USEB132001_Mustang_IRP Summary and Locations Rev2_27 Aug 2020.pdf

PDF 3 MB Posted

Attached to
Repair Water Mains and Roads
Solicitation number
W50S9A-20-B-0001
Issued by

About this file

This solicitation package describes requirements for a firm fixed-price construction contract to repair water mains and roads at the 151st Air Refueling Wing, Utah Air National Guard base in Salt Lake City, Utah. The project scope includes construction of roads, curbs, gutters, sidewalks, replacing water mains and laterals, fire hydrants, and storm drains. Water meters and detector check valves will also be replaced. The base bid is for work on Mustang Lane and North Loop, with optional additional work on Patriot Way and Sabre Street. A brand name requirement is specified for a Hersey Model DC detector check valve. The projected value is between $5-10 million. The pre-bid conference is August 11th and bids are due August 31st. The contract period of performance is 365 days after notice to proceed. The set-aside is for small businesses under NAICS code 237110 with a $39.5 million size standard. The solicitation is available on betaSAM.gov and interested parties must monitor the site for amendments and information.

View the file

Other files

File Type Posted
Repair Water Mains and Roads_Questions_Answers_28 Aug 2020.pdf PDF
USEB132009_Sabre Street_Revised Drawing C-02_28 Aug 2020.pdf PDF
Solicitation Amendment_W50S9A-20-B-0001-0003 Repair Water Mains and Roads.pdf PDF
USEB132019_Patriot Way_Revised Drawing GC-03_27 Aug 2020.pdf PDF
Repair Water Mains and Roads_Questions_Answers_27 Aug 2020.pdf PDF
USEB132009_Sabre Street_Revised Drawing GC-03_27 Aug 2020.pdf PDF
USEB132001_Mustang Lane_Revised Drawing GC-03_27 Aug 2020.pdf PDF
W50S9A-20-B-0001-0002_Repair Water Mains and Roads.pdf PDF
Solicitation Amendment_W50S9A-20-B-0001-0001_Repair Water Mains and Roads.pdf PDF
Mustang RFI 01_Marked Drawing.pdf PDF
Repair Water Mains and Roads_Questions_Answers_24 Aug 2020.pdf PDF
USEB132001_Mustang_Building Fire Suppression List.pdf PDF
USEB132009_Sabre Street_Geotech Report.pdf PDF
USEB132001_Mustang_Geotechnical Report.pdf PDF
USEB132001_Mustang Lane_BN Justification_KO Signed_Redacted.pdf PDF
USEB132001_Mustang Lane_Specifications_23Jul20.pdf PDF
USEB132019_Patriot Way_Design Narrative.pdf PDF
USEB132019_Patriot Way_Specifications_23Jul20.pdf PDF
W50S9A-20-B-0001 Repair Water Mains and Roads.pdf PDF
USEB132009_Sabre Street_Specifications_23Jul20.pdf PDF
USEB132019_Patriot Way_Geotechnical Report.pdf PDF
USEB132001_Mustang_Design Narrative.pdf PDF
USEB132001_Mustang_Env Summary.pdf PDF
USEB132009_Sabre Street_Design Narrative.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8/27/2020 UTANG Repair Water Mains & Roads

Environmental Concerns

CONTAMINATED SOIL

• Contaminated soil cannot be used as fill elsewhere. It must be sampled and disposed at approved landfill (regulation allows for return to site, but the project specs do not allow this)

• Contaminated soil would be disposed as non‐hazardous waste due to LUST site exemption found in 40 CFR 261.4(b)10 [Lab and Landfill Options] o For the Wasatch Regional Landfill, a sample must be taken and waste profiled (expect 3 day turnaround for lab and profiling before disposal); landfill can provide rolloff container at cost;

estimate disposal at $40/ton o Landfill Profile: Richard McMullin 801‐253‐1111 RMcMullin@republicservices.com o Lab: American West Analytical Services 801‐263‐8686 TCLP Metals, TCLP Volatile, TCLP

Semivolatile (confirm these with McMullin)

WATER

• Contaminated Zones: Contaminated water must be sampled and disposed off-site of according to federal, state, and local regulations for the type and quantity of contaminant.

• Non-Contaminated Zones: Rising groundwater can be pumped out and either returned to the site (no permit required) when finished or discharged to the storm drain with a Utah Groundwater Discharge permit (see permit section of Specs: 01 41 26).

o Contamination Disposal option: ET Technologies o Permit: Contact DEQ, Hillary Mason 801‐536‐4162 for initial assistance https://deq.utah.gov/legacy/programs/water‐quality/ground‐water/permits/index.htm#cuicp [Option]

KNOWN CONTAMINATION ZONE

• Workers must be notified of contaminated soil and groundwater:

o Ground water only: (Vinyl Chloride) (TCE) (Cis‐1,2‐DCE) (1,1‐DCE) o Soil & GW: (Benzene) (TPH‐G) (TPH‐D)

• See maps of IRP zones

• See map of IRP wells; well integrity must be preserved for seven known wells. Nine wells are expected in the zone. Two wells have not been located (ANGMW16‐B & ANGMW16‐C). If located, notify government. Government will evaluate and determine how to proceed.

PIPE MATERIAL IN CONTAMINATION ZONE

• Drinking Water standards apply; Utah Administrative Code R309‐550‐5(10); SLC public utilities does not use PVC in contaminated soil. Ductile Iron piping is required in contaminated areas. For details on locations and requirements, see Drawings and Specifications (particularly Mustang Dwgs G-04 Notes 46-48 and C-04) mailto:RMcMullin@republicservices.com https://deq.utah.gov/legacy/programs/water-quality/ground-water/permits/index.htm#cuicp https://deq.utah.gov/legacy/programs/water-quality/utah-underground-injection-control/resources.htm https://deq.utah.gov/legacy/programs/water-quality/utah-underground-injection-control/resources.htm https://rules.utah.gov/publicat/code/r309/r309-550.htm

Site ST008

UST-016MW

CLINTON AVE

N

W

2nd ST

W

3rd ST

Site SS002

MW-8

MW-7

MW-6

MW-12

MW-11

S2MW-2

S1MW-1

ANGMW-22 ANGMW-21

ANGMW-20

ANGMW-19

UST-012MW

S1/2MW-24

ANGMW-17C

ANGMW-17B

ANGMW-15C

ANGMW-15B

ANGMW-13C

ANGMW-13B

ANGMW-13A

MW-9

MW-5

MW-4

MW-2

MW-10

FPW-1

UST-011MW

S1/2MW-23

ANGMW-18C

ANGMW-18B

ANGMW-17A

ANGMW-16C

ANGMW-16B

ANGMW-16A

ANGMW-15A

\\Brookside\gis_share\ENBG\00_Proj\A\AirNationalGuard\UANG\MapFiles\GWR_2017_0815\Fig02-01_Wells.mxd JN025436 4/4/2018 16:13:06

Figure 2-1 Groundwater Monitoring Well Locations 151st Air Refueling Wing, Utah Air National Guard Salt Lake City, Utah

LEGEND

Monitoring Wells Gauged

Monitoring Wells Gauged and Sampled

Monitoring Wells Not Used

Area of Detected Impacts, September 2015

151st Air Refueling Wing Property

Site SS002 and ST008 Location

Building Number50

Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Note: ANGMW-14A/-14B/-14C destroyed by 2016 parking lot grading activities.

0 100 200 Feet

1 inch = 100 feet

1257626098N Rectangle

1257626098N Text Box Highlighted well was abandoned July 2020, no longer required to be preserved.

A

A

A A

A

A

FIRE STATION

UST-010MW

UST-008MW

UST-016MW

ANGMW-16A

UST-007MWa

UST-015MW

SLC \\slcdbp01\GIS\PROJECTS\UANG\MapFiles\GWR_2018_04\GW_mon_analys_result_Apr18.mxd JN025436 8/3/2018 11:10:48

FIGURE 3-3

Groundwater Monitoring Analysis Results - October 2018 151st Air Refueling Wing, Utah Air National Guard Salt Lake City, Utah

A Monitoring Well Site TU011 Location

Former Building 1608

³ 0 25 5012.5

Feet 1 inch = 35 feet

Notes Groundwater monitoring results stated in mg/L COC = Chemical of Concern J = Estimated result ISL = Initial Screening Level mg/L = Milligrams per liter TPH-D = Total Petroleum Hydrocarbon - Diesel Range Organics TPH-G = Total Petroleum Hydrocarbon - Gasoline Range Organics Parent Sample / Duplicate Sample

COC

Benzene

TPH-G

TPH-D

Oct 2018 / FD

0.0016 / 0.0024

0.39 J / 0.42

0.13 J / <0.11 J

ISL

0.005

COC

Benzene

TPH-G

TPH-D

Oct 2018 0.0081

2.6 J+

1.4

ISL

0.005

COC

Benzene

TPH-G

TPH-D

Oct 2018

0.00057 J

0.046

0.16 J

ISL

0.005

COC

Benzene

TPH-G

TPH-D

Oct 2018 <0.0004

0.01 J

0.053 J

ISL

0.005

COC

Benzene

TPH-G

TPH-D

Oct 2018 <0.0004 0.016

0.05 J

ISL

0.005

COC

Benzene

TPH-G

TPH-D

Oct 2018 <0.0004 <0.025 <0.05

ISL

0.005

@A @A

@A

@A

@A

@A

@A @A

@A

@A

@A

@A@A@A

@A@A@A

@A@A@A

@A

@A@A@A

@A@A

@A

@A

@A@A

@A

@A

@A

@A

@A

@A

@A

FPW‐1

MW‐2

MW‐5

MW‐6

MW‐7

MW‐8

MW‐9

MW‐10

MW‐11

MW‐12

ANGMW‐13A

ANGMW‐13B

ANGMW‐13C

ANGMW‐14A

ANGMW‐14B ANGMW‐14C

ANGMW‐15A

ANGMW‐15B

ANGMW‐15C

ANGMW‐17AANGMW‐17B

ANGMW‐17C

ANGMW‐18B

ANGMW‐18C

ANGMW‐19

ANGMW‐20

ANGMW‐21

ANGMW‐22

S1/2MW‐23 S1/2MW‐24

S1MW‐1

S2MW‐2

UST‐012MW

UST‐016MW

Site ST008

CLINTON AVE

N

W

2nd ST

W

3rd ST

Site SS002

SLC \\Brookside\gis_share\ENBG\00_Proj\A\AirNationalGuard\UANG\MapFiles\GWR_2017_Sep_Dec\Fig03‐03_Groundwater Monitoring Analysis Results ‐ Sept2017.mxd JN025436 4/4/2018 16:04:21

LEGEND

@A Monitoring Wells

Building Number50

FIGURE 3-4

Groundwater Monitoring Analysis Results - October 2018 151st Air Refueling Wing, Utah Air National Guard Salt Lake City, Utah

³ 0 50 10025

Feet 1 inch = 100 feet

Notes:

1. All concentrations reported in micrograms per liter (µg/L).

2. All wells sampled between October 2 - October 9.

3. 1,1-DCE = 1,1-Dichloroethene, cis-1,2-DCE = cis-1,2-Dichloroethene, trans-1,2-DCE = trans-1,2-Dichloroethene, TCE = Trichloroethene, VC = Vinyl Chloride.

4. J = The analyte was positively identified: the associated numerical value is the approximate concentration of the analyte in the sample.

5. # / # = Parent Sample Concentration / Field Duplicate Concentration.

6. Bold indicates the analyte was detected.

7. Red indicates the analyte exceeded cleanup level.

Analyte Cleanup Level (µg/L)

1,1‐DCE 7

cis‐1,2‐DCE 70 trans‐1,2‐DCE 100

TCE 5

VC 2

Analyte ANGMW‐13C

1,1‐DCE < 0.8

cis‐1,2‐DCE < 0.4 trans‐1,2‐DCE < 0.4

TCE < 0.4

VC < 0.2

Analyte ANGMW‐15A

1,1‐DCE < 0.8

cis‐1,2‐DCE 0.98 J trans‐1,2‐DCE 0.69 J

TCE 0.16 J

VC 1.2 J

Analyte ANGMW‐15B

1,1‐DCE < 0.8

cis‐1,2‐DCE 2.0 trans‐1,2‐DCE 1.0

TCE 0.3 J

VC 2.2

Analyte ANGMW‐15C

1,1‐DCE < 0.8

cis‐1,2‐DCE 0.46 J trans‐1,2‐DCE < 0.4

TCE < 0.4

VC 0.12

Analyte ANGMW‐16A

1,1‐DCE < 0.8

cis‐1,2‐DCE 1.1 trans‐1,2‐DCE < 0.4

TCE < 0.4

VC 6.9

Analyte ANGMW‐18B

1,1‐DCE < 0.8

cis‐1,2‐DCE < 0.4 trans‐1,2‐DCE < 0.4

TCE < 0.4

VC < 0.2

Analyte ANGMW‐18C

1,1‐DCE < 0.8

cis‐1,2‐DCE < 0.4 trans‐1,2‐DCE < 0.4

TCE < 0.4

VC < 0.2

Analyte ANGMW‐19

1,1‐DCE 1.3

cis‐1,2‐DCE 100 trans‐1,2‐DCE 31

TCE < 0.4

VC 210

Analyte MW‐2

1,1‐DCE < 0.8

cis‐1,2‐DCE 0.37 J trans‐1,2‐DCE < 0.4

TCE 0.73 J

VC < 0.2

Analyte MW‐4

1,1‐DCE < 0.8 /< 0.8

cis‐1,2‐DCE 1.8 / 2 trans‐1,2‐DCE 7.8 / 6.7

TCE < 0.4 / 0.18 J

VC 19 / 23

Analyte MW‐5

1,1‐DCE < 0.8

cis‐1,2‐DCE < 0.4 trans‐1,2‐DCE < 0.4

TCE 0.23 J

VC < 0.2

Analyte S1/2MW‐23

1,1‐DCE < 0.8

cis‐1,2‐DCE 2.3 trans‐1,2‐DCE 4.4

TCE < 0.4

VC 9.3

Analyte S1/2MW‐24

1,1‐DCE < 0.8

cis‐1,2‐DCE < 0.4 trans‐1,2‐DCE < 0.4

TCE 0.48 J

VC 0.17 J

Analyte S2MW‐2

1,1‐DCE 28/24

cis‐1,2‐DCE 2,900/2,800 trans‐1,2‐DCE 61/53

TCE 1,400/1,500

VC 650/590

Analyte UST‐011MW

1,1‐DCE < 0.8

cis‐1,2‐DCE 0.64 J trans‐1,2‐DCE 2.4

TCE < 0.4

VC < 0.2

Analyte UST‐016MW

1,1‐DCE < 0.8

cis‐1,2‐DCE 0.33 J trans‐1,2‐DCE < 0.4

TCE < 0.4

VC

Analyte ANGMW‐22

1,1‐DCE < 0.8

cis‐1,2‐DCE 0.66 J trans‐1,2‐DCE 50

TCE 0.21 J

VC 11

Analyte ANGMW‐20

1,1‐DCE < 0.8

cis‐1,2‐DCE < 0.4 trans‐1,2‐DCE < 0.4

TCE 0.29 J

VC < 0.2

< 0.2

USEB132001 - 5d. Env Summary
USEB132001 - 5d-1. [IRP Wells] Sites 2 and 8 GW Long-Term Monitoring Report (Aug 2018)
USEB132001 - 5d-2. [IRP Wells] Unmarked SE Corner - temp
USEB132001 - 5d-3. [IRP Zones] Pages from SLC_Annual_Site2and8_GWRpt_2018_Final
USEB132001 - 5d-4. [IRP Zones] Pages from SLC_SiteTU011_Oct2018SemiAnnual_GWRpt_Final

File details come from the government source that posted it. Updated .