14 W50S8Y-20-R-5000 Amendment 0002.pdf
PDF 151 KB Posted
- Solicitation number
- W50S8Y-20-R-5000
About this file
This federal solicitation seeks proposals for construction repair work at the 116th Air Control Squadron Operations and Training Building located at Camp Rilea in Warrenton, Oregon. The project magnitude is between $5 million and $10 million. The North American Industry Classification System code for this work is 236220. Proposals are due 100% small business set-aside for firms with a size standard of $36.5 million or less. The period of performance end date has increased from 270 to 480 days. The pre-proposal conference site visit information is in section 00100. Funds are not presently available but are anticipated to become available by 30 September 2020. Award will be made based on best value criteria in the solicitation.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendments to solicitation, addition of bid addendum 1, and additional responses to RFIs.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S8Y20R5000
X 9B. DATED (SEE ITEM 11)
07-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Jun-2020
CODE
USPFO OR 142 MISSION SUPPORT CONTRACTING
6801 NE CORNFOOT ROAD
PORTLAND OR 97218-2797
W50S8Y 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S8Y20R5000
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The contractor period of performance end date has increased by 210 days from 270 days to 480 days.
The following have been modified:
SECTION 00010
PRICING SCHEDULE
NOTES
1. All information related to this Request for Proposal (RFP), including pertinent changes/amendments and information will be posted on Contracting Opportunities at: https://beta.sam.gov
2. Instructions for the preparation of proposals are located in Sections 00100, 00110 and 00120.
3. For security reasons, all potential offerors, plan rooms and printing companies are required to be registered in the GSA System for Award Management (SAM) database. Firms can register via the SAM internet site at https://www.sam.gov/portal/public/SAM/. Interested offerors are required to submit their representations and certifications at the same site.
4. Offeror is advised of the insurance requirement contained in this solicitation (FAR Clause 52.228-5 Insurance – Work on a Government Installation). Certification of the required coverage for the prime contractor shall be furnished prior to beginning work on this contract. The Contracting Officer may request evidence of the required insurance at any time during the life the contract.
5. Reference DFARS Provision 252.236-7008, Contract Prices – Bidding Schedules. The term “Bidding Schedule” shall also be construed to mean “Offer Schedule” or “Schedule”. The terms “bid” and “offer”, and “bidder” and “offeror” shall be construed as having the same meaning in this solicitation and resulting contract.
6. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the System for Award Management (SAM) database. Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See FAR Subpart 19.1). Submit with the proposal any size determination for the Joint Venture entity received from the Small Business Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business Administration ( IAW FAR 19.302 (b)) to determine eligibility. All questions regarding Joint Ventures must be directed to the Small Business Administration (SBA) and not the Contracting Officer.
7. 40 U.S.C.chapter 31, subchapter III, Bonds (formerly known as the Miller Act), requires performance and payment bonds for any construction contract exceeding $150,000. Noncompliance with the solicitation requirement for a bid guarantee requires rejection of an initial proposal as unacceptable, if a determination is made to award the contract based on initial proposals without discussion.
W50S8Y20R5000
TABLE OF CONTENTS
SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK
SECTION 00010 – PRICING SCHEDULE, NOTES
SECTION 00100 – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00110 – PROPOSAL PREPARATION INSTRUCTIONS
SECTION 00120 – PROPOSAL EVALUATION AND BASIS FOR AWARD
SECTION 00600 – REPRESENTATIONS & CERTIFICATIONS
SECTION 00700 – CONTRACT CLAUSES
SECTION 00800 – SPECIAL CONTRACT REQUIREMENTS
SECTION 01000 – GENERAL REQUIREMENTS
ATTACHMENT 1 – PLANS AND SPECIFICATIONS VOL I, Project # EWRM 12-2100, dated 02 Mar 18 ATTACHMENT 2 – PLANS AND SPECIFICATIONS VOL II, Project # EWRM 12-2100, dated 02 Mar 18 ATTACHMENT 3 – PLANS AND SPECIFICATIONS Complete Set, Project # EWRM 12-2100, dated 02 Mar 18
ATTACHMENT 4 – BRAND NAME JUSTIFICATION FOR MONACO FIRE ALARM
ATTACHMENT 5 – BRAND NAME JUSTIFICATION FOR ANDOVER HVAC CONTROL
ATTACHMENT 6 – W50S8Y-20-R-5000_0001 RFI RESPONSES, dated 22 May 2020 ATTACHMENT 7 – BID ADDENDUM 1, dated 28 May 2020 ATTACHMENT 8 – W50S8Y-20-R-5000_0002 RFI RESPONSES, dated 2 Jun 2020
EXHIBIT A – PERFORMANCE RELEVANCY QUESTIONNAIRE
EXHIBIT B – SUBCONTRACTOR INFORMATION AND CONSENT FORM
EXHIBIT C – REFERENCE QUESTIONNAIRE
EXHIBIT D – LETTER OF COMMITMENT
(End of Summary of Changes)