USEB262315 - 5l. HVAC Pictures Bldg. 302.pdf

PDF 5 MB Posted

Attached to
USEB262315 - B302 ISRG Ops HVAC Increase
Solicitation number
W50S9A26QA015
Issued by

About this file

This document is a picture file containing 71 photographs documenting HVAC and electrical infrastructure for contract W50S9A26QA015.

The images show a 7.5-ton Roof Top Unit (RTU) with associated nameplate and specification details, along with comprehensive photographs of the 110th floor installation and related building systems. The documentation includes pictures of floor-level infrastructure such as raised floor panels, cable penetrations, and support structures; CRAC (Computer Room Air Conditioning) distribution lines and condensate lines running through floor cavities and plenum spaces; electrical panels and circuit breaker assemblies with multiple breaker configurations; ceiling and plenum areas showing ductwork, piping, and wiring distribution; and roof-mounted equipment including the RTU unit, control panels, and electrical disconnects. Additional images document mechanical room equipment including multiple CRAC unit control panels, an AHU-1 (Air Handling Unit) manufactured by McQuay with associated nameplate information, and panel board wiring diagrams. The roof photographs include detail shots with measurement references showing roof surface conditions and equipment mounting details. All images are organized by location and system type, providing visual documentation of the installed HVAC and electrical systems throughout the facility.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Image 1: 7.5 Ton RTU

Image 2: 110 Floor

W50S9A26QA015 Pictures

Image 3: 110 Floor

Image 4: 110 Floor

Image 5: 110 Floor

Image 7: 110 Floor

Image 8: 110 Floor

Image 6: CRAC Name Plate

Image 9: 110 Floor

Image 10: 110 Floor

Image 11: 110 Floor

Image 12: 110 Floor CRAC lines

Image 13: 110 Floor CRAC lines

Image 14: 110 Floor CRAC lines

Image 17: 110 Floor CRAC lines

Image 15: Electric Panel

Image 16: Electric Panel

Image 18: Electric Panel

Image 19: Electric Panel

Image 20: Electric Panel

Image 21: 110 Floor

Image 22: 110 Floor

Image 23: 110 Floor

Image 24: 110 Floor

Image 25: 110 Floor

Image 26: 110 Floor

Image 27: Room 110 Plenum

Image 28: 110 Plenum

Image 30: 110 Ceiling/Plenum

Image 31: 110 Ceiling/Plenum

Image 32: 110 Ceiling/Plenum

Image 34: Ceiling/Plenum

Image 33: 110 Ceiling/Plenum

Image 35: Ceiling/Plenum

Image 36: Ceiling/Plenum

Image 37: Ceiling/Plenum

Image 38: Ceiling/Plenum

Room Plenum

Image 39

Image 40: Electric Panel

Image 41: Ceiling/Plenum

Image 42: Ceiling/Plenum

Image 43: Ceiling/Plenum

Image 44: 110-A Ceiling/Plenum

Image 45: 110-C Ceiling/Plenum

Image 46: 110-C Ceiling/Plenum

Image 47: 110-C Ceiling/Plenum

Image 48: 110-C Ceiling/Plenum

Image 49: Ceiling/Plenum

Image 50: Ceiling/Plenum

Image 51: Roof

Image 53: Roof

Image 52: Roof

Image 54: Roof

Image 55: Roof

Image 56: Roof

Image 57: Mechanical Room

Image 58: Mechanical Room

Image 59: Mechanical Room

Image 62: AHU-1 Name Plate

Image 63: AHU-1

Image 68: Panel

Image 67: Panel

Image 69: Ceiling/Plenum

Image 70: Ceiling/Plenum

Image 71: Panel

File details come from the government source that posted it. Updated .