This federal contract solicitation seeks proposals for a project to repair a runway at Selfridge Air National Guard Base in Michigan. The project period of performance is 270 calendar days with a project magnitude between $10-25 million. Proposals are due no later than January 16, 2024. Funds are not currently available but are anticipated to become available by September 30, 2024. The solicitation is unrestricted with no set-asides. The NAICS code is 237310 for highway, street and bridge construction. The Michigan Army National Guard is the contracting agency.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
127 MSC
STEVEN STOCKING
(586) 239-4881
43200 MAPLE ST.
SELFRIDGE ANGB MI 48045
F8Y36P3263A001-0001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
THe purpose of this amendment is to make the follow ing changes in accordance w ith the enclsoed summary of changes:
1. The Wage Determination is updated to General Decision Number: MI20230001 12/22/2023
2. The Liqudated Damages have been updated as per the revised clause at 52.211-12
3. Paragrpah 3 Section 01 00 00 Division 01 – General Requirements has been updated regarding the compensation of inspectors.
4. The peroid of performance is 270 calendar days after receipt of Notice to Proceed.
5. The dates bids are due is now 16 January 2024, The time bids are due remain unchanged.
6. Note 4 on sheet G-203, remove “and install new Taxiw ay B lights on Taxiw ay B.” Note 4 is updated to , “Remove existing temporary Runw ay 01L-19R lights
1. CONTRACT ID CODE PAGE OF PAGES
J 1 42
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Jan-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S8524B0001
X 9B. DATED (SEE ITEM 11)
14-Nov-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Jan-2024
CODE
USPFO MI 127 MISSION SUPPORT CONTRACTING
43200 MAPLE ST
SELFRIDGE ANGB MI 48045-5213
W50S85 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W50S85
FACILITY CODECODE
EMAIL:TEL:
W50S8524B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 09-Jan-2024 11:00 AM to 16-Jan-2024 11:00 AM.
The contractor period of performance end date has decreased by 30 days from 300 days to 270 days.
The required performance has changed from Project Title and number VGLZ 172042 Repair RunwayPeriod of Performance: 300 calendar days1) Set-aside: This project is being solicited as unrestricted.2) Small Business Size Standard: $45,000,000.003) NAICS Code: 237310: Highway, Street, and Bridge Construction4) Project Magnitude: between $10,000,000.00 and $25,000,000.005) Submit Proposals no later than:
See Box 13 and any amendments for Proposal Due Date6) Prospective bidders are highly encouraged to attend a pre-bid conference and site visit: See Clause 52.236-27 for time and date. (See Instructions for Access Requirements)7) An Original Bid Bond is required, and due with Bid.8) Solicitation and all information notices, amendments for this solicitation w ill be posted at https://sam.gov/Funds are not presently available for this contract.
Currently, the Government anticipates funds will become available prior to but no later than 30 September 2024.
This action has been identified on the National Guard priority list for aw ard if funds become available and the prices received are within an awardable range. to Project Title and number VGLZ 172042 Repair RunwayPeriod of Performance: 270 ccalendar days1) Set-aside: This project is being solicited as unrestricted.2) Small Business Size Standard: $45,000,000.003) NAICS Code: 237310: Highway, Street, and Bridge Construction4) Project Magnitude:
between $10,000,000.00 and $25,000,000.005) Submit Proposals no later than: See Box 13 and any amendments for Proposal Due Date6) Prospective bidders are highly encouraged to attend a pre-bid conference and site visit: See Clause 52.236-27 for time and date. (See Instructions for Access Requirements)7) An Original Bid Bond is required, and due with Bid.8) Solicitation and all information notices, amendments for this solicitation w ill be posted at https://sam.gov/Funds are not presently available for this contract. Currently, the Government anticipates funds will become available prior to but no later than 30 September 2024. This action has been identified on the National Guard priority list for aw ard if funds become available and the prices received are within an awardable range..
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
300 dys. ANP 1 127 CES/CEOHS
28545 SUPPLY ST
BLDG 103
SELFRIDGE ANGB MI 48045
FOB: Destination
F8Y36H
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
270 dys. ANP 1 127 CES/CEOHS
28545 SUPPLY ST
BLDG 103
SELFRIDGE ANGB MI 48045
FOB: Destination
F8Y36H
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 270 calendar after the Contractor receives the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of:
1. For the 84-calendar day runway shutdown Liquidated Damages will be assessed in the amount of $29,773.86 (standard rate) and/or $43,639.02 (overtime rate) for each calendar day until the work is completed or accepted. In addition a one-time legal fee of $153.00 will apply.
2. After the runway shutdown is complete if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,276.50 ( standard rate) and/or $1,663.30 (Overtime rate) for each calendar day of delay until the work is completed or accepted. In addition a onetime legal fee of $153.00 will apply.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
STATEMENT OF WORK
Section 01 00 00 Division 01 – General Requirements
1. INSURANCE - MINIMUM AMOUNTS
1.1. Reference Contract Clause titled, “Insurance - Work on a Government Installation” (FAR 52.228-5). Types and minimum amounts are as follows:
TYPE AMOUNTS
Workmen’s Compensation $100,000 (see paragraph 1.2, below)
Comprehensive General Liability $500,000 per occurrence for bodily injury
Comprehensive Automobile Liability $200,000 per person and $500,000 per accident for bodily injury and $20,000 for property damage
(If applicable) $200,000 per person and $500,000 per occurrence Aircraft Public and Passenger for bodily injury, other than passenger liability Liability and $200,000 per occurrence for property damage;
coverage for passenger, liability bodily injury shall be at least $200,000 multiplied by the number of seats or number of passengers, whichever is greater.
1.2. Except in states with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers.
1.3. NOTE: Before commencing work under this contract, the Contractor shall certify to the Contracting
Officer, in writing, that the required insurance has been obtained. The policies referenced in the certification (s) shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government’s interest shall not be effective (1) for such period as the laws of the state in which this contract is to be performed prescribe or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer. The Contractor shall maintain a copy of proofs of required insurance and shall make copies available to the Contracting Officer upon request. The Contractor shall maintain a copy of all subcontractors’ proofs of required insurance and shall make copies available to the Contracting Officer upon request.
2. Reserved.
3. SCHEDULING
3.1. Normal base work hours for the Contractor will be between the hours of 7:00 AM through 4:30 PM, excluding Saturdays, Sundays, and Federal Holidays. If the Contractor desires to work during periods other than above, he must notify the Contracting Officer’s Representative (COR) five (5) working days in advance of his intention to work during other periods to allow assignment of additional inspection forces. When the COR determines that they are reasonably available, he may authorize the Contractor to perform work during periods other than normal duty hours/days..
3.2. The following Federal legal Holidays are observed by this base:
New Year’s Day 1 January Martin Luther King’s Birthday Third Monday of January President’s Day Third Monday of February Memorial Day Last Monday of May Juneteenth 19 June Independence Day 4 July Labor Day First Monday in September
Columbus Day Second Monday in October Veteran’s Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
3.3. NOTE: Any of the above holidays falling on a Saturday will be observed the preceding Friday; holidays falling on a Sunday will be observed on the following Monday.
3.4. Prior to commencing work on the job initially, resumption of work after prolonged interruption (7 calendar days or more), commencement of any warranty work, and upon completion of warranty work, the contractor must notify the Contracting Officer (or the Contracting Officer’s Representative). When relocating to new sites, returning to sites for follow-up work on a phased work plan, notification to the Contracting Officer’s Representative is sufficient. Notification should be by personal contact; however, advance notification may be by telephone, or in writing, and should be accomplished sufficiently in advance to allow scheduling of inspection forces. The purpose of the above precautions is to ensure construction inspection and recording of work proceedings.
3.5. The organization of the specifications into divisions, sections, and articles, and the arrangement of the drawings shall not control the Contractor in dividing the work among subcontractors or in establishing the extent of the work to be performed by any trade.
4. INVOICING AND PAYMENT
4.1. Properly prepared invoices, bearing the contract number, shall be submitted in duplicate to the Contracting Office, via email to Steven Stocking at steven.stocking.2@us.af.mil or Anna Randal at anna.randall.1@us.af.mil on designated invoice forms provided at the pre-construction meeting PRIOR to uploading in Wide Area Workflow (WAWF) the DFAS paying system. This submission will be for review prior to submitting an electronic invoice through Wide Area Workflow (WAWF). See end of this Section for important information and codes needed.). Payment will be made by in accordance with FAR clause 52.232-5 Fixed-Price Construction Contracts and FAR clause 52.232-27, Prompt Payment for Construction Contracts, all payments will be made by electronic transfer of funds (EFT).
4.2. To meet compliance with DFARS 252.232-7003, Electronic Submission of Payment Requests, you shall submit your request for payment (invoice) through WAWF. For more information on the WAWF system, including how to register, visit https://wawf.eb.mil. Payment will be made by paying office specified in the contract award in accordance with the clauses Payments under Fixed-Price Construction Contracts, FAR 52.232-5, and Prompt Payment for Construction Contracts, FAR 52.232-27.
4.3. The Government will make payment through WAWF upon satisfactory completion of work AND receipt of a proper certification for payment. Do not input invoice into WAWF until the pre-approval of invoice is received from the contracting officer. This will lessen the need for rejections in WAWF Payment may be withheld unless all contractual requirements including but not limited to: RECEIPT OF PROPER WEEKLY PAYROLLS IAW DAVIS BACON REQUIREMENTS, Small Business Subcontracting Reports, have been timely received.
4.4. All requests for payments through WAWF must include a Subcontractor Payment Register pursuant to
FAR Clause 52.232-5 and a contractor’s certification that reads as follows:
I hereby certify, to the best of my knowledge and belief that – The amounts requested are only for performance in accordance with the specifications, terms and conditions of the contract; All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and requirements of Chapter 39 of Title 31, United States Code; This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from subcontractor or supplier in accordance with the terms and conditions of the subcontract; and This certification is not to be construed as final acceptance of a subcontractor’s performance.
4.5. The Government will make payment upon satisfactory completion of work AND receipt of a proper certification for payment. Payment may be withheld unless all contractual requirements, including but not limited to:
RECEIPT OF PROPER WEEKLY PAYROLLS IAW CONSTRUCTION WAGE REQUIREMENTS FAR 52.222-
6, and Small Business Subcontracting Reports, have been timely received. Payrolls shall indicate CLIN to which they are applicable.
4.6. A release of claims is required for all final payment requests and shall be submitted by the contractor with the final invoice.
5. CONTRACT ADMINISTRATION
5.1. The contracting office of the 127th WG, Selfridge Air National Guard Base is the office having administrative jurisdiction over this contract for all matters. A list of the names and telephone numbers of the Government team comprising the contract administrator, Contracting Officer’s Representative (COR), consultant, and point of contact at the project site will be provided at the post-award/pre-construction conference.
5.2. All correspondence shall be addressed to the Contracting Officer. A copy of all correspondence shall be furnished to the contracting officer’s representative. Enclosures attached to or transmitted with the correspondence shall also be furnished with an original and one copy. Each letter shall reference the contract name, contract number, project number, and project title, and shall have only one subject. For tracking purposes, a sequential numbering system should be used for all correspondence.
6. PAPERLESS CONTRACTING
6.1. The National Guard is fully committed to the Federal Government’s electronic commerce and paperless contracting initiatives. As such, it is anticipated that to the maximum extent possible to include but not limited to correspondence, modification distribution, etc., to include specifications and drawings, will be issued using electronic methods, i.e., electronic mail (e-mail). Contractors shall have and maintain capability to receive documents in this manner.
6.2. Additionally, it is anticipated that within the life of this contract, other electronic processes will be enacted.
These include, but are not limited to, electronic bidding/offers, change order proposals, and electronic invoicing.
When implemented by the Contracting Officer, contractors shall participate fully in any of these new requirements at no additional cost to the Government.
7. TELEPHONE COMMUNICATIONS SECURITY MONITORING
All communications with DOD organizations are subject to communications security (COMSEC) review.
Contractor personnel must be aware that telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. The DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DOD organizations. Therefore, civilian contractor personnel are advised that any time they place a call to, or receive a call from, a DOD organization, they are subject to COMSEC procedures. The contractor shall assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with DOD information.
8. UTILITY SERVICES: See Section 01 51 00, Temporary Utilities of AECOM Specifications.
9. WORK PROGRESS AND PREPARATION OF PROGRESS SCHEDULES AND REPORTS
9.1. A weekly meeting may be held with the Contractor, COR and Contracting Officer (KO), if necessary, to discuss work progress, problems and potential change orders. The Contractor shall attend these meetings at no additional cost to the Government. Prior to beginning work on specific work elements of a project, the contractor shall confer with the COR and agree on a sequence of procedures and means of access to premises and buildings;
space for storage of materials and equipment; delivery of materials; and use of approaches, use of corridors, stairways and similar means of passage.
10. DESIGNATION OF TECHNICAL REPRESENTATIVE
The Contracting Officer will appoint a qualified Contracting Officer’s Representative (COR) for the purposes of technically administering the contract; however, all matters concerning this contract or any work ordered placed against this contract must first be approved by the Contracting Officer. This in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in terms of the contract.
11. CONTRACTOR STAFF AND EMPLOYEES
11.1. Prior to commencing on-site construction, the contractor shall provide the Contracting Officer with a telephone number and email address at which the contractor or his representative may be contacted at any time during regular working hours and an emergency number at which the contractor may be contacted in situations requiring immediate attention.
11.2. Supervision. The Government shall not exercise any supervision or control over the contractor employees performing services under this contract; such employees shall be accountable not to the Government, but solely to the contractor, who in turn is responsible to the Government.
11.3. Contractor’s Employees. All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may, in writing, require the contractor to remove from the job site, any employee the Contracting Officer deems incompetent, careless or otherwise objectionable.
12. RECORD DRAWINGS
During construction of a project and on the job site, the contractor shall maintain a completed record of all changes and corrections from the layout shown on the drawings, if applicable. The contractor shall enter such changes and corrections on contract or record drawings promptly and submit the “red line” drawings to the Contracting Officer upon completion of the project. The record drawings shall indicate all changes and corrections concerning the actual locations of all sub-surface utility lines. In order for the location of these lines and appurtenances to be determined in the event the surface opening or indictors become covered or obscured, the record drawings shall show, by offset dimensions to two permanently fixed surface features, the end of each run including each change in direction.
Valves splice boxes, and similar appurtenances shall be located by dimensioning along the utility run from a reference point. The average depth below the surface of each run shall also be recorded. The Government does not guarantee the accuracy of existing record drawings; it is the contractor’s responsibility to verify all as-built conditions.
13. VERIFICATION OF DIMENSIONS
The contractor shall be responsible for the coordination and proper relation of all aspects of the work. He/she shall field verify all dimensions and advise the Contracting Officer of any discrepancies prior to proceeding with any phase of the work. Where exact locations are not given for the positioning of equipment and devices, they shall be positioned to permit easy access for maintenance and for removal and replacement of component parts.
14. SECURITY REQUIREMENTS
14.1. The contractor shall comply with all security regulations imposed by the base/post commander and/or agency occupying the space where work is to be performed. Any necessary security clearances shall be obtained prior to commencement of work.
14.2. It is expected that new security requirements to satisfy contractor personal identification requirements in Homeland Security Presidential Directive (HSPD-12), ''Policy for a Common Identification Standard for Federal Employees and Contractors,'' and Federal Information Processing Standards Publication (FIPS PUB) Number 201, ''Personal Identity Verification (PIV) of Federal Employees and Contractors” are incorporated in the life of this contract. Contractor shall comply with all requirements, at no additional cost to the Government.
14.3. The contractor shall ensure that all parts of the facility where work is being performed are adequately protected against vandalism and theft.
14.4. Contractors shall follow instructions provided by the Security Forces for access to Selfridge Air National Guard Base. If a gate pass is not granted to a contractor allowing the delivery of goods, execution of warranty support, or performance of services please contact the contracting officer. Be sure that all employees have the proper ID (driver's license, state ID, immigration card, U.S. Passport, etc.). If they do not have the proper ID, they will be turned away.
14.5. The Prime Contractor and all its subcontractors will be required to wear orange or lime colored safety vests while performing work on the installation.
14.6. U.S. Government will not be held liable for any delays or breach of contract caused by refusal of the
Security Forces to allow entry.
14.7. All prospective contractors MUST be U.S. citizens or MUST have established and maintain legal residence in the U.S. and are authorized by the US government to work in the United States (i.e., Green card, worker authorization, etc.). All prospective contractors MUST have at least one form of U.S. government issued photo identification (driver's license, U.S. passport, U.S. work visa, etc.) for entry to the installation. Security Forces will review any questionable identification documents for determination as to whether said identification is authorized for access to the installation.
14.8. All prospective contractors/contractor employees, once it has been established that they maintain the appropriate credential as described in one above, are subject to a Criminal History Check.
14.9. Note: For the purposes of Contracting services, it is implied that, that all parties agree to a Criminal
History Background Check once entered into any contract. Any documents that are provided and found fraudulent to include, but not limited to driver’s licenses, contracting licenses, etc., will result in an arrest and potential termination for default from the contract. All contractors are subject to search in order to obtain entry onto the installation and while working on the installation. Any refusal to submit to a search of their person or vehicle will be deemed as an act of aggression against the installation and will be cause for dismissal from the installation and revocation of future privileges and installation access.
14.10. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background. Checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services, or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy.
Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
14.11. For Contractors that do not require CAC but require access to a DoD Facility and/or Installation.
Contractor and all associated sub-contractors’ employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
14.12. AT Level I Training. This standard language is for contractor employees with an area of performance within a government-controlled installation, facility, or area. All contractor employees, to include subcontractor employees, requiring access Government Installations, Facilities and Controlled Access areas shall. complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. AT level I Awareness Training is available at the following website: http://jko.jten.mil
15. REGULATIONS
15.1. The contractor shall comply with all applicable Federal, State, Local, DOD, National Guard Bureau, Army and Air Force regulations pertaining to safety, traffic control and fire prevention.
16. HAZARDOUS MATERIALS
16.1. Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract.
16.2. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos-containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating. Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities.
29 CFR 1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.
17. COORDINATION WITH GOVERNMENT ACTIVITIES
17.1. If it becomes necessary to interrupt work activities in buildings and/or areas for construction purposes, permission to do so must be requested in writing to the Contracting Officer five working days prior to commencing work on the planned interruption and shall be subject to Civil Engineering approval. Written requests for street closing shall be submitted for approval of the Civil Engineer 14 working days prior to closing the street.
17.2. Work in connection with this contract which requires utility outages, including electrical, water, gas, steam, etc., which will stop or limit (as determined by the Contracting Officer) normal activities in the building, construction area or other affected areas, shall be performed by the contractor at a time other than the regular work period of the organization occupying the facility. Work required by the contractor on a non-standard basis or at premium pay shall be done at no additional cost to the Government. Request for utility outages shall be submitted to the Civil Engineer, in writing five working days prior to commencing work and shall be subject to his/her approval.
17.3. Any temporary construction for facilities used by the contractor for preventing interruption of normal work activity or loss of utility services shall be subject to Contracting Officer’s approval.
18. UNAUTHORIZED PERSONNEL
The contractor shall inform all personnel working under his jurisdiction (including subcontractor and visiting supplier personnel) that access to areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices, and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.
19. PERFORMANCE EVALUATION OF CONTRACTOR
19.1. As a minimum, the contractor’s performance will be evaluated upon final inspection. Any specific requirements for contract quality control and quality assurance by the Government personnel will be defined in the specifications. The contractor will be rated as outstanding, satisfactory or unsatisfactory in the areas of contract quality control, timely performance, effectiveness of management, compliance with labor standards, and compliance with safety standards. The contractor will be notified of any unsatisfactory rating, either in an individual element or in the overall rating, prior to completing the evaluation, and all contractor comments will be made a part of the official record. Performance evaluation reports will be available to all DoD Contracting Officers for their future use.
19.2. Past Performance evaluations will be posted via https://www.cpars.gov. It is the responsibility of the contractor to request access to this site.
20. Reserved.
21. Reserved.
22. PRE-CONSTRUCTION CONFERENCE
Before work commences on this contract, the Contracting Officer will conduct a conference to acquaint the contractor with Government policies and procedures that are to be observed during the execution of the work and to develop mutual understanding relative to the administration of the contract. Contractors and/or major subcontractors shall attend this meeting at no additional cost to the Government.
23. PARTNERING
The Government intends to encourage the formation of cohesive partnerships with the contractors on selected contracts. This partnership will be structured to draw on the strengths of each organization in order to identify and achieve reciprocal goals. The objective is effective contract performance in achieving completion within budget, on schedule, and in accordance with the Plans and Specifications. This partnership between the contractor and the Government will be voluntary and its implementation will not be a part of the contract requirements, nor will it result in a change to the contract price or terms.
24. SUBCONTRACTING PLAN
(Applicable to Large Businesses) All large businesses were required to submit a Subcontracting Plan in accordance with FAR 19.7 with their proposal. This approved plan is incorporated into this award. The contractor shall compile consolidated reports at least semi-annually or when directed by the Contracting Officer, when data is required for reporting purposes.
25. The Following is provided to assist in the subcontractor reporting required by 52.204-10, REPORTING
EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS
FUNDING AGENCY CODE: 5700 AWARDING AGENCY CODE: 2100 TAS: 573840
END OF SECTION 01 00 00 GENERAL REQUIREMENTS
WAGE DETERMINATION
"General Decision Number: MI20230001 12/22/2023
Superseded General Decision Number: MI20220001
State: Michigan
Construction Types: Highway (Highway, Airport & Bridge xxxxx and Sewer/Incid. to Hwy.)
Counties: Michigan Statewide.
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023 1 02/03/2023 2 02/17/2023 3 03/17/2023 4 05/12/2023 5 05/19/2023 6 05/26/2023 7 07/21/2023 8 08/25/2023 9 09/29/2023 10 10/06/2023 11 10/20/2023 12 11/03/2023 13 12/22/2023
CARP0004-004 06/01/2019
REMAINDER OF STATE
Rates Fringes
CARPENTER ( Piledriver)..........$ 27.62 20.59
CARP0004-005 06/01/2018
LIVINGSTON (Townships of Brighton, Deerfield, Genoa, Hartland, Oceola & Tyrone), MACOMB, MONROE, OAKLAND, SANILAC, ST. CLAIR
AND WAYNE COUNTIES
Rates Fringes
CARPENTER (Piledriver)...........$ 30.50 27.28
ELEC0017-005 06/01/2023
STATEWIDE
Rates Fringes
Line Construction Groundman/Driver............$ 29.24 7.20+32% Journeyman Signal Tech, Communications Tech, Tower Tech & Fiber Optic Splicers.$ 52.02 7.20+32% Journeyman Specialist.......$ 53.83 32%+7.20 Operator A..................$ 37.13 7.20+32% Operator B..................$ 34.67 7.20+32%
Classifications
Journeyman Specialist: Refers to a crew of only one person working alone.
Operator A: Shall be proficient in operating all power equipment including: Backhoe, Excavator, Directional Bore and Boom/Digger truck.
Operator B: Shall be proficient in operating any 2 of the above mentioned pieces of equipment listed under Operator A.
ENGI0324-003 06/01/2023
ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON,
CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO,
ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB,
MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO,
PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC,
SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:
OPERATOR: Power Equipment (Steel Erection)
GROUP 1....................$ 53.02 25.25
GROUP 2....................$ 54.02 25.25
GROUP 3....................$ 51.52 25.25
GROUP 4....................$ 52.52 25.25
GROUP 5....................$ 50.02 25.25
GROUP 6....................$ 51.02 25.25
GROUP 7....................$ 49.75 25.25
GROUP 8....................$ 50.75 25.25
GROUP 9....................$ 49.30 25.25
GROUP 10....................$ 50.30 25.25
GROUP 11....................$ 48.57 25.25
GROUP 12....................$ 49.57 25.25
GROUP 13....................$ 48.21 25.25
GROUP 14....................$ 49.21 25.25
GROUP 15....................$ 47.57 25.25
GROUP 16....................$ 44.37 25.25
GROUP 17....................$ 28.89 12.40
GROUP 18....................$ 33.38 25.25
FOOTNOTE:
Paid Holidays: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Engineer when operating combination of boom and jib 400' or longer
GROUP 2: Engineer when operating combination of boom and jib 400' or longer on a crane that requires an oiler
GROUP 3: Engineer when operating combination of boom and jib 300' or longer
GROUP 4: Engineer when operating combination of boom and jib 300' or longer on a crane that requires an oiler
GROUP 5: Engineer when operating combination of boom and jib 220' or longer
GROUP 6: Engineer when operating combination of boom and jib 220' or longer on a crane that requires an oiler
GROUP 7: Engineer when operating combination of boom and jib 140' or longer
GROUP 8: Engineer when operating combination of boom and jib 140' or longer on a crane that requires an oiler
GROUP 9: Tower crane & derrick operator (where operator's work station is 50 ft. or more above first sub-level)
GROUP 10: Tower crane & derrick operator (where operator's work station is 50 ft. or more above first sub-level) on a crane that requires an oiler
GROUP 11: Engineer when operating combination of boom and jib 120' or longer
GROUP 12: Engineer when operating combination of boom and jib 120' or longer on a crane that requires an oiler
GROUP 13: Crane operator; job mechanic and 3 drum hoist and excavator
GROUP 14: Crane operator on a crane that requires an oiler
GROUP 15: Hoisting operator; 2 drum hoist and rubber tired backhoe
GROUP 16: Forklift and 1 drum hoist
GROUP 17: Compressor or welder operator
GROUP 18: Oiler
ENGI0324-004 06/01/2023
AREA 1: ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, EATON,
HILLSDALE, IONIA, KALAMAZOO, KENT, LAKE, MANISTEE, MASON,
MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA,
ST. JOSEPH, VAN BUREN
AREA 2: ANTRIM, BENZIE, CHARLEVOIX, EMMET, GRAND TRAVERSE,
KALKASKA, LEELANAU, MISSAUKEE AND WEXFORD COUNTIES:
(Steel Erection)
AREA 1
GROUP 1....................$ 53.02 25.25
GROUP 2....................$ 49.75 25.25
GROUP 3....................$ 48.21 25.25
GROUP 4....................$ 44.37 25.25
GROUP 5....................$ 28.89 12.40
GROUP 6....................$ 33.38 25.25
AREA 2
GROUP 1....................$ 53.02 25.25
GROUP 2....................$ 49.75 24.25
GROUP 3....................$ 48.21 25.25
GROUP 4....................$ 44.37 25.25
GROUP 5....................$ 28.89 12.40
GROUP 6....................$ 33.38 25.25
FOOTNOTES:
Crane operator with main boom and jib 300' or longer: $1.50 additional to the group 1 rate. Crane operator with main boom and jib 400' or longer: $3.00 additional to the group 1 rate.
PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Crane Operator with main boom & jib 400', 300', or 220' or longer.
GROUP 2: Crane Operator with main boom & jib 140' or longer, Tower Crane; Gantry Crane; Whirley Derrick.
GROUP 3: Regular Equipment Operator, Crane, Dozer, Loader, Hoist, Straddle Wagon, Mechanic, Grader and Hydro Excavator.
GROUP 4: Air Tugger (single drum), Material Hoist Pump 6"" or over, Elevators, Brokk Concrete Breaker.
GROUP 5: Air Compressor, Welder, Generators, Conveyors
GROUP 6: Oiler and fire tender
ENGI0324-005 09/01/2023
AREA 1: GENESEE, LAPEER, LIVINGSTON, MACOMB, MONROE, OAKLAND,
ST. CLAIR, WASHTENAW AND WAYNE COUNTIES
AREA 2: ALCONA, ALLEGAN, ALGER, ALPENA, ANTRIM, ARENAC, BARAGA,
BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS,
CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD,
DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND
TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA,
IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT,
KWEENAW, LAKE, LEELANAU, LENAWEE, LUCE, MACKINAC, MANISTEE,
MARQUETTE, MASON, MECOSTA, MENOMINEE, MIDLAND, MISSAUKEE,
MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW,
ONTONAGON, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE,
ROSCOMMON, SAGINAW, SANILAC, SCHOOLCRAFT, SHIAWASSEE, ST.
JOSEPH, TUSCOLA, VAN BUREN AND WEXFORD COUNTIES
(Underground construction (including sewer))
AREA 1:
GROUP 1....................$ 41.08 25.25
GROUP 2....................$ 36.25 25.25
GROUP 3....................$ 35.52 25.25
GROUP 4....................$ 34.95 25.25
GROUP 5....................$ 25.35 12.10
AREA 2:
GROUP 1....................$ 39.27 25.25
GROUP 2....................$ 34.38 25.25
GROUP 3....................$ 33.88 25.25
GROUP 4....................$ 33.60 25.25
GROUP 5....................$ 25.35 12.10
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Backfiller tamper; Backhoe; Batch plant operator (concrete); Clamshell; Concrete paver (2 drums or larger);
Conveyor loader (Euclid type); Crane (crawler, truck type or pile driving); Dozer; Dragline; Elevating grader;
Endloader; Gradall (and similar type machine); Grader;
Mechanic; Power shovel; Roller (asphalt); Scraper (self-propelled or tractor drawn); Side boom tractor (type D-4 or equivalent and larger); Slip form paver; Slope paver; Trencher (over 8 ft. digging capacity); Well drilling rig; Concrete pump with boom operator; Hydro Excavator
GROUP 2: Boom truck (power swing type boom); Crusher; Hoist;
Pump (1 or more - 6-in. discharge or larger - gas or diesel- powered or powered by generator of 300 amperes or more - inclusive of generator); Side boom tractor (smaller than type D-4 or equivalent); Tractor (pneu-tired, other than backhoe or front end loader); Trencher (8-ft. digging capacity and smaller);Vac Truck and End dump operator;
GROUP 3: Air compressors (600 cfm or larger); Air compressors (2 or more-less than 600 cfm); Boom truck (non-swinging, non- powered type boom); Concrete breaker (self-propelled or truck mounted - includes compressor); Concrete paver (1 drum-l/2 yd. or larger); Elevator (other than passenger);
Maintenance person; Pump (2 or more-4-in. up to 6-in.
discharge-gas or diesel powered - excluding submersible pumps); Pumpcrete machine (and similar equipment); Wagon drill (multiple); Welding machine or generator (2 or more-300 amp. or larger - gas or diesel powered)
GROUP 4: Boiler; Concrete saw (40 hp or over); Curing machine (self-propelled); Farm tractor (with attachment); Finishing machine (concrete); Hydraulic pipe pushing machine;
Mulching equipment; Pumps (2 or more up to 4-in. discharge, if used 3 hours or more a day, gas or diesel powered -excluding submersible pumps); Roller (other than asphalt);
Stump remover; Trencher (service); Vibrating compaction equipment, self-propelled (6 ft. wide or over); Sweeper (Wayne type); Water wagon and Extend-a boom forklift
Group 5: Fire Person, Oiler
* ENGI0324-006 06/01/2023
GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW, WAYNE, ALCONA,
ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY,
BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN,
CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON,
EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE,
HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON,
KALAMAZOO, KALKASKA, KENT, KEWEENAW, LAKE, LAPEER, LEELANAU,
LENAWEE, LIVINGSTON, LUCE, MACKINAC, MANISTEE, MARQUETTE,
MASON, MECOSTA, MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM,
MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, ONTONAGON,
OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON,
SAGINAW, ST. CLARE, ST. JOSEPH, SANILAC, SCHOOLCRAFT,
SHIAWASSEE, TUSCOLA, VAN BUREN AND WEXFORD COUNTIES
Power equipment operators:
(AIRPORT, BRIDGE & HIGHWAY
CONSTRUCTION)
GROUP 1.....................$ 40.46 25.25
GROUP 2.....................$ 37.73 25.25
GROUP 3.....................$ 33.17 25.55
GROUP 4.....................$ 33.00 25.25
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt plant operator; Crane operator (does not include work on bridge construction projects when the crane operator is erecting structural components); Dragline operator; Shovel operator; Locomotive operator; Paver operator (5 bags or more); Elevating grader operator; Pile driving operator; Roller operator (asphalt); Blade grader operator; Trenching machine operator (ladder or wheel type); Auto-grader; Slip form paver; Self-propelled or tractor-drawn scraper; Conveyor loader operator (Euclid type); Endloader operator (1 yd. capacity and over);
Bulldozer; Hoisting engineer; Tractor operator; Finishing machine operator (asphalt); Mechanic; Pump operator (6-in.
discharge or over, gas, diesel powered or generator of 300 amp. or larger); Shouldering or gravel distributing machine operator (self- propelled); Backhoe (with over 3/8 yd.
bucket); Side boom tractor (type D-4 or equivalent or larger); Tube finisher (slip form paving); Gradall (and similar type machine); Asphalt paver (self- propelled);
Asphalt planer (self-propelled); Batch plant (concrete-central mix); Slurry machine (asphalt); Concrete pump (3 in. and over); Roto-mill; Swinging boom truck (over 12 ton capacity); Hydro demolisher (water blaster);
Farm-type tractor with attached pan; Vacuum truck operator;
Batch Plant (concrete dry batch); Concrete Saw Operator (40h.p. or over; Tractor Operator (farm type); Finishing Machine Operator (concrete); Grader Operator (self-propelled fine grade or form (concrete)).
GROUP 2: Screening plant operator; Washing plant operator;
Crusher operator; Backhoe (with 3/8 yd. bucket or less);
Side boom tractor (smaller than D-4 type or equivalent);
Sweeper (Wayne type and similar equipment); Greese Truck;
Air Compressor Operator (600 cu.ft. per min or more); Air Compressor Operator (two or more, less than 600 cfm);
GROUP 3: Boiler fire tender; Tractor operator (farm type with attachment); Concrete Breaker; Wagon Drill Operator;
GROUP 4: Oiler; Fire tender; Trencher (service); Flexplane operator; Cleftplane operator; Boom or winch hoist truck operator; Endloader operator *under 1 yd. capacity); Roller Operator (other than asphalt); Curing equipment operator (self-propelled); Power bin operator; Plant drier (6 ft.
wide or over); Guard post driver operator (power driven);
All mulching equipment; Stump remover; Concrete pump (under 3-in.); Mesh installer (self-propelled); End dump; Skid Steer.
ENGI0324-007 05/01/2023
ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON,
IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON
AND SCHOOLCRAFT COUNTIES:
(Steel Erection) Compressor, welder and forklift....................$ 38.50 25.00 Crane operator, main boom & jib 120' or longer........$ 44.97 25.00 Crane operator, main boom & jib 140' or longer........$ 44.17 24.60 Crane operator, main boom & jib 220' or longer........$ 45.27 25.00 Mechanic with truck and tools.......................$ 44.10 25.00 Oiler and fireman...........$ 39.96 25.00 Regular operator............$ 42.32 25.00
ENGI0324-008 10/01/2022
ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY,
BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX,
CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA,
DICKINSON, EATON, EMMET, GENESEE, GLADWIN, GOGEBIC,…