05a SOW Attch1 Base Map.pdf
PDF 991 KB Posted
- Attached to
- Base-wide Fire Alarm - Amendment 01 Federal contract opportunity
- Solicitation number
- W50S9E22B002
- Issued by
- Department of the Army National Guard
About this file
This document contains a solicitation for a firm fixed-price contract to provide a base-wide fire alarm repair and upgrade at Camp Murray, Washington. The 194th Wing of the Washington Air National Guard is seeking to award a single contract to provide all plant, labor, materials, tools, equipment, and supervision necessary to complete the project based on a 100% design. The scope of work includes modernizing the fire alarm system with addressable Monaco brand panels that integrate with the existing American Signal Corp brand Mass Notification and Warning System. An option is included to integrate the fire alarm system into the existing MNWS. The magnitude of the contract is estimated between $1,000,000 and $5,000,000. Interested offerors must be registered in the System for Award Management. All inquiries must be submitted in writing to the 194th Contracting Office by the specified date.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A m e r i c a n L a k e
WDFW Public Boat Launch
Beard Island
Core Island
Luzon Island Med ical Co rp Rd
Campground Naval Militia Loop
Cavalry Lane
803rd Engineer Drive
Armor Drive
Aviation Drive
Cavalry Lane
Murray Creek
41st Division Way
Militia Drive
Infantry Drive
Infantry Drive
Quartermaster Road
Pierce County Readiness Center
Storage
Air Defense Lane
41st Division Way
Engineer Dr
41stDivisionWay
Co as t A rt i l ler y R oa d
Ar mo r D riv e
Armor Dr
Berkeley St SW
Washington Ave SW
Grant Ave SW Portland Ave SW
Union Ave SW
Milita ry Road
Boundary St
W Th o rn e L n S W
Jackson Ave
Blaine Ave
JBLM
Main Post
Tillicum
North JBLM
§̈¦5 North
JBLM
South Gate
Main Gate
Commercial Inspection Gate
4B
FieldA rtiller yTrail
6A
5C
20B
5D
5E
51 50
5A
5B
117 65
39A
B3
34A
20A
104A
4A 4C
B2
98A
5H
104B
B1
17A
98B
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
7 7
6 6
5 5
4 4
3 3
2 2
1 1
Camp Murray Installation Map
BLDG # GRID BLDG # GRID
1 F5 44 E4 2 F5 45 E4 3 F5 46 E4
4A D4 47 E4 4B D4 48 E4 4C D4 49 E4 5 D5 50 C7
5A D5 51 C7 5B D5 53 D7 5C D4 54 D6 5D D4 57 D7 5E D5 61 D6 6 D6 62 D6
6A D5 63 D6 7 F5 64 D6 8 F3 65 D6 9 F5 90 G3 12 D4 91 G3 13 D4 92 G3 15 F4 98A F2 16 F4 98B F2 17 F4 99 G3
17A F4 101 C6 17B F4 102 C6 18 F4 103 C6 19 F3 104 D6 20 F3 104A D6
20A E3 105 C6 20B F3 106 C6 21 E5 107 C6 23 F4 109 C6 24 F4 112 C5 25 E6 113 C5 26 F5 114 C6 32 E4 116 D5 33 G4 117 D6 34 E3 118 F5
34A E3 120 E6 36 D4 126 E6 39 D3 127 E6 40 E4 137 D4 41 E4 B1 C4 42 E4 B2 C4 43 E4 B3 C4
Exit 122
0 250 500 750 1,000125 Feet
Fence Railroad Buildings Installation Area
Date Created: March 1, 2016
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Project Location
Slide Number 1
File details come from the government source that posted it. Updated .