Amendment 4 W50S8524B0001.pdf
PDF 247 KB Posted
- Attached to
- VGLZ 172042 Repair Runway
- Solicitation number
- W50S8524B0001
About this file
This document provides details for a federal contract solicitation to repair a runway. The solicitation is for non-personal services including plant, labor, materials, tools, equipment, supplies, and supervision to repair Runway Keel in accordance with drawings, plans, specifications, and terms. The period of performance is 300 calendar days. The solicitation is unrestricted with a small business size standard of $45 million. The project magnitude is between $10-25 million. Bids are due by the date specified in amendments to the solicitation. An original bid bond is required with the bid. Funds may become available by September 2024, and the project has been identified on the National Guard's priority list for award if prices are within a range and funds are available. The soliciting agency is the Department of the Army Michigan Army National Guard.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
127 MSC
STEVEN STOCKING
(586) 239-4881
43200 MAPLE ST.
SELFRIDGE ANGB MI 48045
F8Y36P3263A001-0001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to make the follow ing changes in accordance w ith the enclosed "Summary of Changes":
1. Incorporate Addendum 1 into the terms and conditions of this soliciation and any subsequent contract.
2. Incorporate unit price struture for Asphalt and crack repairs. Please refer to the revised line item structure.
3. The clause at FAR 52.211-18, "Variation in Estimated Quantity". is hereby incorporated into the terms and conditions of this soliciation and any subsequent contract.
4. The Wage Determinatiion is updated to General Decision Number: MI20240001 01/05/2024
5. There are no other changes and all other terms shall remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 44
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Jan-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S8524B0001
X 9B. DATED (SEE ITEM 11)
14-Nov-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Jan-2024
CODE
USPFO MI 127 MISSION SUPPORT CONTRACTING
43200 MAPLE ST
SELFRIDGE ANGB MI 48045-5213
W50S85 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W50S85
FACILITY CODECODE
EMAIL:TEL:
W50S8524B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
ADDENDUM 1
This addendum applies to the following documents:
(X ) Specifications (X ) Contracting Document W50S8524B0001 (X ) Statement of Work (SOW) dated 28 September 2023 (X ) Drawings Description of Addendum 001 Due to clarifications from solicitation requests for information (RFI) for the Repair Runway project, the Specifications requires a modification:
A. Add to Section 01 51 00 – General Requirements, 2.2, A
a. The Contractor is responsible for supplying and installing the meter and associated equipment. The Contractor will be responsible to provide the drop, meter and all associated material, equipment, and licensed electrician for the electrical connection B. Remove Section 01 51 00 – General Requirements, 2.2, B
a. The cost of electricity consumed during construction, up until beneficial occupancy by SANG shall be paid by the Government.
C. Add to Section 01 51 00 – General Requirements, 2.2, B
a. The Contractor will pay $0.118 per Kilowatt Hour to the Government for electrical power usage reimbursement. Will be billed monthly.
D. Add Section 01 51 00 – General Requirements, 5.11
a. There are no utilities (water, electricity, sanitary, natural gas) available in the designated staging area.
There is an area available across from Bldg 825 (Medical Facility) on Jefferson Rd. to place a temporary office trailer, to be provided by the Contractor.
E. Use Section 03 30 00 – Cast-In-Place Concrete, 2.6.1.1
a. Epoxy-coated reinforcement bars
Due to clarifications from solicitation requests for information (RFI) for the Repair Runway project, the Contracting Document W50S8524B0001 requires a modification:
A. Remove Section 3.1
a. If the Contractor desires to work during periods other than above, he must notify the Contracting Officer’s Representative (COR) five (5) working days in advance of his intention to work during other periods to allow assignment of additional inspection forces. When the COR determines that they are reasonably available, he may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of the inspection, at overtime rates, will be charged to the Contractor and will be deducted from the final payment of the Contract amount.
Due to clarifications from solicitation requests for information (RFI) for the Repair Runway project, the Statement of Work (SOW) dated 28 September 2023 requires a modification:
A. Remove Section 4.c
a. Currently, the base is open from Monday thru Friday 0700-1700. Any work outside these hours and on Federal Holidays must be requested, in a written request to the Contracting Officer or appointed representative, at least 72 business hours in advance and then approved by the Contracting Officer. Requested approval for weekend and holiday work will not be eligible for equitable adjustments unless the work was at the request of the Government.
Due to clarifications from solicitation requests for information (RFI) for the Repair Runway project, the Drawings requires a modification:
A. Remove from Figure C401, C402, C403, C404, C405, and C406
a. Fifth note: Base will allow flexible work schedule (e.g., 12-hour workdays, weekend work, etc.) to meet 6-week construction schedule.
B. Remove to Figure C601, Repair Area 1 Detail
a. Deformed Steel Reinforcing Bar C. Add to Figure C601, Repair Area 1 Detail
a. Epoxy-coated Steel Reinforcing Bar D. Remove from Figure G203, Construction Activities: Phase 3, Note 4
a. and install new Taxiway B lights on Taxiway B
ADD: Prior to the shutdown of the runway a separate notice to proceed shall be issued so as to codify the 84 calandar day shut down period of performance END OF Addendum . 001
SECTION 00 10 00 - SOLICITATION
CLIN 0001
The CLIN extended description has changed from:
Requirements Description- VGLZ172042 - Non personal services: Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary to Repair Runway Keel in accordancewith drawings, plans, specifications, and all applicable terms and conditions.
To:
Requirements Description- VGLZ172042 - Non personal services: Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary to Repair Runway Keel in accordancewith drawings, plans, specifications, and all applicable terms and conditions. The price on this line item exlcudes Crack repair and Asphalt Repair. Bidders shall price crack repairs and asphalt repairs as per the bid schedule.
CLIN 0002 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Crack Repair
FFP
Non personal services: Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary in support of crack repair in supprt of VGLZ172042 - Repair Runway Keel Repair Runway Keel in accordancewith drawings, plans, NET AMT
SUBCLIN 0002AA is added as follows:
0002AA 4,000 Linear
Foot
1/4-1" Crack Repair
FFP
1. Bidders are required to submit a unit price for 1/4-1" crack repair listed above.
Failure to provide a unit price for this line item will result in the rejection of the bid as non-responsive. Further, bids determined to be unbalanced as to individual unit prices will be rejected as non-responsive.
2. Contractor is to pro-rate mobilization costs to the respective unit priced and lump sum bid items.
3. Quantities listed in this line item are estimated only. No claims for anticipated profits, loss of profits, or damage of any sort due to differences between the estimated quantities of any item included in the original work will be allowed.
Reference FAR 52.211-18, "Variation in Estimated Quantity". UNDER NO
CIRCUMSTANCES SHALL THE CONTRACTOR PERFORM WORK IN
EXCESS OF THE ESTIMATED QUANTITIES WITHOUT THE EXPRESS
WRITTEN PERMISSION OF THE CONTRACTING OFFICER.
FOB: Destination
SUBCLIN 0002AB is added as follows:
0002AB 4,000 Linear
1"-2" Crack Repair
1. Bidders are required to submit a unit price for 1"-2" crack repair listed above.
Failure to provide a unit price for this line item will result in the rejection of the bid as non-responsive. Further, bids determined to be unbalanced as to individual unit prices will be rejected as non-responsive.
2. Contractor is to pro-rate mobilization costs to the respective unit priced and lump sum bid items.
3. Quantities listed in ths line item are estimated only. No claims for anticipated profits, loss of profits, or damage of any sort due to differences between the estimated quantities of any item included in the original work will be allowed.
Reference FAR 52.211-18, "Variation in Estimated Quantity". UNDER NO
CIRCUMSTANCES SHALL THE CONTRACTOR PERFORM WORK IN
EXCESS OF THE ESTIMATED QUANTITIES WITHOUT THE EXPRESS
SUBCLIN 0002AC is added as follows:
0002AC 1,500 Linear
2" and greater Crack Repair
1. Bidders are required to submit a unit price for2" and greater crack repair listed above. Failure to provide a unit price for this line item will result in the rejection of the bid as non-responsive. Further, bids determined to be unbalanced as to individual unit prices will be rejected as non-responsive.
2. Contractor is to pro-rate mobilization costs to the respective unit priced and lump sum bid items.
3. Quantities listed in this line item are estimated only. No claims for anticipated profits, loss of profits, or damage of any sort due to differences between the estimated quantities of any item included in the original work will be allowed.
Reference FAR 52.211-18, "Variation in Estimated Quantity". UNDER NO
CIRCUMSTANCES SHALL THE CONTRACTOR PERFORM WORK IN
EXCESS OF THE ESTIMATED QUANTITIES WITHOUT THE EXPRESS
CLIN 0003 is added as follows:
Asphalt Repair
FFP
Non personal services: Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary in support of Asphalt repair in supprt of VGLZ172042 - Repair Runway Keel Repair Runway Keel in accordancewith drawings, plans, SUBCLIN 0003AA is added as follows:
0003AA 11,028 Net Ton
(2,000
LB).
2” wearing course
1. Bidders are required to submit a unit price for 2" of wearing asphalt course as listed above. Failure to provide a unit price for this line item will result in the rejection of the bid as non-responsive. Further, bids determined to be unbalanced as to individual unit prices will be rejected as non-responsive.
2. Contractor is to pro-rate mobilization costs to the respective unit priced and lump sum bid items.
3. Quantities listed in this line item are estimated only. No claims for anticipated profits, loss of profits, or damage of any sort due to differences between the estimated quantities of any item included in the original work will be allowed.
Reference FAR 52.211-18, "Variation in Estimated Quantity". UNDER NO
CIRCUMSTANCES SHALL THE CONTRACTOR PERFORM WORK IN
EXCESS OF THE ESTIMATED QUANTITIES WITHOUT THE EXPRESS
SUBCLIN 0003AB is added as follows:
0003AB 11,028 Net Ton
2” base course
. Bidders are required to submit a unit price for 2" of base asphalt course as listed above. Failure to provide a unit price for this line item will result in the rejection of the bid as non-responsive. Further, bids determined to be unbalanced as to individual unit prices will be rejected as non-responsive.
2. Contractor is to pro-rate mobilization costs to the respective unit priced and lump sum bid items.
3. Quantities listed in this line item are estimated only. No claims for anticipated profits, loss of profits, or damage of any sort due to differences between the estimated quantities of any item included in the original work will be allowed.
Reference FAR 52.211-18, "Variation in Estimated Quantity". UNDER NO
CIRCUMSTANCES SHALL THE CONTRACTOR PERFORM WORK IN
EXCESS OF THE ESTIMATED QUANTITIES WITHOUT THE EXPRESS
SUBCLIN 0003AC is added as follows:
0003AC 14,887 Net Ton
2.25” Base course
1. Bidders are required to submit a unit price for 2.25" course as listed above.
Failure to provide a unit price for this line item will result in the rejection of the bid as non-responsive. Further, bids determined to be unbalanced as to individual unit prices will be rejected as non-responsive.
2. Contractor is to pro-rate mobilization costs to the respective unit priced and lump sum bid items.
3. Quantities listed in this line item are estimated only. No claims for anticipated profits, loss of profits, or damage of any sort due to differences between the estimated quantities of any item included in the original work will be allowed.
Reference FAR 52.211-18, "Variation in Estimated Quantity". UNDER NO
CIRCUMSTANCES SHALL THE CONTRACTOR PERFORM WORK IN
EXCESS OF THE ESTIMATED QUANTITIES WITHOUT THE EXPRESS
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
270 dys. ANP 1 127 CES/CEOHS
28545 SUPPLY ST
BLDG 103
SELFRIDGE ANGB MI 48045
F8Y36H
To:
CAGE
270 dys. ANP 1 127 CES
STEPHEN M. KLENKE
28900 SELFRIDGE AVE
BLDG 127
SELFRIDGE ANGB MI 48045-5223
(586) 239-4086
F8Y36P
The following Delivery Schedule for SUBCLIN 0002AA has been added:
CAGE
84 dys. ANP 4,000 127 CES
STEPHEN M. KLENKE
28900 SELFRIDGE AVE
BLDG 127
SELFRIDGE ANGB MI 48045-5223
(586) 239-4086
The following Delivery Schedule for SUBCLIN 0002AB has been added:
CAGE
84 dys. ANP 4,000 127 CES
STEPHEN M. KLENKE
28900 SELFRIDGE AVE
BLDG 127
SELFRIDGE ANGB MI 48045-5223
(586) 239-4086
The following Delivery Schedule for SUBCLIN 0002AC has been added:
CAGE
84 dys. ANP 1,500 127 CES
STEPHEN M. KLENKE
28900 SELFRIDGE AVE
BLDG 127
SELFRIDGE ANGB MI 48045-5223
(586) 239-4086
The following Delivery Schedule for SUBCLIN 0003AA has been added:
CAGE
84 dys. ANP 11,028 127 CES
STEPHEN M. KLENKE
28900 SELFRIDGE AVE
BLDG 127
SELFRIDGE ANGB MI 48045-5223
(586) 239-4086
The following Delivery Schedule for SUBCLIN 0003AB has been added:
CAGE
84 dys. ANP 11,028 127 CES
STEPHEN M. KLENKE
28900 SELFRIDGE AVE
BLDG 127
SELFRIDGE ANGB MI 48045-5223
(586) 239-4086
The following Delivery Schedule for SUBCLIN 0003AC has been added:
CAGE
84 dys. ANP 14,887 127 CES
STEPHEN M. KLENKE
28900 SELFRIDGE AVE
BLDG 127
SELFRIDGE ANGB MI 48045-5223
(586) 239-4086
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following Acceptance/Inspection Schedule was added for CLIN 0002:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A N/A
The following Acceptance/Inspection Schedule was added for SUBCLIN 0002AA:
Destination Government Destination Government
The following Acceptance/Inspection Schedule was added for SUBCLIN 0002AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0002AC:
The following Acceptance/Inspection Schedule was added for CLIN 0003:
N/A N/A N/A N/A
The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AA:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AB:
The following Acceptance/Inspection Schedule was added for SUBCLIN 0003AC:
The following have been added by full text:
52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)
If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE DETERMINATION
"General Decision Number: MI20240001 01/05/2024
Superseded General Decision Number: MI20230001
State: Michigan
Construction Types: Highway (Highway, Airport & Bridge xxxxx and Sewer/Incid. to Hwy.)
Counties: Michigan Statewide.
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024
CARP0004-004 06/01/2019
REMAINDER OF STATE
Rates Fringes
CARPENTER ( Piledriver)..........$ 27.62 20.59
CARP0004-005 06/01/2018
LIVINGSTON (Townships of Brighton, Deerfield, Genoa, Hartland, Oceola & Tyrone), MACOMB, MONROE, OAKLAND, SANILAC, ST. CLAIR
AND WAYNE COUNTIES
CARPENTER (Piledriver)...........$ 30.50 27.28
ELEC0017-005 06/01/2023
STATEWIDE
Rates Fringes
Line Construction Groundman/Driver............$ 29.24 7.20+32% Journeyman Signal Tech, Communications Tech, Tower Tech & Fiber Optic Splicers.$ 52.02 7.20+32% Journeyman Specialist.......$ 53.83 32%+7.20 Operator A..................$ 37.13 7.20+32% Operator B..................$ 34.67 7.20+32%
Classifications
Journeyman Specialist: Refers to a crew of only one person working alone.
Operator A: Shall be proficient in operating all power equipment including: Backhoe, Excavator, Directional Bore and Boom/Digger truck.
Operator B: Shall be proficient in operating any 2 of the above mentioned pieces of equipment listed under Operator A.
ENGI0324-003 06/01/2023
ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON,
CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO,
ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB,
MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO,
PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC,
SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:
OPERATOR: Power Equipment (Steel Erection)
GROUP 1....................$ 53.02 25.25
GROUP 2....................$ 54.02 25.25
GROUP 3....................$ 51.52 25.25
GROUP 4....................$ 52.52 25.25
GROUP 5....................$ 50.02 25.25
GROUP 6....................$ 51.02 25.25
GROUP 7....................$ 49.75 25.25
GROUP 8....................$ 50.75 25.25
GROUP 9....................$ 49.30 25.25
GROUP 10....................$ 50.30 25.25
GROUP 11....................$ 48.57 25.25
GROUP 12....................$ 49.57 25.25
GROUP 13....................$ 48.21 25.25
GROUP 14....................$ 49.21 25.25
GROUP 15....................$ 47.57 25.25
GROUP 16....................$ 44.37 25.25
GROUP 17....................$ 28.89 12.40
GROUP 18....................$ 33.38 25.25
FOOTNOTE:
Paid Holidays: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Engineer when operating combination of boom and jib 400' or longer
GROUP 2: Engineer when operating combination of boom and jib 400' or longer on a crane that requires an oiler
GROUP 3: Engineer when operating combination of boom and jib 300' or longer
GROUP 4: Engineer when operating combination of boom and jib 300' or longer on a crane that requires an oiler
GROUP 5: Engineer when operating combination of boom and jib 220' or longer
GROUP 6: Engineer when operating combination of boom and jib 220' or longer on a crane that requires an oiler
GROUP 7: Engineer when operating combination of boom and jib 140' or longer
GROUP 8: Engineer when operating combination of boom and jib 140' or longer on a crane that requires an oiler
GROUP 9: Tower crane & derrick operator (where operator's work station is 50 ft. or more above first sub-level)
GROUP 10: Tower crane & derrick operator (where operator's work station is 50 ft. or more above first sub-level) on a crane that requires an oiler
GROUP 11: Engineer when operating combination of boom and jib 120' or longer
GROUP 12: Engineer when operating combination of boom and jib 120' or longer on a crane that requires an oiler
GROUP 13: Crane operator; job mechanic and 3 drum hoist and excavator
GROUP 14: Crane operator on a crane that requires an oiler
GROUP 15: Hoisting operator; 2 drum hoist and rubber tired backhoe
GROUP 16: Forklift and 1 drum hoist
GROUP 17: Compressor or welder operator
GROUP 18: Oiler
ENGI0324-004 06/01/2023
AREA 1: ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, EATON,
HILLSDALE, IONIA, KALAMAZOO, KENT, LAKE, MANISTEE, MASON,
MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA,
ST. JOSEPH, VAN BUREN
AREA 2: ANTRIM, BENZIE, CHARLEVOIX, EMMET, GRAND TRAVERSE,
KALKASKA, LEELANAU, MISSAUKEE AND WEXFORD COUNTIES:
(Steel Erection)
AREA 1
GROUP 1....................$ 53.02 25.25
GROUP 2....................$ 49.75 25.25
GROUP 3....................$ 48.21 25.25
GROUP 4....................$ 44.37 25.25
GROUP 5....................$ 28.89 12.40
GROUP 6....................$ 33.38 25.25
AREA 2
GROUP 1....................$ 53.02 25.25
GROUP 2....................$ 49.75 24.25
GROUP 3....................$ 48.21 25.25
GROUP 4....................$ 44.37 25.25
GROUP 5....................$ 28.89 12.40
GROUP 6....................$ 33.38 25.25
FOOTNOTES:
Crane operator with main boom and jib 300' or longer: $1.50 additional to the group 1 rate. Crane operator with main boom and jib 400' or longer: $3.00 additional to the group 1 rate.
PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Crane Operator with main boom & jib 400', 300', or 220' or longer.
GROUP 2: Crane Operator with main boom & jib 140' or longer, Tower Crane; Gantry Crane; Whirley Derrick.
GROUP 3: Regular Equipment Operator, Crane, Dozer, Loader, Hoist, Straddle Wagon, Mechanic, Grader and Hydro Excavator.
GROUP 4: Air Tugger (single drum), Material Hoist Pump 6"" or over, Elevators, Brokk Concrete Breaker.
GROUP 5: Air Compressor, Welder, Generators, Conveyors
GROUP 6: Oiler and fire tender
ENGI0324-005 09/01/2023
AREA 1: GENESEE, LAPEER, LIVINGSTON, MACOMB, MONROE, OAKLAND,
ST. CLAIR, WASHTENAW AND WAYNE COUNTIES
AREA 2: ALCONA, ALLEGAN, ALGER, ALPENA, ANTRIM, ARENAC, BARAGA,
BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS,
CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD,
DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND
TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA,
IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT,
KWEENAW, LAKE, LEELANAU, LENAWEE, LUCE, MACKINAC, MANISTEE,
MARQUETTE, MASON, MECOSTA, MENOMINEE, MIDLAND, MISSAUKEE,
MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW,
ONTONAGON, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE,
ROSCOMMON, SAGINAW, SANILAC, SCHOOLCRAFT, SHIAWASSEE, ST.
JOSEPH, TUSCOLA, VAN BUREN AND WEXFORD COUNTIES
(Underground construction (including sewer))
AREA 1:
GROUP 1....................$ 41.08 25.25
GROUP 2....................$ 36.25 25.25
GROUP 3....................$ 35.52 25.25
GROUP 4....................$ 34.95 25.25
GROUP 5....................$ 25.35 12.10
AREA 2:
GROUP 1....................$ 39.27 25.25
GROUP 2....................$ 34.38 25.25
GROUP 3....................$ 33.88 25.25
GROUP 4....................$ 33.60 25.25
GROUP 5....................$ 25.35 12.10
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Backfiller tamper; Backhoe; Batch plant operator (concrete); Clamshell; Concrete paver (2 drums or larger);
Conveyor loader (Euclid type); Crane (crawler, truck type or pile driving); Dozer; Dragline; Elevating grader;
Endloader; Gradall (and similar type machine); Grader;
Mechanic; Power shovel; Roller (asphalt); Scraper (self-propelled or tractor drawn); Side boom tractor (type D-4 or equivalent and larger); Slip form paver; Slope paver; Trencher (over 8 ft. digging capacity); Well drilling rig; Concrete pump with boom operator; Hydro Excavator
GROUP 2: Boom truck (power swing type boom); Crusher; Hoist;
Pump (1 or more - 6-in. discharge or larger - gas or diesel- powered or powered by generator of 300 amperes or more - inclusive of generator); Side boom tractor (smaller than type D-4 or equivalent); Tractor (pneu-tired, other than backhoe or front end loader); Trencher (8-ft. digging capacity and smaller);Vac Truck and End dump operator;
GROUP 3: Air compressors (600 cfm or larger); Air compressors (2 or more-less than 600 cfm); Boom truck (non-swinging, non- powered type boom); Concrete breaker (self-propelled or truck mounted - includes compressor); Concrete paver (1 drum-l/2 yd. or larger); Elevator (other than passenger);
Maintenance person; Pump (2 or more-4-in. up to 6-in.
discharge-gas or diesel powered - excluding submersible pumps); Pumpcrete machine (and similar equipment); Wagon drill (multiple); Welding machine or generator (2 or more-300 amp. or larger - gas or diesel powered)
GROUP 4: Boiler; Concrete saw (40 hp or over); Curing machine (self-propelled); Farm tractor (with attachment); Finishing machine (concrete); Hydraulic pipe pushing machine;
Mulching equipment; Pumps (2 or more up to 4-in. discharge, if used 3 hours or more a day, gas or diesel powered -excluding submersible pumps); Roller (other than asphalt);
Stump remover; Trencher (service); Vibrating compaction equipment, self-propelled (6 ft. wide or over); Sweeper (Wayne type); Water wagon and Extend-a boom forklift
Group 5: Fire Person, Oiler
ENGI0324-006 06/01/2023
GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW, WAYNE, ALCONA,
ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY,
BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN,
CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON,
EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE,
HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON,
KALAMAZOO, KALKASKA, KENT, KEWEENAW, LAKE, LAPEER, LEELANAU,
LENAWEE, LIVINGSTON, LUCE, MACKINAC, MANISTEE, MARQUETTE,
MASON, MECOSTA, MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM,
MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, ONTONAGON,
OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON,
SAGINAW, ST. CLARE, ST. JOSEPH, SANILAC, SCHOOLCRAFT,
SHIAWASSEE, TUSCOLA, VAN BUREN AND WEXFORD COUNTIES
Power equipment operators:
(AIRPORT, BRIDGE & HIGHWAY
CONSTRUCTION)
GROUP 1.....................$ 40.46 25.25
GROUP 2.....................$ 37.73 25.25
GROUP 3.....................$ 33.17 25.55
GROUP 4.....................$ 33.00 25.25
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt plant operator; Crane operator (does not include work on bridge construction projects when the crane operator is erecting structural components); Dragline operator; Shovel operator; Locomotive operator; Paver operator (5 bags or more); Elevating grader operator; Pile driving operator; Roller operator (asphalt); Blade grader operator; Trenching machine operator (ladder or wheel type); Auto-grader; Slip form paver; Self-propelled or tractor-drawn scraper; Conveyor loader operator (Euclid type); Endloader operator (1 yd. capacity and over);
Bulldozer; Hoisting engineer; Tractor operator; Finishing machine operator (asphalt); Mechanic; Pump operator (6-in.
discharge or over, gas, diesel powered or generator of 300 amp. or larger); Shouldering or gravel distributing machine operator (self- propelled); Backhoe (with over 3/8 yd.
bucket); Side boom tractor (type D-4 or equivalent or larger); Tube finisher (slip form paving); Gradall (and similar type machine); Asphalt paver (self- propelled);
Asphalt planer (self-propelled); Batch plant (concrete-central mix); Slurry machine (asphalt); Concrete pump (3 in. and over); Roto-mill; Swinging boom truck (over 12 ton capacity); Hydro demolisher (water blaster);
Farm-type tractor with attached pan; Vacuum truck operator;
Batch Plant (concrete dry batch); Concrete Saw Operator (40h.p. or over; Tractor Operator (farm type); Finishing Machine Operator (concrete); Grader Operator (self-propelled fine grade or form (concrete)).
GROUP 2: Screening plant operator; Washing plant operator;
Crusher operator; Backhoe (with 3/8 yd. bucket or less);
Side boom tractor (smaller than D-4 type or equivalent);
Sweeper (Wayne type and similar equipment); Greese Truck;
Air Compressor Operator (600 cu.ft. per min or more); Air Compressor Operator (two or more, less than 600 cfm);
GROUP 3: Boiler fire tender; Tractor operator (farm type with attachment); Concrete Breaker; Wagon Drill Operator;
GROUP 4: Oiler; Fire tender; Trencher (service); Flexplane operator; Cleftplane operator; Boom or winch hoist truck operator; Endloader operator *under 1 yd. capacity); Roller Operator (other than asphalt); Curing equipment operator (self-propelled); Power bin operator; Plant drier (6 ft.
wide or over); Guard post driver operator (power driven);
All mulching equipment; Stump remover; Concrete pump (under 3-in.); Mesh installer (self-propelled); End dump; Skid Steer.
ENGI0324-007 05/01/2023
ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON,
IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON
AND SCHOOLCRAFT COUNTIES:
(Steel Erection) Compressor, welder and forklift....................$ 38.50 25.00 Crane operator, main boom & jib 120' or longer........$ 44.97 25.00 Crane operator, main boom & jib 140' or longer........$ 44.17 24.60 Crane operator, main boom & jib 220' or longer........$ 45.27 25.00 Mechanic with truck and tools.......................$ 44.10 25.00 Oiler and fireman...........$ 39.96 25.00 Regular operator............$ 42.32 25.00
ENGI0324-008 10/01/2022
ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY,
BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX,
CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA,
DICKINSON, EATON, EMMET, GENESEE, GLADWIN, GOGEBIC, GRAND
TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA,
IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT,
KEWEENAW, LAKE, LAPEER, LEELANAU, LENAWEE, LIVINGSTON, LUCE,
MACKINAC, MACOMB, MANISTEE, MARQUETTE, MASON, MECOSTA,
MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MONROE,
MUSKEGON, NEWAYGO, OAKLAND, OCEANA, OGEMAW, ONTONAGON, OSCEOLA,
OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST.
CLARE, ST. JOSEPH, SANILAC, SCHOOLCRAFT, SHIAWASSEE, TUSCOLA,
VAN BUREN, WASHTENAW, WAYNE AND WEXFORD COUNTIES
(Sewer Relining)
GROUP 1.....................$ 35.37 14.77
GROUP 2.....................$ 33.33 14.77
SEWER RELINING CLASSIFICATIONS
GROUP 1: Operation of audio-visual closed circuit TV system, including remote in-ground cutter and other equipment used in connection with the CCTV system
GROUP 2: Operation of hot water heaters and circulation systems, water jetters and vacuum and mechanical debris removal systems
ENGI0325-012 05/01/2023
Rates Fringes
Power equipment operators -gas distribution and duct installation work:
GROUP 1.....................$ 36.18 25.25
GROUP 2.....................$ 33.45 25.25
SCOPE OF WORK: The construction, installation, treating and reconditioning of pipelines transporting gas vapors within cities, towns, subdivisions, suburban areas, or within private property boundaries, up to and including private meter settings of private industrial, governmental or other premises, more commonly referred to as ""distribution work,"" starting from the first metering station, connection, similar or related facility, of the main or cross country pipeline and including duct installation.
Group 1: Backhoe, crane, grader, mechanic, dozer (D-6 equivalent or larger), side boom (D-4 equivalent or larger), trencher(except service), endloader (2 yd.
capacity or greater).
GROUP 2: Dozer (less than D-6 equivalent), endloader (under 2 yd. capacity), side boom (under D-4 capacity), backfiller, pumps (1 or 2 of 6-inch discharge or greater), boom truck (with powered boom), tractor (wheel type other than backhoe or front endloader). Tamper (self-propelled), boom truck (with non-powered boom), concrete saw (20 hp or larger), pumps (2 to 4 under 6-inch discharge), compressor (2 or more or when one is used continuously into the second day) and trencher(service). Oiler, hydraulic pipe pushing machine, grease person and hydrostatic testing operator.
IRON0008-007 06/01/2022
ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON,
IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON
Ironworker - pre-engineered metal building erector...........$ 23.70 6.95
IRONWORKER
General contracts $10,000,000 or greater......$ 38.14 28.70 General contracts less than $10,000,000............$ 38.14 28.70
Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day.
IRON0025-002 06/01/2023
ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON,
CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO,
ISABELLA, JACKSON, LAPEER, LIVINGSTON, MACOMB, MIDLAND,
MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE,
ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. CLAIR, TUSCOLA,
WASHTENAW AND WAYNE COUNTIES:
Ironworker - pre-engineered metal building erector
ALLEGAN, ANTRIM, BARRY,
BENZIE, BRANCH, CALHOUN,
CHARLEVOIX, EATON, EMMET,
GRAND TRAVERSE, HILLSDALE,
IONIA, KALAMAZOO,
KALKASKA, KENT, LAKE,
LEELANAU, MANISTEE, MASON,
MECOSTA, MISSAUKEE,
MONTCALM, MUSKEGON,
NEWAYGO, OCEANA, OSCEOLA,
OTTAWA, ST. JOSEPH, VAN
BUREN AND WEXFORD COUNTIES:.$ 24.59 25.43
Bay, Genesee, Lapeer, Livingston (east of Burkhardt Road), Macomb, Midland, Oakland, Saginaw, St. Clair, The University of Michigan, Washtenaw (east of U.S. 23) & Wayne...$ 25.81 26.43
IRONWORKER
Ornamental and Structural...$ 34.50 38.44 Reinforcing.................$ 32.68 35.15
IRON0055-005 07/01/2022
LENAWEE AND MONROE COUNTIES:
Rates Fringes
IRONWORKER
Pre-engineered metal buildings...................$ 23.59 19.35 All other work..............$ 33.00 27.20
IRON0292-003 06/01/2020
BERRIEN AND CASS COUNTIES:
Rates Fringes
IRONWORKER (Including pre-engineered metal building erector).........................$ 31.75 22.84
LABO0005-006 10/01/2022
Rates Fringes
Laborers - hazardous waste abatement: (ALCONA, ALPENA, ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE
AND WEXFORD COUNTIES - Zone 10) Levels A, B or C............$ 17.45 12.75 class b....................$ 18.64 12.90 Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D...............$ 16.45 ** 12.75 class a....................$ 17.64 12.90
Zone 10 Laborers - hazardous waste abatement: (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT
COUNTIES - Zone 11) Levels A, B or C............$ 25.18 12.90 Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D...............$ 22.58 12.90 Laborers - hazardous waste abatement: (ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY (except the city of Portland);
KALAMAZOO, KENT, LAKE,
MANISTEE, MASON, MECOSTA,
MONTCALM, MUSKEGON, NEWAYGO,
OCEANA, OSCEOLA, OTTAWA, ST.
JOSEPH AND VAN BUREN COUNTIES
- Zone 9) Levels A, B or C............$ 21.88 13.26 Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D...............$ 20.80 12.90 Laborers - hazardous waste abatement: (ARENAC, BAY, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, OGEMAW, ROSCOMMON, SAGINAW
AND TUSCOLA COUNTIES - Zone 8) Levels A, B or C............$ 23.74 12.95 Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D...............$ 20.80 12.90 Laborers - hazardous waste abatement: (CLINTON, EATON
AND INGHAM COUNTIES; IONIA
COUNTY (City of Portland);
LIVINGSTON COUNTY (west of Oak Grove Rd., including the City of Howell) - Zone 6) Levels A, B or C............$ 26.33 12.95
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D...............$ 24.64 12.90 Laborers - hazardous waste abatement: (GENESEE, LAPEER
AND SHIAWASSEE COUNTIES -
Zone 7) Levels A, B or C............$ 24.20 13.80 Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D...............$ 23.20 13.80 Laborers - hazardous waste abatement: (HILLSDALE, JACKSON AND LENAWEE COUNTIES
- Zone 4) Levels A, B or C............$ 27.13 14.95 Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D...............$ 24.17 12.90 Laborers - hazardous waste abatement: (LIVINGSTON COUNTY (east of Oak Grove Rd. and south of M-59, excluding the city of Howell); AND WASHTENAW COUNTY - Zone 3) Levels A, B or C............$ 29.93 14.20 Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D...............$ 28.93 14.20 Laborers - hazardous waste abatement: (MACOMB AND WAYNE COUNTIES - Zone 1) Levels A, B or C............$ 29.93 16.90 Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D...............$ 28.93 16.90 Laborers - hazardous waste abatement: (MONROE COUNTY - Zone 4) Levels A, B or C............$ 31.75 14.90
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D...............$ 31.75 14.90 Laborers - hazardous waste abatement: (OAKLAND COUNTY and the Northeast portion of LIVINGSTON COUNTY bordered by Oak Grove Road on the West and M-59 on the South - Zone 2) Level A, B, C...............$ 29.93 16.90 Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D...............$ 28.93 16.90 Laborers - hazardous waste abatement: (SANILAC AND ST.
CLAIR COUNTIES - Zone 5) Levels A, B or C............$ 26.21 16.62 Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D...............$ 24.75 16.35
LABO0259-001 09/01/2023
AREA 1: MACOMB, OAKLAND AND WAYNE COUNTIES
AREA 2: ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA,
BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX,
CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA,
DICKINSON, EATON, EMMET, GENESEE, GLADWIN, GOGEBIC, GRAND
TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA,
IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT,
KEWEENAW, LAKE, LAPEER, LEELANAU, LENAWEE, LIVINGSTON, LUCE,
MACKINAC, MANISTEE, MARQUETTE, MASON, MECOSTA, MENOMINEE,
MIDLAND, MISSAUKEE, MONROE, MONTCALM, MONTMORENCY, MUSKEGON,
NEWAYGO, OCEANA, OGEMAW, ONTONAGON, OSCEOLA, OSCODA, OTSEGO,
OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLARE, ST.
JOSEPH, SANILAC, SCHOOLCRAFT, SHIAWASSEE, TUSCOLA, VAN BUREN,
WASHTENAW AND WEXFORD COUNTIES
Laborers - tunnel, shaft and caisson:
AREA 1
GROUP 1....................$ 23.62 16.93
GROUP 2....................$ 23.73 16.93
GROUP 3....................$ 23.79 16.93
GROUP 4....................$ 23.97 16.93
GROUP 5....................$ 24.22 16.93
GROUP 6....................$ 24.55 16.93
GROUP 7....................$ 17.83 16.93
AREA 2
GROUP 1....................$ 27.57 16.93
GROUP 2....................$ 25.24 16.93
GROUP 3....................$ 25.34 16.93
GROUP 4....................$ 29.57 16.93
GROUP 5....................$ 25.76 16.93
GROUP 6....................$ 26.07 16.93
GROUP 7....................$ 25.57 16.93
SCOPE OF WORK: Tunnel, shaft and caisson work of every type and description and all operations incidental thereto, including, but not limited to, shafts and tunnels for sewers, water, subways, transportation, diversion, sewerage, caverns, shelters, aquafers, reservoirs, missile silos and steel sheeting for underground construction.
TUNNEL LABORER CLASSIFICATIONS
GROUP 1: Tunnel, shaft and caisson laborer, dump, shanty, hog house tender, testing (on gas) and watchman
GROUP 2: Manhole, headwall, catch basin builder, bricklayer tender, mortar machine and material mixer
GROUP 3: Air tool operator (jackhammer, bush hammer and grinder), first bottom, second bottom, cage tender, car pusher, carrier, concrete, concrete form, concrete repair, cement invert laborer, cement finisher, concrete shoveler, conveyor, floor, gasoline and electric tool operator, gunite, grout operator, welder, heading dinky person, inside lock tender, pea gravel operator, pump, outside lock tender, scaffold, top signal person, switch person, track, tugger, utility person, vibrator, winch operator, pipe jacking, wagon drill and air track operator and concrete saw operator (under 40 h.p.)
GROUP 4: Tunnel, shaft and caisson mucker, bracer, liner plate, long haul dinky driver and well point
GROUP 5: Tunnel, shaft and caisson miner, drill runner, key board operator, power knife operator, reinforced steel or mesh (e.g. wire mesh, steel mats, dowel bars, etc.)
GROUP 6: Dynamite and powder
GROUP 7: Restoration laborer, seeding, sodding, planting, cutting, mulching and top soil grading; and the restoration of property such as replacing mailboxes, wood chips, planter boxes, flagstones, etc.
LABO0334-001 09/01/2022
Rates Fringes
Laborers - open cut:
ZONE 1 - MACOMB, OAKLAND
AND WAYNE COUNTIES:
GROUP 1....................$ 23.47 16.72
GROUP 2....................$ 23.58 16.72
GROUP 3....................$ 23.63 16.72
GROUP 4....................$ 23.71 16.72
GROUP 5....................$ 24.17 16.72
GROUP 6....................$ 22.00 16.72
GROUP 7....................$ 17.84 16.72
ZONE 2 - LIVINGSTON COUNTY
(east of M-151 (Oak Grove Rd.)); MONROE AND
WASHTENAW COUNTIES:
GROUP 1....................$ 25.20 16.72
GROUP 2....................$ 24.91 16.72
GROUP 3....................$ 25.03 16.72
GROUP 4....................$ 25.10 16.72
GROUP 5....................$ 25.25 16.72
GROUP 6....................$ 22.55 16.72
GROUP 7....................$ 22.11 16.72
ZONE 3 - CLINTON, EATON,
GENESEE, HILLSDALE AND
INGHAM COUNTIES; IONIA
COUNTY (City of Portland);
JACKSON, LAPEER AND
LENAWEE COUNTIES;
LIVINGSTON COUNTY (west of M-151 Oak Grove Rd.);
SANILAC, ST. CLAIR AND
SHIAWASSEE COUNTIES:
GROUP 1....................$ 23.39 16.72
GROUP 2....................$ 23.13 16.72
GROUP 3....................$ 23.25 16.72
GROUP 4....................$ 23.30 16.72
GROUP 5....................$ 23.44 16.72
GROUP 6....................$ 20.74 16.72
GROUP 7....................$ 22.23 16.72
ZONE 4 - ALCONA, ALLEGAN,
ALPENA, ANTRIM, ARENAC,
BARRY, BAY, BENZIE,
BERRIEN, BRANCH,
CALHOUN, CASS, CHARLEVOIX,
CHEBOYGAN, CLARE,
CRAWFORD, EMMET,
GLADWIN, GRAND TRAVERSE,
GRATIOT AND HURON
COUNTIES; IONIA COUNTY
(EXCEPT THE CITY OF
PORTLAND); IOSCO,
ISABELLA, KALAMAZOO,
KALKASKA, KENT,
LAKE,LEELANAU, MANISTEE,
MASON, MECOSTA, MIDLAND,
MISSAUKEE, MONTCALM,
MONTMORENCY, MUSKEGON,
NEWAYGO, OCEANA, OGEMAW,
OSCEOLA, OSCODA, OTSEGO,
OTTAWA, PRESQUE ISLE,
ROSCOMMON, SAGINAW, ST.
JOSEPH, TUSCOLA, VAN BUREN
AND WEXFORD COUNTIES:
GROUP 1....................$ 22.42 16.72
GROUP 2....................$ 22.15 16.72
GROUP 3....................$ 22.26 16.72
GROUP 4....................$ 22.33 16.72
GROUP 5....................$ 22.45 16.72
GROUP 6....................$ 19.67 16.72
GROUP 7....................$ 22.30 16.72
ZONE 5 - ALGER, BARAGA,
CHIPPEWA, DELTA,
DICKINSON, GOGEBIC,
HOUGHTON, IRON,
KEWEENAW, LUCE, MACKINAC,
MARQUETTE, MENOMINEE,
ONTONAGON AND SCHOOLCRAFT
COUNTIES:
GROUP 1....................$ 22.24 16.72
GROUP 2....................$ 22.38 16.72
GROUP 3....................$ 22.51 16.72
GROUP 4....................$ 22.56 16.72
GROUP 5....................$ 22.64 16.72
GROUP 6....................$ 19.99 16.72
GROUP 7....................$ 22.45 16.72
SCOPE OF WORK:
Open cut construction work shall be construed to mean work which requires the excavation of earth including industrial, commercial and residential building site excavation and preparation, land balancing, demolition and removal of concrete and underground appurtenances, grading, paving, sewers, utilities and improvements; retention, oxidation, flocculation and irrigation facilities, and also including but not limited to underground piping, conduits, steel sheeting for underground construction, and all work incidental thereto, and general excavation. For all areas except the Upper Peninsula, open cut construction work shall also be construed to mean waterfront work, piers, docks, seawalls, breakwalls, marinas and all incidental work. Open cut construction work shall not include any structural modifications, alterations, additions and repairs to buildings, or highway work, including roads, streets, bridge construction and parking lots or steel erection work and excavation for the building itself and back filling inside of and within 5 ft. of the building and foundations, footings and piers for the building. Open cut construction work shall not include any work covered under Tunnel, Shaft and Caisson work.
OPEN CUT LABORER CLASSIFICATIONS
GROUP 1: Construction laborer
GROUP 2: Mortar and material mixer, concrete form person, signal person, well point person, manhole, headwall and catch basin builder, headwall, seawall, breakwall and dock builder
GROUP 3: Air, gasoline and electric tool operator, vibrator operator, driller, pump person, tar kettle operator, bracer, rodder, reinforced steel or mesh person (e.g., wire mesh, steel mats, dowel bars, etc.), welder, pipe jacking and boring person, wagon drill and air track operator and concrete saw operator (under 40 h.p.), windlass and tugger person and directional boring person
GROUP 4: Trench or excavating grade person
GROUP 5: Pipe layer (including crock, metal pipe, multi-plate or other conduits)
GROUP 6: Grouting man, audio-visual television operations and all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work and the installation and repair of water service pipe and appurtenances
GROUP 7: Restoration laborer, seeding, sodding, planting, cutting, mulching and top soil grading; and the restoration of property such as replacing mailboxes, wood chips, planter boxes, flagstones, etc.
LABO0465-001 06/01/2023
LABORER: Highway, Bridge and Airport Construction
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .