This solicitation seeks bids for a firm fixed-price contract to repair water mains and roads at the 151st Air Refueling Wing, Roland R. Wright ANG Base in Salt Lake City, Utah. The project includes construction of roads, curbs, sidewalks, replacement of water mains and laterals, and installation of fire hydrants and storm drains. Water meters and detector check valves will also be replaced. The base bid is for work on Mustang Lane and North Loop, with options to extend the work to Patriot Way and Sabre Street. The projected value is between $5-10 million. The solicitation number is W50S9A-20-B-0001 and bids are due August 31, 2020. The contract is set aside for small businesses and work must be completed within 365 days of the notice to proceed. The solicitation documents are available on betaSAM.gov and interested parties should monitor the site for any amendments.

View the file

Other files

File Type Posted
Repair Water Mains and Roads_Questions_Answers_28 Aug 2020.pdf PDF
USEB132009_Sabre Street_Revised Drawing C-02_28 Aug 2020.pdf PDF
Solicitation Amendment_W50S9A-20-B-0001-0003 Repair Water Mains and Roads.pdf PDF
USEB132019_Patriot Way_Revised Drawing GC-03_27 Aug 2020.pdf PDF
Repair Water Mains and Roads_Questions_Answers_27 Aug 2020.pdf PDF
USEB132009_Sabre Street_Revised Drawing GC-03_27 Aug 2020.pdf PDF
USEB132001_Mustang Lane_Revised Drawing GC-03_27 Aug 2020.pdf PDF
USEB132001_Mustang_IRP Summary and Locations Rev2_27 Aug 2020.pdf PDF
Solicitation Amendment_W50S9A-20-B-0001-0001_Repair Water Mains and Roads.pdf PDF
Mustang RFI 01_Marked Drawing.pdf PDF
Repair Water Mains and Roads_Questions_Answers_24 Aug 2020.pdf PDF
USEB132001_Mustang_Building Fire Suppression List.pdf PDF
USEB132009_Sabre Street_Geotech Report.pdf PDF
USEB132001_Mustang_Geotechnical Report.pdf PDF
USEB132001_Mustang Lane_BN Justification_KO Signed_Redacted.pdf PDF
USEB132001_Mustang Lane_Specifications_23Jul20.pdf PDF
USEB132019_Patriot Way_Design Narrative.pdf PDF
USEB132019_Patriot Way_Specifications_23Jul20.pdf PDF
W50S9A-20-B-0001 Repair Water Mains and Roads.pdf PDF
USEB132009_Sabre Street_Specifications_23Jul20.pdf PDF
USEB132019_Patriot Way_Geotechnical Report.pdf PDF
USEB132001_Mustang_Design Narrative.pdf PDF
USEB132001_Mustang_Env Summary.pdf PDF
USEB132009_Sabre Street_Design Narrative.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this solicitation amendment is to accomplish the follow ing:

1) Publish a second questions and answ ers document, dated 27 Aug 2020.

2) Update DFARS Clause 252.236-7001 to add the follow ing documents:

a. IRP Summary and Locations Rev2, dated 27 Aug

b. USEB132001 Mustang Lane Revised GC-03

c. USEB132009 Sabre Street Revised GC-03

d. USEB132019 Patriot Way Revised GC-03

See Summary of Changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S9A20B0001

X 9B. DATED (SEE ITEM 11)

31-Jul-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Aug-2020

CODE

USPFO UT 151 MISSION SUPPORT CONTRACTING

765 N 2200 WEST

SALT LAKE CITY UT 84116-2999

W50S9A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S9A20B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Date Document No.

Specifications (Mustang Lane & North Loop) 23 July 2020 Drawings (Mustang Lane & North Loop) 16 December 2019 Revised C-02 Drawing (Mustang Lane & North Loop) 18 August 2020 Revised GC-03 Drawing (Mustang Lane & North Loop) 27 August 2020 Design Narrative (Mustang Lane & North Loop) 16 December 2019 Fire Hydrants_Distances (Mustang Lane & North Loop) 22 November 2019 Environmental Summary (Mustang Lane & North Loop) 17 July 2019 IRP Wells Unmarked SE Corner No Date IRP Summary and Locations Rev2 27 August 2020 Groundwater Monitoring Analysis Results October 2017 Figure 3.3

W50S9A20B0001

Groundwater Monitoring Analysis Results December 2017 Figure 3.4 Groundwater Monitoring Well Locations 4 April 2018 Figure 2.1 Geotechnical Investigation Letter 31 July 2018 Specifications (Patriot Way) 23 July 2020 Drawings (Patriot Way) 16 December 2019 Revised GC-03 Drawing (Patriot Way) 27 August 2020 Design Narrative (Patriot Way) 16 December 2019 Specifications (Sabre Street) 16 December 2019 Drawings (Sabre Street) 16 December 2019 Revised GC-03 Drawing (Sabre Street) 27 August 2020 Design Narrative (Sabre Street) 16 December 2019