F9S3S4 - 109 CES RPM-SRM

KIMBERLY KOTKOSKIE

1 AIR NATIONAL GUARD ROAD

SCOTIA NY 12302-9752

TEL: 518-344-2431 FAX:

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

W50S8J23Q0002 28-Feb-2023 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

USPFO NY PURCHASING & CONTRACTING

330 OLD NISKAYUNA ROAD

LATHAM NY 12110-2224

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ]X FOB

DESTINATION

[ ] OTHER

(See Schedule)

30-Mar-2023(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

518 786 0399RICHARD W. POWELL

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

W50S8J23Q0002

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job BLDG 1 Section G Reattach membrane

FFP

EPDM Roof- Building 1, Section G membrane is separating near the edges and shall be reattached. Approximately 155 LF shall be reattached. These areas are marked with arrows and red lines in Figure #1 (See SOW). (See SOW for extended description) FOB: Destination DWG NR: Roof 1 Sec. G

PSC CD: Z2AA

NET AMT

0002 1 Job Building 8 & Building 18

FFP

Bittium sealant and labor to repair the blemishes. Buiding 8, Figure #3 (See SOW) show the sections of Building 8. All four sections will have some items to address and are shown for illustrative purposes. Figure #4 (see SOW) indicates the location and type of damage to be repaired per section. Restore surfacing material. Building 18 (Section A) Figure in SOW shows the type of damage on the section of the roof to be repaired. Additional descriptive pictures of the damage are provided in the Appendix. (See SOW for extended description) FOB: Destination DWG NR: Bldg 8 & Bldg 18

0003 1 Job Building 20 SectionA

FFP

Inspect and replace loose fasteners. Clean and prepare surface, re-glue seam and seal edge. elastomeric coating including labor. SOW indicate the location and type of damage to be repaired. (See SOW for extended description) FOB: Destination DWG NR: Bldg 20 Sec. A

0004 1 Job Building 26

FFP

Building 26, Section B membrane is separating at the edges. Approximately 120 LF shall be reattached. These areas are marked with red lines in Figure #2 (See SOW). (See SOW for extended description) FOB: Destination DWG NR: Bldg 26

1001 1 Job OPTION Building 7 (Section C)

FFP

Inspection, Repair Labor, Metal Strip. Figures in the SOW indicate the location and type of damage to be repaired. (See SOW for extended description) FOB: Destination DWG NR: Bldg 7 Sec C

1002 1 Job OPTION Building 42

FFP

Inspect and replace loose fasteners, clean and prepare surface, re-glue seam and seal edge, slastomeric coating including labor. (See SOW for extended description) FOB: Destination DWG NR: Bldg 42

1003 1 Job OPTION Building 55 & Building 56

FFP

Repair surface and paint. Satellite imagery of the roof is in the SOW figure. (See SOW for extended description) FOB: Destination DWG NR: Bldg 55 & Bldg 56

WAGE DETERMINATIONS

"General Decision Number: NY20230002 02/24/2023

Superseded General Decision Number: NY20220002

State: New York

Construction Types: Building, Heavy and Highway

Counties: Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer, Saratoga, Schenectady, Schoharie and Washington Counties in New York.

BUILDING CONSTRUCTION PROJECTS (For all counties except COLUMBIA, FULTON, GREENE & MONTGOMERY) (does not include single family homes and apartments up to a including 4 stories), HEAVY

AND HIGHWAY CONSTRUCTION PROJECTS

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage |

| | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2023 1 01/13/2023 2 01/27/2023 3 02/24/2023

ASBE0040-002 05/01/2022

Rates Fringes

Asbestos/Insulator Worker SCOPE OF WORK: includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems.....................$ 38.40 24.42

HAZARDOUS MATERIAL HANDLER

Duties limited to preparation wetting;

stripping; removal;

scrapping; vacuuming;

bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems..........$ 38.40 24.42

BOIL0197-002 01/01/2021

Rates Fringes

BOILERMAKER......................$ 38.59 26.00

BRNY0002-019 07/01/2018

Rates Fringes

BRICKLAYER

BRICKLAYERS, STONE MASONS,

CEMENT MASONS, PLASTERERS,

POINTERS, CAULKERS &

CLEANERS....................$ 36.19 20.48

HEAVY & HIGHWAY

CONSTRUCTION

CEMENT MASONS..............$ 37.23 19.51

MARBLE, TILE & TERRAZZO

FINISHERS...................$ 27.16 16.85

MARBLE, TILE & TERRAZZO

WORKERS.....................$ 34.66 19.58

CARP0279-006 07/01/2019

Rates Fringes

Carpenters:

HEAVY AND HIGHWAY

CONSTRUCTION (COLUMBIA AND

GREENE COUNTIES)

Carpenters, Millwrights, Pile Drivers...............$ 38.09 29.08

CARP0291-005 07/01/2022

Rates Fringes

Carpenters:

SARATOGA COUNTY

BUILDING....................$ 34.00 23.18

WASHINGTON COUNTY

BUILDING....................$ 29.00 22.46

PAID HOLIDAYS: Labor Day, provided the employee has been on the payroll the calender week or any of the holiday week preceding the holiday and works the day after the holiday.

CARP0291-008 07/01/2022

ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND

SCHOHARIE COUNTIES

Rates Fringes

Carpenters:

BUILDING CONSTRUCTION

(Excluding Montgomery County) Carpenters & Soft Floor Layers.....................$ 34.00 23.18 Piledriver.................$ 31.68 20.60

HEAVY & HIGHWAY

CONSTRUCTION

Carpenters.................$ 37.52 23.55

CARP0291-010 07/01/2022

Rates Fringes

Carpenters:

CARPENTERS..................$ 37.52 23.55

DIVER TENDERS...............$ 34.02 21.10

DIVERS (Dry Day)............$ 38.52 23.55

DIVERS......................$ 62.52 23.55

PILEDRIVERS.................$ 33.02 21.10

ELEC0236-001 06/01/2022

ALBANY; COLUMBIA; FULTON; GREENE (that portion North of a line following the south limits of the city of Catskill);

MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE;

WASHINGTON

ELECTRICIAN......................$ 45.00 30.59

ELEC0363-004 04/01/2022

GREENE COUNTY (Portion of)

Rates Fringes

ELECTRICIAN......................$ 44.00 3%+36.67+a

FOOTNOTE:

a. Paid Holidays: New Year's Day, President's Day, Memorial Day, Fourth of July, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day

ELEC1249-003 05/04/2020

ELECTRICIAN (LINE

CONSTRUCTION: LIGHTING AND

TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 27.72 6.75%+33.90 Groundman (Truck Driver)....$ 36.96 6.75%+33.90 Groundman Truck Driver (tractor trailer unit)......$ 39.27 6.75%+33.90 Lineman & Technician........$ 46.20 6.75%+33.90 Mechanic....................$ 36.96 6.75%+33.90

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

ELEC1249-004 05/03/2021

Rates Fringes

ELECTRICIAN (Line Construction) Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :

Flagman....................$ 32.82 7%+34.40 Groundman digging machine operator...................$ 49.23 7%+34.40 Groundman truck driver (tractor trailer unit).....$ 46.50 7%+34.40 Groundman Truck driver.....$ 43.76 7%+34.40

Lineman and Technician.....$ 54.70 7%+35.40 Mechanic...................$ 43.76 7%+34.40 Substation:

Cable Splicer..............$ 60.17 7%+35.40 Flagman....................$ 32.82 7%+34.40 Ground man truck driver....$ 43.76 7%+34.40 Groundman digging machine operator...................$ 49.23 7%+34.40 Groundman truck driver (tractor trailer unit).....$ 46.50 7%+34.40 Lineman & Technician.......$ 54.70 7%+35.40 Mechanic...................$ 43.76 7%+34.40 Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 61.62 7%+35.40 Flagman....................$ 33.61 7%+34.40 Groundman Digging Machine Operator...................$ 50.42 7%+34.40 Groundman Truck Driver (tractor-trailer unit).....$ 47.62 7%+34.40 Groundman Truck Driver.....$ 44.82 7%+34.40 Lineman & Technician.......$ 56.02 7%+35.40 Mechanic...................$ 44.82 7%+34.40

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEC1249-007 05/02/2022

COLUMBIA COUNTY

ELECTRICIAN (LIGHTING AND

TRAFFIC SIGNAL INCLUDING ANY

AND ALL FIBER OPTIC CABLE

NECESSARY FOR THE TRAFFIC

SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD

WEATHER INFORMATION SYSTEMS)

Flagman.....................$ 28.91 7%+34.90 Groundman Digging Machine Operator....................$ 43.37 7%+34.90 Groundman Truck Driver (Tractor-trailer unit)......$ 40.96 7%+34.90 Groundman Truck Driver......$ 38.55 7%+34.90 Lineman and Technician......$ 48.19 7%+36.90 Mechanic....................$ 38.55 7%+34.90

PAID HOLIDAYS:

a. Memorial Day, New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEC1249-008 01/01/2022

Rates Fringes

ELECTRICIAN (Line Construction)

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer..............$ 36.28 3%+5.14 Groundman..................$ 18.25 3%+5.14 Installer Repairman- Teledata Lineman/Technician- Equipment Operator.........$ 34.43 3%+5.14 Tree Trimmer................$ 28.25 3%+10.23

a. New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.

ELEV0035-001 01/01/2023

ALBANY; COLUMBIA (Towns of Claverack, Hillsdale, Ghent, Stockport, Austerlitz, Canaan, New Lebanon, Chatham, Kinderhook, Styvesant and Greenport); FULTON; GREENE (Towns of

Durham, Greenville, New Baltimore, Coxcsackie and Athens);

MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY, SCHOHARIE AND

WASHINGTON COUNTIES

Elevator Constructor.............$ 53.02 37.335+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ELEV0138-004 01/01/2023

COLUMBIA COUNTY (THE TOWNS OF ANCRAM, CLERMONT, COPAKE,

GALLATIN, GERMANTOWN, LIVINGSTON, AND TAGHKANIC); GREEN COUNTY

(THE TOWNS OF HUNTER AND CATSKILL)

ELEVATOR MECHANIC................$ 67.35 37.335+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0158-008 07/01/2022

BUILDING

EXCLUDING MONTGOMERY COUNTY

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP A(1)..................$ 47.81 30.74

GROUP A.....................$ 47.32 30.74

1..........................$ 49.06 30.74 2..........................$ 50.06 30.74

GROUP B.....................$ 46.30 30.74

GROUP C.....................$ 43.40 30.74

Hazardous work - Anytime Operating Engineers are involved with level C or above, $2.50 per hour over regular rate.

FOOTNOTE:

a. Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS (BUILDING):

GROUP A(1): Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline, boom truck (over 5 tons)

GROUP A(1): Crane Premiums:

1 over 150'- $1.00 2 over 200'- $2.00

GROUP A: Shovel, All Excavators (including rubber tire full swing), gradalls, power road grader, all CMI equipment, front-end rubber tire loader, tractor-mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, Belcrete system, automated asphalt concrete plant and tractor road paver, boom truck (5 tons and under), maintenance engineer, self contained crawler, drill-hydraulic rock drill.

GROUP B: Backhoe, (rubber-tired backhoe/loader combination), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydrohammer, concrete spreader, concrete finishing machine, one drum hoist, power hoisting (single drum), hoist - two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A-L frame winches, cord and well drillers (one drum), post hole digger, model CHB Vibro-Tamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8 cu. yd. or smaller

GROUP C: Fork lift, high lift, lull, oiler, fireman and heavy- duty greaser, boilers, and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, welding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4"" and over, murphy type diesel generator, conveyor, elevators, concrete mixer and belcrete power pack (belcrete system), seeding, and mulching machines, pumps

ENGI0158-026 07/01/2022

HEAVY & HIGHWAY

Power equipment operators:

GROUP 1.....................$ 49.42 29.55

GROUP 2.....................$ 48.51 29.55

GROUP 3.....................$ 45.94 29.55

GROUP 4.....................$ 53.42 29.55

GROUP 5.....................$ 52.42 29.55

GROUP 6.....................$ 51.42 29.55

GROUP 7.....................$ 51.03 29.55

POWER EQUIPMENT OPERATOR CLASSIFICATIONS (HEAVY & HIGHWAY):

GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual Drum Paver, Excavator (All Purpose Hydraulically Operated) (Gradall or Similar), Front End Loader ( 4 cu. yd. and Over), Head Tower (Sauerman or Equal), Hoist (Two or Three Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P.)

Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self-propelled), Hydra-Spiker, ride-on, Hydraulic Pump (jacking system), Hydro-Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or Trailer Mounted Log , Chipper (Self Feeder), Tug Operator (Manned Rented Equipment Excluded), Tunnel Shovel

GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary Drill (Truck or Tractor Mounted), Boring Machine, Cage Hoist, Central Mix Plant (NonAutomated) and All Concrete Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self-contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One Drum), Hydro-Axe, Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant Engineer, Profiler (105 H.P. and under), Grinder, Post Hole Digger and Post Driver, Power Broom (towed), Power Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride-on, Shell Winder, Skid steer loader (Bobcat or similar), Span-Saw, ride-on, Steam Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant Refrigeration Equipment (for soil stabilization)Road Widener, Roller (all above subgrade), Sea Mule, Self-contained Ride-on Rock Drill, Excluding Air-Track Type Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.

Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat

GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride-on Boiler (used in conjunction with production), Bituminous Heater, self-propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Fork Lift, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands-off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw (self-propelled), Conveyor, Deck Hand, Directional Drill Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride-on, Tie Extractor, ride-on, Tie Handler, ride-on, Tie Inserter, ride-on, Tie Spacer, ride-on, Tire Repair, Track Liner, ride-on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point

GROUP 4: Tower Cranes

GROUP 5: Cranes 50 tons and over

GROUP 6: Cranes 49 tons and below

GROUP 7: Master Mechanic

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day

* IRON0012-011 07/01/2022

ALBANY; COLUMBIA; FULTON (Albin, Bleecker, Broad, Johnstown, Mayfield, Northampton and Perth); GREENE, MONTGOMERY (Amsterdam, Charleston, Florida, Glen, Mohawk and Root);

RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; and WASHINGTON

COUNTIES:

Ironworkers:

Sheeter, Bucker-up..........$ 33.75 26.53 Sheeter.....................$ 33.75 26.53

Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcing, Stone Derrickmen..................$ 33.50 26.53

IRON0440-007 07/01/2022

FULTON (Twps. of Caroga, Ephratah, Oppenheim, Stratford);

MONTGOMERY (Twps of Canajoharie, Minden, Palatine, St.

Johnsville):

IRONWORKER

Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone Derrickman..................$ 31.25 29.19

LABO0017-001 07/01/2019

COLUMBIA COUNTY (Twps of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)

LABORER

COLUMBIA COUNTY (Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont, and the City of Hudson) (Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work) HEAVY & HIGHWAY GROUP 1:...................$ 38.90 27.15+a GROUP 2:...................$ 43.15 27.15+a GREENE COUNTY (Township of Catskill) HEAVY & HIGHWAY:

GROUP 1:...................$ 34.15 27.15+a GROUP 2:...................$ 38.90 27.15+a GROUP 3:...................$ 43.15 27.15+a GROUP 4:...................$ 48.00 27.15+a

TUNNEL, SHAFT & CAISSON

WORK

GROUP 1....................$ 48.05 29.50+a

For HEAVY & HIGHWAY CLASSIFICATIONS in COLUMBIA COUNTY (Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)

HEAVY & HIGHWAY CLASSIFICATIONS

GROUP 1: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective equipment and clothing are not required

GROUP 2: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required

For HEAVY & HIGHWAY CLASSIFICATIONS in GREENE COUNTY (Township of Catskill)

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, President's Day, Memorial Day, Independence Day, Lincoln's Birthday, Labor Day, Election Day, Veterans Day, Thanksgiving Day, Christmas Day, provided the employee is an employee of the company prior to the scheduled holiday and reports to work the first day following the holiday unless prevented from doing so for legitimate reasons.

GROUP 1: Flagperson, gateperson

GROUP 2: General laborers, chuck tender, handling and distributing drinking water, distributing all tools and supplies of laborers, nipper, powder carrier, magazine tender, warehouse laborers, concrete man, vibrator man, mason tender, mortar man, spraying, brushing and covering of concrete for curing and preservative purposes, traffic striper, scaffold builder, concrete curb and sidewalk form setter; permanent traffic striping and reflective devices, placing and maintenance of all flares, cones, lights, signs, barricades, traffic patterns, and all temporary reflective type materials for traffic control, custodial work, traffic directors, temporary heat or light tenders, tool room, dewatering pump men, pitman, dumpmen, snow removal and firewatch, asphalt man, joint setter, signal person, pipelayer, pipe lining and relining, wellpoints, conduit and duct layer, wire puller, rip rap and dry stone layer, steel rod carrier, core drill, rock splitter, Hilti gun air or electric, jackhammer, bush hammer, pavement breaker, chipping hammer, wagon drill, air track, jib rig, joy drill, gunite and sand blasting, coal passer and other machine operators, power tool operator, sprayer and nozzle man on mulching and seeding machine, all guard rail and fence, all seeding and sod laying, all landscape work, grade checker, all bridge work, walk behind self-propelled power saw, grinder, groover or similar type machine, walk behind tamper and roller of all types, salvage, stripping, wrecking and dismantling laborer (including barman, cutting torch and burner man), sheeting and shoring coming under laborers jurisdiction, bit grinder, operator of form pin puller and drivers, sandblasting, joint and jet sealer, filling and wiring baskets for gabion walls, permanent sign man, median barrier, sta-wall or similar type product, chain saw operator, railroad track laborer, waterproofer, pre-stressed and pre-cast concrete brick, block and stone pavers, power tools used to perform work usually done by laborers, power buggy and pumpcrete operator, fireproof, plaster and caustic pump, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous materials abatement when protective clothing and equipment is not required, power brush cutter, retention liners, artificial turf, retaining walls, walk behind surface planer, welding related to laborers work, remote controlled equipment normally operated by laborers, all technician work including but not limited to stitching, seaming, heat welding, fireproof sprayer, mortar mixer, concrete finisher, form setter for concrete curbs and flatwork.

Gunite nozzle man, stone cutters, granite stone layer, manhole, catch basin or inlet installing, laser men.

Ground man on milling machine

GROUP 3 Ingersoll Rand heavy duty crawler-master HCMZ, any drill using a 4"" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required, all working foremen including grade, pipe concrete, clearing, blacktop, drill, paving and blaster etc., Hydraulic drill or similar, forklift for masonry only, Blaster and asphalt screedman

GROUP 4: Asbestos, toxic, lead or hazardous material abatement foreman

For TUNNEL, SHAFT & CAISSON WORK CLASSIFICATIONS

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, President's Day, Memorial Day, Independence Day, Labor Day, Election Day, Veterans Day, Thanksgiving Day, Christmas Day

GROUP 1: Laborer, Pit and Dumpman, Chuck Tender, Brakeman and Powderman;

Miner and all machine men, Safety Miner, all shaft work, caisson work, drilling, blow pipe, all air tools, tugger, scaling, nipper gunniting from pot to nozzle, bit grinder, signal man (top and bottom), shield driven tunnel, mixed face and soft ground liner plate tunnel in free air

LABO0035-001 07/01/2017

FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD);

MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND

ST. JOHNSVILLE)

Laborers Building Construction Asbestos Removal............$ 24.00 20.64+a Blasters, Form Setters, MotorBuggy Operator (Rider Type)......................$ 23.00 20.64+a Hazardous Waste Removal Hazardous waste removal includes wetting, stripping, removal, scrapping, vaccuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems.........$ 24.00 20.64+a

HEAVY & HIGHWAY:

GROUP 1:...................$ 28.05 23.74+a GROUP 2:...................$ 28.25 23.74+a GROUP 3:...................$ 28.45 23.74+a GROUP 4:...................$ 28.65 23.74+a Laborers....................$ 22.50 20.64+a Pipelayers, Motor Mixers, Motor Buggy Operator (Walk Behind) Power Lift (Walk Behind)...............$ 22.65 20.64+a Wagon Drill Operator........$ 22.90 20.64+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.

GROUP 1: Common Laborers, Flagman, Outboard and Hand boats

GROUP 2: Bull Float, Chain Saw, Concrete aggregate bin, Concrete Bootman, Gin Buggy, Hand or Machine Vibrator, Jackhammer, Mason Tender, Mortar Mixer, Pavement Breaker, Handlers of all steel mesh, Small generators for laborer's tools, Installation of bridge drainage, Pipelayers, Vibrator type rollers, Tamper, Drill doctor, Tail or Screw Operator on asphalt paver, Water pump operator (1 1/2"" and single diaphragm), Nozzle (asphalt, gunnite, seeding and sand blasting), Laborers on chain link fence erection, Rock splitter and power unit, Pusher type concrete saw and all other gas, electric, oil, and air tool operators, Wrecking laborers

GROUP 3: All rock or drilling machine operators (except quarry master and similar type), Acetylene torch operators, and Asphalt paver, Powderman

GROUP 4: Blasterers, Form setters, Stone or Granite Curb setters

LABO0157-001 07/01/2017

FULTON (Twps. of Bleeker, Mayfield, Northhampton, Johnstown, Broadalbin and Perth); MONTGOMERY (Twps. of Mohawk, Glen, Charleston, Amsterdam, and Florida); SARATOGA (Twps. of Day, Hadley, Edinburg, Corinth, Moreau, South Glens Falls, Providence, Greenfield, Wilton, Northcumberland, Galway, Milton, Saratoga Springs, Charlton, Ballston, Malta and Clifton Park); SCHENECTADY and SCHOHARIE COUNTIES.

LABORER

BUILDING:

GROUP 1....................$ 28.74 20.14+a GROUP 2....................$ 30.09 20.14+a

HEAVY & HIGHWAY:

GROUP 1:...................$ 30.55 21.29+a GROUP 2:...................$ 30.75 21.29+a GROUP 3:...................$ 30.95 21.29+a GROUP 4:...................$ 31.15 21.29+a GROUP 5:...................$ 32.55 21.29+a

LABORER CLASSIFICATIONS

Group 1: Common Laborers

Group 2: Asbestos and Toxic Materials

Commercial projects valued at $800,000 or less and/or industrial projects valued at $100,000 or less, excluding demolition work (the complete razing of structures) 75% of the basic wage scale with full benefits will apply

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day

LABORER CLASSIFICATIONS

GROUP 1: Common laborers, flagman, outboard & hand boats

GROUP 2: Bull float, chain saw, concrete aggregate bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tamper, drill doctor, tail or screw operator on asphalt paver, water pump operator (1 1/2"") and single diaphragm), nozzle (asphalt, gunnite, seeding, and sand blasting), laborers on chain fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, and air tool operators, wrecking laborers

GROUP 3: All rock drilling machine operators (except quarry master and similar type), acetylene torch operator, and asphalt paver, powderman

GROUP 4: Blasterers, form setters, stone or granite curb setters

GROUP 5: Hazardous waste removal

LABO0190-001 07/01/2022

ALBANY; GREEN; RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA

COUNTY (Townships of Stillwater, Halfmoon, Saratoga)

Laborers:

BUILDING:

GROUP 1....................$ 32.86 24.57

GROUP 2....................$ 34.21 24.57

LABORERS CLASSIFICATIONS

GROUP 1: Common Laborers

GROUP 2: Hazardous waste removal Commercial projects valued at $800,000 or less and/or industrial projects valued at $100,000 or less excluding demolition work, (complete razing of structures) will receive 75% of basic wage scale with full fringes will apply

LABO0190-002 07/01/2018

ALBANY; RENSSELAER; COLUMBIA (Twps. of Stuyvesant, Stockport, Kinderhook, New Lebanon, Cannan, Ghent, Chatham, Austerlitz).

GREENE (except Catskill Township). WASHINGTON COUNTY. SARATAGO COUNTY (Townships of Stillwater, Halfmoon Saratoga)

HEAVY & HIGHWAY:

GROUP 1:...................$ 30.94 22.70

GROUP 2:...................$ 31.14 22.70

GROUP 3:...................$ 31.34 22.70

GROUP 4:...................$ 31.54 22.70

GROUP 5:...................$ 32.94 22.70

FOOTNOTE:

PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.

LABORERS CLASSIFICATIONS

GROUP 1: Common laborers, flagmen, outboard and hand boats

GROUP 2: Bull float, chain saw, concrete aggregated bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tampers, drill doctor, Tail or screw operator on asphalt paver, Water pump operator (1 1/2"" and single diaphragm), Nozzle (asphalt, gunnite, seeding, and sand blasting) Laborers on chain link fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, air tool operators, and wrecking laborers

GROUP 3: All rock air drilling machine operators (except quarry master and similar type), acetylene torch operators, and asphalt paver, powderman

GROUP 4: Blasterers, form setters, stone or granite curb setters

GROUP 5: Hazardous waste removal

LABO0235-006 05/01/2018

COLUMBIA (Twps. of Greenport, Claverack, Hillsdale, Livingston, Germantown, Taghkanic, Copake, Clermont, Gallatin, Ancram):

HEAVY & HIGHWAY

GROUP 1....................$ 24.40 29.75+a GROUP 2....................$ 28.16 29.75+a GROUP 3....................$ 29.16 29.75+a

LABORERS CLASSIFICATIONS (HEAVY & HIGHWAY)

GROUP 1: Flagperson; Placing and maintenance of all flares, cones, lights, signs, barricades; traffic control custodial work; traffic directors; temporary heat or light tenders;

tool rooms

GROUP 2: General Laborers, Dumpman, Pitman, Concrete man;

Signal man; Pipelayers; Rip rap; Dry stone layer; Jack hammer; Powderman; Highscalers power buggy operator; Steel rod carrier; Vibratory operator; other machine operator;

wrecking; Vibrator operator-compactor; Gunite and sandblasting; Water pump 2"" or under; Nipper; Chucker;

Asphalt Workers

GROUP 3: Asphalt raker; Asphalt Screedman; Drillers (all);

Laser Beam Operator; Form Setter/Aligners; Blasters

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, Presidents Day, Good Friday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, November Election Day, Thanksgiving Day, and Christmas Day

PAIN0009-013 07/01/2022

Rates Fringes

GLAZIER..........................$ 34.01 26.91

PAIN0155-002 05/01/2021

COLUMBIA AND GREENE COUNTIES

Rates Fringes

Painters:

Drywall Finisher............$ 35.94 24.66 Lead Abatement Work.........$ 35.94 24.66 Painter/Paperhanger.........$ 35.94 24.66 Spray Rate..................$ 36.94 24.66

PAIN0201-001 05/01/2022

Rates Fringes

Painters:

Lead Abatement Workers, Structural Steel Zone 1.....................$ 31.79 19.75 Zone 2.....................$ 31.79 19.75 Painters, Drywall Finishers, Spray Zone 1.....................$ 30.79 19.75

Zone 2.....................$ 30.79 19.75

Zone #1 Entire counties of ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA

ZONE #2 All of WASHINGTON County

PAIN0806-002 10/01/2022

ALBANY, COLUMBIA, FULTON, GREENE, MONTGOMERY, RENNSELAER,

SCHOHARIE, SCHENECTADY, SARATOGA AND WASHINGTON

Painters:

Structural Steel and Bridge.$ 54.50 52.73

PLUM0007-001 05/01/2022

ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER;

SCHENECTADY; SARATOGA (Towns of Charlton, Clifton Park, Galway, Halfmoon, Milton, Stillwater and Waterford)

PLUMBER/PIPEFITTER...............$ 48.30 28.15

PLUM0112-019 05/01/2022

Townships of Canajoharie and Minden

Rates Fringes

PLUMBER (Including Steamfitting) Northern Zone...............$ 39.25 31.35

PLUM0773-002 05/01/2022

SARATOGA (Remainder of County); WASHINGTON COUNTY:

Rates Fringes

PLUMBER/PIPEFITTER...............$ 39.65 32.73

ROOF0203-003 06/01/2021

SCHOHARIE COUNTY:

ROOFER...........................$ 28.05 17.79

ROOF0241-001 07/01/2022

Rates Fringes

ROOFER...........................$ 33.55 22.35

SFNY0669-001 01/01/2023

Rates Fringes

SPRINKLER FITTER.................$ 40.81 26.47

SHEE0083-001 06/01/2019

Rates Fringes

Sheet metal worker...............$ 33.73 33.04+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day. If any of these holidays fall on a Saturday or Sunday, either the preceding Friday or following Monday will be observed as the holiday.

TEAM0294-003 07/01/2021

Rates Fringes

Truck drivers:

HEAVY & HIGHWAY

GROUP 1....................$ 32.65 27.52+a GROUP 2....................$ 32.71 27.52+a GROUP 3....................$ 32.80 27.52+a GROUP 4....................$ 32.93 27.52+a GROUP 5....................$ 33.09 27.52+a

TRUCK DRIVERS CLASSIFICATIONS (HEAVY & HIGHWAY)

GROUP 1: Pick-ups, panel trucks, flatboy material trucks (straight jobs), single axle dump trucks, dumpsters, receivers, greasers, truck tireman

GROUP 2: Tandems, batch trucks, mechanics

GROUP 3: Semi-trailers, low-boy trucks, asphalt distributor trucks, agitator, mixer trucks and dumpcrete type vehicles, truck mechanic, fuel truck

GROUP 4: Specialized earth moving equipment - euclid type or similar off-highway equipment, where not self-loaded, straddle (ross) carrier, self-contained concrete unit

GROUP 5: Off-highway tandem back dump, twin engine equipment and double hitched equipment where not self-loaded

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee works the day before and the day after the holiday.

TEAM0294-004 07/01/2019

BUILDING CONSTRUCTION

EXCLUDING MONTGOMERY COUNTY

Rates Fringes

Truck drivers:

GROUP 1.....................$ 27.67 24.28+a GROUP 2.....................$ 27.97 24.28+a

FOOTNOTES:

a. One week vacation after 1 year; 2 weeks vacation after 5 years.

TRUCK DRIVERS BUILDING CLASSIFICATIONS

GROUP 1: Straight, winch, transit mix on job site, road oilers, dump, panel, pick-up, water and fuel trucks on site (including nozzle)

GROUP 2: Euclid or similar equipment, lowboy or lowboy trailers

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division

U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISIO"

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government

Section F - Deliveries or Performance

INSTRUCTIONS

INSTRUCTIONS

1. INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

You are invited to submit a quote in response to our Request for Quote (RFQ) W50S8J23Q002, Repair various roofs, Project No. VBDZ232100 at the 109th Airlift Wing/Stratton ANGB, NY.

This solicitation is set-aside 100% for small businesses.

EVALUATION:

Quotes will be evaluated using Simplified Acquisition Procedures IAW FAR Part 13. The Government will award a contract resulting from this solicitation to the responsible contractor who submits the best value quote considering price and non-price related factors. Non-Price related factors include the following:

Contractor shall provide a short (no more than one (1) page per project) project description (include Customer Name; Location & Dollar Value) and scope description for three (3) roofing projects of industrial/commercial size in the Northeast (included Maine, New Hampshire, Vermont, New York, Pennsylvania and Massachusetts) that include repair of membrane, metal, modified bitumen, and/or elastomeric coating. Types of repair can be spread out across the three projects. Please include references and their contact information.

The overarching evaluation approach is as follows:

Quotes will be sorted based on whether the quote includes three (3), two (2), one (1) or zero (0) projects as described above for non-price related factors. Quotes which include the maximum of three (3) projects will be evaluated first.

The Government will evaluate the non-price factor information submitted with the lowest priced quote that contains the maximum of three (3) projects under the non-price factor submittal. This evaluation will focus on both similarity of experience and quality of previous work, which may be determined by contacting the references provided for each project, a review of available information in CPARS, and/or the Contracting Officer’s knowledge and previous experience.

If, in the Government’s opinion, the lowest priced quote (of those which included three (3) projects) demonstrates experience across the three (3) projects which is both similar and high quality, the Government may determine that particular offerors’ quote represents the best value without conducting a more in-depth review of any other quote.

If, on the other hand, the Government discovers experience or quality information that represents a significant concern, OR if the Government is unable to determine the quoted price to be fair and reasonable, the Government may decide to evaluate the next lowest priced quote. If all quotes containing three (3) projects are exhausted, the Government will move on to those containing two (2) projects, and so on until a quote is identified which in the Government’s opinion, represents the best value. Award will be made to the contractor who, in the Government’s opinion, submits the best value quote based on the integrated assessment of price and non-price related factors.

Offerors are advised that the evaluation process is subjective and the best value may not be the lowest price.

2. NOTICE OF SITE VISIT:

A site visit will be held on Monday, March 20, 2023 / 2:00 PM. Contractors will meet at the Civil Engineering Building 25, 1 Air National Guard Rd, Scotia, NY 12302.

Due to security concerns, all offerors must register to attend the site visit. Email the following information for all attendees to richard.w.powell44.mil@army.mil Firm Name Telephone Number Visitor's Full Name This information must be provided NLT 3:00PM Friday, March 17, 2023 to secure a spot. The furnishing of the information above is voluntary; however, your failure to furnish all or part of the requested information may result in the Government's denial of your access to the site visit.