Replace B-120 Chiller CURZ 212316 Construction Drawings - June 3 2022.pdf
PDF 9 MB Posted
- Attached to
- VTANG Replace B-120 Chiller Federal contract opportunity
- Solicitation number
- W50S9C-22-B-0004
About this file
This solicitation is for replacement of an existing 81-ton roof-mounted chiller on Building 120 at the Vermont Army National Guard. The project includes removal of the existing chiller and installation of a new ground-mounted chiller, along with all associated electrical, mechanical and plumbing work. Site work will modify the flightline fence to maintain security during construction. The contractor must provide a sequenced work plan with a maximum two-week transfer period from existing to new chiller. The contractor will also submit redline drawings and operation/maintenance manuals. The solicitation was issued by the Department of the Army Vermont Army National Guard for this chiller replacement project at the South Burlington, Vermont facility.
View the file
Other files for this federal contract opportunity
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GEN
OFFICER
FW/CCFW/CVMSG/CC
OG/C
C
MDG/CC
GEN
OFFICER
FW/CCFW/CVMSG/CC
OG/C
C
MDG/CC
BASE LOCATION MAP • REPLACE B-120 CHILLER
NOT TO SCALE
PROJECT
NORTH
TAXIWAY E
TA
X
IW
AY
F
N C
O D
R
IV
E
323321 322
N
CO
D
RIV
E
N C
O D
R
IV
E
FA
LCON ST
REET
FAA
TOWERS
NATIONAL
BASE
ENTRANCE
G U
A
RD
AV
EN
U E
GATE
HOUSE
SECONDARY
HAUL ROUTE:
MAY BE USED
FOR LARGE
DELIVERIES W/
5 DAYS NOTICE NORTH
GATE
HOUSE
NORTH
CONSTRUCTION
ENTRANCE
PV ARRAY
TA
X
IW
AY
F
PRIMARY
HAUL
ROUTE
REPLACE B-120
CHILLER
VERMONT AIR NATIONAL GUARD
SOUTH BURLINGTON, VERMONT
CURZ 212316
CONSTRUCTION DRAWINGS
JUNE 3, 2022
DRAWING SYMBOLS
ABBREVIATIONS
FF finish floor FE fire extinguisher FLG flashing FD floor drain FRT fire retardant FTG footing FND foundation GA gage, gauge GALV galvanized GC general contract(or) GWB gypsum wall board HWD hardwood HVAC heating, ventilating & air conditioning HT height HOR horizontal HPDL high pressure decorative laminate ID inside diameter INS insulation JAN janitor JT joint LAV lavatory MAX maximum MDF medium density fiberboard MECH mechanical MFR manufacturer MH manhole MO masonry opening MTL metal MIN minimum NIC not in contract NTS not to scale OC on center OD outside diameter OPNG opening OP-CI owner provided-contractor installed OP-OI owner provided-owner installed
PNT paint(ed) PR pair PL plate PT pressure treated PWD plywood REF refrigerator R riser RM room RO rough opening SAC suspended acoustic ceiling SHTH sheathing SIM similar SPEC specification(s) SQ square STD standard SD storm drain STRUC structural SYS system TBP tile backing panel TDO thermoset decorative overlay TEL telephone TG tempered glass THK thick(ness) TH threshold T&G tongue & groove TOC top of concrete TOM top of masonry TOS top of steel TOW top of wall T tread TYP typical UNO unless noted otherwise VERT vertical VCT vinyl composition tile VR vapor retarder VT vinyl tile WG wire glass W/O without WD wood
C O N S U L T A N T S
A R C H I T E C T S
1 1 7 S t P a u l S t r e e t 3 r d F l o o r
B u r l i n g t o n, V t.
0 5 4 0 1
P: 8 0 2 • 8 6 3 • 2 2 2 7
F: 8 0 2 • 8 6 3 • 0 0 9 3
ALVAR E Z
SIENKIEWYCZ
S M I T H
C I V I L
MECHANICAL
SAS PROJECT NO. 1209
ABI additive bid item ACT acoustic ceiling tile ADJ adjustable AFF above finish floor ALUM aluminum ANC anchor, anchorage ARCH architect(ural) BSMT basement BIT bituminous BLKG blocking BD board BOT bottom BRK brick BLDG building BTWN between CB catch basin CJ control joint CLG ceiling CT ceramic tile CO clean out CL closet CLR clear(ance) COL column CONC concrete CMU concrete masonry unit CONT continuous or continue DP dampproofing DEM demolish, demolition DET detail DIA diameter DWG drawing DF drinking fountain ELEC electric(al) EL elevation ELEV elevator EQ equal EXG existing EXT exterior FG fiberglass FIN finish
KREBS & LANSING
164 MAIN ST.
COLCHESTER, VT 05446
P: 802-878-0375 F: 802-878-9618
MATERIALS
STONE
(PLAN/ELEV.)
COMPACTED
GRANULAR
FILL
CONCRETE
CONCRETE BLOCK
SPRAY APPLIED
URETHANE
INSULATION
RIGID
INSULATION
FINISH
WOOD
ROUGH
WOOD
PLYWOOD
GYPSUM
BOARD
SOUND
ATTENUATION
BATTS
PARTICLE
BOARD OR MDF
TILE BACKING
PANEL
••BRICK
STONE
(SECTION)
STEEL OR HEAVY
GAUGE
METAL
FOAM IN PLACE
INSULATION
INTERIOR ELEVATION
BUILDING SECTION
WALL SECTION
DETAIL
ENLARGED DETAIL
WINDOW TYPE
DOOR NUMBER
VERTICAL ELEVATION
A
Elevation reference number
EL. 100'-0"
A-7
A-2 See this detail...
...on this drawing
A-6
B A-4
B A-4See this section...
...on this drawing
ROOM FINISH SCHEDULE
Room finish schedule reference number for walls
Room finish schedule reference number for base/floors
W1 B1 F1W1 or
LIST OF DRAWINGS
CIVIL DRAWINGS
X-1 EXISTING CONDITIONS SITE PLAN
C-1 SITE PLAN
ARCHITECTURAL DRAWINGS
A-1 EXTERIOR ELEVATION, CONCRETE SLAB DETAILS AND SPECIFICATIONS
YEATON ASSOCIATES
40 SOUTH RIVER
ROAD #36
BEDFORD, NH 03110
P: 603-444-6578
MECHANICAL DRAWINGS
M1.1 MECHANICAL SITE PLAN
M5.1 MECHANICAL DETAILS AND SCHEDULES
S T R U C T U R A L
RICHARD M. DOHERTY, P.E.
595 DORSET STREET
S. BURLINGTON, VT 05403
P: 802-660-9212 F: 802-660-8403 ramp ramp ramp
C O N S U L T A N T S
KREBS & LANSING
164 MAIN ST.
COLCHESTER, VT 05446
P: 802-878-0375 F: 802-878-9618
CIVIL
RICHARD M. DOHERTY, P.E.
595 DORSET STREET #6
SO. BURLINGTON, VT
05403 P: 802-660-9212 F: 802-8660-8403
YEATON ASSOCIATES
40 SOUTH RIVER ROAD #36
BEDFORMD, NH 03110
P: 603-444-6578
STRUCTURAL
SCALE: 1" = 20'
R E V I S I O N S
CHECKED: SWH
DATE:
P R O J E C T
DRAWN: TJB/SWH
VERMONT AIR
NATIONAL
GUARD
JUNE 3, 2022
P: 8 0 2 * 8 6 3 * 2 2 2 7
F: 8 0 2 * 8 6 3 * 0 0 9 3
ALVAR E Z
A R C H I T E C T S
SIENKIEWYCZ
S M I T H
1 1 7 S t. P a u l S t r e e t 3 r d F l o o r
B u r l i n g t o n, V T 05401
MECHANICAL/
ELECTRICAL
REPLACE
B-120
CHILLER
SOUTH BURLINGTON,
VERMONT
TYPE B
SUBMITTAL
X-1
EXISTING
CONDITIONS
SITE PLAN
KL - PROJECT NO: 22102
BUILDING 120
BUILDING 140
NCO Drive
22102/B120-chiller.dwg
SAS PROJECT NO: 1209
CURZ: 212316
ramp ramp
16'
4.
8'
C O N S U L T A N T S
KREBS & LANSING
164 MAIN ST.
COLCHESTER, VT 05446
P: 802-878-0375 F: 802-878-9618
CIVIL
SCALE: 1" = 20'
R E V I S I O N S
CHECKED: SWH
DATE:
P R O J E C T
DRAWN: TJB/SWH
VERMONT AIR
NATIONAL
GUARD
JUNE 3, 2022
P: 8 0 2 * 8 6 3 * 2 2 2 7
F: 8 0 2 * 8 6 3 * 0 0 9 3
ALVAR E Z
A R C H I T E C T S
SIENKIEWYCZ
S M I T H
1 1 7 S t. P a u l S t r e e t 3 r d F l o o r
B u r l i n g t o n, V T 05401
SOUTH BURLINGTON,
VERMONT
TYPE B
SUBMITTAL
C-1
SITE PLAN
KL - PROJECT NO: 22102
BUILDING 120
BUILDING 140
NCO Drive
22102/B120-chiller.dwg
SAS PROJECT NO: 1209
CURZ: 212316
NEW CHILLER
30' x 8' unit on 34' x 10' concrete pad
New 8' chain link fence with vinyl slats.
New underground piping. Refer to mechanical plans for details
X X X X X X X X X X X X X X
X X X X X X X X X X X X X X
X X X X X X X X X X X X X X
RICHARD M. DOHERTY, P.E.
595 DORSET STREET #6
SO. BURLINGTON, VT
05403 P: 802-660-9212 F: 802-8660-8403
YEATON ASSOCIATES
40 SOUTH RIVER ROAD #36
BEDFORMD, NH 03110
P: 603-444-6578
STRUCTURAL
MECHANICAL/
ELECTRICAL
REPLACE
B-120
CHILLER
Restore all disturbed areas with topsoil, seed, and mulch
Four (4) new bollards
The flight line fence shall be secured at the end of each work day. No gaps shall be left in the fence line throughout alteration.
FLIGHT LINE NOTES
1. The work area where the Chiller and pad are to be installed requires removal of a portion of the flight line security fence. Sequence the work so that the relocated new fence is installed first to separate the work area from the ramp on the secure flight line side of the fence.
Access to the work area is predominately from the B-120 parking lot across the lawn..
2. The flight line fence shall be secured at the end of each work day. No gaps shall be left in the fence line throughout alternation.
3. Access to the ramp on the secure side of the flight line fence requires an escort. Organize the work to minimize the need to access the ramp.
VTANG CURZ: 212316
C O N S U L T A N T S
A R C H I T E C T S
1 1 7 S t . P a u l S t r e e t 3 r d F l o o r
B u r l i n g t o n , V T 0 5 4 0 1
P: 8 0 2 • 8 6 3 • 2 2 2 7
F: 8 0 2 • 8 6 3 • 0 0 9 3
ALVAR E Z
SIENKIEWYCZ
S M I T H
R E V I S I O N S
SAS PROJECT NUMBER: 1209
P R O J E C T
COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC
DATE: JUNE 3, 2022
SCALE: AS NOTED
DRAWN BY: SAL
CHECKED: SHS
YEATON ASSOCIATES
40 SOUTH RIVER ROAD #36
BEDFORD, NH 03110
P: 603-444-6578
M E C H A N I C A L / E L E C T R I C A L
CIVIL ENGINEERING ASSOCIATES
10 MANSFIELD VIEW LANE
SOUTH BURLINGTON, VT 05403
P: 802-864-2323
C I V I L
RICHARD M. DOHERTY, P.E.
595 DORSET STREET
S. BURLINGTON, VT 05403
P: 802-660-9212
S T R U C T U R A L
REPLACE
B-120
CHILLER
VERMONT AIR
NATIONAL
GUARD
SOUTH BURLINGTON,
VERMONT
TVXZ R Q P
WEST ELEVATION OF B-120
3/16" = 1'-0"
30' LONG MODULAR CHILLER
UNIT ON A NEW REINFORCED
CONCRETE SLAB
RELOCATE AND REPLACE FENCE
16'-0"
INSULATED PIPES
EXISTING BOLLARDS
CHAIN LINK FENCE
CONDUIT
34'-0"
CONCRETE SLAB
PIPE BRACKETS
EXISTING SCORED
SPLIT FACE CMU
VENEER
EXISTING PREFINISHED
CORRUGATED METAL
SIDING ATTACHED TO 1"
RECESSED SMOOTH CMU
VENEER.
8'-0"
A-1
12" SLAB-ON-GRADE
34'-0"
'-0
A-1
PLAN • CHILLER SLAB
1/4" = 1'-0"2
CHILLER
SEE CIVIL SITE DRAWING FOR LOCATION
STRUCTURAL EARTHWORK
1. PRIOR TO PLACING COMPACTED CRUSHED STONE, ALL ORGANIC MATERIAL, TOPSOIL,
DEBRIS AND ANY OTHER DELETERIOUS MATERIAL SHALL BE REMOVED.
2. CRUSHED STONE SHALL BE CLEAN, HARD, CRUSHED STONE, MEETING THE
REQUIREMENTS OF THE FOLLOWING TABLE:
SIEVE DESIGNATION %PASSING
1 3/4" 100
1 1/2" 90-100
1" 20-55
3/4" 0-15
3/8" 0-5
3. CRUSHED STONE SHALL BE PLACED IN 8-INCH LAYERS, SPRAYED WITH WATER, AND
COMPACTED WITH A VIBRATORY PLATE COMPACTER.
4. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT, A SIEVE ANALYSIS FOR
THE CRUSHED STONE. THE TEST SHALL BE CONDUCTED, AT THE CONTRACTOR'S
EXPENSE, BY A TESTING FIRM APPROVED BY THE ENGINEER. ADDITIONAL SAMPLES
SHALL BE TESTED UNTIL A MATERIAL MEETING THE ABOVE REQUIREMENTS IS PROVIDED.
5. CONTRACTOR SHALL DESIGN, FURNISH AND INSTALL ALL TEMPORARY SHEETING,
SHORING AND BRACING NECESSARY TO SAFELY COMPLETE THE CONSTRUCTION.
CONCRETE NOTES
1. ALL CONCRETE SHALL BE NORMAL WEIGHT HAVING A MINIMUM COMPRESSIVE STRENGTH
OF 4,000 PSI AT 28 DAYS WITH THE FOLLOWING REQUIREMENTS:
28 Day Compressive Strength(psi) 4,000
Max. WaterCement Ratio (lb./lb.) 0.44
Min. Cement Factor (Sacks/C.Y.) 7.0
Entrained Air Content (%) 5-7
Slump (Inches, before adding HRWR) 2-4
ADMIXTURES -USE AIR ENTRAINING AGENT CONFORMING TO ASTM C260 WITH 5-7%
TOTAL AIR. USE HIGH RANGE WATER REDUCING AGENT CONFORMING
TO ASTM C494 IN ALL CONCRETE.
DESIGN MIX - SUBMIT A CURRENT DESIGN MIX, WITH 28 DAY COMPRESSIVE
STRENGTH TEST, TO THE ENGINEER FOR APPROVAL PRIOR TO
STARTING CONSTRUCTION.
2. ALL REINFORCING STEEL SHALL COMPLY WITH ASTM A615, GRADE 60.
3. REINFORCEMENT SHALL BE SECURELY TIED IN ITS PROPER PLACE BEFORE AND DURING
POURING OPERATIONS USING APPROVED CHAIRS AND SPACERS AS REQUIRED.
4. PROPER VIBRATION OF THE CONCRETE IS IMPORTANT IN THE PLACEMENT OF ALL
CONCRETE; THE CONTRACTOR SHALL MAKE PROVISIONS FOR BACK-UP VIBRATION
EQUIPMENT.
5. CURING
CONCRETE SHALL BE SPRAYED WITH A CURING COMPOUND.
6. THE CONTRACTOR WILL EMPLOY A QUALIFIED ENGINEERING TESTING FIRM TO PERFORM
STANDARD FIELD TESTING OF THE CONCRETE WORK. ONE SET OF 4 CYLINDERS SHALL
BE CAST AND TESTED FOR EACH DAY’S POUR. IN ADDITION, CONCRETE DENSITY,
TEMPERATURE, SLUMP AND AIR CONTENT SHALL BE RECORDED. SEND COPIES OF THE
TEST RESULTS TO THE OWNER AND THE ENGINEER.
3" C
LR
1/
2" C
LR
. #6 @ 12" O.C. EACH WAY
TOP & BOTTOM
12" COMPACTED CRUSHED STONE
1" CHAMFER, TYP.
12" SLAB
COOLING TOWER
OPERATING WEIGHT
22,670 LBS
10'-0" x 34'-0"
SECTION THRU CHILLER SLAB
3/4" = 1'-0"1
3"
APPROXIMATE
GRADE
EXTERIOR ELEVATION,
CONCRETE
SLAB DETAILS
AND SPECIFICATIONS
BOLLARD DETAIL
1" = 1'-0"3
4' -0
1'
-0
4' -0
REMOVABLE
YELLOW PLASTIC
SLEEVE
8" STD. GALV.
STEEL PIPE
GRADE
FILL BOLLARD
WITH CONCRETE,
DOME TOP.
3'-0"SQ. x 12" CONCRETE
FOOTING WITH #4 BARS
BOTH WAYS
C O N S U L T A N T S
A R C H I T E C T S
1 1 7 S t. P a u l S t r e e t
3 r d F l o o r
B u r l i n g t o n, V T
0 5 4 0 1
P: 8 0 2 • 8 6 3 • 2 2 2 7
F: 8 0 2 • 8 6 3 • 0 0 9 3
ALVAR E Z
SIENKIEWYCZ
S M I T H
R E V I S I O N S
DATE: JUNE 3, 2022
SCALE: AS NOTED
CHECKED:
DRAWN:
SAS PROJECT NO: 1209
CURZ : 212316
P R O J E C T
REPLACEMENT
B-120
CHILLER
VERMONT AIR
NATIONAL
GUARD
SOUTH BURLINGTON,
VERMONT
CIVIL
CIVIL ENGINEERING
ASSOCIATES
10 MANSFIELD VIEW LANE
SOUTH BURLINGTON, VT 05403
STRUCTURAL
RICHARD M. DOHERTY, P.E.
595 DORSET STREET
S. BURLINGTON, VT 05403
P: 802-660-9212
MECHANICAL/
ELECTRICAL:
YEATON ASSOCIATES
40 SOUTH RIVER ROAD #36
BEDFORD, NH 03110
P: 603-444-6578
YA# 21V06ME
www.yeatonassociates.com
ST
A T E O F V ERMONT
P R
O
F E S S I O N A L E N G IN
EE
R
R E G I S T E R
E D
NO. 5915
W A
YNE G. FILLIO
N
M1.1
MECHANICAL SITE PLAN
RCN
RCN
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
CH-1
AutoCAD SHX Text
6"CHWS/R CTE 4"XCHWS/R DOWN THRU ROOF
AutoCAD SHX Text
6"CHWS
AutoCAD SHX Text
6"CHWR
AutoCAD SHX Text
6"CHWR
AutoCAD SHX Text
6"CHWS
AutoCAD SHX Text HVAC-1: REPLACE EXISTING 2-WAY VALVE : REPLACE EXISTING 2-WAY VALVE WITH A 3-WAY AS PER DETAIL ON DWG. M5.1
AutoCAD SHX Text
AutoCAD SHX Text
LOCATION OF EXISTING MSB SWITCHBOARD BELOW IN MECHANICAL ROOM
AutoCAD SHX Text
BURIED PIPING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DP1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PRESSURE REDUCING VALVE
AutoCAD SHX Text
AUTOMATIC CONTROL VALVE (2-WAY)
AutoCAD SHX Text
STRAINER WITH BLOWDOWN
AutoCAD SHX Text
EXISTING CHILLED WATER RETURN
AutoCAD SHX Text
EXISTING CHILLED WATER SUPPLY
AutoCAD SHX Text
CONN. POINT OF NEW WORK TO EXISTING
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
PRESSURE RELIEF VALVE
AutoCAD SHX Text
AUTO BALANCING VALVE
AutoCAD SHX Text
THERMOMETER
AutoCAD SHX Text
CHILLED WATER RETURN
AutoCAD SHX Text
CHILLED WATER SUPPLY
AutoCAD SHX Text
XCHWS
AutoCAD SHX Text
XCHWR
AutoCAD SHX Text
CHWS
AutoCAD SHX Text
CHWR
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
UNION
AutoCAD SHX Text
DIRECTION OF FLOW (WATER)
AutoCAD SHX Text
CONCENTRIC REDUCER
AutoCAD SHX Text
ECCENTRIC REDUCER
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
PIPE RISE
AutoCAD SHX Text
PIPE DROP
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
DIRECTION OF FLOW (AIR)
AutoCAD SHX Text
SELF-CONTAINED VALVE
AutoCAD SHX Text ACD AD AFF A.L. APD ATC CFM C.M. EA EAT E.C. EF ESP EWT FAI FC FD F.O. FPM FTR G.C. GPM H.C. HP LAT LWT MBH MOD M.C. N.C. N.I.C. N.O. NTS OA P.C. RA RPM SA SCT SCV SD TSP TYP. U/C UH VD WPD WTD WTR
AutoCAD SHX Text AUTOMATIC CONTROL DAMPER ACCESS DOOR ABOVE FINISHED FLOOR ACOUSTICALLY LINED AIR PRESSURE DROP AUTOMATIC TEMPERATURE CONTROL CUBIC FEET PER MINUTE CONSTRUCTION MANAGER ENTERING AIR ENTERING AIR TEMPERATURE ELECTRICAL CONTRACTOR EXHAUST FAN EXTERNAL STATIC PRESSURE ENTERING WATER TEMPERATURE FRESH AIR INTAKE FLEX CONNECTION FIRE DAMPER FLAT OVAL FEET PER MINUTE FIN-TUBE RADIATION GENERAL CONTRACTOR GALLONS PER MINUTE HARDWARE CLOTH HORSEPOWER LEAVING AIR TEMPERATURE LEAVING WATER TEMPERATURE THOUSAND BTU'S PER HOUR MOTOR OPERATED DAMPER MECHANICAL CONTRACTOR NORMALLY CLOSED NOT IN CONTRACT NORMALLY OPEN NOT TO SCALE OUTSIDE AIR PLUMBING CONTRACTOR RETURN AIR REVOLUTIONS PER MINUTE SUPPLY AIR SELF-CONTAINED THERMOSTAT SELF-CONTAINED THERMOSTATIC VALVE SMOKE DAMPER TOTAL STATIC PRESSURE TYPICAL UNDER CUT DOOR UNIT HEATER VOLUME DAMPER WATER PRESSURE DROP WATER TEMPERATURE DROP WATER TEMPERATURE RISE
AutoCAD SHX Text
CIRCUIT SETTER (C.S./SHUTOFF VALVE)
AutoCAD SHX Text
SCV
AutoCAD SHX Text
ACV
AutoCAD SHX Text
DEMOLITION LINE TYPE LEGEND
AutoCAD SHX Text
EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. TO BE REMOVED.
AutoCAD SHX Text
EXISTING GENERAL CONSTRUCTION TO BE REMOVED.
AutoCAD SHX Text
EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. TO REMAIN.
AutoCAD SHX Text
1. ALL EQUIPMENT AND PIPING SHOWN DIAGRAMMATICALLY ONLY. EXACT LOCATION TO ALL EQUIPMENT AND PIPING SHOWN DIAGRAMMATICALLY ONLY. EXACT LOCATION TO BE DETERMINED AND COORDINATED IN THE FIELD BY ALL TRADES INVOLVED. 2. ALL ROUGH OPENINGS THRU EXTERIOR WALLS SHALL BE SEALED/CAULKED ALL ROUGH OPENINGS THRU EXTERIOR WALLS SHALL BE SEALED/CAULKED WATERTIGHT WITH ELASTOMERIC SEALANT. 3. CHILLED WATER RUNOUTS TO HYDRONIC TERMINALS SHALL BE MADE WITH NO CHILLED WATER RUNOUTS TO HYDRONIC TERMINALS SHALL BE MADE WITH NO BULLHEAD TEES. 4. FIRE AND MOISTURE SEAL ALL PIPE PENETRATIONS THRU GENERAL CONSTRUCTION.FIRE AND MOISTURE SEAL ALL PIPE PENETRATIONS THRU GENERAL CONSTRUCTION.
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
DEMOLITION KEYNOTES ' '
AutoCAD SHX Text
1. REMOVE EXISTING CHILLER XCH-1 INCLUDING ALL CONTROLS, POWER AND OTHER REMOVE EXISTING CHILLER XCH-1 INCLUDING ALL CONTROLS, POWER AND OTHER XCH-1 INCLUDING ALL CONTROLS, POWER AND OTHER INCLUDING ALL CONTROLS, POWER AND OTHER ASSOCIATED APPURTENANCES. REMOVE EXISTING WATER PIPING AND VALVES FOR EVAPORCOOL SYSTEM BACK TO MAIN. THE PENETRATION SHALL BE LEFT IN PLACE AND CAPPED ON BOTH ENDS SO AS TO NOT DISTURB THE SECURITY PARTITIONS. VALVED TEES SHALL BE PROVIDED TO ALLOW FOR OPERATION OF THE XCH-1 UNTIL THE XCH-1 UNTIL THE UNTIL THE PROPOSED CH-1 WAS BEEN INSTALLED, TESTED AND IS READY FOR OPERATION AT CH-1 WAS BEEN INSTALLED, TESTED AND IS READY FOR OPERATION AT WAS BEEN INSTALLED, TESTED AND IS READY FOR OPERATION AT WHICH TIME THE XCH-1 SHALL BE REMOVED AND THE TEES CAPPED. THE EXISTING XCH-1 SHALL BE REMOVED AND THE TEES CAPPED. THE EXISTING SHALL BE REMOVED AND THE TEES CAPPED. THE EXISTING 8'6" AND 8'8" STEEL SKID BEAMS SHALL BE REMOVED FROM ON TOP OF THE CURB. THE EXISTING CURB AND FLASHING ARE TO REMAIN. ALL CONDUITS/PENETRATIONS/OPENINGS FROM THE FACILITY CONNECTING TO THE EXISTING CHILLER SHALL BE CAPPED/FILLED IN ACCORDANCE WITH ICD 705. NO PENETRATIONS SHALL BE LEFT OVERNIGHT UNLESS COMPLIANT WITH ICD 705 AND SHALL BE INSPECTED BY THE ADVANCED PROGRAM OFFICE AND COR FOR APPROVAL. 2. EXISTING CONDUIT AND WIRING FROM EXISTING CHILLER 'XCH-1' TO SWITCHBOARD EXISTING CONDUIT AND WIRING FROM EXISTING CHILLER 'XCH-1' TO SWITCHBOARD 'MSB' SHALL BE REMOVED COMPLETE. CUT, FILL, AND CAP EXISTING CONDUIT THROUGH ROOF ON BOTH ENDS SO AS TO NOT DISTURB THE SECURITY PARTITIONS. THIS WORK SHALL BE COMPLETED AFTER THE PROPOSED CHILLER IS OPERATIONAL AND FULLY TESTED. 3. REMOVE EXISTING 3P-250A CIRCUIT BREAKER WITHIN SWITCHBOARD 'MSB' SERVING REMOVE EXISTING 3P-250A CIRCUIT BREAKER WITHIN SWITCHBOARD 'MSB' SERVING EXISTING CHILLER 'XCH-1'. THIS WORK SHALL BE COMPLETED AFTER THE PROPOSED CHILLER IS OPERATIONAL AND FULLY TESTED. 4. CONTRACTOR HAS A 2 WEEKS (10 BUSINESS DAYS) MAXIMUM OF DOWN TIME FOR THE CONTRACTOR HAS A 2 WEEKS (10 BUSINESS DAYS) MAXIMUM OF DOWN TIME FOR THE TRANSFER OF XCH-1 TO CH-1. THIS INCLUDES ALL WORK FOR CONTROLS, TESTING, BALANCING, AND ELECTRICAL. AFTER THIS 2 WEEKS USERS OF THE SPACE SHALL BE ABLE TO RESUME NORMAL BUILDING OPERATIONS. CONTRACTO TO PROVIDE 2 MONTH SCHEDULING REQUEST, TO BE APPROVED BY COR, PRIOR TO CHILLER TRANSFER WORK.
AutoCAD SHX Text
NEW WORK KEYNOTES ' '
AutoCAD SHX Text
1. PROVIDE 3P-400AF/400AT LSI CIRCUIT BREAKER WITHIN EXISTING SPACE IN PROVIDE 3P-400AF/400AT LSI CIRCUIT BREAKER WITHIN EXISTING SPACE IN SWITCHBOARD 'MSB'. EXISTING SWITCHBOARD 'MSB' IS EATON POW-R-LINE-C, 480/277V, 1600A, 3-PHASE, 4-WIRE, 65KAIC. 2. PROVIDE 3#500MCM,1#3G.,3”C FROM SWITCHBOARD 'MSB' TO CHILLER 'CH-1'. PROVIDE 3#500MCM,1#3G.,3”C FROM SWITCHBOARD 'MSB' TO CHILLER 'CH-1'. C FROM SWITCHBOARD 'MSB' TO CHILLER 'CH-1'. CONDUIT SHALL BE ROUTED TO FOLLOW CHILLER PIPING TO CHILLER 'CH-1'. 3. PROVIDE 3P/400A NEMA 3R UNFUSED DISCONNECT SWITCH AT CHILLER 'CH-1'. PROVIDE 3P/400A NEMA 3R UNFUSED DISCONNECT SWITCH AT CHILLER 'CH-1'. COORDINATE EXACT LOCATION AND MOUNTING OF DISCONNECT SWITCH IN FIELD. PROVIDE CONVENIENCE WEATHERPROOF GFI RECEPTACLE FOR CHILLER TIED INTO LOCAL 120V, 20A, RECEPTACLE CIRCUIT WITH 2#12,1#12G,3/4"C. 4. FINAL LOCATION OF THE CHILLER SHALL BE AS PER THE SITE CIVIL PLANS. IF THERE FINAL LOCATION OF THE CHILLER SHALL BE AS PER THE SITE CIVIL PLANS. IF THERE IS ANY CONFLICT IN LOCATION THE SITE CIVIL PLANS SHALL SUPERCEDE THE MECHANICAL PLANS. 5. CONTRACTOR IS RESPONSIBLE TO PROVIDE A SIESMIC COMPATABLE PIPE SUPPORT CONTRACTOR IS RESPONSIBLE TO PROVIDE A SIESMIC COMPATABLE PIPE SUPPORT CONFIGURATION TO ALLOW THE PIPING TO SPAN THE GAP WITHOUT ANY MOUNTING POINTS ON THE SIMULATOR BAY WALLS OR ROOF. 6. CONTRACTOR IS RESPONSIBLE TO PROVIDE A STEP UP AND OVER THE CHILLED WATER CONTRACTOR IS RESPONSIBLE TO PROVIDE A STEP UP AND OVER THE CHILLED WATER PIPING FOR THE WALKWAY THAT PROTECTS THE PIPING FROM DAMAGE.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MEN'S BATHROOM
AutoCAD SHX Text
AutoCAD SHX Text
UNCLASSIFIED COMM.
AutoCAD SHX Text 312.
AutoCAD SHX Text
CRAC
AutoCAD SHX Text 5A
AutoCAD SHX Text
XHWS
AutoCAD SHX Text
XHWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
XCHWS
AutoCAD SHX Text
XCHWR
AutoCAD SHX Text
XHWS
AutoCAD SHX Text
XHWR
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text 3"
AutoCAD SHX Text
XCHWR
AutoCAD SHX Text
XV2-1
AutoCAD SHX Text
XHVAC-2
AutoCAD SHX Text
XB-1
AutoCAD SHX Text
XB-2
AutoCAD SHX Text
XE.T.
AutoCAD SHX Text
XA.S.
AutoCAD SHX Text
XA.C.
AutoCAD SHX Text
2" XCHWS/R UP TO XHVAC-2 WITH EXISTING 3-WAY BYPASS TO BE CLOSED.
AutoCAD SHX Text P
AutoCAD SHX Text
XCHWS
AutoCAD SHX Text
XCHWR
AutoCAD SHX Text
XCHWS
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text 4"
AutoCAD SHX Text 3"
AutoCAD SHX Text
DP2
AutoCAD SHX Text
ACV
AutoCAD SHX Text V1
AutoCAD SHX Text (105)
AutoCAD SHX Text 2 "12"
AutoCAD SHX Text
4"XCHWS/R DN FROM ROOF
AutoCAD SHX Text Date: 06/01/2022-10:40, Dwg: 21V06ME M1.1.dwg, Tab: M1.1, User: Rnealley06/01/2022-10:40, Dwg: 21V06ME M1.1.dwg, Tab: M1.1, User: Rnealley, Dwg: 21V06ME M1.1.dwg, Tab: M1.1, User: Rnealley21V06ME M1.1.dwg, Tab: M1.1, User: Rnealley, Tab: M1.1, User: RnealleyM1.1, User: Rnealley, User: RnealleyRnealley
AutoCAD SHX Text
MECHANICAL SITE PLAN
AutoCAD SHX Text
SCALE: 1" = 20'-0"
AutoCAD SHX Text
FIRST FLOOR PARTIAL PIPING PLAN
AutoCAD SHX Text
SCALE: 1/8"=1'-0"
Pipe Spacing
Height Off Roof
Varies
C O N S U L T A N T S
A R C H I T E C T S
1 1 7 S t. P a u l S t r e e t
3 r d F l o o r
B u r l i n g t o n, V T
0 5 4 0 1
P: 8 0 2 • 8 6 3 • 2 2 2 7
F: 8 0 2 • 8 6 3 • 0 0 9 3
ALVAR E Z
SIENKIEWYCZ
S M I T H
R E V I S I O N S
DATE: JUNE 3, 2022
SCALE: AS NOTED
CHECKED:
DRAWN:
SAS PROJECT NO: 1209
CURZ : 212316
P R O J E C T
REPLACEMENT
B-120
CHILLER
VERMONT AIR
NATIONAL
GUARD
SOUTH BURLINGTON,
VERMONT
CIVIL
CIVIL ENGINEERING
ASSOCIATES
10 MANSFIELD VIEW LANE
SOUTH BURLINGTON, VT 05403
STRUCTURAL
RICHARD M. DOHERTY, P.E.
595 DORSET STREET
S. BURLINGTON, VT 05403
P: 802-660-9212
MECHANICAL/
ELECTRICAL:
YEATON ASSOCIATES
40 SOUTH RIVER ROAD #36
BEDFORD, NH 03110
P: 603-444-6578
YA# 21V06ME
www.yeatonassociates.com
ST
A T E O F V ERMONT
P R
O
F E S S I O N A L E N G IN
EE
R
R E G I S T E R
E D
NO. 5915
W A
YNE G. FILLIO
N
M5.1
MECHANICAL
DETAILS AND
SCHEDULES
RCN
RCN
AutoCAD SHX Text
HORIZONTAL PIPE GUIDE DETAIL
AutoCAD SHX Text
CHANNEL OR BUILDING STRUCTURE
AutoCAD SHX Text
SPIDER
AutoCAD SHX Text
PIPE GUIDE
AutoCAD SHX Text
BOLT (TYP.)
AutoCAD SHX Text
SET SCREW
AutoCAD SHX Text
PIPE
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
SERVICE PIPING.
AutoCAD SHX Text
TYPICAL PIPE HANGER & ROLLER DETAIL
AutoCAD SHX Text
PIPE ROLL STAND
AutoCAD SHX Text
ANGLE SUPPORT BY MECHANICAL CONTRACTOR.
AutoCAD SHX Text
INSULATION (TYP.)
AutoCAD SHX Text SERVICE PIPING AS INDICATED IN SPECIFICATIONS SHALL BE INSTALLED ON ROLLER HANGERS.
AutoCAD SHX Text
BOLT (TYP.)
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
GALVANIZED INSUL. SHIELD PER SPEC. SECTION 230719.
AutoCAD SHX Text
GALVANIZED INSUL. SHIELD PER SPEC. SECTION 230719.
AutoCAD SHX Text
PIPE HANGER PER SPECIFICATIONS.
AutoCAD SHX Text
CHILLER EVAPORATOR PIPING DETAIL
AutoCAD SHX Text
EVAPORATOR
AutoCAD SHX Text P
AutoCAD SHX Text
DRAIN (CAPPED)
AutoCAD SHX Text
1" BALL VALVE
AutoCAD SHX Text
(TYP. 2)
AutoCAD SHX Text
VALVE VENT.
AutoCAD SHX Text
CAPPED BALL
AutoCAD SHX Text
GAUGE COCK
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
BLOWDOWN.
AutoCAD SHX Text
STRAINER WITH
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
4" CHWS
AutoCAD SHX Text
(TYP. 2)
AutoCAD SHX Text
SWITCH
AutoCAD SHX Text
FLOW
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
4" CHWR
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
FLEXIBLE CONNECTOR
AutoCAD SHX Text
FLANGE (TYP.)
AutoCAD SHX Text
SENSOR (TYP. 2)
AutoCAD SHX Text
GAUGE
AutoCAD SHX Text
PRESSURE
AutoCAD SHX Text P
AutoCAD SHX Text
PRESSURE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AIR-TO-WATER HEAT PUMP SCHEDULE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
MAKE & MODEL
AutoCAD SHX Text
TONS PER MODULE
AutoCAD SHX Text
NO. OF MODULES
AutoCAD SHX Text
MODULES OPERATING/RESERVE
AutoCAD SHX Text
COOLING MODE PERFORMANCE
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
MCA
AutoCAD SHX Text
MOCP
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
TONS
AutoCAD SHX Text
EER
AutoCAD SHX Text
COP
AutoCAD SHX Text
GLYCOL
AutoCAD SHX Text
EWT
AutoCAD SHX Text
LWT
AutoCAD SHX Text
FLOW RATE
AutoCAD SHX Text
WPD
AutoCAD SHX Text
VOLTS
AutoCAD SHX Text
PH
AutoCAD SHX Text
CY
AutoCAD SHX Text
CH-1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 4/1
AutoCAD SHX Text 102.9
AutoCAD SHX Text 12.11
AutoCAD SHX Text 3.553
AutoCAD SHX Text 30% P.G.
AutoCAD SHX Text 52°F
AutoCAD SHX Text 42°F
AutoCAD SHX Text
270 GPM
AutoCAD SHX Text 16.3'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1 2
AutoCAD SHX Text FURNISH AIR SOURCE MODULAR CHILLER COMPRISED OF (5) 30-TON MODULES, EACH MODULE SHALL HAVE SCROLL COMPRESSORS WITH 410A REFRIGERANT, COMPRESSOR WRAPS FOR SOUND ATTENUATION, ISOLATION VALVES, STRAINERS, MICROPROCESSOR CONTROLS, QUICK INTERCONNECT MODULAR DESIGN, DISCONNECT PER MODULE, 5-YEAR WARRANTY, VARIABLE FLOW EVAPORATOR, MAIN POWER DOOR INTERLOCK DISCONNECT SWITCH, INTEGRAL PUMPS WITH VFD CONTROLS, INTEGRAL FREE COOLING, 160 GALLON TANK, AIR SEPARATOR, LOW AMBIENT KIT FOR OPERATION TO -20°F, ECM FANS, INTERFACE PANEL AND SINGLE POINT POWER CONNECTIONS. UNIT SHALL BE SHIPPED IN MODULES, A FACTORY MOUNTED DDC PANEL WITHSCHNEIDER ELECTRONICS INTEGRATION CAPABILITY AND FIELD ASSEMBLED ON SITE. SITE INSPECTION, START-UP AND TESTING MUST BE PERFORMED BY A FACTORY REPRESENTATIVE. DIMENSIONS 359.5" LONG x 86" WIDE x 101.5" TALL. EXPANSION TANK IN PUMP MODULE UNIT IS COMPRISED OF THE FOLLOWING MODULES: (1-2) ACCESSORY MODULES WITH 160 GAL. CHILLER TANK AND PUMP (270.0 GPM @ 110.0' EXTERNAL HEAD, 20 HP MOTOR WITH VFD), (3-7) CHILLER MODULES WITH FREE COOLING. 70% WATER/30% PROPYLENE GLYCOL.
AutoCAD SHX Text
AutoCAD SHX Text
%%UCH-1 PLAN
AutoCAD SHX Text (1)
AutoCAD SHX Text (2)
AutoCAD SHX Text (3)
AutoCAD SHX Text (4)
AutoCAD SHX Text (5)
AutoCAD SHX Text (6)
AutoCAD SHX Text (7)
AutoCAD SHX Text
AutoCAD SHX Text
%%UKEY INFORMATION
AutoCAD SHX Text
- The support shall be engineered to ensure member/
AutoCAD SHX Text component capacities and deflection criteria are not
AutoCAD SHX Text exceeded. Maximum loading from any base to the
AutoCAD SHX Text finished roof surface is not to exceed 2.0 psi unless
AutoCAD SHX Text specifically allowed otherwise in the project specification.
AutoCAD SHX Text Deflection in the horizontal header bar is not to exceed the
AutoCAD SHX Text span length by 360 or 1/8.
AutoCAD SHX Text
- Recommended spacing is not to exceed 10 feet centers
AutoCAD SHX Text depending upon the load. Make certain each pipestand is
AutoCAD SHX Text properly elevated to even loadweight at all pipestands.
AutoCAD SHX Text
- Width and height are built job specific based on information
AutoCAD SHX Text provided to manufacturer.
AutoCAD SHX Text
- Frame is made with 12 Gauge Channel; size is determined
AutoCAD SHX Text during design
AutoCAD SHX Text
- Base Material: Hot dip galvanized or stainless steel
AutoCAD SHX Text
- All metal parts are hot dip galvanized or stainless steel
AutoCAD SHX Text Clevis Hanger
AutoCAD SHX Text %%UIsometric View
AutoCAD SHX Text %%UTop View
AutoCAD SHX Text %%USide View
AutoCAD SHX Text %%UFront View
AutoCAD SHX Text
ROOFTOP PIPE ROLL STAND DETAIL
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
AutoCAD SHX Text
1 1/2" X 1 1/2" X 1/8" ANGLE IRON BRACKETS. (TYP.)
AutoCAD SHX Text
DOUBLE BOLT RISER CLAMP (TYP.)
AutoCAD SHX Text NOTE: ALL ANGLE IRONS TO BE PAINTED WITH 2 COATS RUST INHIBITOR PAINT. COLOR DETERMINED BY VTANG
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
WALL
AutoCAD SHX Text ANCHORS SHALL BE CERTIFIED TO BE COMPATIBLE BY MANUFACTURER WITH EXISTING WALL CONSTRUCTION: METAL SIDING WITH 4" SCORED SPLIT FACE CMU VENEER AND 8" METAL STUD BACKUP
AutoCAD SHX Text
DOUBLE BOLT RISER CLAMP (TYP.)
AutoCAD SHX Text
1 1/2" X 1 1/2" X 1/8" ANGLE IRON BRACKETS. (TYP.)
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
VERTICAL EXTERIOR PIPE SUPPORT DETAIL
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
AutoCAD SHX Text
- Final design and configuration is the responsibility of the contractor
AutoCAD SHX Text and it is a delegated design to the manufacturer retained by the
AutoCAD SHX Text successful contractor.
AutoCAD SHX Text
GRADE
AutoCAD SHX Text
(#1 & #2 STONES)
AutoCAD SHX Text
UNDISTURBED EARTH
AutoCAD SHX Text
BEDDING (FINE GRAVEL)
AutoCAD SHX Text
HAUNCHING (1/2 O.D. HEIGHT)
AutoCAD SHX Text
INITIAL BACKFILL (12" MIN.)
AutoCAD SHX Text
FINAL BACKFILL
AutoCAD SHX Text
6" MIN.
AutoCAD SHX Text
5'-0" MIN.
AutoCAD SHX Text
PIPE EMBEDMENT
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
18"WIDER THAN PIPE O.D.
AutoCAD SHX Text
EXCAVATED TRENCH WIDTH
AutoCAD SHX Text
PIPE TRENCH CROSS SECTION (TYP)
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
AutoCAD SHX Text Date: 06/01/2022-10:40, Dwg: 21V06ME M5.1.dwg, Tab: M5.1, User: Rnealley06/01/2022-10:40, Dwg: 21V06ME M5.1.dwg, Tab: M5.1, User: Rnealley, Dwg: 21V06ME M5.1.dwg, Tab: M5.1, User: Rnealley21V06ME M5.1.dwg, Tab: M5.1, User: Rnealley, Tab: M5.1, User: RnealleyM5.1, User: Rnealley, User: RnealleyRnealley
| B120-chiller-X-1.pdf |
| Sheets and Views |
| X-1 |
| B120-chiller-C-1.pdf |
| Sheets and Views |
| C-1 |
| 1209 B120 Chiller Elev_060322.pdf |
| A-1 [Sheet Title] |
| Viewport-3 |
| Viewport-7 |
| Viewport-8 |
| Viewport-9 |
| 21V06ME Mech 20210601.pdf |
| Sheets and Views |
| 21V06ME M1.1-M1.1 |
| 21V06ME M5.1-M5.1 |
File details come from the government source that posted it. Updated .