This is a Questions and Answers document from a federal contract solicitation for transformer services at Stewart Air National Guard Base.
The contract involves the management and coordination of 22 transformers located at Stewart Air National Guard Base. The government estimates 4-6 mobilizations and outage windows across a 180-day performance period, though the actual number of mobilizations will be determined by the contractor. The contractor is responsible for scheduling outages and coordinating with the Government and local energy supplier (Central Hudson) as needed. A revised Transformer List with kVA ratings for each unit has been provided as an attachment. Contract award is anticipated by mid-September, no later than September 30, with contractor work on coordination to begin immediately upon award. A site visit was scheduled for August 11 at 10:00 AM to allow contractors to inspect the transformers and photograph nameplates. All 22 transformers are located on Stewart Air National Guard Base.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment 0001.pdf | ||
| Pricing Worksheet.pdf | ||
| Electrical Distribution Map.jpeg | JPEG file | |
| RFI 4.pdf | ||
| Solicitation Amendment 0001.pdf | ||
| RFI 3.pdf | ||
| Site Visit Meeting Minutes.pdf | ||
| Site Visit Sign-in Sheet.pdf | ||
| Transformer List.pdf | ||
| RFI 1.pdf | ||
| Pricing Worksheet.pdf | ||
| Circuit Map.pdf | ||
| Pricing Worksheet.pdf | ||
| Wage Determination.pdf | ||
| Provisions and Clauses.pdf | ||
| Transformer List.pdf | ||
| Site Visit Instructions.pdf | ||
| Performance Work Statement.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10) Please provide the kVA rating for each transformer?
The Transformer List has been revised and attached that adds a column for kVA rating.
11) How will the outage windows be scheduled across the 180-day performance period and 4–6 anticipated mobilizations?
The 4-6 anticipated mobilizations is a government estimate, actual mobilizations will be determined by the contractor. These outages will be coordinated by the contractor with the Government and if coordination with the local energy supplier (Central Hudson) is required, the Contractor shall provide all coordination.
12) Is there an anticipated start date?
The contractor shall begin working on the coordination upon award. It is expected that award will be made by mid- September, but no later than 30 September.
13) Please confirm that all 22 transformers are located at Stewart Air National Guard Base?
All 22 are located on Stewart Air National Guard Base.
14) Are photographs of the transformers and their nameplates available?
A site visit will take place on 11 August at 10:00AM. Contractors are free to attend and take any necessary pictures.
File details come from the government source that posted it. Updated .