITECTURE
TYPICAL TYPICAL TYPICAL TYPICAL TYPICAL
REFER TO ASHRAE STANDARD 135-2020 FOR
DEFINITIONS AND MINIMUM CAPABILITIES
OF CONTROLLERS AND PICS STATEMENTS
2C22 BACNET MS/TP
BACNET/IP CAT6E
DDC NETWORK AND PANEL ARCHITECTURE
NTS
NOTES
1. CONTRACTOR SHALL COORDINATE THE LOACTION OF EQUIPMENT AND
REQUIRED PANELS WITH OTHER TRADES AND EXISTING CONDITIONS
TO INSHURE A COMPLETE AND OPERATIONAL SYSTEM.
LEGEND
BACnet - Building Controler
BACnet - Advance Application Controler
BACnet - Application Specific Controler
Third Party Equipment
EF-4:
EF-5, MD-1, MD-12:
M
SPACE TEMPERATURE
AI
SENSOR
T
M
DAMPER OPEN
SIGNAL (EF-5 ONLY)
DO
DAMPER OPEN
SIGNAL (EF-5 ONLY)
DO
MOTOR
STARTER
FAN START
DO
FAN CURRENT
AI
SIGNAL
T
P
P
T
T
M M
M
M
T
P
T
T
M M
T
P
T
T
M M
PROJECT MANAGER
PROJECT NUMBER
0 1" 2"
SCALE
FILENAME
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MECHANICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
C. STATSER
C. GIPSON
D. HOGAN
M. OSSANNA
T. PRICE
J. CAMPBELL
COMMUNICATIONS M. ADKISON
B
IM
/1
J V
C
H M
C a m p M u rr a y A
S O
G F a c ili ty /1
-M
F E
C .r v t
/2
/2
:3
:3
P M
M605 10078627
CHRIS MANZ
HDRE_ALL_DISCIPLINES.rte
ERU CONTROL DIAGRAM
CAMP MURRAY
ASOG FACILITY
AIR SUPPORT
OPERATIONS CENTER
T AITEMP
AO
AO
COOLING
VALVE
NETWORK
CONNECTION
NETWORK
CONNECTION
TO DIFFERENT
FAN COIL UNITS
REFER TO PLANS
TO DIFFERENT
FAN COIL UNITS
REFER TO PLANS
TO DIFFERENT
FAN COIL UNITS
REFER TO PLANS
TO DIFFERENT
FAN COIL UNITS
REFER TO PLANS
NETWORK
CONNECTION
FROM DIFFERENT
AIR HANDLING UNITS
REFER TO PLANS
TO DIFFERENT
AIR HANDLING UNITS
REFER TO PLANS
ERV-1 CONTROL DIAGRAM
ERV-2 CONTROL DIAGRAM ERV-3 CONTROL DIAGRAM
NTS
D U
C T
P R
E S
S U
R E
T R
A N
S M
IT
T
E R
E X
H A
U S
T A
IR
T
E M
P E
R A
T U
R E
A I
A I
A I
A I
A I
A I
NTS
D U
C T
P R
E S
S U
R E
T R
A N
S M
IT
T
E R
E X
H A
U S
T A
IR
T
E M
P E
R A
T U
R E
A I
A I
A I
A I
A I
NTS
D U
C T
P R
E S
S U
R E
T R
A N
S M
IT
T
E R
E X
H A
U S
T A
IR
T
E M
P E
R A
T U
R E
A I
A I
A I
A I
A I
AUTO/OFF: FANS SHALL BE AUTOMATICALLY ENABLED DURING OCCUPIED
TIMES AND SHALL RUN CONTINUOUSLY AS DESCRIBED BELOW WITH
DAMPERS OPEN. WHEN IN OFF POSITION FANS SHALL SHUT DOWN AND
EXHAUST AND OUTSIDE AIR DAMPER SHALL CLOSE. DAMPERS AND
ACTUATORS PROVIDED WITH UNIT.
SET-POINTS:
OCCUPIED SUPPLY AIR PRESSURE: 0.75” WC (ADJUSTABLE).
OCCUPIED VENTILATION EXHAUST PRESSURE: 1.0” WC (ADJUSTABLE).
DURING OCCUPIED TIMES THE EXHAUST FAN AND THE SUPPLY FAN SHALL RUN AT A FIXED
RPM.
CONTROL SYSTEM SHALL MONITOR THE FOLLOWING POINT:
1. DIRTY FILTER ALARM FOR OUTSIDE AIR AND EXHAUST AIR
SET AT 0.5” WC (ADJUSTABLE).
2. DDC SYSTEM SHALL PROVIDE AN ACTIVE DISPLAY OF THE
OUTSIDE AIR AND EXHAUST AIR FLOW RATES.
3. CONTRACTOR SHALL COORDINATE NUMBER AND TYPE OF POINTS
SHOWN IN THE DDC SYSTEM WITH THE CONTRACTING OFFICER.
HEATING COIL (HC-1) AND COOLING COIL (CC-1)
DDC SHALL MONITOR HEATING WATER CONTROL VALVE POSITION FOR HW TEMP RESET.
REFER TO BOILER SEQUENCE OF OPERATION.
THE HEATING AND COOLING COILS SHALL WORK TOGETHER WITHOUT
OVERLAPING (REHEATING) TO MAINTAIN ROOM SETPOINT FOR THE FITNESS AREA.
AUTO/OFF: FANS SHALL BE AUTOMATICALLY ENABLED DURING OCCUPIED
TIMES AND SHALL RUN CONTINUOUSLY AS DESCRIBED BELOW WITH
DAMPERS OPEN. WHEN IN OFF POSITION FANS SHALL SHUT DOWN AND
EXHAUST AND OUTSIDE AIR DAMPER SHALL CLOSE. DAMPERS AND
ACTUATORS PROVIDED WITH UNIT.
DURING OCCUPIED TIMES THE ERV EXHAUST FAN AND THE SUPPLY FAN SHALL
RUN TO PROVIDE VENTILATION AIR.
OCCUPIED TIME: CONTRACTOR SHALL COORDINATE WITH END USER.
CONTROL SYSTEM SHALL MONITOR THE FOLLOWING POINT:
1. DIRTY FILTER ALARM FOR OUTSIDE AIR AND EXHAUST AIR
SET AT 0.5” WC (ADJUSTABLE).
2. DDC SYSTEM SHALL PROVIDE AN ACTIVE DISPLAY OF THE
OUTSIDE AIR AND EXHAUST AIR FLOW RATES.
3. CONTRACTOR SHALL COORDINATE THE NUMBER AND TYPE OF POINTS
SHOWN WITH THE CONTRACTING OFFICER.
AUTO/OFF: FANS SHALL BE AUTOMATICALLY ENABLED DURING OCCUPIED
TIMES AND SHALL RUN CONTINUOUSLY AS DESCRIBED BELOW WITH
DAMPERS OPEN. WHEN IN OFF POSITION FANS SHALL SHUT DOWN AND
EXHAUST AND OUTSIDE AIR DAMPER SHALL CLOSE. DAMPERS AND
ACTUATORS PROVIDED WITH UNIT.
DURING OCCUPIED TIMES THE ERV EXHAUST FAN AND THE SUPPLY FAN SHALL
RUN TO PROVIDE VENTILATION AIR.
OCCUPIED TIME: CONTRACTOR SHALL COORDINATE WITH END USER.
CONTROL SYSTEM SHALL MONITOR THE FOLLOWING POINT:
1. DIRTY FILTER ALARM FOR OUTSIDE AIR AND EXHAUST AIR
SET AT 0.5” WC (ADJUSTABLE).
2. DDC SYSTEM SHALL PROVIDE AN ACTIVE DISPLAY OF THE
OUTSIDE AIR AND EXHAUST AIR FLOW RATES.
3. CONTRACTOR SHALL COORDINATE THE NUMBER AND TYPE OF POINTS
SHOWN WITH THE CONTRACTING OFFICER.
ENERGY RECOVERY UNIT ERV-1
ENERGY RECOVERY UNIT ERV-2
ENERGY RECOVERY UNIT ERV-3
SUPPLY/RETURN
AIRFLOW
SUPPLY/
EXHAUST
FILTER
PRESSURE
O A
E X
H A
U S
T A
IR
T
E M
P E
R A
T U
R E
S U
P P
L Y
A
IR
P R
E S
S U
R E
S U
P P
L Y
A
IR
T E
M P
E R
A T
U R
E
SUPPLY AIR TO
FAN COIL UNITS
E X
H A
U S
T F
R O
M R
E S
T R
O O
M S
A N
D B
R E
A K
R O
O M
FACTORY
DAMPER
HC-1
CC-1
TO FAN COIL FC-3
TO THE FITNESS AREA
D A
M P
E R
P O
S
IT
IO
N
FIL
TE
R
FILTER
SUPPLY/RETURN
AIRFLOW
SUPPLY/
EXHAUST
FILTER
PRESSURE
O A
E X
H A
U S
T A
IR
T
E M
P E
R A
T U
R E
E X
H A
U S
T
S U
P P
L Y
A
IR
T E
M P
E R
A T
U R
E
ROOF
OUTSIDE AIR
INTAKE HOOD
FACTORY
DAMPER
D A
M P
E R
P O
S
IT
IO
N
FIL
TE
R
FILTER
SUPPLY/RETURN
AIRFLOW
SUPPLY/
EXHAUST
FILTER
PRESSURE
O A
E X
H A
U S
T A
IR
T
E M
P E
R A
T U
R E
E X
H A
U S
T S
U P
P L Y
A
IR
T E
M P
E R
A T
U R
E
FACTORY
DAMPER
D A
M P
E R
P O
S
IT
IO
N
FIL
TE
R
FILTER
EXHAUST FROM REST ROOMS
AND BREAK ROOM 1
ROOF
RELIEF AIR
INTAKE HOOD
ROOF
OUTSIDE AIR
INTAKE HOOD
E X
H A
U S
T
RELIEF AIR
INTAKE HOOD
ROOF
TO FAN COIL FC-2
ROOF
OUTSIDE AIR
INTAKE HOOD
ROOF
RELIEF AIR
INTAKE HOOD
AIVALVE
POSITION
HEATING
VALVE
04/30/2023 ISSUED FOR CONSTRUCTION
1 07/27/2023 ADDENDUM #1
3. VIRTUAL METER VALUES SHALL BE CALCULATED USING STANDARD THERMODYNAMIC EQUATIONS FROM MEASURED DDC POINTS SUCH AS
AMPERAGES, AIR & WATER FLOW MEASUREMENT, SPEED SIGNALS, VFD FEEDBACKS, TEMPERATURE SENSORS, AND BALANCING INFORMATION FOR
CONSTANT VOLUME FANS AND PUMPS
2. REFER TO SPECIFICATION 230923.02 1.5 FOR SOFTWARE LICENSING
1. REFER TO SPECIFICATION 230900 1.4.11 ENERGY METERING FOR OVERALL REQUIREMENTS OF THE VIRTUAL METERING SYSTEM
NOTES:
UNIT HEATER UH-1,2,3 3 1 1
CABINET UNIT HEATER CUH-1,2,3 3 1 1
MAN COOLER MC-1A, B, C, D 4 1 1
EXHAUST FANS EF-1 TO 5 5 1 1
VAV TERMINAL UNITS VAV-100'S, 200'S, 300'S 49 1 1
FAN COILS UNITS FC-1 TO 12 12 3 1 1 1
ENERGY RECOVERY VENTILATOR ERV-1,2,3 3 3 1 1 1
COIL SCHEDULE CC-1, HC-1 2 2 1 1
AIR HANDLING UNITS AHU-1,2,3 3 3 1 1 1
PUMPS PUMPS 1A,B, 2A,B, 3,4,5 7 1 1
CHILLED WATER SECONDARY LOOP 1 1 1
DRY BED COOLER DB-1 1 1 1
CHILLERS CH-1,2 2 1 1
BOILER SECONDARY LOOP 1 1 1
BOILER B-1,2 BOIL-1,2 2 1 1
MECHANICAL EQUIPMENT DESIGNATION
QUANTITY OF
EQUIPMENT
QUANTITY OF
VIRTUAL
METERS
SUPPLY FAN
KWH
RETURN /
EXHAUST
FAN KWH
HEATING
BTU/HR
COOLING
BTU/HR
VFD
FEEDBACK
KWH
VIRTUAL METERS
THE FOLLOWING LISTS THE DIFFERENT VIRTUAL METERS THAT WILL BE CREATED FOR EACH TYPE OF EQUIPMENT
VIRTUAL ENERGY METERS
0 1" 2"
SCALE
FILENAME
CIVIL
STRUCTURAL
ARCHITECTURAL
ELECTRICAL
MECHANICAL
FIRE PROTECTION
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
C. STATSER
C. GIPSON
D. HOGAN
M. OSSANNA
T. PRICE
J. CAMPBELL
COMMUNICATIONS M. ADKISON
B
IM
/1
J V
C
H M
C a m p M u rr a y A
S O
G F a c ili ty /1
-M
F E
C .r v t
/2
/2
:3
:3
P M
M706 10078627
CHRIS MANZ
HDRE_ALL_DISCIPLINES.rte
HVAC SCHEDULES
CAMP MURRAY
ASOG FACILITY
AIR SUPPORT
OPERATIONS CENTER
4. ALL CONTROL VALVES SHALL BE 2-POSITION ON/OFF VALVES
3. CONTACTOR AND DISCONNECT BY ELECTRICAL.
FLOW PATTERN TO MAXIMIZE AIR DISTRIBUTION AT FLOOR.
2. PROVIDE WITH LOUVER CONE TO DIRECT AIR DOWN. ADJUST TO MAXIMIZE AIR
1. UNIT HEATERS SHALL BE MOUNTED APPROXIMATELY 10' ABOVE THE FINISHED FLOOR.
NOTES:
NOTES 1,2,3 1,2,3 1,3,4,5
MANUFACTURER STERLING STERLING STERLING
MODEL VS-40* VS-40* HS-108
AREA/LOCATION SERVED 1407 FIRE SUPPLY 1227 MECH 1408 VEHICLE BAY
WEIGHT 35 LBS 35 LBS 50 LBS
DIMENSIONS (IN) 18"X18"X7" 18"X18"X7" 24"X18"X14"
CONTROL VALVE FAILURE... OPEN OPEN OPEN
CONTROL VALVE ARRANGEMENT 2-WAY 2-WAY NOTE 5
CONTROL VALVE Cv 0.8 0.8 1.9
CONTROL VALVE SIZE 1/2" 1/2" 1/2"
RUNOUT PIPE SIZE 3/4" NPT 3/4" NPT 3/4" NPT
FLUID 140⁰ @ 30% PG 140⁰ @ 30% PG 140⁰ @ 30% PG
FLOW RATE 1 GPM 1 GPM 3 GPM
MBH 16.7 16.7 16.7
H E
A T
IN
G
EAT DEG F 60 60 60
VOLTS / PHASE 110/1 110/1 110/1
HP 1/40 1/40 1/12
RPM 1,550 1,550 1,000
DISCHARGE ORIENTATION DOWNFLOW DOWNFLOW HORIZONTAL
OUTLET VELOCITY (FPM) 877 877 1,000
G E
N E
R A
L
CFM 600 600 1,800
DESIGNATION UH-1 UH-2 UH-3A & 3B
UNIT HEATER SCHEDULE
B. ACTUATOR TO BE OUTSIDE OF AIR STREAM.
A. FRAME TYPE TO BE COORDINATED WITH CONTRACTOR.
GENERAL NOTES (APPLY TO ALL DAMPERS):
4. DAMPER SHALL MEET AMCA STANDARD 511 1A OF NOT GREATER THAN 3 CFM AT 1" W.C.
3. PROVIDE ACTUATOR EQUIVALENT TO BELIMO AFB24 WITH 180 INCH POUNDS OF TORQUE WITH SPRING RETURN.
2. PROVIDE ACTUATOR EQUIVALENT TO BELIMO NFB24-MFT WITH 90 INCH POUNDS OF TORQUE WITH SPRING RETURN.
1. PROVIDE ACTUATOR EQUIVALENT TO BELIMO LF24 WITH 35 INCH POUNDS OF TORQUE AND SPRING RETURN.
KEY NOTES:
NOTES: 1, 4 NOT USED NOT USED NOT USED NOT USED NOT USED 2,4 2,4 2,4 2,4 2,4 2,4
MANUFACTURER RUSKIN NOT USED NOT USED NOT USED NOT USED NOT USED RUSKIN RUSKIN RUSKIN RUSKIN RUSKIN RUSKIN
MODEL CD36 NOT USED NOT USED NOT USED NOT USED NOT USED CD36 CD36 CD36 CD36 CD36 CD36
LOCATION EF-5 MECH PLATFORM NOT USED NOT USED NOT USED NOT USED NOT USED 1408 VEHICLE BAY 1408 VEHICLE BAY 1408 VEHICLE BAY 1407 FIRE SUPP 1407 FIRE SUPP 1227 MECH
REQUIRED TORQUE FOR DAMPER... 25 IN-LBS NOT USED NOT USED NOT USED NOT USED NOT USED 45 IN-LBS 25 IN-LBS 25 IN-LBS 25 IN-LBS 25 IN-LBS 45 IN-LBS
FAIL POSITION CLOSED NOT USED NOT USED NOT USED NOT USED NOT USED CLOSED CLOSED CLOSED CLOSED CLOSED CLOSED
OPERATION 2-POSTION NOT USED NOT USED NOT USED NOT USED NOT USED 2-POSTION 2-POSTION 2-POSTION 2-POSTION 2-POSTION 2-POSTION
BLADES ALUMINUM WITH SEALS NOT USED NOT USED NOT USED NOT USED NOT USED ALUMINUM WITH SEALS ALUMINUM WITH SEALS ALUMINUM WITH SEALS ALUMINUM WITH SEALS ALUMINUM WITH SEALS ALUMINUM WITH SEALS
LINKAGE CONCEALED IN FRAME NOT USED NOT USED NOT USED NOT USED NOT USED CONCEALED IN FRAME CONCEALED IN FRAME CONCEALED IN FRAME CONCEALED IN FRAME CONCEALED IN FRAME CONCEALED IN FRAME
FRAME AND BLADE MATERIAL ALUMINUM NOT USED NOT USED NOT USED NOT USED NOT USED ALUMINUM ALUMINUM ALUMINUM ALUMINUM ALUMINUM ALUMINUM
BLADE ACTION PARALLEL BLADE NOT USED NOT USED NOT USED NOT USED NOT USED PARALLEL BLADE PARALLEL BLADE PARALLEL BLADE PARALLEL BLADE PARALLEL BLADE PARALLEL BLADE
PRESSURE LOSS ACROSS DAMPER 0.06' NOT USED NOT USED NOT USED NOT USED NOT USED 0.1" 0.06' 0.06' 0.06' 0.06' 0.09"
FACE VELOCITY (FEET/MIN) 675 NOT USED NOT USED NOT USED NOT USED NOT USED 213 675 675 675 675 300
CFM MAX. 1,200 NOT USED NOT USED NOT USED NOT USED NOT USED 850 1,700 235 235 235 1,200
FACE AREA (SQUARE FEET) 1.8 NOT USED NOT USED NOT USED NOT USED NOT USED 4.0 1.8 0.4 0.4 2.3 4.0
DAMPER HEIGHT (INCHES) 16 NOT USED NOT USED NOT USED NOT USED NOT USED 24 16 8 8 18 24
DAMPER WIDTH (INCHES) 16 NOT USED NOT USED NOT USED NOT USED NOT USED 24 16 8 8 18 24
SERVICE EXHAUST NOT USED NOT USED NOT USED NOT USED NOT USED INTAKE EXHAUST EXHAUST EXHAUST INTAKE INTAKE
DESIGNATION MD-1 MD-2 MD-3 MD-4 MD-5 MD-6 MD-7A, 7B MD-8 MD-9 MD-10 MD-11 MD-12
MOTORIZED DAMPER SCHEDULE
FC-2 = 1080 CFM
AHU-3 = 2900 CFM
AHU-2 = 2100 CFM
AHU-1 = 1300 CFM
5. SUPPLY RATE IS AS FOLLOWS:
FC-2 = 865 CFM
AHU-3 = 2320 CFM
AHU-2 = 1680 CFM
AHU-1 = 1040 CFM
4. EXHAUST RATE IS AS FOLLOWS:
3. SUPPLY AIR IS SUM OF OA TO AHU-1,2,3 AND FC-2.
2. BALANCE ERV-2 TO SO THE RETURN AIR TOTAL IS AS SHOWN.
1. EXHAUST AIR FLOW IS THE SUM OF THE RESTROOM AREA + BREAK ROOM 2.
NOTES:
5. ALL UNITS SHALL BE FURNISHED WITH DOUBLE WALL CONSTRUCTION.
4. PROVIDE UNITS WITH INTEGRAL LOW LEAKAGE DAMPERS (3 CFM AT 1" WC MAX) AND ACTUATOR ON ALL OUTSIDE AND EXHAUST
AIR DUCTS.
3. CONTROLS SHALL BE COMPATIBLE WITH BUILDING DDC SYSTEM.
2. PROVIDE WITH SINGLE POINT ELECTRICAL CONNECTION, WITH STARTER AND DISCONNECT.
1. UNITS SHALL BE CONSTANT VOLUME.
APPLIES TO ALL:
NOTES: 1 2 3,4
MANUFACTURER RENEWAIRE RENEWAIRE RENEWAIRE
MODEL HE-3X HE-2X HE2XINV
AREA SERVED
FITNESS
AREA/RESTROOMS
FC-3
SECURE FAN COILS AHU-1,2,3
FC-2
PRE-FILTER EFF MERV 8 MERV 8 MERV 8
WEIGHT LBS. 900 600 2,600
LENGTH INCHES 72" 59" 81"
WIDTH INCHES 63" 42" 125"
HEIGHT INCHES 44" 35" 71''
VOLTAGE 460/3 460/3 460/3
RETURN FAN MOTOR HP 3 HP WITH BELT DRIVE 2 HP WITH BELT DRIVE 5 HP WITH BELT DRIVE
SUPPLY FAN MOTOR HP 3 HP WITH BELT DRIVE 2 HP WITH BELT DRIVE 5 HP WITH BELT DRIVE
OUTSIDE AIR ENTERING AIR TEMP (DB/WB) - SUMMER 85/65 85/65 85/65
OUTSIDE AIR ENTERING AIR TEMP (DB/WB) - WINTER 29/21 29/21 29/21
RETURN ENTERING AIR TEMP (DB/WB) - SUMMER 78/63 78/63 78/63
RETURN ENTERING AIR TEMP (DB/WB) - WINTER 70/54 70/54 70/54
EXTERNAL STATIC PRESSURE (EXHAUST) 1.25" 1" 1
EXHAUST CFM MAX 2,880 600 5,905
SUPPLY LEAVING AIR TEMP (DB/WB) - SUMMER 79/63 79/63 79/63
SUPPLY LEAVING AIR TEMP (DB) - WINTER 55/42 58/44 53/41
EXTERNAL STATIC PRESSURE (SUPPLY) 1.0" 1" 1"
SUPPLY CFM MAX 3,070 715 7,380
DESIGNATION ERV-1 ERV-2 ERV-3
DEDICATED ENERGY RECOVERY VENTILATOR UNIT SCHEDULE
04/30/2023 ISSUED FOR CONSTRUCTION
1 07/27/2023 ADDENDUM #1
Specifications
Construct ASOG Complex Contract Number: ETRD169847 Type B-3 Final 30 September 2021
SECTION 01 33 00
SUBMITTAL PROCEDURES
08/18
PART 1 GENERAL
1.1 SUMMARY
1.1.1 Submittal Information
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
1.1.2 Project Type
The Contractor's Quality Control (CQC) System Manager are to check and approve all items before submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:
Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.
The Contractor and the Designer of Record (DOR), if applicable, are to check and approve all items before submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .