Site Visit Meeting Minutes.pdf

PDF 167 KB Posted

Attached to
Medium Voltage Electrical Distribution Transformer PM
Solicitation number
W50S8D26Q1C85
Issued by

About this file

This document is a Memorandum for Record documenting the minutes of a site visit held on August 11, 2026, for Solicitation W50S8D26Q1C85, a medium voltage electrical distribution transformer preventative maintenance project. The contracting officer is Joseph Kugler of the 105th Airlift Wing (ANG) located in Newburgh, NY. The solicitation is being issued as a Request for Quote (RFQ) under FAR Part 12 for the acquisition of commercial products and services, designated as a total small business set-aside under NAICS code 238210 (Electrical Contractors and Other Wiring Installation Contractors). The contract period is 180 days, inclusive of all work and cleanup activities. Quotes are due by August 19, 2026, at 11:00 AM, and must be submitted through the SAM.gov Contract Opportunities website.

The project scope involves servicing multiple medium voltage transformers throughout the base with staggered power shutdowns estimated at four to six separate mobilizations to minimize mission impact. Contractors are responsible for coordinating all power shutdown schedules with the Government during normal business hours; night and weekend work is not required. The Government will provide generators for critical facilities during specific shutdowns, and building managers of facilities without generators will make their own accommodations. Contractors should not plan generator provision. Power shutdowns may be scheduled at any time during the 180-day period, with preference for every other Monday when the base operates with limited personnel. A schedule of these closed days will be provided post-award. Questions must be submitted in writing to joseph.kugler.1@us.af.mil, with all responses posted to SAM.gov. Additional Request for Information (RFI) responses regarding oil sampling and filtering requirements are anticipated and will also be posted to the contract opportunities website.

View the file

Other files

File Type Posted
Solicitation Amendment 0001.pdf PDF
Pricing Worksheet.pdf PDF
Solicitation Amendment 0001.pdf PDF
Electrical Distribution Map.jpeg JPEG file
RFI 4.pdf PDF
RFI 3.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
RFI 2.pdf PDF
Transformer List.pdf PDF
RFI 1.pdf PDF
Pricing Worksheet.pdf PDF
Circuit Map.pdf PDF
Pricing Worksheet.pdf PDF
Wage Determination.pdf PDF
Transformer List.pdf PDF
Site Visit Instructions.pdf PDF
Performance Work Statement.pdf PDF
Provisions and Clauses.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEMORANDUM FOR RECORD

DEPARTMENTOFTHEAIRFORCE

105th AIRLIFT WING (ANG)

ONE MAGUIRE WAY

NEWBURGH NY 12550-5075

SUBJECT: MINUTES OF SITE VISIT, SOLICITATION W50S8D26Q1C85, MEDIUM VOLTAGE ELECTRICAL

DISTRIBUTION TRANSFORMER PM

11 August 2026, 1000 - 1100

1. The list of contractors attending the meeting is shown on the attached sign-in sheet. The following Government representatives attended the subject meeting:

Name Position Joseph Kugler Contracting Officer Michael Lynch Deputy Base Civil Engineer Biron Pitts 105th CE Power Production Craftsman

2. The following items were discussed during the site visit meeting:

a. The acquisition process was explained and all were notified that the solicitation is being issued as a Request for Quote (RFQ) under FAR Part 12 Acquisition of Commercial Products and Commercial Services. Contract period is 180 days. This includes all work to include cleanup.

b. The solicitation is being issued as a total small business set-aside under the applicable NAICS code 238210, Electrical Contractors and Other Wiring Installation Contractors.

c. Quotes are due by 19 August 2026 at 11:00 AM. Contractors were reminded to check the solicitation posting at https://sam.gov/ Contract Opportunities regularly for any changes throughout the solicitation phase.

3. Contractors were reminded that all questions must be submitted in writing via email to:

joseph.kugler.1@us.af.mil. All questions must be routed through the Contracting Office. All Contractor questions when answered will be posted to the https://sam.gov/ Contract Opportunities website. If a question arises that will result in a change to the plans or specifications, an official amendment will be issued. All correspondence, questions and answers, amendments etc. will be issued or posted through Contract Opportunities. All amendments will need to be acknowledged.

4. Mike Lynch then discussed details of the project. A review of the circuit map was discussed that illustrates the circuit group that will be included in this project’s scope of work. A transformer list was also provided to include the voltage of each transformer that will be serviced. Power shutdown will need to be staggered throughout the period of performance in order to manage mission impact. Therefore, it is estimated that there will be 4 to 6 separate mobilizations to accommodate these shutdowns. This is just an estimate and contractors will need to determine for themselves how many mobilizations they will need based on what they see in the field during today’s site visit. Advanced coordination between the contractor and the Government will be needed to schedule all power shutdowns to minimize mission impact.

5. A contractor asked if work would need to be extended to nights and weekend hours to accommodate power shutdowns. This will not be necessary. All coordination and scheduling work should take place during normal business hours.

6. Another contractor asked if they would be responsible for providing generators to operate at certain locations during power shutdowns. The government already has generators on some of the critical facilities that will be active during specific shutdowns. Building managers of other facilities that do not have generators will be informed of power outages and will have to make their own accommodations.

Therefore, the contactor will not be responsible for providing generators.

7. Timeframe for scheduling power shutdowns does not need to be separated evenly over the 180 day period of performance. Shutdowns can be coordinated at anytime during the 180 days. It was noted that every other Monday, the Base is closed with limited personnel onsite. It would be ideal to schedule shutdowns around these days to limit impact to mission operations. A schedule of these days will be provided after award to assist with coordinating power shutdowns.

8. A few RFI’s are expected to be submitted after the site visit regarding drawing oil samples from transformers under positive/negative states and also filtering requirements of some transformers. Once received, the Government will provide responses, which will be posted to the solicitation page on the https://sam.gov/ Contract Opportunities website.

9. All attendees were escorted out to the field to see several transformers to get a better understanding of current conditions and take pictures of available nameplates as necessary to gather further information. The site visit concluded at approximately 1130.

APPROVED

Attachments Sign-in Sheet Joseph Kugler, MSgt, NYANG Contracting Officer

2026-08-12T08:10:28-0400
KUGLER.JOSEPH.JAY.1022232416

File details come from the government source that posted it. Updated .