Q and A as of 3Aug22 W50S9C22B0004 Replace B-120 Chiller.pdf
PDF 152 KB Posted
- Attached to
- VTANG Replace B-120 Chiller
- Solicitation number
- W50S9C-22-B-0004
About this file
This document contains questions and answers related to federal contract solicitation number W50S9C-22-B-0004 from the Vermont Army National Guard to replace an existing 81-ton roof-mounted chiller on Building 120 with a new ground-mounted chiller system. The project includes all required electrical, mechanical, plumbing piping, controls and wiring for a complete operational system as indicated in the project drawings and specifications. Site work will modify the flightline fence to maintain security during construction near the flightline. Work will require sequencing with the new chiller constructed first, a maximum two week transfer to the new system, and demolition/removal of the existing chiller afterwards. The construction contractor will provide any redline drawings and operation/maintenance manuals to the government.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W50S9C-22-B-0004
REPLACE B-120 CHILLER
QUESTIONS and ANSWERS
As of 8/3/22
1. Question: In lieu of using the ASTM C547 and ASTM C795 rigid molded noncombustible, with wicking materiel as specified in the HVAC PIPING INSULATION SPEC NUMBER 23 07 19, page 2, paragraph 2.2 Note A. and Weatherproofed with smooth Aluminum and aluminum fitting covers.
Can we use 2" thick polyunsaturate (urethane) pipe insulation with a ASJ jacket vapor barrier, weather proofed with a PVC jacket and use PVC fitting covers?
Answer: The exterior above grade piping is called out in specification 23 21 13 – Hydronic Piping section 2.3.A as factory insulated HDPE pipe and does not require additional insulation.
The proposed insulation is allowable with 2.3.B PP-RCT piping. The scheduled insulation in 23 07 19 – Piping Insulation section 2.2.A is for the interior chilled water piping required for the piping for the bypass valve.
2. Question: What is the weight of the existing chiller to be removed?
Answer: The existing chiller weighs approximately 12,000 lbs.
3. Question: Please confirm the location of the existing 2-way valve within the Special Access Program Facility (SAPF) that requires replacement with a 3-way valve and describe access situation in the area of the valve?
Answer: The note pertaining to replacing the 2-way valve on HVAC-1 is to be removed as the existing 2-way valve shall remain as is. Install the bypass as indicated on the first floor partial piping plan with a 2-1/2” bypass line, 2-way valve and a circuit setter set for 105 GPM.
(Wording revised 3 Aug 22)
4. Question: Please confirm the intent is to remove the section of existing fence on C-1 where the new bump out around the Chiller is indicated?
Answer: Confirmed.
5. Question: What is the existing glycol %?
Answer: 30% Propylene Glycol/70% Water
6. Question: Is lightning protection required on the Chiller?
Answer: No.
7. Question: Where the new pipes run vertically down the SAPF simulator wall on the East side just North of the ladder near the corner, can we attach brackets to the wall?
W50S9C-22-B-0004
REPLACE B-120 CHILLER
QUESTIONS and ANSWERS
As of 8/3/22
Answer: Yes if the attachment does not penetrate the wall. Refer to - WALL TYPES-BI ADD_072922.pdf. (Wording revised 3 Aug 22)
8. Question: Are there any special requirements when we cap the pipes and conduit that penetrate the roof of the SAPF?
Answer: Yes. The contactor shall treat existing abandoned penetrations as spare conduits per IC Tech Spec for ICD/ICS705 Section G. SCIF Perimeter Penetrations Criteria. “Installation of additional conduit penetration for future utility expansion is permissible provided the expansion conduit is filled with acoustic fill and capped (end of pipe cover).”
Additionally, the government will perform a sound test on capped conduits to verify that the contactors workmanship meets (Sound Transmission Class) STC-50 criteria. (Wording revised 3 Aug 22)
REMINDER – ALL QUESTIONS MUST BE SUBMITTED FIVE WORKING DAYS PRIOR TO