A3- SOW Berry Field Repair 1st floor restrooms B747_7.11.24.pdf
PDF 227 KB Posted
- Attached to
- Repair Restrooms and Sustain Steel Structures
- Solicitation number
- W50S97-24-B-0004
- Issued by
-
Department of the Army National Guard
About this file
This document is a Statement of Work (SOW) for the repair of the 1st floor restrooms in Building 747 at Berry Field Air National Guard Base in Nashville, Tennessee. The SOW details the contractor requirements, which include providing all necessary management, tools, equipment, transportation, supervision, and labor to complete the repairs. The work involves demolishing and replacing 13 fixtures (7 faucets, 6 toilets, 2 urinals), flooring and tiling, lighting, and the ceiling. The contractor must submit a dust/debris plan and product submittals for approval. The period of performance is 90 calendar days, and the contractor must provide weekly activity reports and photos to the Contracting Officer's Representative.
The related federal contract opportunity is a solicitation (W50S97-24-B-0004) for the repair of the restrooms and sustainment of steel structures at Berry Field Air National Guard Base. The contract is a firm fixed-price, set aside for small businesses with a NAICS code of 236220. The contract duration is 180 days after the notice to proceed, and the estimated contract value is between $250,000 and $500,000. A pre-bid conference is scheduled for August 30, 2024, and the bid opening is scheduled for September 15, 2024.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
UNITED STATES AIR FORCE
118th Wing Tennessee Air National Guard
Berry Field Air National Guard Base, Nashville, TN
STATEMENT OF WORK
Repair 1st Floor Restrooms, B747
BKTZ232019
11 July 2024
1.0 STATEMENT OF WORK
1.1. The contractor shall provide, unless otherwise noted, all management, tools, equipment, transportation, supervision, and labor necessary to repair the facilities as shown on contract drawings and specifications, Nashville, International Airport (IAP) Repair 1st Floor Restrooms, B747, base-wide Attachment 1 and 2, hereinafter referred to as "plans". Contractor shall perform all work in accordance with this Statement of Work (SOW) and the plans. Contractor shall coordinate all work with the Contracting Officer and Civil Engineer office and is subject to the work schedule as stated in this document. Upon completion, the facility must be complete and usable for the entire base populace.
1.2. These requirements, together with the technical specifications, standards, and drawings specified in the contract documents, cover the requirements for all work associated with Repair 1st Floor Restrooms, B747, Nashville IAP. The following section is a general description of the work involved:
A. 13 fixtures:
1. 7 Faucets: Demolish old sinks faucets and install new.
2. 6 toilets: Demolish old toilets and install new
3. 2 urinals: Demolish old urinals and install new
4. 8 partitions: Demolish old fixture partitions and install new
B. Flooring and tiling:
1. Demolish flooring, interior wall covering, tiling and install new
C. Lighting
1. Demolish existing lighting and install new
D. Ceiling.
1. Demolish existing ceiling and install new
2. Reroute ceiling fan as necessary for adequate air circulation.
E. Reference Drawing. See below for government concept layout.
1.3. Work shall be performed as shown on the plans and as described in this document.
1.3.1. Contractor will provide material for and perform all work to repair 1st Floor Restrooms, B747. The contractor must submit dust/debris plan (see attached AF66) that describes measures to prevent the entrance of dust/debris in the areas where work is to be performed. Contractor must provide submittals of materials to the Civil Engineer. (See Submittals Section Below.)
1.3.2. All materials shall meet or exceed all applicable referenced standards, local requirements, and conform to codes and ordinances of authorities having jurisdiction.
1.3.3. Prepare work site and ensure that dimensions are as indicated on shop drawings.
1.3.4. Coordinate with base authorities to obtain all passes required to enter the work site.
1.4. .INSTALLATION:
1.4.1. Installation shall meet or exceed all applicable federal, state and local requirements, referenced standards and conform to codes and ordinances of authorities having jurisdiction.
1.4.2. All equipment and material installations shall be in accordance with manufacturer’s published specifications and guidelines.
1.4.3. Contractor shall furnish all parts, assembly, and connections during construction.
1.5. EXECUTION
1.5.1. The performance period for this project is 90 calendar days.
1.6.2 FIELD QUALITY CONTROL: Contractor shall generate and send activity reports to the COR at james.bell.69@us.af.mil each week with a summary of work completed and 4 new pictures of completed work each week during the period of performance.
2.0 SPECIFICATIONS – B801 repairs: Contractor SHALL comply with attached specifications on the plans and as follows:
2.1. PART 1 – GENERAL
2.1.1. SUBMITTALS: Manufacturer's product literature, data, and warranty information. Contractor will provide submittals for final selection by Base Civil Engineer from manufacturer’s product catalog.
Maj James Bell
DBCE, 118 CES, USAF
| STATEMENT OF WORK |
| Repair 1st Floor Restrooms, B747 |
| 1.0 STATEMENT OF WORK |
| 1.3. Work shall be performed as shown on the plans and as described in this document. |
| 1.3.1. Contractor will provide material for and perform all work to repair 1st Floor Restrooms, B747. The contractor must submit dust/debris plan (see attached AF66) that describes measures to prevent the entrance of dust/debris in the areas where wor... |
| 1.3.2. All materials shall meet or exceed all applicable referenced standards, local requirements, and conform to codes and ordinances of authorities having jurisdiction. |
| 1.3.3. Prepare work site and ensure that dimensions are as indicated on shop drawings. |
| 1.3.4. Coordinate with base authorities to obtain all passes required to enter the work site. |
| 1.4. .INSTALLATION: |
| 1.4.1. Installation shall meet or exceed all applicable federal, state and local requirements, referenced standards and conform to codes and ordinances of authorities having jurisdiction. |
| 1.4.2. All equipment and material installations shall be in accordance with manufacturer’s published specifications and guidelines. |
| 1.4.3. Contractor shall furnish all parts, assembly, and connections during construction. |
| 1.5. EXECUTION |
| 1.6.2 FIELD QUALITY CONTROL: Contractor shall generate and send activity reports to the COR at james.bell.69@us.af.mil each week with a summary of work completed and 4 new pictures of completed work each week during the period of performance. |
| 2.0 SPECIFICATIONS – B801 repairs: Contractor SHALL comply with attached specifications on the plans and as follows: |
| 2.1. PART 1 – GENERAL |
| 2.1.1. SUBMITTALS: Manufacturer's product literature, data, and warranty information. Contractor will provide submittals for final selection by Base Civil Engineer from manufacturer’s product catalog. |
| Maj James Bell |
| DBCE, 118 CES, USAF |
| 2024-07-11T13:11:02-0500 | |
| BELL.JAMES.MARK.1149108064 |
File details come from the government source that posted it. Updated .