This document contains pre-bid questions and responses for solicitation number W50S9420B0001 to construct a gymnasium and additional storage area. The project involves demolishing an existing building superstructure and foundation, performing foundation improvements, and constructing a new gymnasium facility and storage area for the 143rd Civil Engineer Squadron. The construction work shall be performed according to the provided plans and specifications. The NAICS code is 236220 for construction of other new nonresidential structures with a small business size standard of $39.5 million in average annual receipts over the past three years. The project magnitude is between $1 million to $5 million. The solicitation is set aside for small businesses. Responses to bidder questions clarify responsibilities for special inspections and the removal of existing footings. Funds are anticipated to become available by September 30, 2020 for award to the responsible bidder offering the most advantageous price.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Bid RFIs W50S94-20-B-0001 Construct Gym

TWLR152518

28 August 2020

ID Bid Inquiry Received Response Closed

Drawing S-004 calls for the required Special Inspections. Can you please confirm that these inspections will be completed by the designer-of-record and will be compensated by the federal government

26-08-20

POND RESPONSE:

The contractor is responsible for engaging the special inspection agency

GOVT RESPONSE:

The Government concurs with POND response. The offeror shall be responsible for coordination with and payment of Special Inspection Agencies.

28-08-20

Drawing S-101 calls for portions of the existing slab to be existing to remain and S-301 calls for new foundation walls. Drawing AD-101 note 3 calls for the demolition of the existing Quonset hut but does not address the existing foundation. Can you confirm that the existing foundation is to be removed in its entirety with a new foundation provided and tied into the existing slab scheduled to remain?

26-08-20

POND RESPONSE:

The existing footings shall be removed. See note 7 on sheet S-101.

GOVT RESPONSE:

The Government concurs with POND response.

28-08-20