A2A- 118th Repair 1st Floor Restrooms B747_Revised Spec 01 50 00_09.12.24.pdf

PDF 102 KB Posted

Attached to
Repair Restrooms and Sustain Steel Structures
Solicitation number
W50S97-24-B-0004
Issued by

About this file

This document is a Pre-solicitation Notice for a federal construction contract to repair restrooms and sustain steel structures at the Berry Field Air National Guard (ANG) Base in Nashville, TN. The contract will be a single firm fixed-price award with a 180-day period of performance. The work includes demolition, update of finishes, partitions, fixtures, and flooring in the restrooms, as well as anti-corrosion coating and selective fastener replacement and painting for the steel structures. The contract is set aside 100% for Small Businesses under NAICS code 236220, with a size standard of $45,000,000. A pre-bid conference is scheduled for August 30, 2024, and the bid opening is set for September 15, 2024. The solicitation and associated documents will be available on the SAM.gov Contract Opportunities page. In addition to the base work, the solicitation will include an option for sustaining steel structures base-wide.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BKTZ232019

09.12.24 TEMPORARY FACILITIES AND CONTROLS 01 50 00-1

SECTION 01 50 00

TEMPORARY FACILITIES AND CONTROLS

PART 1 GENERAL

1.1 UTILTIES SERVICES FOR CONSTRUCTION PURPOSES

A. The Contractor shall make arrangement for any and all temporary connections to existing utilities. Costs for this and any utility services required during construction shall be the sole responsibility of the contractor. All costs for the same shall be included in the bid. No separate payments shall be made by the Government for tap fees or any other costs associated with the installation of use of utilities during construction. Contractor shall also include costs for all permanent utility tap fees in the base bid.

B. The Contractor shall furnish and install all temporary piping and wiring required for the use of these services during construction and upon completion of the work shall remove such temporary piping and wiring. The contracting Officer shall approve the installation and location of the temporary piping and wiring, etc.

1.2 BARRICADES AND SPECIAL CONTROLS

A. Special care shall be taken to provide adequate barriers and warning signs to prevent access of unauthorized persons to work areas where hazardous work is being performed.

B. Schedule and perform all work to interfere as little as possible with vehicular traffic flow. Poor planning and gross inconsideration of traffic flow will be just cause for the Contracting Officer to stop the Contractor’s work until the unsatisfactory conditions have been remedied.

C. Provide temporary signage to route pedestrian and vehicular traffic around the construction site.

Such signage shall be as directed by the Contracting Officer.

1.3 CONSTRUCTION AIDS

1.4

Provide necessary staging, scaffolding, and hoisting equipment and temporary walkways and ladders required for installation of the work under the Contract.

Parking of cars shall be in the immediate area of the construction and confined to the area designated by the Contracting Officer.

All shipments of materials will be addressed to the Contractor and under no circumstances delivered to the military warehouses.

PROJECT OFFICE

09.12.24 TEMPORARY FACILITIES AND CONTROLS 01 50 00-2

1.5 ANITARY FACILITIES

A. Provide adequate temporary toilet facilities for the use of workmen, conforming to applicable laws, ordinances, and governmental regulations.

B. Upon completion of the work, temporary toilet facilities shall be removed from the site.

1.6 TEMPORARY ENCLOSURES

A. Provide temporary weather tight closures for all exterior openings after walls and roof of the new building are constructed when it is necessary to protect the work from the weather and to permit the use of temporary heat. Provide weather tight and security protection of the existing building until what time as the new construction is able to provide weather tightness and security.

Provide safety barriers as required to protect the occupants of the building.

1.7 TEMPORARY HEAT AND VENTILATION

A. Provide temporary heat and ventilation as necessary for protection and drying out of the work to be prosecuted in cold weather.

B. Heat shall be provided by means of approved temporary heating equipment which installation and operation will not damage the work. Provide adequate and proper fuels and all services required to furnish heat as required. Salamanders shall not be used inside the building. Heaters used to dry out or protect freshly placed concrete shall be of a type and shall be so ventilated as to prevent carbon dioxide from damaging concrete.

C. After the construction of the building has reached a point where the permanent heating systems are operable, the Contractor may use the permanent heating equipment for temporary heating.

The heating system shall not be used for temporary heat until the building is broom clean and shall not be used without all filters in place. Upon completion of the work, all ducts shall be internally cleaned and all filters shall be replaced with new filters.

D. Costs of providing temporary heat shall be borne by the Contractor.

09.12.24 TEMPORARY FACILITIES AND CONTROLS 01 50 00-3

1.8 BULLETIN BOARD AND JOB SIGN - Deleted Section

1.9

A.

RODENT AND VERMIN CONTROL

A. Provide on the project site ample and suitable refuse containers with covers. The Contractor shall be responsible for containing and removing from the site all refuse from meals eaten on the site and other rodent or vermin attracting refuse.

B. During the construction period, precaution shall be taken as necessary to control the entry and breeding of rodents and vermin in the building.

C. If, within three months after occupancy of the building, the building is found to be infested by rodents or vermin, the Contractor shall bear the cost of extermination.

1.10 PROTECTION

A. Weather Protection: Provide at all times protection against rain, wind, storms, frost, or heat so as to maintain all work, materials, equipment and fixtures free from injury or damage. At the end of the day’s work, all new work likely to be damaged by weather conditions shall be covered.

1.11 MAINTENANCE OF TRAFFIC AND CIRCULATION

A. Maintain circulation of traffic, both pedestrian and vehicular, and access to all parts of the site by fire-fighting apparatus during construction.

END OF SECTION