05a SOW Attch1 Base Map.pdf

PDF 991 KB Posted

Attached to
Base-wide Fire Alarm - Amendment 01 Federal contract opportunity
Solicitation number
W50S9E22B002
Issued by
Department of the Army National Guard

About this file

This document contains a solicitation for a firm fixed-price contract to provide a base-wide fire alarm repair and upgrade at Camp Murray, Washington. The 194th Wing of the Washington Air National Guard is seeking to award a single contract to provide all plant, labor, materials, tools, equipment, and supervision necessary to complete the project based on a 100% design. The scope of work includes modernizing the fire alarm system with addressable Monaco brand panels that integrate with the existing American Signal Corp brand Mass Notification and Warning System. An option is included to integrate the fire alarm system into the existing MNWS. The magnitude of the contract is estimated between $1,000,000 and $5,000,000. Interested offerors must be registered in the System for Award Management. All inquiries must be submitted in writing to the 194th Contracting Office by the specified date.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A m e r i c a n L a k e

WDFW Public Boat Launch

Beard Island

Core Island

Luzon Island Med ical Co rp Rd

Campground Naval Militia Loop

Cavalry Lane

803rd Engineer Drive

Armor Drive

Aviation Drive

Cavalry Lane

Murray Creek

41st Division Way

Militia Drive

Infantry Drive

Infantry Drive

Quartermaster Road

Pierce County Readiness Center

Storage

Air Defense Lane

41st Division Way

Engineer Dr

41stDivisionWay

Co as t A rt i l ler y R oa d

Ar mo r D riv e

Armor Dr

Berkeley St SW

Washington Ave SW

Grant Ave SW Portland Ave SW

Union Ave SW

Milita ry Road

Boundary St

W Th o rn e L n S W

Jackson Ave

Blaine Ave

JBLM

Main Post

Tillicum

North JBLM

§̈¦5 North

JBLM

South Gate

Main Gate

Commercial Inspection Gate

4B

FieldA rtiller yTrail

6A

5C

20B

5D

5E

51 50

5A

5B

117 65

39A

B3

34A

20A

104A

4A 4C

B2

98A

5H

104B

B1

17A

98B

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

7 7

6 6

5 5

4 4

3 3

2 2

1 1

Camp Murray Installation Map

BLDG # GRID BLDG # GRID

1 F5 44 E4 2 F5 45 E4 3 F5 46 E4

4A D4 47 E4 4B D4 48 E4 4C D4 49 E4 5 D5 50 C7

5A D5 51 C7 5B D5 53 D7 5C D4 54 D6 5D D4 57 D7 5E D5 61 D6 6 D6 62 D6

6A D5 63 D6 7 F5 64 D6 8 F3 65 D6 9 F5 90 G3 12 D4 91 G3 13 D4 92 G3 15 F4 98A F2 16 F4 98B F2 17 F4 99 G3

17A F4 101 C6 17B F4 102 C6 18 F4 103 C6 19 F3 104 D6 20 F3 104A D6

20A E3 105 C6 20B F3 106 C6 21 E5 107 C6 23 F4 109 C6 24 F4 112 C5 25 E6 113 C5 26 F5 114 C6 32 E4 116 D5 33 G4 117 D6 34 E3 118 F5

34A E3 120 E6 36 D4 126 E6 39 D3 127 E6 40 E4 137 D4 41 E4 B1 C4 42 E4 B2 C4 43 E4 B3 C4

Exit 122

0 250 500 750 1,000125 Feet

Fence Railroad Buildings Installation Area

Date Created: March 1, 2016

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Project Location

Slide Number 1

File details come from the government source that posted it. Updated .