A4- BKTZ192002 Sustain Steel Structures drawings.pdf
PDF 10 MB Posted
- Attached to
- Repair Restrooms and Sustain Steel Structures
- Solicitation number
- W50S97-24-B-0004
- Issued by
-
Department of the Army National Guard
About this file
This document is a Pre-solicitation Notice for a federal contract opportunity to repair restrooms and sustain steel structures at the Berry Field Air National Guard (ANG) Base in Nashville, TN. The contract will be a single firm fixed-price contract to provide labor, materials, and supervision for anti-corrosion coating, fastener replacement, painting, restroom demolition, and updates to finishes, partitions, fixtures, and flooring. The contract duration is 180 days after notice to proceed. This project is set aside 100% for Small Business, with a NAICS code of 236220 and a size standard of $45,000,000. The magnitude of the project is between $250,000 and $500,000. A pre-bid conference is scheduled for August 30, 2024, and the bid opening is scheduled for September 15, 2024. The solicitation and related documents will be available on the Contract Opportunities page at SAM.gov.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TENNESSEE AIR NATIONAL GUARDTENNESSEE AIR NATIONAL GUARD
BKTZ192002
SUSTAIN STEEL STRUCTURES BASEWIDE
BKTZ192002
SUSTAIN STEEL STRUCTURES BASEWIDE
30 AUGUST 2019
118 WING/CE
PROJECT REVIEW
DATE
DATE
DATE
DATE
DATE
DATE
ATO
SECURITY
PROJECT MANAGER
USING ORGANIZATION
ENVIRONMENTAL MANAGEMENT
COMMUNICATIONS
FIRE DEPARTMENT DATE
DATEGROUND SAFETY
DATEWING / CC
DATECIVIL ENGINEER
DATECONTRACTING OFFICER
8t h W
IN
G
S u st ai n S te el
S tr u ct u re s B as ew id e
BKTZ192002
08.30.19
INDEX
LO
C
A
TI
O N
M A
P, D
R A
W
IN
G L
IS
T
A N
D N
O
TE
S
H
U S
PF
O
B
D
R A
W
IN
G S
I
N D
E X
RJB
CJS
DRAWING LIST
LOCATION MAP
BUILDING 811
CONSTRUCTION ACCESS ROUTE
NASHVILLE
LEGEND
GENERAL NOTES
PROJECT CONTACTS
CONSTRUCTION SITE ACCESS NOTES
BUILDING 810
BUILDING 747
BUILDING 810
h W
IN
G
S u st ai n S te el
S tr u ct u re s B as ew id e
BKTZ192002
08.30.19
C1.1
W ar eh ou se , C an op y an d E n tr y R ep ai rs
B
B
H
U S
PF
O
B
D
R A
W
IN
G S
I
N D
E X
RJB
CJS
LEGEND:
R01
R02
R03
NOTES:
REPAIR #1
1. CONTRACTOR SHALL PREP AND PAINT ALL STRUCTURAL STEEL OF THE CANOPY, SEE NOTE #2.
2. REMOVE AND REPLACE ALL EXISTING NUTS AND PAINT NEW NUTS AND EXISTING BOLTS.
3. CONTRACTOR SHALL NOT PREP AND PAINT METAL ROOF PANELS, METAL DECKING OR PURLINS
UNLESS OTHERWISE DIRECTED.
4. COLOR AS APPROVED BY COR. SEE SPECIFICATION SECTION 09 96 00.
REPAIR #2
1. CONTRACTOR SHALL PREP AND PAINT ALL STEEL PIPE COLUMNS OF THE EXISTING CANOPY ON THE CE WAREHOUSE, SEE
NOTE #2.
2. COLOR AS APPROVED BY COR. SEE SPECIFICATION SECTION 09 96 00.
REPAIR #3
1. CONTRACTOR SHALL PREP AND PAINT ALL STRUCTURAL STEEL MEMBERS OF THE CANOPY, SEE NOTE #2.
2. CONTRACTOR SHALL NOT PAINT THE EXISTING METAL ROOF PANELS OR METAL DECKING UNLESS OTHERWISE NOTED.
3. COLOR AS APPROVED BY COR. SEE SPECIFICATION SECTION 09 96 00.
SCALE: 1" = '
0 20 40 60
R03
R03
R02
R02
R02
R02
R01
R01
R01 h W
IN
G
S u st ai n S te el
S tr u ct u re s B as ew id e
BKTZ192002
08.30.19
C1.2
S ta ir s
R em ot e fr om
B u ild in gs
H
U S
PF
O
B
D
R A
W
IN
G S
I
N D
E X
RJB
CJS
R05
R04
R06
R04
R05
SCALE: 1" = '
0 20 40 60
R06
REPAIR #4
1. CONTRACTOR SHALL SAND EXISTING HANDRAIL TO BARE STEEL.
2. PREP AND PAINT THE FULL LENGTH OF THE EXISTING HANDRAIL INCLUDING RAILING AT
TOP LANDING, SEE NOTE #2.
3. COLOR AS APPROVED BY COR. SEE SPECIFICATION SECTION 09 96 00.
REPAIR #5
1. CONTRACTOR SHALL SAND EXISTING HANDRAILS TO BARE STEEL.
2. PREP AND PAINT THE FULL LENGTH OF THE EXISTING HANDRAIL (~35 LF), SEE NOTE #2.
(TYPICAL BOTH SIDES)
3. COLOR AS APPROVED BY COR. SEE SPECIFICATION SECTION 09 96 00.
REPAIR #6
1. CONTRACTOR SHALL SAND EXISTING HANDRAILS TO BARE STEEL.
2. PREP AND PAINT THE FULL LENGTH OF THE EXISTING HANDRAIL (~30 LF), SEE NOTE #2.
3. REMOVE AND REPLACE ALL EXISTING END CAPS.
(TYPICAL BOTH SIDES)
4. COLOR AS APPROVED BY COR. SEE SPECIFICATION SECTION 09910.
LEGEND:
NOTES:
h W
IN
G
S u st ai n S te el
S tr u ct u re s B as ew id e
BKTZ192002
08.30.19
C1.3
S ta ir s
R em ot e fr om
B u ild in gs (C on t.
H
U S
PF
O
B
D
R A
W
IN
G S
I
N D
E X
RJB
CJS
R07
R08
R08
SCALE: 1" = '
0 20 40 60
REPAIR #7
1. CONTRACTOR SHALL SAND EXISTING HANDRAILS TO BARE STEEL.
2. PREP AND PAINT THE FULL LENGTH OF THE EXISTING HANDRAIL(~45 LF), SEE NOTE #2.
(TYPICAL BOTH SIDES)
3. COLOR AS APPROVED BY COR. SEE SPECIFICATION SECTION 09 96 00.
REPAIR #8
1. CONTRACTOR SHALL SAND EXISTING HANDRAILS TO BARE STEEL.
2. PREP AND PAINT THE FULL LENGTH OF THE EXISTING HANDRAIL(~55 LF), SEE NOTE #2.
(TYPICAL BOTH SIDES )
3. COLOR AS APPROVED BY COR. SEE SPECIFICATION SECTION 09 96 00.
R07 h W
IN
G
S u st ai n S te el
S tr u ct u re s B as ew id e
BKTZ192002
08.30.19
C1.4
S ta ir s
R em ot e fr om
B u ild in gs (C on t.
H
U S
PF
O
B
D
R A
W
IN
G S
I
N D
E X
RJB
CJS
R09
R09
SCALE: 1" = '
0 20 40 60
REPAIR #9 -
1. CONTRACTOR SHALL SAND EXISTING HANDRAILS TO BARE STEEL.
2. PREP AND PAINT THE FULL LENGTH OF THE EXISTING HANDRAIL (~57 LF), SEE NOTE #2.
(TYPICAL BOTH SIDES)
3. COLOR AS APPROVED BY COR. SEE SPECIFICATION SECTION 09 96 00.
C1.5
S ta ir R ai ls
, F ro n t an d
B ac k C an op y R ep ai rs
B u ild in g
H
U S
PF
O
B
D
R A
W
IN
G S
I
N D
E X
RJB
CJS
8t h W
IN
G
S u st ai n S te el
S tr u ct u re s B as ew id e
BKTZ192002
08.30.19
R11
SCALE: 1" = '
0 20 40 60
R12
R11
R13
R12
R10
R14
REPAIR #13 -15
1. CONTRACTOR SHALL PREP AND PAINT ALL STRUCTURAL STEEL MEMBERS OF THE CANOPY.
2. CONTRACTOR SHALL NOT PAINT THE EXISTING METAL ROOF PANELS OR METAL DECKING.
3. COLOR AS APPROVED BY COR. SEE SPECIFICATION SECTION 09 96 00.
REPAIR #11 and 12
1. CONTRACTOR SHALL SAND EXISTING HANDRAILS TO STEEL.
2. PRIME AND PAINT FULL LENGTH OF EXISTING HANDRAILS, SEE NOTE #2.
3. CONTRACTOR SHALL PRESSURE WASH AND INSTALL SIKA-FLEX 1CSL OR APPROVED EQUAL AT ALL ANCHORS.
4. COLOR AS APPROVED BY COR. SEE SPECIFICATION SECTION 09 96 00.
REPAIR #10
1. CONTRACTOR SHALL SAND EXISTING HANDRAILS TO STEEL.
2. PREP AND PAINT FULL LENGTH OF EXISTING HANDRAILS INCLUDING
HANDRAIL AT TOP LANDING, SEE NOTE #2.
3. CONTRACTOR SHALL PRESSURE WASH AND INSTALL SIKA-FLEX 1CSL OR
APPROVED EQUAL AT ALL ANCHORS.
4. CONTRACTOR SHALL NOT PREP AND PAINT STAIR TREADS.
5. COLOR AS APPROVED BY COR. SEE SPECIFICATION SECTION 09 96 00.
R15
LEGEND:
NOTES:
R10
R10
R13
R13
R15
R14 h W
IN
G
S u st ai n S te el
S tr u ct u re s B as ew id e
BKTZ192002
08.30.19
C1.6
Fl ag a n d Li gh t
Po le
R ep ai rs
B u ild in g
H
U S
PF
O
B
D
R A
W
IN
G S
I
N D
E X
RJB
CJSSCALE: 1" = '
0 20 40 60
R16
R17
(TYP. OF 6)
R16
(TYP. OF 2)
R17
REPAIR #16
1. CONTRACTOR SHALL PREP AND PAINT EXISTING FLAG POLE,
SEE NOTE #2. (TYPICAL OF 2)
2. COLOR AS APPROVED BY COR. SEE SPECIFICATION
SECTION 09 96 00.
REPAIR #17
1. CONTRACTOR SHALL PREP AND PAINT EXISTING LIGHT POLES
INCLUDING BASE, SEE NOTE #2. (TYPICAL OF 6)
2. COLOR AS APPROVED BY COR. SEE SPECIFICATION SECTION 09 96 00.
h W
IN
G
S u st ai n S te el
S tr u ct u re s B as ew id e
BKTZ192002
08.30.19
C1.7
S ta ti c
D is pl ay
R ep ai r
H
U S
PF
O
B
D
R A
W
IN
G S
I
N D
E X
RJB
CJSSCALE: 1" = '
0 20 40 60
R18
REPAIR #18
1. CONTRACTOR SHALL PREP AND PAINT EXISTING STATIC DISPLAY ANCHOR
BOLTS, SEE NOTE #2.
2. COLOR AS APPROVED BY COR. SEE SPECIFICATION SECTION 09 96 00.
LEGEND:
NOTES:
R18
R18
R18 h W
IN
G
S u st ai n S te el
S tr u ct u re s B as ew id e
BKTZ192002
08.30.19
C2.1
S pe ci fic at io n
RJB
CJS
| 00-Cover |
| 01-Index |
| 02-C1-1 Warehouse, Canopy and Entry Repairs - B810 & 811 |
| 03-C1-2 Stairs Remote form Building Repairs |
| 04-C1-3 Stairs Remote from Buildings Cont |
| 05-C1-4 Stairs Remote from Buildings Cont |
| 06-C1-5 Stair Rails, Front and Rear Canopy Repairs B747 |
| 07-C1-6 Flag Pole and Light Pole Repairs |
| 08-C1-7 Static Display Repairs |
| 09-C2-1 Specification lowsize |
File details come from the government source that posted it. Updated .