This document package includes an invitation for bid and related files for a federal construction contract opportunity. The Utah Army National Guard is soliciting bids to repair water mains and roads at the 151st Air Refueling Wing base in Salt Lake City, Utah. The base bid requirement is for work on Mustang Lane and North Loop, with two option items for Patriot Way and Sabre Street. The projected value is between $5-10 million. Bids are due on August 31, 2020. The period of performance is 365 days from notice to proceed. This acquisition is set aside for small businesses under NAICS code 237110 for water and sewer line construction with a size standard of $39.5 million. The pre-bid conference is August 11 and the work location is the 151st Air Refueling Wing base. An attached brand name justification requires use of Hersey detector check valves for the base bid work. Interested parties should monitor the betaSAM website for solicitation documents and amendments.

View the file

Other files

File Type Posted
Repair Water Mains and Roads_Questions_Answers_28 Aug 2020.pdf PDF
USEB132009_Sabre Street_Revised Drawing C-02_28 Aug 2020.pdf PDF
Solicitation Amendment_W50S9A-20-B-0001-0003 Repair Water Mains and Roads.pdf PDF
USEB132019_Patriot Way_Revised Drawing GC-03_27 Aug 2020.pdf PDF
Repair Water Mains and Roads_Questions_Answers_27 Aug 2020.pdf PDF
USEB132009_Sabre Street_Revised Drawing GC-03_27 Aug 2020.pdf PDF
USEB132001_Mustang Lane_Revised Drawing GC-03_27 Aug 2020.pdf PDF
W50S9A-20-B-0001-0002_Repair Water Mains and Roads.pdf PDF
USEB132001_Mustang_IRP Summary and Locations Rev2_27 Aug 2020.pdf PDF
Mustang RFI 01_Marked Drawing.pdf PDF
Repair Water Mains and Roads_Questions_Answers_24 Aug 2020.pdf PDF
USEB132001_Mustang_Building Fire Suppression List.pdf PDF
USEB132009_Sabre Street_Geotech Report.pdf PDF
USEB132001_Mustang_Geotechnical Report.pdf PDF
USEB132001_Mustang Lane_BN Justification_KO Signed_Redacted.pdf PDF
USEB132001_Mustang Lane_Specifications_23Jul20.pdf PDF
USEB132019_Patriot Way_Design Narrative.pdf PDF
USEB132019_Patriot Way_Specifications_23Jul20.pdf PDF
W50S9A-20-B-0001 Repair Water Mains and Roads.pdf PDF
USEB132009_Sabre Street_Specifications_23Jul20.pdf PDF
USEB132019_Patriot Way_Geotechnical Report.pdf PDF
USEB132001_Mustang_Design Narrative.pdf PDF
USEB132001_Mustang_Env Summary.pdf PDF
USEB132009_Sabre Street_Design Narrative.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this solicitation amendment is to accomplish the follow ing:

1) Change the bid opening time on 31 August 2020 as follow s:

FROM: 10:00 AM MDT

TO: 3:00 PM MDT

2) Update Section 00100 Instructions to Bidders to reflect the second site visit on 26 August 2020 at 2:00 PM MDT.

3) Update FAR Clause 52.236-27 to reflect the second site visit scheduled for 26 August 2020 at 2:00 PM MDT.

4) Move solicitation provisions FAR 52.204-24 and 52.204-26 from Section 00700 and into Section 00600 as full-text.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 16

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S9A20B0001

X 9B. DATED (SEE ITEM 11)

31-Jul-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Aug-2020

CODE

USPFO UT 151 MISSION SUPPORT CONTRACTING

765 N 2200 WEST

SALT LAKE CITY UT 84116-2999

W50S9A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S9A20B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

BLOCK 14 CONTINUATION

5) Update DFARS Clause 252.236-7001 to add the revised Mustang Lane Drawing C-02 in response to an RFI.

6) Remove the previous Wage Determination and incorporate Wage Determination UT20200008, Modification #3, dated July 30, 2020.

See Summary of Changes

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 31-Aug-2020 10:00 AM to 31-Aug-2020 03:00 PM.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

SECTION 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

NOTICE: Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available. Currently, the Government anticipates funds will become available prior to but no later than midnight 30 Sep 2020. This action has been identified on the National Guard priority list for award if funds become available and the prices received are within an awardable range.”

Description of the Project: This project will replace aged water mains, some of which date back to the 1950s.

These water mains have leaked consistently in recent years. Replacing the water mains with proper size and routing will also correct deficiencies in fire suppression flow. The new water mains will be relocated in the roadways, and these roads will also be fully replaced in the project. Applicable work areas are Mustang Lane and North Loop (Base Bid), Patriot Way (Option), and Sabre Street (Option).

1. Instructions to Bidders:

1.1. You are invited to submit a bid in response to Invitation for Bids (IFB) # W50S9A-20-B-0001, Repair

Water Mains and Roads, Project Numbers USEB132001, USEB132019, USEB132009.

1.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price and price related factors.

1.3. This solicitation is set-aside 100% for small business concerns.

2. Notice of Pre-bid conference and site visit:

2.1. A pre-bid conference will be conducted on August 11, 2020 at 9:00 AM MDT the purposes of briefing on the bid requirements and answering questions regarding this solicitation. This conference will be held at Roland R. Wright ANG Base located at 765 N 2200 W, Salt Lake City, UT 84116. Interested contractors are highly encouraged to attend the pre-bid conference. The site visit will be held following the conference. ***UPDATE*** Due to the number of questions generated from the site visit, the government is conducting a second site visit on August 26, 2020 at 2:00 PM MDT. Names of attendees shall be provided to the points of contact listed on betaSAM.gov NO LATER THAN 8:00 AM MDT on August 26, 2020.

2.2. Due to security conditions, all offerors must register to attend the pre-bid conference and site visit. Email the following information for all attendees to Jacob Caldwell and Bruce Weaver at jacob.caldwell.5@us.af.mil and bruce.weaver.4@us.af.mil

Firm Name and Telephone Number Visitor’s Name Drivers License Citizenship

2.3. The aforementioned information must be provided in advance, three (3) business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.

2.4. Visitors shall present the following information upon arrival: (1) Vehicle Registration, (2) Valid Drivers

License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.

2.5. Information provided at this conference or site visit shall not change the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

2.6. A record of the conference and questions shall be made and furnished to all prospective bidders electronically via the solicitation notice on https://www.betaSam.gov

3. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:

3.1. Submit all questions in the format shown below by email to the contracting office at the addresses show below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must go through the Contracting Office.

Subject Line: Reference No. SOLICITATION W50S9A-20-B-0001 Email: Jacob.Caldwell.5@us.af.mil and Bruce.Weaver.4@us.af.mil

PRE-BID INQUIRY FORMAT

Date of Bid Inquiry: _______________

From: ______________________________ Company Name: ________________________________

Address:_____________________________________________________________________________

Phone Number: _____________________________ Fax Number:______________________________

Email address: ________________________________________________________________________

Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)

3.2 Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid.

3.3 All questions and requests for information (RFI) must be received NOT LATER THAN the 7th business day prior to bid opening. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY IN

THIS PROCESS.

3.4 Any changes to the drawings, specifications, etc. will be issued in the form of an amendment. However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on Contract Opportunities (FBO) at https://beta.SAM.gov

3.5 Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids.

3.6 For security reasons, all technical and engineering data related to this solicitation will be distributed using Contract Opportunities at https://beta.SAM.gov/ Plans and specifications are locked on contract opportunities and require Contractors to request explicit access from the Contracting Officer OR export controlled access through DLA. See complete instructions on betaSAM. Contract Opportunities (FBO) is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with beta.SAM.gov before accessing the system.

3.7 Amendments, if/when issued will be posted to contract opportunities https://beta.sam.gov/ for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons.

4. BID REPOSITORY AND BID OPENING:

4.1. A bid repository is provided for hand carried bids and is located at the Roland R. Wright ANG Base

Contracting Office, Building 218, 765 N 2200 W, Salt Lake City, UT 84116. Hand carried bids must be deposited in the repository prior to the time established for opening of bids. Bidders are cautioned that they will be required to sign-in and obtain a visitor’s pass to enter the facility and should allow time to accomplish this. See instructions for obtain access to the base in the Site Visit instruction. Follow the same instruction for obtaining entry to hand carry bid. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.

4.2. The bid opening will occur at the time and date specified in Block 13 of the SF1442 in the auditorium at

Building 210 on the Roland R. Wright ANG Base, 765 N 2200 W, Salt Lake City, UT 84116.

NOTE: Due to the COVID-19 pandemic, the governent will limit attendance at the bid opening to a maximum of two representatives for all interested offeror (Prime Contractor).

5. WAGE DETERMINATION:

5.1. Construction Wage Rates are applicable to this project are as shown in Section 00800.

6. BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS: This IFB does not commit the Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.

7. CLAUSES:

7.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.

8. DISPOSITION OF UNSUCCESSFUL BIDS:

In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful bids including the bid bond.

9. OFFERORS QUALIFICATIONS:

To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.

10. BRAND NAME REQUIREMENTS POSTED ON betaSAM

10.1 Hersey Detector Check Valve, Model DC – Mustang Lane and North Loop Drawings, Page 32

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

11 August 2020 at 9:00 AM MDT and 26 August 2020 at 2:00 PM MDT

(c) Participants will meet at--

Roland R. Wright ANG Base 765 N 2200 W Salt Lake City, UT 84116

(End of provision)

SECTION 00600 - REPRESENTATIONS & CERTIFICATIONS

The following have been added by full text:

52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)

The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in the provision at 52.204-26, Covered Telecommunications Equipment or Services--Representation, or in paragraph (v) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items.

(a) Definitions. As used in this provision-

Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

(b) Prohibition.

(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.

115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to--

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.

115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to--

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services."

(d) Representations. The Offeror represents that--

(1) It [ ] will, [ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and

(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that--

It [ ] does, [ ] does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.

(e) Disclosures.

(1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:

(i) For covered equipment--

(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);

(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and

(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.

(ii) For covered services--

(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or

(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.

(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:

(i) For covered equipment--

(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);

(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and

(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.

(ii) For covered services--

(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or

(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.

52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION (DEC

2019)

(a) Definitions. As used in this provision, “covered telecommunications equipment or services” has the meaning provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

(b) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for “covered telecommunications equipment or services”.

(c) Representation. The Offeror represents that it [ ___ ] does, [ ___ ] does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument.

SECTION 00700 - CONTRACT CLAUSES

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Date Document No.

Specifications (Mustang Lane & North Loop) 23 July 2020 Drawings (Mustang Lane & North Loop) 16 December 2019 Revised C-02 Drawing (Mustang Lane & North Loop) 18 August 2020 Design Narrative (Mustang Lane & North Loop) 16 December 2019 Fire Hydrants_Distances (Mustang Lane & North Loop) 22 November 2019 Environmental Summary (Mustang Lane & North Loop) 17 July 2019 IRP Wells Unmarked SE Corner No Date Groundwater Monitoring Analysis Results October 2017 Figure 3.3 Groundwater Monitoring Analysis Results December 2017 Figure 3.4 Groundwater Monitoring Well Locations 4 April 2018 Figure 2.1 Geotechnical Investigation Letter 31 July 2018 Specifications (Patriot Way) 23 July 2020 Drawings (Patriot Way) 16 December 2019 Design Narrative (Patriot Way) 16 December 2019 Specifications (Sabre Street) 16 December 2019 Drawings (Sabre Street) 16 December 2019 Design Narrative (Sabre Street) 16 December 2019

(End of clause)

The following have been deleted:

52.204-24 Representation Regarding Certain Telecommunications and

Video Surveillance Services or Equipment.

DEC 2019

52.204-26 Covered Telecommunications Equipment or Services-- Representation.

DEC 2019

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

DAVIS BACON WAGE DETERMINATION

"General Decision Number: UT20200008 07/31/2020

Superseded General Decision Number: UT20190008

State: Utah

Construction Type: Heavy

County: Salt Lake County in Utah.

Including Water and Sewer line and Natural Gas Pipeline Construction

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 01/31/2020 2 02/21/2020 3 07/31/2020

* ELEC0057-002 03/01/2020

Rates Fringes

LINE CONSTRUCTION

Lineman.....................$ 49.41 16.27

ENGI0003-005 07/01/2013

Rates Fringes

OPERATOR: Power Equipment

(1)Mechanic-Excluding Natural Gas Pipeline Construction................$ 27.55 15.65 (2A)Blade/Grader............$ 25.89 15.65

(3) Backhoe/Excavator, Front End Loader(Over 5 cu.yds.)....................$ 25.37 15.65

(4) Asphalt Paver, Bulldozer, Front End Loader(2 to 5 cu. yds.), Grade Setter, Oil Distributor, Scraper........$ 24.37 15.65

(5) Asphalt Roller, Bobcat/Skid loader, Front End Loader(Under 2 cu.

yds.), Oiler................$ 23.37 15.65

(6) Screed..................$ 22.41 15.65

(7) Roller(Dirt and Grade Compaction).................$ 21.50 15.65

ENGI0003-056 07/01/2013

Natural Gas Pipeline Construction Only

Rates Fringes

OPERATOR: Power Equipment Backhoe/Excavator/Trackhoe, Blade/Grader, Boom, Bulldozer, Mechanic.........$ 35.68 17.57 Oiler.......................$ 22.03 11.88

IRON0027-001 07/01/2019

Rates Fringes

IRONWORKER.......................$ 28.68 22.60

LABO0295-006 07/01/2014

Natural Gas Pipeline Construction Only

Rates Fringes

LABORER

Common or General, Pipelayer...................$ 20.59 8.65 Pot Tender and Sand blaster.$ 20.85 8.65

LABO0295-015 07/01/2014

Rates Fringes

LABORER

(1)Flagger..................$ 20.59 8.65

(3)Mason Tender (Cement/Concrete), Hand Held Saw, Jackhammer, Power Saw...................$ 20.85 8.65 (5)Hand Held Drill..........$ 21.65 8.65

LABO0295-038 07/01/2014

Excluding Natural Gas Pipeline & Water/Sewer Line Construction

Rates Fringes

LABORER (1)Common or General)....$ 20.59 8.65

TEAM0222-001 07/01/2018

NATURAL GAS PIPELINE CONSTRUCTION ONLY

Rates Fringes

TRUCK DRIVER

Group 1:

Articulated End Dump, Low Boy, Rollagon or Similar type Equipment, Truck Mechanic...................$ 36.88 12.12 Group 2:

A-Frame, Challenger(For transportation purposes), Forklift, Fuel Truck, Gin Pole, Rubber-Tired Tractor, Tandem Float (4 & 5 Axle), Track Truck/All-Track Dumper Equipment, Vacuum Truck, Winch Truck................$ 36.30 12.12 Group 3:

Ambulance , Bus, Dump Truck (2 and 3 axle), Flatbed Truck (2 and 3 axle), Grease Truck, Hot Pass Truck (3 axle), Jeep, Pick-up, Single Axle Float (3 axle), Skid Truck (2 and 3 axle), Station Wagon, Stringer Bead & Hot Pass (2 axle), Swamp Buggy/ Marsh Buggy, or similar type equipment, Team Driver, Water Truck (2 and 3 axle).$ 35.95 12.12

Premium Pay:

Add $2.25 to the above Rate for the following classifications

Group 1: Low Boy and Truck Mechanic Group 2: Stringer Truck

SUUT2008-039 08/19/2008

Rates Fringes

CARPENTER, Includes Form Work....$ 14.63 0.97

CEMENT MASON/CONCRETE FINISHER...$ 17.06 3.16

ELECTRICIAN......................$ 23.74 7.64

LABORER: Landscape..............$ 7.25 0.00

LABORER: Pipelayer (Excluding Natural Gas Pipeline Construction)....................$ 14.00 0.00

OPERATOR: Crane.................$ 28.97 9.40

OPERATOR: Trackhoe (Excluding Natural Gas Pipeline and Water/Sewer Line Construction)....................$ 19.98 0.00

TRUCK DRIVER (Excluding Natural Gas Pipeline Construction)....................$ 14.44 3.99

WATER & SEWER LINES:

Laborer, Common or General.......$ 12.81 0.00

WATER & SEWER LINES:

Operator - Backhoe/Trackhoe......$ 16.50 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"