This justification and approval document outlines a contract for personal protective equipment for a construction project. The 143rd Airlift Wing Base Contracting Office will award a contract for the construction of a fitness center and storage area, to include 20 Tyvek protective suits or approved equal products. While the specifications reference Tyvek suits, equal products meeting the specifications will be permitted. The total value of the suits is $300. The justification cites authority from the Federal Acquisition Regulation and details market research conducted. It includes certifications from the base civil engineer and contracting officer, and determines the anticipated costs to be fair and reasonable.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Control No:

PFO 20-04

DEPARTMENTS OF THE ARMY AND THE AIR FORCE

RHODE ISLAND NATIONAL GUARD

USPFO-RI/143D AIRLIFT WING

1841 SOUTH COUNTY TRAIL, EAST GREENWICH, RI 02818-1728

Justification and Approval for Other than Full and Open Competition

1. Contracting Activity: 143d Airlift Wing, Base Contracting Office/USPFO-RI Purchasing & Contracting Division

2. Description of Action: The action being procured is a new contract for the construction of a fitness center and storage area. This will be a pre-fabricated metal building built on an existing slab. The project will be awarded through an invitation for bid and funded with Air Force Sustainment, Restoration, and Maintenance (SRM) Funds. The contract calls for Tyvek (or approved equal) suits for personal protective gear.

3. Description of Supplies/Services: The Tyvek suit is an industry standard for personal protective equipment. The specifications do not require that the contractor use Tyvek. If the contractor can find a product that meets the same specifications as Tyvek then it will be approved for use in the project. The total value of the suits is $300.00 ($15/suit with 20 suits required).

4. Authority Cited: The statutory authority permitting other than full and open competition is 10 U.S.C.

Section 2304 (c)(1), as implemented by the Federal Acquisition Regulation (FAR) 6.302-1(c), the property or services needed by the agency are available only from one responsible source or only from a limited number of responsible sources.

5. Reason for Authority Cited: Personal Protective Equipment follows extremely stringent criteria to ensure the health and protection of personnel. It is critical that the contractor use well established and known brand names in order to comply with all Federal Rules and Regulations. If the contractor can find an equal product it will be permitted for use by the engineer.

6. Efforts to Obtain Competition: The contract will be put out for solicitation and any qualified contractor can bid on the project. If an acceptable product that meets the specifications for the Tyvek model is found it will be accepted.

a. Effective competition. There is an expectation of adequate competition for this project. The notices required by FAR 5.201 shall be or have been published, and that any bids or proposals received shall be considered.

7. Actions to Increase Competition: Actions taken to increase competition are to allow any model that meets the specifications based on the Tyvek Suit.

8. Market Research: A quick internet search was completed and there are multiple vendors for this type of protection suit.

9. Interested Sources: N/A william.j.henry1 Highlight

2 FOR OFFICIAL USE ONLY

10. Other Facts: Competition is not being limited by putting a basis of design product in the specifications, anyone qualified can bid on the project and a model that meets the specifications of the Tyvek Suit but isn’t that model will also be accepted.

11. Technical Certification: Include the following statement:

I certify that the supporting data under my cognizance, which are included in the justification are accurate and complete to the best of my knowledge and belief.

Typed Name: Lt Col Kathleen Mahoney Date:

Title: Base Civil Engineer Signature:

12. Requirements Certification: Include the following statement:

I certify that the supporting data under my cognizance, which are included in the justification are accurate and complete to the best of my knowledge and belief.

Typed Name: Lt Col Kathleen Mahoney Date:

Title: Base Civil Engineer Signature:

13. Fair and Reasonable Cost Determination: Include the following determination:

I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable.

The cost was will be compared with the Independent Government Estimate as provided by Pond & Company and certified by the 143d Civil Engineer Squadron

Typed Name: Lt Col Kathleen Mahoney Date:

Title: Base Civil Engineer Signature:

14. Contracting Officer Certification: This certification shall be made by the contracting officer who will sign the contract resulting from this justification and approval. Include the following statement:

I certify that this justification is accurate and complete to the best of my knowledge and belief. Typed Name: Mr. William Henry Date:

Title: Base Contracting Officer Signature:

17 Aug 2020

17 Aug 2020

17 Aug 2020

2020-08-17T09:02:50-0400
MAHONEY.KATHLEEN.1244107296
2020-08-17T09:03:06-0400
MAHONEY.KATHLEEN.1244107296
2020-08-17T09:03:22-0400
MAHONEY.KATHLEEN.1244107296
2020-08-17T11:31:52-0400
HENRY.WILLIAM.JOSEPH.1012927688

File details come from the government source that posted it. Updated .