3. VGLZ 172042 - Drawings SANG Runway Repair B3 (1).pdf
PDF 23 MB Posted
- Attached to
- VGLZ 172042 Repair Runway
- Solicitation number
- W50S8524B0001
About this file
This federal contract opportunity solicitation seeks proposals for repair work on Runway B3 at Selfridge Air National Guard Base in Michigan. The solicitation was issued by the Department of the Army Michigan Army National Guard under number W50S8524B0001 for project VGLZ 172042. Offerors are requested to provide all labor, materials, equipment and supervision necessary to complete repairs to the runway's pavement, markings and lighting systems. The deadline for proposal submissions is June 15, 2024, with award of the firm fixed price contract expected by August 1, 2024. The place of performance will be at the Base. A pre-proposal site visit is scheduled for May 15, 2024 to allow prospective offerors to inspect the runway and ask any clarifying questions.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSED RUNWAY
MILL/OVERLAY LIMITS
PROPOSED TAXIWAY
TEMPORARY
MARKINGS LIMITS
TITLE SHEET
T100
SELFRIDGE ANG BASE MAPLOCATION MAP
BASE
SELFRIDGE AIR NATIONAL GUARD BASE
REPAIR RUNWAY
THE 127th WING, MICHIGAN AIR NATIONAL GUARD
CODE SUMMARY
APPLICABLE CODES AND STANDARDS
2012 INTERNATIONAL BUILDING CODE (IBC) T100 TITLE SHEET
GENERAL
G101 CSPP NOTES
G201-G203 CSPP PHASING PLANS
G501 PHASING DETAILS
CIVIL
C100 HAUL ROUTES AND MILLINGS DEPOSIT AREAS
C101 RUNWAY REPAIR LAYOUT PLAN
C201-C206 EXISTING SURVEY AND DEMOLITION PLAN
C301 TYPICAL CROSS SECTIONS
C401-C406 PROPOSED PLAN AND PROFILES
C500-C506 RUNWAY/ TAXIWAY B MARKING LAYOUT PLANS, DETAILS & NOTES
C601-C603 FULL DEPTH PAVEMENT REPAIR DETAIL & NOTES
C701-C702 TAXIWAYS H & J GRADING PLANS
C800 SHOULDER CRACK SURVEY PLAN
REFERENCE
R-001 ENVIRONMENTAL AREAS OF CONCERN
DRAWING INDEX
PROJECT NUMBER: VGLZ 172042
CONTRACT NUMBER: W912JB-13-D-4005
AUGUST 11, 2023
UNITED FACILITIES CRITERIA (UFC)
UNITED FACILITIES GUIDE SPECIFICATIONS (UFGS)
Feet 0 4,000 8,000
NORTH
NOT TO SCALE
http://www.AECOM.com
27777 Franklin Road, Suite 2150 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
REPAIR RUNWAY
http://www.AECOM.com
27777 Franklin Road, Suite 2150 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
REPAIR RUNWAY
CSPP NOTES
G101
1. CONSTRUCTION COORDINATION
· CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE MOVEMENT OF WORKERS AND THE
DELIVERY OF MATERIALS WITHIN SELFRIDGE AIR NATIONAL GUARD (ANG) BASE.
· THE PROJECT SUPERINTENDENT OR COMPETENT ALTERNATE SHALL SERVE AS THE ON-PROJECT COORDINATOR FOR THE CONTRACTOR AND SHALL BE ON THE PROJECT SITE AT ALL TIMES DURING
THE PERFORMANCE OF THIS CONTRACT UNTIL THE WORK IS COMPLETED AND ACCEPTED.
· PRIOR TO THE START OF EACH PHASE OF THE WORK, THE CONTRACTOR SHALL SCHEDULE A
MEETING WITH ANG BASE AND APPLICABLE PERSONNEL OF THE CONTRACTOR TO DISCUSS
CONTINGENCY PLANNING. THE TOPICS OF DISCUSSION SHALL INCLUDE SETTING UP WORK AREA BARRICADES AND LIGHTING, BACKUP EQUIPMENT AS REQUIRED BY AND MATERIALS, EMERGENCY
NOTIFICATION PROCEDURES AND EMERGENCY CONTACTS, TEMPORARY STOCKPILE LOCATIONS,
PROCEDURES THAT MUST BE FOLLOWED SHOULD THE CONTRACTOR BE UNABLE TO OPEN A PHASE
AT THE END OF SCHEDULED DAY OR NIGHT TIME WORK HOURS AND OTHER TOPICS AS
APPROPRIATE.
· THE CONTRACTOR SHALL CONDUCT ALL HIS OPERATIONS IN SUCH A MANNER SO AS TO MAINTAIN A SMOOTH, SAFE, UNINTERRUPTED FLOW OF AIRCRAFT AND VEHICULAR TRAFFIC ADJACENT TO THE
WORK SITE.
· FEDERAL AVIATION ADMINISTRATION (FAA) FORM 7460-1 IS REQUIRED TO BE FILED WITH THE FAA FOR
THIS PROJECT ALONG WITH ALL CRANE ACTIVITY ASSOCIATED WITH CONSTRUCTION. THE
CONTRACTOR SHALL COORDINATE WITH ANG BASE FOR THE PROPOSED TYPE AND HEIGHT OF THE
EQUIPMENT BEING USED ON THE PROJECT FOR DETERMINING THE FAA FILING REQUIREMENTS.
2. CONSTRUCTION PHASING NOTES
· SEE SHEETS G201 TO G203 FOR DETAILED PHASING OF THIS PROJECT.
· SEE SHEET G501 FOR CONSTRUCTION PHASING DETAILS.
· SEE SHEET C100 FOR HAUL ROUTES, MILLING DEPOSIT AREA AND CONTRACTOR STAGING/STORAGE
AREA.
· THIS PROJECT CONTAINS PHASES AND SUB-PHASES. THE SUB-PHASES REFER TO THE AREAS WITHIN EACH PHASE. UNLESS OTHERWISE INDICATED, PHASES AND THEIR ASSOCIATED SUB-PHASES CAN BE
SHUTDOWN SIMULTANEOUSLY, BUT THE CONTRACTOR MUST STILL ADHERE TO THE CALENDAR
LIMITATIONS FOR THE SUB-PHASES.
· EACH PHASE/SUB-PHASE SEQUENCE AND ALL RUNWAY/TAXIWAY/TAXILANE CLOSURES SHALL BE
COORDINATED WITH THE CONTRACTING OFFICER.
· LOW PROFILE BARRICADES, PER DETAILS ON SHEET G501, SHALL BE ERECTED AT CLOSED TAXIWAYS AND AROUND THE CURRENT WORK AREA TO CONTROL CONSTRUCTION TRAFFIC AND TO DELINEATE
THE WORK AREA TO CONSTRUCTION PERSONNEL.
· NO MORE THAN ONE PHASE SHALL BE CLOSED AT A TIME FOR CONSTRUCTION, UNLESS OTHERWISE
INDICATED WITHIN THE PLANS OR APPROVED BY THE CONTRACTING OFFICER.
· CALENDAR DAY LIMITATIONS FOR THE PHASES AND SUB-PHASES ARE LISTED ON THE INDIVIDUAL
PHASES.
· BEFORE OPENING AN AREA TO AIRCRAFT OPERATIONS, THAT PHASE MUST BE TOTALLY COMPLETE
AS REQUIRED BY PHASING PLANS.
· UNLESS OTHERWISE INDICATED, CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF UFC 3-260-01 APPENDIX B, SECTION 14 "CONSTRUCTION PHASING PLAN AND OPERATIONAL SAFETY ON
AIRFIELDS DURING CONSTRUCTION".
3. AREAS AND OPERATIONS AFFECTED BY THE CONSTRUCTION ACTIVITY.
· ALL HIGH PROFILE EQUIPMENT, SUCH AS CRANES, WILL BE LOWERED WHEN NOT IN USE. ALL EQUIPMENT ON THE PROJECT SITE SHALL BE EQUIPPED WITH AN ORANGE/WHITE FLAG OR YELLOW
STROBE/BEACON. BEACONS SHALL BE OPERATIONAL WHENEVER EQUIPMENT IS ON THE PROJECT
SITE. EQUIPMENT USED DURING NIGHT TIME OPERATIONS SHALL BE EQUIPPED WITH A BEACON.
· ALL BARRICADES OUTLINED IN THE CONSTRUCTION PLANS SHALL BE LOW-PROFILE BARRICADES MATCHING THE DETAIL ON SHEET G501. ANY VARIATION FROM THIS BARRICADE TYPE MUST BE
SUBMITTED TO AND APPROVED BY THE CONTRACTING OFFICER.
· CONTRACTOR SHALL MAINTAIN CONTROL OF EQUIPMENT AND PERSONNEL AND PREVENT MOVEMENT OUTSIDE OF THE PROJECT LIMITS AND/OR THROUGH ACTIVE AIRCRAFT OPERATION AREAS. ACTIVE AIRCRAFT OPERATION AREAS INCLUDE TAXIWAYS AND RUNWAYS NOT CLOSED DUE TO THE PROJECT
REQUIREMENTS. FOR EXAMPLE, WHILE AIRCRAFT MAY BE MOVING ALONG OPEN TAXIWAYS,
CONTRACTOR'S PERSONNEL WILL NOT BE PERMITTED TO ACCESS THESE OPEN TAXIWAYS WITHOUT
SECURING PERMISSION FROM THE ATCT. CONTRACTOR EQUIPMENT, VEHICLES, AND PERSONNEL
SHALL YIELD TO ALL AIRCRAFT MOVEMENT AND EMERGENCY EQUIPMENT. CONTRACTOR'S
EQUIPMENT SHALL BE REMOVED FROM TAXIWAY CLEARANCE AREA AND RUNWAY CLEAR ZONE
WHEN NOT IN USE (REFER TO UFC 3-260-01).
4. PROJECT SITE ACCESS
· ACCESS TO THE SITE WILL BE VIA THREE PROJECT GATES AS SHOWN ON HAUL ROUTES PLAN SHEET
C100. NO OTHER ACCESS POINTS ARE PERMITTED WITHOUT THE WRITTEN APPROVAL FROM THE
CONTRACTING OFFICER.
· HAUL ROUTES FROM THE ACCESS GATES SHALL BE ADEQUATELY DELINEATED WITH TRAFFIC CONES, AND/OR BARRICADES TO MARK TRAVEL ROUTES FOR CONSTRUCTION AND DELIVERY VEHICLES AND
TO PREVENT VEHICLES FROM STRAYING FROM DESIGNATED TRAVEL ROUTES. SIMILARLY,
PATHWAYS FROM THE APPROPRIATE STAGING AREAS TO THE CURRENT WORK AREA SHALL BE
ADEQUATELY DELINEATED IN THE SAME MANNER. ALL TRAFFIC CONTROL MEASURES SHOULD BE
PLACED AS SUCH TO ALLOW BASE RESCUE AND FIREFIGHTING VEHICLES (ARFF) TO TRAVEL
THROUGH THE AREA.
· CONTRACTOR SHALL COORDINATE SECURITY ARRANGEMENTS WITH ANG BASE DURING THE COURSE OF THE PROJECT. CONTRACTOR SHALL MEET THE SECURITY REQUIREMENTS ESTABLISHED BY ANG
BASE AND SHALL BE RESPONSIBLE FOR ENSURING THAT CONTRACTOR'S PERSONNEL AND
SUBCONTRACTOR'S PERSONNEL ADHERE TO SUCH REQUIREMENTS.
· CONSTRUCTION TRAFFIC WILL BE LIMITED TO THE PATHWAYS AS INDICATED ON THE PLANS, UNLESS
OTHERWISE APPROVED BY THE CONTRACTING OFFICER.
5. PROJECT SITE MANAGEMENT
WILDLIFE
· ALL PERSONNEL SHALL TAKE IMMEDIATE ACTION TO ELIMINATE WILDLIFE HAZARDS WHENEVER THEY ARE DETECTED. HAZARDS INCLUDE, BUT ARE NOT LIMITED TO, TRASH (FOOD SCRAPS AND
MISCELLANEOUS WASTE), STANDING WATER, TALL GRASS AND SEEDS. THE CONTRACTOR SHALL
CONTACT ANG BASE OPERATIONS IMMEDIATELY IN THE EVENT THAT WILDLIFE IS OBSERVED FOR
ANY NECESSARY REMOVAL.
TRASH
· THE CONTRACTOR SHALL OBSERVE STRICT ADHERENCE TO SITE CLEANLINESS. DAILY VISUAL
INSPECTIONS SHALL BE PERFORMED BY THE CONTRACTOR AND AIRPORT TO ENSURE SITE
TRASH IS PICKED UP TO PREVENT FROM BEING BLOWN AROUND THE AIRFIELD. TRASH IS
CONSIDERED A HAZARD IN THAT IT MAY BECOME WINDBLOWN AND BECOME FOREIGN OBJECT
DEBRIS (FOD); OR IT MAY ATTRACT UNWANTED WILDLIFE WHICH MAY PRESENT SERIOUS
HAZARDS TO AIRCRAFT. CONTRACTOR SHALL BE RESPONSIBLE FOR PICKING UP ALL OBSERVED
FOD REGARDLESS OF THE SOURCE OF THE FOD.
FOREIGN OBJECT DEBRIS (FOD) MANAGEMENT
· A MINIMUM OF ONE SWEEPER SHALL BE ON-SITE AND OPERATIONAL AT ALL TIMES. THIS
SWEEPER SHALL BE DEDICATED FOR THE EXCLUSIVE USE OF CLEANING AND FOD FROM THE
RUNWAY, TAXIWAY, AND TAXILANE AREAS. THE BROOM SHALL NOT BE COMPRISED BRISTLES.
· CONTRACTOR SHALL BE RESPONSIBLE FOR IMMEDIATELY CLEANING UP ANY FOD GENERATED
FROM CONSTRUCTION ACTIVITIES WITHIN AIRCRAFT MOVEMENT AREAS AND MAINTAINING
EFFECTIVE CONTROL OF FOD AT ALL TIMES THROUGHOUT ALL AREAS OF OPERATIONS.
· PRIOR TO OPENING TAXIWAYS AND RUNWAY AREAS TO AIRCRAFT A FOD CHECK SHALL BE
PERFORMED BY CONTRACTOR PERSONNEL AND THE CONTRACTING OFFICER. PROJECT AREAS
SHALL NOT BE OPENED TO AIRCRAFT TRAFFIC BEFORE PERFORMING THE FINAL FOD CHECK.
· PILES OF RUBBLE AND/OR SUPPLIES ARE NOT PERMITTED ALONG ANY AREAS OPEN TO
AIRCRAFT. ANY PILE GENERATED IN THESE AREAS SHALL BE CLEANED UP AND HAULED AWAY
BEFORE THE END OF THE WORK DAY. ANY OPEN TRENCHES OR EXCAVATION ALONG AREAS
OPEN TO AIRCRAFT SHALL BE BACKFILLED OR SECURELY COVERED AS SOON AS POSSIBLE AND
NOT LEFT OPEN DURING NON-WORK HOURS. AIRCRAFT OPERATIONS WILL NOT BE ALLOWED ON
A TAXIWAY/RUNWAY WHERE OPEN TRENCHES OR EXCAVATIONS OCCUR WITHIN THE CLEARANCE
ZONES.
· THE CONTRACTOR IS REQUIRED TO CONTROL DUST AND DEBRIS THAT RESULTS FROM HIS
OPERATIONS. WASTE AND LOOSE MATERIALS SHALL NOT BE PLACED IN ACTIVE MOVEMENT
AREAS. MATERIALS TRACKED ONTO THESE AREAS MUST BE REMOVED CONTINUALLY DURING
THE COURSE OF THE PROJECT.
· FOD CHECKS ARE TO BE PERFORMED BEFORE LEAVING STAGING AREAS AND PHASE AREAS.
THIS CHECK SHALL INCLUDE INSPECTION OF VEHICLES AND EQUIPMENT FOR POTENTIAL FOD
AND THE REMOVAL OF SUCH MATERIALS TO PREVENT FOD DEBRIS FROM BEING INTRODUCED
INTO AREAS OPEN TO AIRCRAFT TRAFFIC.
HAZARDOUS MATERIALS (HAZMAT) MANAGEMENT
· ALTHOUGH HAZARDOUS MATERIALS ARE NOT ANTICIPATED ON THIS PROJECT, THE
CONTRACTOR WILL BE REQUIRED TO FOLLOW THE SAFETY PROVISIONS OUTLINED IN THE
CONTACT DOCUMENTS FOR CIRCUMSTANCES WHICH MAY OCCUR ON THIS PROJECT. ALL
LUBRICATING LIQUIDS AND SOLIDS (OILS AND GREASES) SHALL BE SECURED AND CONTAINED IN
DRY AREAS UNTIL USED BY TRAINED PERSONNEL OR MECHANICS. ALL WASTE MATERIAL SHALL
BE PROPERLY DISPOSED OF IN ACCORDANCE WITH ALL APPLICABLE ENVIRONMENTAL LAWS AND
ACCORDING TO MANUFACTURER'S DIRECTIONS. CONSTRUCTION FUEL SHALL NOT BE STORED
AT THE SITE.
6. NOTIFICATION OF CONSTRUCTION ACTIVITIES
· APPROPRIATE NOTICES TO AIRMEN (NOTAMS) MUST BE ISSUED PRIOR TO COMMENCING WORK
ACTIVITIES IN THE VICINITY OF AIRCRAFT OPERATION AREAS. CONTRACTOR SHALL COORDINATE
WORK ACTIVITIES AND PROJECT SCHEDULE WITH THE SELFRIDGE ANG BASE AT LEAST TWO
WEEKS PRIOR TO EACH CHANGE IN CONSTRUCTION PHASING. MTAA SHALL COORDINATE
ISSUANCE OF NOTAMS BASED UPON INFORMATION SUPPLIED BY THE CONTRACTOR. ANG BASE
SHALL ISSUE NOTAMS AND CONFIRM THAT NOTAMS HAVE BEEN PUBLISHED. PRIOR TO MOVING
INTO AIRCRAFT MOVEMENT AREAS TO ERECT TRAFFIC CONTROL, CONFIRMATION OF ISSUANCE
OF NOTAMS WITH AIR TRAFFIC CONTROL TOWER SHALL BE MADE WHILE SECURING PERMISSION
TO ENTER AIRCRAFT MOVEMENT AREAS.
EMERGENCY NOTIFICATION PROCEDURES
· THE SUPERINTENDENT SHALL BE THE 24 HOUR ON-CALL REPRESENTATIVE FOR EMERGENCY
SITUATIONS.
· 24 HOUR EMERGENCY CONTACTS FOR POLICE, FIRE, MEDICAL RESPONSE, AND KEY PROJECT
PERSONNEL TO BE PROVIDED BY ANG BASE PRIOR TO START OF WORK.
· THE CONTRACTOR WILL PROVIDE A SUBMITTAL INCLUDING A LIST OF CONTACT PERSONNEL FOR
THE CONTRACTOR AND SUBCONTRACTORS, INCLUDING ADDRESSES AND TELEPHONE NUMBERS
FOR USE IN THE EVENT OF AN EMERGENCY. AS CHANGES OCCUR AND ADDITIONAL INFORMATION
BECOMES AVAILABLE, CONTRACTOR SHALL CORRECT AND CHANGE THE PREVIOUS LISTS.
7. INSPECTION REQUIREMENTS
DAILY INSPECTIONS
· THE CONTRACTOR IS RESPONSIBLE FOR QUALITY CONTROL INSPECTION OF HIS/HER OWN
WORK, AS WELL AS FOR ALL SAFETY REQUIREMENTS FOR THE PROJECT. THE CONTRACTOR IS
REQUIRED TO ADHERE TO THE CONTRACT DOCUMENTS, WHICH INCLUDE ALL SAFETY
REQUIREMENTS OF THIS SAFETY AND PHASING PLAN. INSPECTIONS OF THE WORK ZONE
CONES/BARRICADES, STOCKPILE AREAS, EQUIPMENT, EROSION/SEDIMENT CONTROL DEVICES
AND ADJACENT SURFACES SHALL OCCUR ON A DAILY BASIS TO ENSURE ALL CONDITIONS MEET
THE REQUIREMENTS SPECIFIED WITHIN THIS SAFETY & PHASING PLAN AND THE CONTRACT
DOCUMENTS. THE CONTRACTOR WILL ALSO BE RESPONSIBLE FOR ANY INSPECTIONS OF
MOVEMENT AREAS PRIOR TO THE AREA BEING OPENED FOR ANY AIRCRAFT. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO ADDRESS CONSTRUCTION SAFETY ISSUES ADJACENT OR
INCIDENTAL TO THE PROJECT, EVEN IF THEY ARE NOT DIRECTLY RELATED TO THIS PROJECT.
FINAL INSPECTIONS
· ANY DAMAGE ALONG THE HAUL ROUTES SHALL BE REPAIRED BY THE CONTRACTOR PRIOR TO
THE COMPLETION OF THE PHASE FOR WHICH THE ROUTE IS USED. ALL HAUL ROUTES AND WORK
AREAS SHALL BE INSPECTED BY CONTRACTOR AND THE CONTRACTING OFFICER PRIOR TO ANY
PAVEMENT SECTION BEING RE-OPENED TO AIRCRAFT. THE ANG BASE WILL ALSO HAVE A
STANDING INVITATION TO THESE INSPECTIONS. THE CONTRACTOR SHALL PERFORM A FINAL
INSPECTION OF ALL HAUL ROUTES NEAR THE COMPLETION OF PROJECT WITH ANY DEFECTS
BEING REPAIRED TO AS GOOD OR BETTER THAN EXISTING CONDITION BEING A CONDITION FOR
SUBSTANTIAL COMPLETION OF THE PROJECT.
8. UNDERGROUND UTILITIES
· PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL WALK THE JOB SITE WITH ANG BASE
PERSONNEL AND THE CONTRACTING OFFICER TO IDENTIFY ANY EXISTING UNDERGROUND
UTILITIES, CABLES AND WIRES.
· THE CONTRACTOR SHALL VERIFY, IDENTIFY, LOCATE, MARK OUT & PROTECT THE ACTUAL
LOCATIONS OF UTILITIES PRIOR TO ANY EXCAVATION. WHEN AT ALL FEASIBLE, THE
CONTRACTOR WILL MARK EXISTING UTILITIES IN THE PROJECT AREA.
· THE CONTRACTOR SHALL COORDINATE WITH ALL APPROPRIATE AGENCIES.
· THE CONTRACTOR SHALL HAND-DIG WHEN WITHIN 3 FEET OF ANY KNOWN OR SUSPECTED
UTILITY.
· THE CONTRACTOR SHALL PROTECT ALL UNDERGROUND UTILITIES DURING THE DURATION
OF THE PROJECT.
9. NAVAIDS
GENERAL
· NAVAID SHUTDOWNS WILL BE REQUIRED WHEN CLOSING RUNWAY 01-19. SHUTDOWNS WILL
BE COORDINATED THROUGH ANG BASE OPERATIONS. NAVAIDS WILL BE SHUT DOWN BY
ANG BASE.
· PRIOR TO START OF THE WORK ON AIRFIELD, CONTRACTOR SHALL COORDINATE WITH ANG
BASE OPERATIONS AND OBTAIN THE COMPLETE LIST AND LOCATION OF NAVIGATIONAL
AIDS THAT MAYBE IMPACTED BY THE CONSTRUCTION ACTIVITY.
10. RUNWAY AND TAXIWAY VISUAL AIDS
GENERAL
· PRIOR TO CONSTRUCTION, TEMPORARY CLOSURES WILL BE NOTED WITH THE USE OF LOW
PROFILE BARRICADES AND RUNWAY/TAXIWAY CLOSURE X'S AS NOTED ON THE PLANS.
BARRICADES SHOULD BE SECURED TO PREVENT MOVEMENT FROM JET BLAST. THE ANG
BASE WILL PROVIDE NOTAMS FOR CLOSURES AND THE CONTRACTOR WILL BE REQUIRED
TO PROVIDE, PLACE AND MAINTAIN TEMPORARY BARRICADES DURING THE DURATION OF
WORK BEING PERFORMED IN THE AREA.
MARKINGS
· ALL PAVEMENT MARKINGS WILL BE REPLACED FOR RUNWAY/TAXIWAY RELATED
CONSTRUCTION WORK AS SHOWN ON THE PLANS. PAVEMENT MARKINGS WILL COMPLY
WITH THE SPECIFICATIONS OUTLINED IN THE CONTRACT DOCUMENTS AND SHALL BE IN
THE LOCATIONS PROVIDED HEREIN.
LIGHTING, SIGNS, AND VISUAL NAVAIDS
· CONTRACTOR SHALL COORDINATE WITH ANG BASE TO DE-ENERGIZE RUNWAY LIGHTS,
VISUAL NAVAIDS, TAXIWAY EDGE LIGHTS AND SIGNS CIRCUITS WITHIN THE CLOSED
RUNWAY/ TAXIWAYS. CONTRACTOR SHALL COVER LIGHTS AND SIGNS WHERE LIGHTING
CIRCUITS CANNOT BE DE-ENERGIZED. THESE COVERS SHALL BE PLACED UPON INITIAL
CLOSING OF THE PAVEMENT SECTION AND SHALL BE REMOVED ONLY ONCE
CONSTRUCTION IN THE AREA IS COMPLETED AND APPROVED FOR REOPENING TO
AIRCRAFT OPERATIONS.
· THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER AND THE ANG
BASE ON WHICH TAXIWAY AND RUNWAY DIRECTIONAL SIGNAGE WILL BE NEED TO BE
COVERED FOR THE INDIVIDUAL PHASE AREAS. THIS COORDINATION SHALL OCCUR PRIOR
TO THE CLOSURE OF A PHASE OR SUB-PHASE FOR CONSTRUCTION.
11. MARKING AND SIGNS FOR ACCESS ROADS, HAUL ROUTES, AND AIRFIELD
· THE ACCESS ROADS USED FOR HAULING AND DELIVERY OF MATERIALS TO THE SITE SHALL
BE MARKED, AS NECESSARY, WITH TEMPORARY GUIDANCE SIGNS (STAKE MOUNTED OR
SAW-HORSE, WEIGHTED DOWN WITH SAND BAGS) CONFORMING TO STATE MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES (MMUTCD) REQUIREMENTS.
· AT ALL ACCESS GATES, SPEED LIMIT SIGNS (20 MPH OR AS REQUIRED BY ANG BASE) SHALL
BE PLACED. STOP SIGNS AND DIRECTION ARROW SIGNS SHALL BE PLACED, AS NECESSARY,
AT KEY POINTS ALONG THE HAUL ROUTES TO ENSURE THE CONTRACTOR VEHICLES
ADHERE TO THE ROUTES SHOWN ON THE PLANS, MINIMIZING THE POTENTIAL FOR
ACCIDENTS OR ERRANTLY DRIVING INTO UNAUTHORIZED ZONES.
· THE CONTRACTOR SHALL ENSURE THAT ALL PERSONNEL ON THE SITE UNDERSTAND THE
MEANING OF THE SIGNS AND ADHERE TO THOSE RULES.
12. HAZARD MARKING AND LIGHTING
· CONTRACTOR SHALL BE RESPONSIBLE FOR THE TRAFFIC CONTROL USED DURING THE
COURSE OF THE PROJECT. CONTRACTOR SHALL FURNISH, INSTALL, MAINTAIN AND
DISMANTLE ALL TRAFFIC CONTROL ITEMS USED DURING THE COURSE OF THE PROJECT.
· ALL VEHICLES AND EQUIPMENT THAT WILL BE CROSSING OR OPERATING IN THE AIR
OPERATIONS AREAS OR ON ANY ACTIVE RUNWAY OR TAXIWAY, AIRCRAFT MOVEMENT
AREAS AND RUNWAY/TAXIWAY SAFETY AREAS SHALL BE MARKED WITH EITHER A FLAG OR
A FLASHING BEACON. THE FLAGS (DAYTIME USE) SHALL BE ON A STAFF ATTACHED TO THE
VEHICLE, 3-FOOT SQUARE WITH ORANGE AND WHITE CHECKERED PATTERN. BEACONS
SHALL BE OF ADEQUATE SIZE AND STRENGTH AS TO BE VISIBLE FROM THE AIR AND
MOUNTED ON THE UPPERMOST PART OF THE VEHICLE. ALL VEHICLES OPERATING DURING
NIGHTTIME OPERATIONS SHALL BE EQUIPPED WITH A FLASHING AMBER BEACON.
· ALL CONTRACTOR'S AND SUBCONTRACTORS' VEHICLES, PERSONNEL AND EQUIPMENT
SHALL BE CONFINED TO THE LIMITS OF THE CONSTRUCTION PHASES, ACCESS WAYS, AND
STAGING AREAS WHERE WORK IS IN PROGRESS.
COPYRIGHT 1999 - FIREHOUSE DESIGNS
1" = 400'
CSPP PHASE 1
& 1A
G201
N O
R T
H
FEET
0 800 1600
PHASING GENERAL NOTES:
1. THIS DRAWING SHALL BE PRINTED IN COLOR.
2. FOR CSPP NOTES SEE SHEET G101.
3. RUNWAY 01-19 WILL BE OPERATIONAL DURING PHASE 1.
4. TAXIWAYS " "E", "J" AND "H" BETWEEN RUNWAY 01-19 AND
TAXIWAY "B" WILL BE CLOSED DURING PHASE 1.
5. RUNWAY 01-19 WILL BE CLOSED DURING PHASE 1A.
6. TAXIWAY "K" WILL BE CLOSED DURING PHASE 1A.
7. PHASE 1A CONSTRUCTION SHALL BE COORDINATED WITH THE
BASE OPERATIONS.
8. FOR CSPP DETAILS SEE SHEET G501.
9. CONTRACTOR SHALL COORDINATE WITH ANG BASE TO
DE-ENERGIZE TAXIWAY EDGE LIGHTS & SIGNS CIRCUITS WITHIN
THE CLOSED TAXIWAYS. CONTRACTOR SHALL COVER LIGHTS
AND SIGNS WHERE LIGHTING CIRCUITS CANNOT BE
DE-ENERGIZED.
http://www.AECOM.com
27777 Franklin Road, Suite 2150 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
REPAIR RUNWAY
RUNWAY 01-19
TA
XI
W
AY
"G
TA
XI
W
AY
"E
TA
XI
W
AY
"H
TAXIWAY "M"
TAXIWAY "A"
M
ID
F
IE
LD
A
CC
ES
S
RO
AD
TA
XI
W
AY
"J
TA
XI
W
AY
"L
TAXIWAY "A"
TAXIWAY "B"
TAXIWAY "G"
PHASE 1
TA
XI
W
AY
"K
DURATION:
1. PHASE 1 - 14 DAYS FROM 0001 TO 2400
2. PHASE 1A - 3 NIGHTS FROM 2200 TO 0600
NOTE:
PHASE 1A MUST BE PERFORMED CONCURRENTLY WITH PHASE 1
CONSTRUCTION ACTIVITIES:
PHASE 1
1. REMOVE EXISTING TAXIWAY B CENTERLINE MARKINGS INCLUDING TAXIWAYS "E",
"H" AND "J" CENTERLINE MARKINGS AT THE INTERSECTIONS PER SHEET C500 AND
INSTALL LOW PROFILE BARRICADES AS SHOWN.
2. PAINT TEMPORARY RUNWAY MARKINGS ON TAXIWAY B PER SHEET C501.
3. PLACE TEMPORARY RUNWAY CLOSURE X MARKINGS OR LIGHTED X OVER NEWLY
PAINTED RUNWAY 01L AND 19R DESIGNATION MARKINGS, MAINTAIN AND REMOVE
WHEN TAXIWAY B IS READY FOR OPERATION AS A TEMPORARY RUNWAY.
PHASE 1A
1. COVER EXISTING TAXIWAYS "E", "H" AND "J" EDGE LIGHTS AND INSTALL LOW
PROFILE BARRICADES. PLACE TEMP LIGHTED X ON RWY 01-19 AND REMOVE AT
THE END OF EACH SHIFT
2. REMOVE EXISTING TAXIWAY B MARKINGS WITHIN TAXIWAY K INTERSECTION PER
SHEET C500 AND PAINT NEW MARKINGS PER SHEET C501 AS REQUIRED PRIOR TO
OPENING OF EXISTING TAXIWAY B FOR OPERATION AS TEMPORARY RUNWAY.
LEGEND:
ACTIVE AIRCRAFT ROUTES
(PHASE 1)
CONSTRUCTION HAUL ROUTE
LOW PROFILE BARRICADES
TRAFFIC CONES
PHASE 1 WORK AREAS
PHASE 1A WORK AREAS
RUNWAY CLOSURE MARKER
PHASE 1A
PHASE 1A
PHASE 1A
PHASE 1
INSTALL LOW PROFILE
BARRICADES AT THE HOLD
BAR ON CLOSED TAXIWAYS
TYP. PHASE 1 AND 1 A
PHASE 1A
TEMPORARY HAUL ROUTE
DURING PHASE 1 & 1A
THROUGH JOY RD GATE.
PROVIDE STOP SIGN, FLAGGER &
FOD CHECK POINT AS REQUIRED
WEST RAMP
EAST RAMP
CW
TR
JB
X X
PHASE 1A
PHASE 1A
X
PHASE 1A ONLY
PHASE 1A ONLY
STAGING AREA
CSPP PHASE 2,
2A, 2B & 2C
G202
N O
R T
H
FEET
0 800 1600
PHASING GENERAL NOTES:
1. THIS DRAWING SHALL BE PRINTED IN COLOR.
2. FOR CSPP NOTES SEE SHEET G101.
3. TEMPORARY RUNWAY 01L-19R WILL BE OPERATIONAL DURING
PHASE 2, 2A & 2B.
4. TAXIWAYS " "E", "J" AND "H" BETWEEN RUNWAY 01-19 AND
TEMPORARY RUNWAY 01L-19R WILL BE CLOSED DURING PHASE 2.
5. RUNWAY 01-19 WILL BE CLOSED DURING PHASE 2, 2A & 2B.
6. TAXIWAY "K" WILL BE CLOSED DURING PHASE 2A.
7. PHASE 2A CONSTRUCTION SHALL BE COORDINATED WITH THE
BASE OPERATIONS.
8. FOR CSPP DETAILS SEE SHEET G501.
9. FOR HAUL ROUTE SEE SHEET C100.
10.CONTRACTOR SHALL COORDINATE WITH ANG BASE TO
DE-ENERGIZE RUNWAY LIGHTS, VISUAL NAVAIDS, TAXIWAY EDGE
LIGHTS AND SIGNS CIRCUITS WITHIN THE CLOSED
RUNWAY/TAXIWAYS. CONTRACTOR SHALL COVER LIGHTS AND
SIGNS WHERE LIGHTING CIRCUITS CANNOT BE DE-ENERGIZED.
11.TAXIWAY A AND TAXIWAY G CANNOT BE CLOSED AND USED AS A
HAUL ROAD SIMULTANEOUSLY, ONE MUST REMAIN OPEN AT ALL
TIMES.
http://www.AECOM.com
27777 Franklin Road, Suite 2150 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
REPAIR RUNWAY
RUNWAY 01-19
TA
XI
W
AY
"G
TA
XI
W
AY
"E
TA
XI
W
AY
"H
TAXIWAY "M"
TAXIWAY "A"
M
ID
F
IE
LD
A
CC
ES
S
RO
AD
TA
XI
W
AY
"J
TA
XI
W
AY
"L
TAXIWAY "A"
TEMP. RUNWAY 01L-19R
(CLASS A VFR)
TAXIWAY "G"
TA
XI
W
AY
"K
DURATION:
1. PHASE 2 & 2B - 60 DAYS FROM 0001 TO 2400
2. PHASE 2A - 14 NIGHTS FROM 2200 TO 0600
3. PHASE 2C - 21 NIGHTS FROM 2200 TO 0600
NOTES:
· PHASE 2A MUST BE PERFORMED CONCURRENTLY WITH PHASE 2
· PHASE 2C MUST BE PERFORMED A MINIMUM 30 DAYS AFTER
COMPLETION OF PAVING OPERATION
CONSTRUCTION ACTIVITIES:
PHASE 2
1. PLACE TEMPORARY RUNWAY CLOSURE LIGHTED X OVER RUNWAY 01 AND 19 DESIGNATION MARKINGS. MAINTAIN
AND REMOVE WHEN RWY 01-19 PHASE WORK IS COMPLETE AND OPERATIONAL.
2. COLD MILL AND ASPHALT OVERLAY OF THE EXISTING RUNWAY PAVEMENT.
3. FULL DEPTH REPAIR OF RUNWAY AND SHOULDER PAVEMENT AREAS AS SHOWN ON THE PLANS.
4. COLD MILL AND ASPHALT OVERLAY OF THE EXISTING TAXIWAYS J AND H PAVEMENT.
5. REMOVAL OF AIRFIELD MARKINGS ON RUNWAY AND TAXIWAY SURFACE AREAS NOT BEING MILLED OR REPAIRED.
6. CRACK REPAIR OF RUNWAY SHOULDERS.
7. RUNWAY AND TAXIWAY PAVEMENT MARKINGS.
PHASE 2A & 2B
1. REMOVAL OF AIRFIELD MARKINGS ON RUNWAY AND TAXIWAY SURFACE AREAS NOT BEING MILLED OR REPAIRED.
2. CRACK REPAIR OF RUNWAY SHOULDERS.
3. RUNWAY AND TAXIWAY PAVEMENT MARKINGS.
PHASE 2C
1. PLACE TEMPORARY RUNWAY CLOSURE LIGHTED X ON RUNWAY 01 AND 19 PER PHASE 2
2. RUNWAY ASPHALT PAVEMENT GROOVING AND FINAL COAT OF PAVEMENT MARKINGS ON RUNWAY AND TAXIWAYS
LEGEND:
ACTIVE AIRCRAFT ROUTES
CONSTRUCTION HAUL ROUTE
LOW PROFILE BARRICADES
TRAFFIC CONES
PHASE 2 & 2C WORK AREAS
PHASE 2A WORK AREAS
PHASE 2B WORK AREAS
RUNWAY CLOSURE MARKERX
TEMPORARY HAUL ROUTE DURING
PHASE 2 THROUGH SOUTH GATE
(SEE PHASING NOTE 11)
INSTALL LOW PROFILE
BARRICADES AT THE HOLD
BAR ON CLOSED TAXIWAYS
TYP.
PHASE 2, 2CPHASE 2A
PHASE 2B
X X
SOUTH GATE
PLACE LOW PROFILE
BARRICADES DURING
PHASES 2 AND 2A
WEST RAMP
EAST RAMP
SOUTH GATE ACCESS
CW
TR
JB
0'
TY
P.
200'
120'
0'
PROVIDE STOP SIGN, FLAGGER
& FOD CHECK POINT
(SEE PHASING NOTE 11)
STAGING AREA
PROVIDE STOP SIGN, FLAGGER &
FOD CHECK POINT AS REQUIRED
INSTALL LOW PROFILE
BARRICADES TYP.
CSPP PHASE 3
& 3A
G203
N O
R T
H
FEET
0 800 1600
PHASING GENERAL NOTES:
1. THIS DRAWING SHALL BE PRINTED IN COLOR.
2. FOR CSPP NOTES SEE SHEET G101.
3. RUNWAY 01-19 WILL BE OPERATIONAL DURING PHASE 3.
4. TAXIWAYS " "E", "J" AND "H" BETWEEN RUNWAY 01-19 AND
TAXIWAY "B" WILL BE CLOSED DURING PHASE 3.
5. RUNWAY 01-19 WILL BE CLOSED DURING PHASE 3A.
6. TAXIWAY "K" WILL BE CLOSED DURING PHASE 3A.
7. PHASE 3A CONSTRUCTION SHALL BE COORDINATED WITH THE
BASE OPERATIONS.
8. FOR CSPP DETAILS SEE SHEET G501.
9. CONTRACTOR SHALL COORDINATE WITH ANG BASE TO
DE-ENERGIZE TAXIWAY EDGE LIGHTS & SIGNS CIRCUITS WITHIN
THE CLOSED TAXIWAYS. CONTRACTOR SHALL COVER LIGHTS
AND SIGNS WHERE LIGHTING CIRCUITS CANNOT BE
DE-ENERGIZED.
http://www.AECOM.com
27777 Franklin Road, Suite 2150 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
REPAIR RUNWAY
RUNWAY 01-19
TA
XI
W
AY
"G
TA
XI
W
AY
"E
TA
XI
W
AY
"H
TAXIWAY "M"
TAXIWAY "A"
M
ID
F
IE
LD
A
CC
ES
S
RO
AD
TA
XI
W
AY
"J
TA
XI
W
AY
"L
TAXIWAY "A"
TAXIWAY "B"
(TEMP RWY 01L-19R)
TAXIWAY "G"
PHASE 3
TA
XI
W
AY
"K
DURATION:
1. PHASE 3 - 14 DAYS FROM 0001 TO 2400
2. PHASE 3A - 3 NIGHTS FROM 2200 TO 0600
NOTE:
PHASE 3A MUST BE PERFORMED CONCURRENTLY WITH PHASE 3
CONSTRUCTION ACTIVITIES:
PHASE 3
1. PLACE TEMPORARY RUNWAY CLOSURE MARKING X OR LIGHTED X OVER
TEMPORARY RUNWAY 01L AND 19R DESIGNATION MARKINGS. MAINTAIN AND
REMOVE WHEN PHASE 3 WORK IS COMPLETE AND TAXIWAY B IS OPERATIONAL.
2. REMOVE EXISTING TEMPORARY RUNWAY 01L-19R MARKINGS.
3. PAINT NEW PAVEMENT MARKINGS ON TAXIWAY B PER SHEET C502.
4. REMOVE EXISTING TEMPORARY RUNWAY 01L-19R LIGHTS AND INSTALL NEW
TAXIWAY B LIGHTS ON TAXIWAY B.
PHASE 3A
1. PLACE TEMP LIGHTED X ON RWY 01-19 AND REMOVE AT THE END OF EACH SHIFT
2. REMOVE TEMPORARY RUNWAY 01L-19R MARKINGS WITHIN TAXIWAY K/B
INTERSECTION AND INSTALL NEW TAXIWAY MARKINGS PER SHEET C502.
LEGEND:
ACTIVE AIRCRAFT ROUTES
(PHASE 3)
CONSTRUCTION HAUL ROUTE
LOW PROFILE BARRICADES
TRAFFIC CONES
PHASE 3 WORK AREAS
PHASE 3A WORK AREAS
RUNWAY CLOSURE MARKERS
PHASE 3A
PHASE 3
INSTALL LOW PROFILE
BARRICADES AT THE HOLD
BAR ON CLOSED TAXIWAYS
TYP. PHASE 3 AND 3A
WEST RAMP
EAST RAMP
CW
TR
JB
TEMPORARY HAUL ROUTE
DURING PHASE 3 & 3A
THROUGH JOY RD GATE.
PROVIDE STOP SIGN, FLAGGER &
FOD CHECK POINT AS REQUIRED STAGING AREA
X
PHASE 3A ONLY
X
PHASE 3A ONLY
X
Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
REPAIR RUNWAY
CONSTRUCTION
PHASING DETAILS
G501
SOUTH
GATE
J0Y RD
GATE
X
X
HAUL ROUTES
AND
MILLINGS DEPOSIT
AREAS
C100
HAUL ROUTES AND MILLINGS DEPOSIT AREAS
Feet 0 1,200 2,400
NORTH
TEMPORARY CLOSURE
BARRICADE LOCATIONS
PLACE TEMPORARY CLOSURE X
MARKINGS PER UFC 3-260-04, FIGURE 8.1
(SEE DETAIL A3 SHEET G501)
PROPOSED RUNWAY
MILL/OVERLAY LIMITS
MILLING DEPOSIT AREA
CONTRACTOR RESPONSIBLE FOR
MAINTENANCE OF PILE HEIGHT AND
SPREADING MILLINGS. MILLING DEPOSIT AREAS
ARE ACCURATE AT PLAN GENERATION BUT MAY
NEED TO BE REASSESSED AFTER PROJECT
AWARD BASED ON BASE SESC PERMIT
REQUIREMENTS. ADDITIONAL SITES AS NEEDED
FOR MILLING DEPOSITS WILL BE PROVIDED BY
THE ANG BASE WITHIN 6 MILES DRIVING
DISTANCE FROM THE RUNWAY.
X
TEMPORARY LIGHTED X PLACED BY
CONTRACTOR AT CURRENT RUNWAY NUMBER
LOCATION. PER FAA AC 150/5340-1 AND
FAA AC 150/5345-55
(SEE DETAIL A5 ON SHEET G501)
TEMPORARY HAUL ROAD http://www.AECOM.com
27777 Franklin Road, Suite 2150 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
REPAIR RUNWAY
NOTES:
1. TAXIWAY A AND TAXIWAY G CANNOT BE
CLOSED AND USED AS A HAUL ROAD
SIMULTANEOUSLY, ONE MUST REMAIN OPEN
AT ALL TIMES.
2. CONTRACTOR IS RESPONSIBLE FOR PAYING
FOR SECURITY AT SOUTH GATE
CONSTRUCTION ENTRANCE.
LEGEND
REMOVE RUNWAY
DESIGNATOR NUMBER
MARKINGS PRIOR TO
RUNWAY CLOSURE
PROPOSED RUNWAY
MILL/OVERLAY LIMITS
PHASE 2
TEMPORARY CLOSURE
BARRICADE LOCATIONS
(SEE PHASING PLANS) TYP.
BASE ESCORT REQUIRED
FOR ALL WORK PERFORMED
WITHIN AIRFIELD LIMITS
REMOVE RUNWAY
DESIGNATOR NUMBER
MARKINGS PRIOR TO
RUNWAY CLOSURE
CONSTRUCTION ENTRY POINT
PHASE 2 (SEE NOTE 1)
CONTRACTOR STAGING/
STORAGE AREA
CONTRACTOR STAGING AND STORAGE
AREA. EXACT SIZE AND LOCATION MUST BE
COORDINATED WITH BASE.
TEMPORARY RUNWAY
01L-19R PHASES 1 & 3
HALL ROUTE
PHASES 1 & 3
PHASE 2B
PHASE 2A
STAGING AREA &
FOD CHECK POINT
PHASES 1 &3
MILLING DEPOSIT AREA 5
(30,000 SQ FT)
TEMPORARY HAUL ROAD
FOR MILLING DEPOSITS
CP 100
CP 101
CP 102
CP 103
CP 104
CP 105
CP 106
CP 107
CP 108
CP 109
CP 110
CP 111
CP 112
CP 113
CP 114
SH
EE
TS
C
C
SH
EE
TS
C
C
SH
EE
TS
C
C
SH
EE
TS
C
C
SH
EE
TS
C
C
C16 AOC
CONSTRUCTION
ENTRY POINT
KC-G
KC-H
KC-J
KC-L
KC-M
KC-K
KC-I
SH
EE
TS
C
C
CP 200
CP 201
BM 7225
BM 6188
MILLING
DEPOSIT
AREA 4
MILLING
DEPOSIT
AREA 1
CRF AOC
SITE LEGEND
SOIL BORING
CONTROL POINT
MATCHLINE
MILL EX. ASPHALT
KC-X
BENCH MARKS
BM
Elevation
579.07
578.30
LOCATION
CHISLED "X" ON CONC. LIGHT BASE
CHISLED "X" ON CONC. LIGHT BASE
CONTROL POINTS
Point #
Northing
407116.04
406674.84
407742.58
408173.01
408565.83
408941.31
409346.32
409702.96
410016.58
410342.89
410748.42
411035.92
411305.30
411517.57
412008.22
408217.42
408113.82
Easting
13535274.72
13535276.70
13535289.34
13535291.04
13535294.49
13535296.14
13535300.66
13535304.47
13535304.21
13535305.30
13535314.03
13535312.60
13535321.13
13535329.08
13535333.48
13534791.28
13534795.90
Elevation
577.83
578.11
578.03
577.16
577.15
577.20
576.86
578.80
576.80
576.52
576.87
577.33
577.40
577.10
577.52
578.28
578.21
NORTH
RUNWAY FULL
DEPTH REPAIR
LAYOUT PLAN
C101 Feet
0 600 1200
MILLINGS DISPOSAL NOTE:
"THIS RISK OF THE SITE CONTAINING CONTAMINATED SOIL EXISTS AND ACTIVE REMEDIATION INVESTIGATION IS ON-GOING; THEREFORE, THIS LOCATION CONTAINS STATE REGULATED MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY SOIL MEDIA RELOCATION RESTRICTIONS; THEREFORE, PROPER SOIL MANAGEMENT AND COORDINATION WITH THE ENVIRONMENTAL MANAGEMENT OFFICE
AT THIS LOCATION IS REQUIRED. SOIL FROM THIS LOCATION SHALL BE PROPERLY DISPOSED TO A LICENSED LANDFILL IF REMOVED FROM THE SITE (INCLUDING SOIL CHARACTERIZATION ANALYTICAL TESTING AND ENVIRONMENTAL OFFICE ANALYTICAL RESULTS REVIEW) OR SOIL MAY REMAIN WITHIN THE AREA OF CONCERN DELINEATED BOUNDARIES, COVERED WITH TOPSOIL, AND SITE VEGETATION RESTORATION (MULCH MATTING AND SEEDING) MUST OCCUR, AS SOIL DISTURBED AREAS." SEE SHEET T100 FOR MILLING DEPOSIT SITE LOCATION. CONTRACTOR IS RESPONSIBLE FOR SPREADING
MILLINGS IN THE APPROVED MILLINGS DEPOSIT AREAS.
CRF-AOC CRASH SITE NOTE:
"THE CONTAMINATED SOIL AT THIS LOCATION CONTAINS STATE REGULATED MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY SOIL MEDIA RELOCATION RESTRICTIONS; THEREFORE, PROPER SOIL
MANAGEMENT AND COORDINATION WITH THE ENVIRONMENTAL MANAGEMENT OFFICE AT THIS
LOCATION IS REQUIRED. SOIL FROM THIS LOCATION SHALL BE PROPERLY DISPOSED TO A LICENSED LANDFILL IF REMOVED FROM THE SITE (INCLUDING SOIL CHARACTERIZATION ANALYTICAL TESTING AND ENVIRONMENTAL OFFICE ANALYTICAL RESULTS REVIEW) OR SOIL MAY REMAIN WITHIN THE
AREA OF CONCERN DELINEATED BOUNDARIES, COVERED WITH TOPSOIL, AND SITE VEGETATION
RESTORATION (MULCH MATTING AND SEEDING) MUST OCCUR, AS SOIL DISTURBED AREAS."
GENERAL NOTES:
1. NO SOIL IS EXPECTED TO BE DISTURBED DURING EXECUTION OF THIS PROJECT. SELFRIDGE HAS
DESIGNATED MILLINGS DEPOSIT AREAS 1 AND 4 AS THE PREFERRED SITES FOR THE RUNWAY
PROJECT. CONTRACTOR TO COORDINATE WIT COR AS TO WHICH DEPOSIT AREA TO USE.
CONTRACTOR IS RESPONSIBLE FOR LABOR AND EQUIPMENT TO SPREAD MILLINGS. MILLINGS
STAGING PILE CANNOT EXCEED THE HEIGHT OF ADJACENT TREETOPS. CONTRACTOR SHALL
BECOME FAMILIARIZED WITH MILLINGS STAGING AREA PRIOR TO BID SUBMITTAL. PLACE TOPSOIL
AND SEED IF MILLINGS DISPOSAL SITE GRASS IS DAMAGED.
2. ENTIRE RUNWAY (150' WIDTH) TO BE MILLED, FILLED, AND RESTRIPED IN ACCORDANCE WITH UFC
3-260-04 16 MAY 2018.
3. CONTRACTOR TO NOTIFY BASE COMMUNICATIONS TO MARK UTILITIES PRIOR TO START OF
CONSTRUCTION ACTIVITIES
FULL DEPTH
REPAIR AREA
NO. 1
FULL DEPTH
REPAIR AREA
NO. 2
FULL DEPTH
REPAIR AREA
NO. 3
FULL DEPTH REPAIR AREA 1
· APPEARS TO BE A PREVIOUS REPAIR AREA
· WIDENED CENTER CRACK SOUTH OF CONCRETE/ASPHALT INTERFACE AND A CRACK AT
INTERFACE
· PROPOSING 35' WIDE PAVEMENT SOUTH OF INTERFACE FULL DEPTH AND 150' RUNWAY WIDTH
REPAIR PER CURRENT DESIGN. SAWCUT/REMOVE 12" OF CONCRETE FULL DEPTH/WIDTH
REMOVAL/REPAIR AT INTERFACE TO REMOVE POTENTIAL EXISTING DOWELS
· UFC 3-260-02 FIGURE 12-36 RIGID-FLEXIBLE PAVEMENT JUNCTION DETAIL REPAIR IS PROPOSED
FOR THIS AREA. SEE SHEET C-601.
· SAWCUT FULL DEPTH AC PAVEMENT AT RUNWAY/SHOULDER INTERFACE, PROTECT SHOULDER
OUTSIDE OF FAILURE AREAS WITH BONDBREAKER AND TEMPORARY SUPPORT DURING REPAIR.
· REPAIR SHOULDER 10' WIDE CENTERED OVER THE CRACK APPROXIMATELY 9' INTO SHOULDER
PER SHEETS C201 AND C601 AND PER DETAIL 3 ON SHEET C603
· FOR PAVEMENT CRACK REPAIRS SEE DETAILS ON SHEET C601 & C603
FULL DEPTH REPAIR AREA 2
· NOT BELIEVED TO BE ASSOCIATED WITH PREVIOUS REPAIR
· CONTRACTOR TO PROTECT UNDERDRAIN.
· 47.2' FULL DEPTH AND 150' RUNWAY WIDTH REPAIR 20' TO NORTH TO ENCOMPASS SPEED
BUMP AND 15' TO THE SOUTH OF CRACKING (TOTAL 35' WIDE)
· ACC TO ACC FULL DEPTH REPAIR DETAIL IS PROPOSED FOR THIS LOCATION
· SAWCUT FULL DEPTH AC PAVEMENT AT RUNWAY/SHOULDER INTERFACE, PROTECT
SHOULDER OUTSIDE OF FAILURE AREAS WITH BONDBREAKER AND TEMPORARY SUPPORT
DURING REPAIR.
· REPAIR SHOULDER 10' WIDE CENTERED OVER THE CRACK APPROXIMATELY 9' INTO
SHOULDER PER SHEETS C201 AND C601 AND PER DETAIL 3 ON SHEET C603
· FOR PAVEMENT CRACK REPAIRS SEE DETAILS ON SHEET C602 & C603
FULL DEPTH REPAIR AREA 3
· NOT BELIEVED TO BE ASSOCIATED WITH PREVIOUS REPAIR
· 75.3' WIDE FULL DEPTH AND 150' RUNWAY WIDTH REPAIR TO COVER DISTRESSED AREA
· SAWCUT FULL DEPTH AC PAVEMENT AT RUNWAY/SHOULDER INTERFACE, PROTECT SHOULDER
OUTSIDE OF FAILURE AREAS WITH BONDBREAKER AND TEMPORARY SUPPORT DURING REPAIR.
· REPAIR SHOULDER 10' WIDE CENTERED OVER THE CRACK APPROXIMATELY 9' INTO SHOULDER
PER SHEETS C201 AND C601 AND PER DETAIL 3 ON SHEET C603
· FOR PAVEMENT CRACK REPAIRS SEE DETAILS ON SHEET C602 & C603
http://www.AECOM.com
27777 Franklin Road, Suite 2150 Southfield, MI 48034 United States
CP 113
CP 114
SB-E
MATCHLINE SHEETS C201 & C401
STORM MANHOLE
RIM 579.44
MATCHLINE SHEETS C202 & C402
STORM MANHOLE
RIM 579.50
579.38
PAVEMENT FAILURE
STA. 0+27.1
150.0'
RUNWAY WIDTH
PAVEMENT FAILURE
STA. 0+13.6
PAVEMENT FAILURE
STA. 0+13.5
PAVEMENT FAILURE
STA. 0+10.4
PAVEMENT FAILURE
STA. 6+74.6
PAVEMENT FAILURE
STA. 6+62.4
KC-J KC-M
KC-K
MILL 6.25" OF ASPHALT
OVERLAY OVER CSB/RCB
(3 LIFTS)
15.2'14.1'
FULL DEPTH REPAIR
AREA NO. 2
STA.6+42.4 - 6+89.6
FULL DEPTH REPAIR AREA
NO. 1 STA. 0-00+35+00
CONTRACTOR TO PROTECT
UNDERLYING STORM SEWER
LINE IN REPAIR AREA
AS
PH
AL
T
SH
OU
LD
ER
AS
PH
AL
T
SH
OU
LD
ER
CONTRACTOR TO PROTECT
SHOULDER OUTSIDE OF
FULL DEPTH REPAIR AREAS,
INCLUDING EDGE LIGHTS/
MANHOLES TYP.
CONTRACTOR TO PROTECT
SHOULDER OUTSIDE OF
FULL DEPTH REPAIR
AREAS, INCLUDING EDGE
LIGHTS/ MANHOLES TYP.
CONTRACTOR TO PROTECT
SHOULDER OUTSIDE OF
FULL DEPTH REPAIR AREAS,
INCLUDING EDGE LIGHTS/
MANHOLES TYP.
CONTRACTOR TO PROTECT
SHOULDER OUTSIDE OF
FULL DEPTH REPAIR
AREAS, INCLUDING EDGE
LIGHTS/ MANHOLES TYP.
CP 113
580.06580.12
580.18 580.08
580.06580.14
580.16 580.06
580.09580.16
580.14 580.03
CP 114
580.07580.10
580.10 580.03
580.05580.13
580.17 580.03
580.02580.18
580.16 580.00
580.06580.06
580.11 580.14
580.12580.08
580.10 580.12
SB-E
MATCHLINE SHEETS C201 & C401
0+00
1+00
1+99
STORM MANHOLE
RIM 579.44
MATCHLINE SHEETS C202 & C402
A
B
D
A
B
D
STORM MANHOLE
RIM 579.50
PAVEMENT FAILURE
STA. 0+27.1
150.0'
RUNWAY WIDTH
PAVEMENT FAILURE
STA. 0+13.6
PAVEMENT FAILURE
STA. 0+13.5
PAVEMENT FAILURE
STA. 0+10.4
PAVEMENT FAILURE
STA. 6+74.6
PAVEMENT FAILURE
STA. 6+62.4
KC-J KC-M
KC-K
0+
0+
1+
1+
2+
2+
3+
3+
4+
4+
5+
5+
6+
6+
7+
7+
8+
8+
9+
15.2'14.1'
LEGEND
UNDERDRAIN
STORM SEWER MANHOLES
SOIL BORING
RWY/TWY EDGE LIGHT
MILL EX. RUNWAY
ASPHALT OVERLAY
KC-X
EXISTING SURVEY
AND
DEMOLITION PLAN
STA. 0+00 - 8+25
C201 Feet
0 100 200
DEMOLITION PLAN
STA. 0+00 - 8+25
EXISTING SURVEY PLAN
STA. 0+00 - 8+25
NORTH
http://www.AECOM.com
27777 Franklin Road, Suite 2150 Southfield, MI 48034 United States
CP 110
STORM MANHOLE
RIM 579.53
CP 111
CP 112
CP 113
MATCHLINE SHEETS C203 & C403
MATCHLINE SHEETS C202 & C402
MATCHLINE SHEETS C201 & C401
BM 6188
579.47
℄ 580.68
℄ 580.71
℄ 580.69
℄ 580.74
℄ 580.71
579.46 ℄ 580.72
MATCHLINE SHEETS C202 & C402
TAXIWAY 'L'
TAXIWAY 'J'
PAVEMENT FAILURE
STA.11+74.4
PAVEMENT FAILURE
STA.12+04.7
KC-I
MILL 6.25" OF ASPHALT
OVERLAY OVER CSB/RCB
(3 LIFTS)
MILL TAXIWAY TO EXISTING PAVEMENT
EDGE FROM 2020 PROJECT
150.0'
RUNWAY WIDTH
15.6'14.3'
SEE SHEET C-701 FOR
TAXIWAY DETAIL
BM 6188
577.79
577.84577.86
578.15
577.80 577.98
577.96 578.29
578.23
578.57
578.50 578.86
578.80
579.37
579.40
579.43579.66
579.72
579.71
579.69
579.68
FULL DEPTH REPAIR AREA
NO. 3 STA. 11+51.9 - 12+27.2
AS
PH
AL
T
SH
OU
LD
ER
AS
PH
AL
T
SH
OU
LD
ER
CONTRACTOR TO PROTECT
SHOULDER OUTSIDE OF FULL
DEPTH REPAIR AREAS,
INCLUDING EDGE LIGHTS/
MANHOLES TYP.
CONTRACTOR TO PROTECT
SHOULDER OUTSIDE OF
FULL DEPTH REPAIR
AREAS, INCLUDING EDGE
LIGHTS/ MANHOLES TYP.
CP 110
580.10 580.10
580.13580.04
580.06 580.23
580.11580.07
580.06 580.11
580.09580.07
580.24 580.07
STORM MANHOLE
RIM 579.53
580.05580.08
580.24 580.10
CP 111
580.09580.08
580.15 580.06
580.09580.10
580.14 580.06
580.04580.11
580.18 580.01
CP 112
CP 113
580.08580.16
580.13 580.06
580.06580.12
580.18 580.08
MATCHLINE SHEETS C203 & C403
MATCHLINE SHEETS C202 & C402
MATCHLINE SHEETS C201 & C401
BM 6188
579.47
℄ 580.68
℄ 580.71
℄ 580.69
℄ 580.74
℄ 580.71
579.46 ℄ 580.72
0+00
1+00
1+99
MATCHLINE SHEETS C202 & C402
D
C
D
C
TAXIWAY 'L'
TAXIWAY 'J'
PAVEMENT FAILURE
STA.11+74.4
PAVEMENT FAILURE
STA.12+04.7
KC-I
8+
9+
9+
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
150.0'
RUNWAY WIDTH
15.6'14.3'
BM 6188
577.79
578.17
577.84577.86
578.15
577.80 577.98
578.21
577.96 578.29
578.46
578.23
578.57
578.62
578.50 578.86
578.92
578.80
579.37
579.40
579.43579.66
579.72
579.71
579.69
579.68
0+00 1+00 2+00 2+50
LEGEND
UNDERDRAIN
STORM SEWER MANHOLES
SOIL BORING
RWY/TWY EDGE LIGHT
MILL EX. RUNWAY
ASPHALT OVERLAY
MILL EX. TAXIWAY
ASPHALT OVERLAY
KC-X
EXISTING SURVEY
AND
DEMOLITION PLAN
STA. 8+25-18+25
C202 Feet
0 100 200
EXISTING SURVEY PLAN
STA. 8+25 - 18+25
DEMOLITION PLAN
STA. 8+25 - 18+25
NORTH
http://www.AECOM.com
27777 Franklin Road, Suite 2150 Southfield, MI 48034 United States
MATCHLINE SHEETS C203 & C403
MATCHLINE SHEETS C202 & C402
MATCHLINE SHEETS C203 & C403
MATCHLINE SHEETS C204 & C404
MILL 6.25" OF ASPHALT
OVERLAY OVER
CSB/RCB (3 LIFTS)
150.0'
RUNWAY WIDTH
15.6'14.3'
AS
PH
AL
T
SH
OU
LD
ER
AS
PH
AL
T
SH
OU
LD
ER
CONTRACTOR TO PROTECT
SHOULDER OUTSIDE OF
FULL DEPTH REPAIR AREAS,
INCLUDING EDGE LIGHTS/
MANHOLES TYP.
CONTRACTOR TO PROTECT
SHOULDER OUTSIDE OF
FULL DEPTH REPAIR
AREAS, INCLUDING EDGE
LIGHTS/ MANHOLES TYP.
580.12580.10
580.09 580.13
580.14580.11
580.10 580.14
CP 107
580.15580.12
580.12 580.17
580.19580.12
580.11 580.14
580.11580.13
580.15 580.13
CP 108
580.14580.15
580.14 580.16
580.11580.14
580.11 580.14
580.12580.12
580.14 580.13
CP 109580.03580.12
580.10 580.08
580.09580.10
580.10 580.10
MATCHLINE SHEETS C203 & C403
MATCHLINE SHEETS C202 & C402
MATCHLINE SHEETS C203 & C403
MATCHLINE SHEETS C204 & C404
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
150.0'
RUNWAY WIDTH
15.6'14.3'
LEGEND
UNDERDRAIN
STORM SEWER MANHOLES
SOIL BORING
RWY/TWY EDGE LIGHT
MILL EX. RUNWAY
ASPHALT OVERLAY
KC-X
C203
EXISTING SURVEY
AND
DEMOLITION PLAN
STA. 18+25 - 28+50
Feet 0 100 200
EXISTING SURVEY PLAN
STA.18+25 - 28+50
DEMOLITION PLAN
STA.18+25 - 28+50
NORTH
http://www.AECOM.com
27777 Franklin Road, Suite 2150 Southfield, MI 48034 United States
MATCHLINE SHEETS C203 & C403
MATCHLINE SHEETS C204 & C404
MATCHLINE SHEETS C204 & C404
MATCHLINE SHEETS C205 & C405
KC-H
MILL 6.25" OF ASPHALT
OVERLAY OVER CSB/RCB
(3 LIFTS)
150.0'
RUNWAY WIDTH
15.4'14.3'
AS
PH
AL
T
SH
OU
LD
ER
AS
PH
AL
T
SH
OU
LD
ER
CONTRACTOR TO PROTECT
SHOULDER OUTSIDE OF
FULL DEPTH REPAIR
AREAS, INCLUDING EDGE
LIGHTS/ MANHOLES TYP.
CONTRACTOR TO PROTECT
SHOULDER OUTSIDE OF
FULL DEPTH REPAIR AREAS,
INCLUDING EDGE LIGHTS/
MANHOLES TYP.
CP 104
580.20580.30
580.29 580.18
580.19580.28
580.28 580.19
580.21580.28
580.27 580.16
580.21580.27
580.24 580.20
CP 105
580.23580.19
580.24 580.18
580.17580.16
580.17 580.16
580.16580.15
580.13 580.17
580.17580.18
580.17 580.10
CP 106
580.17 580.15
580.12 580.14
580.14580.11
580.10 580.14
MATCHLINE SHEETS C203 & C403
MATCHLINE SHEETS C204 & C404
MATCHLINE SHEETS C204 & C404
MATCHLINE SHEETS C205 & C405
KC-H
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
150.0'
RUNWAY WIDTH
15.4'14.3'
LEGEND
UNDERDRAIN
STORM SEWER MANHOLES
SOIL BORING
RWY/TWY EDGE LIGHT
MILL EX. RUNWAY
ASPHALT OVERLAY
KC-X
C204
EXISTING SURVEY
AND
DEMOLITION PLAN
STA. 28+50 - 38+75
Feet 0 100 200
DEMOLITION PLAN
STA. 28+50 - 38+75
EXISTING SURVEY PLAN
STA. 28+50 - 38+75
NORTH
http://www.AECOM.com
27777 Franklin Road, Suite 2150 Southfield, MI 48034 United States
SB-A
SB-B
MATCHLINE SHEETS C204 & C404
MATCHLINE SHEETS C205 & C405
BM 7225
MATCHLINE SHEETS C205 & C405
MATCHLINE SHEETS C206 & C406
TAXIWAY 'H'
MID FIELD ACCESS ROAD
KC-GKC-L
MILL 6.25" OF
ASPHALT OVERLAY
OVER CSB/RCB (3
LIFTS)
MILL TAXIWAY TO EXISTING PAVEMENT
EDGE FROM 2020 PROJECT
150.0'
RUNWAY WIDTH
14.9'14.8'
BM 7225
SEE SHEET C-702 FOR
TAXIWAY DETAIL
MID FIELD ACCESS ROAD
577.80 577.95 578.18 578.46 578.68
579.21
579.43
579.55579.87
579.86
579.84
579.86
579.88
579.91579.64
579.60
579.32
578.85578.64578.40578.13577.90577.80
578.20
AS
PH
AL
T
SH
OU
LD
ER
AS
PH
AL
T
SH
OU
LD
ER
CONTRACTOR TO PROTECT
SHOULDER OUTSIDE OF
FULL DEPTH REPAIR AREAS,
INCLUDING EDGE LIGHTS/
MANHOLES TYP.
CONTRACTOR TO PROTECT
SHOULDER OUTSIDE OF
FULL DEPTH REPAIR
AREAS, INCLUDING EDGE
LIGHTS/ MANHOLES TYP.
CAUTION
APPROX. LOCATION OF COMM.
DUCT BANK, ±60" DEPTH
CAUTION
APPROX. LOCATION OF COMM.
DUCT BANK, ±60" DEPTH
CONTRACTOR TO PROTECT
SHOULDER OUTSIDE OF
FULL DEPTH REPAIR
AREAS, INCLUDING EDGE
LIGHTS/ MANHOLES TYP.
580.39 580.34
580.37580.40
580.34 580.34
580.32580.36
580.35 580.31
CP 102
580.32580.35
580.36 580.36
580.36580.38
580.31 580.32
579.36580.29580.32
580.35 580.30
580.25580.32
580.33 580.26
CP 103580.26580.30
580.29 580.24
580.23580.31
580.27 580.21
580.22580.27
580.26 580.23
580.20580.30
SB-A
SB-B
MATCHLINE SHEETS C204 & C404
MATCHLINE SHEETS C205 & C405
BM 7225
579.59
579.51
℄ 580.94
℄ 580.92
℄ 580.94
℄ 580.92
℄ 580.89
℄ 580.93
℄ 580.91
MATCHLINE SHEETS C205 & C405
MATCHLINE SHEETS C206 & C406
TAXIWAY 'H'
MID FIELD ACCESS ROAD
KC-GKC-L
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
150.0'
RUNWAY WIDTH
14.9'14.8'
CP 200
CP 201
BM 7225
MID FIELD ACCESS ROAD
577.80 577.95 578.18 578.46 578.68
579.21
579.43
579.55579.87
579.86
579.84
579.86
579.88
579.91579.64
579.60
579.32
578.85578.64578.40578.13577.90577.80
578.20 578.27 578.39 578.61 578.81 578.96
579.44
579.52
579.46
0+00 1+00 2+00 2+50
LEGEND
UNDERDRAIN
STORM SEWER MANHOLES
SOIL BORING
RWY/TWY EDGE LIGHT
MILL EX. RUNWAY
ASPHALT OVERLAY
MILL EX. TAXIWAY
ASPHALT OVERLAY
KC-X
C205 Feet
0 100 200
EXISTING SURVEY
AND
DEMOLITION PLAN
STA. 38+75 - 48+75
DEMOLITION PLAN
STA. 38+75 - 48+75
EXISTING SURVEY PLAN
STA. 38+75 - 48+75
NORTH
http://www.AECOM.com
27777 Franklin Road, Suite 2150 Southfield, MI 48034 United States
SB-A
0 58
MATCHLINE SHEETS C205 & C405
MATCHLINE SHEETS C206 & C406
END OF MILL AND OVERLAY
MILL 6.25" OF ASPHALT
OVERLAY OVER CSB/RCB
(3 LIFTS)
150.0'
RUNWAY WIDTH
14.7'15.0'
RUNWAY: 150.00'
(OVERALL WIDTH)
AS
PH
AL
T
SH
OU
LD
ER
AS
PH
AL
T
SH
OU
LD
ER
CONTRACTOR TO PROTECT
SHOULDER OUTSIDE OF
FULL DEPTH REPAIR
AREAS, INCLUDING EDGE
LIGHTS/ MANHOLES TYP.
CONTRACTOR TO PROTECT
SHOULDER OUTSIDE OF
FULL DEPTH REPAIR
AREAS, INCLUDING EDGE
LIGHTS/ MANHOLES TYP.
CP 100
CP 101
580.62580.50
580.57 580.51
580.47580.49
580.44 580.44
580.45580.47
580.48 580.43
580.41580.44
580.44 580.46
580.40580.42
579.92
579.94 579.81
579.86 579.95
580.41 580.42
580.42580.43
580.42 580.38
580.39580.40
580.36 580.37
579.86 579.83
579.95
579.91 579.85
580.38580.38
580.39 580.34
SB-A
0 58
MATCHLINE SHEETS C205 & C405
MATCHLINE SHEETS C206 & C406
END OF MILL AND OVERLAY
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
150.0'
RUNWAY WIDTH
14.7'15.0'
LEGEND
UNDERDRAIN
STORM SEWER MANHOLES
SOIL BORING
RWY/TWY EDGE LIGHT
MILL EX. RUNWAY
ASPHALT OVERLAY
KC-X
C206
EXISTING SURVEY
AND
DEMOLITION PLAN
STA. 48+75 - 57+00
Feet 0 100 200
DEMOLITION PLAN
STA. 48+75 - 57+00
EXISTING SURVEY PLAN
STA. 48+75 - 57+00
NORTH
http://www.AECOM.com
27777 Franklin Road, Suite 2150 Southfield, MI 48034 United States
LEGEND
MILL EX. ASPHALT OVERLAY
ASPHALT
RDM BASE
RUBBILIZED CONCRETE BASE
(RCB)
CEMENT STABILIZED BASE
(CSB)
CROSS SECTION A-A
1.3% - 1.8%1.3% - 1.8%
TYPICAL CROSS SECTION
DETAIL
150.0' WIDTH
MILL 6.25" ASPHALT AND OVERLAY WITH 6.25" ASPHALT
(3 LIFTS) OVER CEMENT STABILIZED BASE
FULL DEPTH REPAIR AREA No. 1
15.0' 15.0'
NTS
NOTES:
1.) EXISTING ASPHALT VARIES FROM 6"-7". EXISTING RUBBILIZED CONCRETE BASE VARIES FROM 10"-18" THICK.
2.) SEE SHEET C602 FOR FULL DEPTH PAVEMENT REPAIR DETAIL.
10"-18" RUBBILIZED CONCRETE
BASE TO REMAIN INTACT
EXISTING GRADE
2" HOT MIX ASPHALT (HMA) COURSE
2" HOT MIX ASPHALT SURFACE LIFT
TO ACHIEVE GRADE AT CENTERLINE
1" MIN. EXISTING ASPHALT TO
REMAIN IN PLACE ABOVE EXISTING
CEMENT STABILIZED BASE AFTER
MILLING PROCESS IF ASPHALT TO
BE MILLED IS GREATER THAN 6.25"
IN DEPTH. MILL TO FULL DEPTH IF
LESS THEN 1" IS REMAINING.
UNDISTURBED
SUBGRADE
TACK COAT APPLIED BETWEEN LAYERS, AS SHOWN
6" CEMENT STABILIZED BASE
2.25" HOT MIX ASPHALT (HMA) COURSE
SHOULDER TO BE
PROTECTED OUTSIDE OF
FULL DEPTH REPAIR AREAS
6"-7" ASPHALT PAVEMENT
1.3% - 1.8%1.3% - 1.8%
MILL 6.25" ASPHALT AND OVERLAY
WITH 6.25" ASPHALT (3 LIFTS) OVER
CEMENT STABILIZED BASE
REPAIR SHOULDER
SEE DETAIL 3, SHEET C603
(TYP. BOTH SIDES)
6" CEMENT
STABILIZED BASE
COMPACTED
RDM BASE
EX. RUBBILIZED
CONCRETE BASE
2 LAYERS OF GEOGRID
CROSS SECTION B-B
CROSS SECTION C-C
1.3% - 1.8%1.3% - 1.8%
FULL DEPTH REPAIR AREA No. 2
FULL DEPTH REPAIR AREA No. 3
NOTES:
1.) EXISTING ASPHALT VARIES FROM 6"-7". EXISTING RUBBILIZED CONCRETE BASE VARIES FROM 10"-18" THICK.
2.) SEE SHEET C602 FOR FULL DEPTH PAVEMENT REPAIR DETAIL.
NOTES:
1.) EXISTING ASPHALT VARIES FROM 6"-7". EXISTING RUBBILIZED CONCRETE BASE VARIES FROM 10"-18" THICK.
2.) SEE SHEET C602 FOR FULL DEPTH PAVEMENT REPAIR DETAIL.
MILL 6.25" ASPHALT AND OVERLAY
WITH 6.25" ASPHALT (3 LIFTS) OVER
CEMENT STABILIZED BASE
REPAIR SHOULDER
SEE DETAIL 3, SHEET C603
(TYP. BOTH SIDES)
6" CEMENT
STABILIZED BASE
COMPACTED
RDM BASE
EX. RUBBILIZED
CONCRETE BASE
2 LAYERS OF GEOGRID
1.3% - 1.8%1.3% - 1.8%
MILL 6.25" ASPHALT AND OVERLAY
WITH 6.25" ASPHALT (3 LIFTS) OVER
CEMENT STABILIZED BASE
6" CEMENT
STABILIZED BASE
COMPACTED
RDM BASE
REPAIR SHOULDER
SEE DETAIL 3, SHEET C603
(TYP. BOTH SIDES)
EX. RUBBILIZED
CONCRETE BASE
2 LAYERS OF GEOGRID
RUNWAY CROSS
SECTIONS
C301 http://www.AECOM.com
27777 Franklin Road, Suite 2150 Southfield, MI 48034 United States
579.16 579.39
0.
0.
579.27
8.
9.
579.41
0.
0.
579.51 579.21579.14
9.
0.
0.
579.36
578.9957 9.
579.32
0.
0.
579.39 579.06579.10
579.36
0.
0.
579.42
8.
9.
579.34
0.
0.
579.47 579.10579.12
579.43
0.
0.
579.34
8.
9.
579.34
0.
0.
579.38 578.99579.18
579.46
0.
0.
579.51
8.
8.
0.
0.
9.
578.98578.94
579.44
0.
0.
579.22
8.
8.
579.26
0.
0.
579.34 579.09578.96
579.35
0.
0.
579.28
8.
8.
579.35
0.
0.
579.38 579.20
579.26
580.10
0.
579.39
579.04 579
579579
ST
OR
M M
AN
HO
LE
RI
M
.4
9.
A B
A B
ST
OR
M
M
AN
HO
LE
RI
M
.5
579.38
KC-J
KC-M
KC-K
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00
PROP. 580.64 PROP. 580.64 PROP. 580.65 PROP. 580.68 PROP. 580.68 PROP. 580.63 PROP. 580.58 PROP. 580.66 PROP. 580.66 PROP. 580.65 PROP. 580.66 PROP. 580.67 PROP. 580.68 PROP. 580.69 PROP. 580.71 PROP. 580.75 PROP. 580.76
EX
./P
R . 5
.6
EX
./P
R . 5
.5
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.5
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
MA
TC
HL
IN
E
SH
EE
T
C4
MA
TC
HL
IN
E
SH
EE
T
C4
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
LEGEND
UNDERDRAIN
STORM SEWER MANHOLES
SOIL BORING
BEACON
MATCHLINE
MILL EX. ASPHALT OVERLAY
ASPHALT
RUBBILIZED CONCRETE BASE
(RCB)
KC-X
RDM BASE
CEMENT STABILIZED BASE
(CSB)
PROPOSED
SITE PLAN AND
PROFILE
STA. 0+00 - 8+25
C401
PROPOSED 150' WIDE 6.25" OF
ASPHALT OVERLAY OVER
CSB/RCB (3 LIFTS)
SITE PLAN
STA. 0+00 - 8+25
PROFILE
STA. 0+00 - 4+50
PROFILE
STA. 4+50 - 8+25
RUNWAY CENTERLINE EXISTING & PROPOSED FINISH
GRADE PROFILE
RUNWAY CENTERLINE EXISTING & PROPOSED FINISH
GRADE PROFILE
N O
R T
H
50 1000
FEET
50 1000
FEET
Feet 0 100 200
PAVEMENT FAILURE
STA. 6+74.6
PAVEMENT FAILURE
STA. 6+62.4
PAVEMENT FAILURE
STA. 0+13.6
PAVEMENT FAILURE
STA. 0+10.4
PAVEMENT FAILURE
STA. 0+13.5 PAVEMENT FAILURE
STA. 0+27.1
ASPHALT SHOULDER
ASPHALT SHOULDER
FULL DEPTH REPAIR
AREA NO. 2 STA.
6+42.4 - 6+89.6
FULL DEPTH
REPAIR AREA NO. 1
STA.0.00 - 0+35.0
CONTRACTOR TO PROTECT UNDERDRAIN
FULL DEPTH
REPAIR AREA NO. 1
STA.0.00 - 0+35.0
FULL DEPTH REPAIR
AREA NO. 2 STA.
6+42.4 - 6+89.6
NOTES:
PER SPEC 32 12 15.13 CONTRACTOR TO PLACE A TEST SECTION FOR
EACH JMF USED PRIOR TO FULL PRODUCTION.
RUNWAY ASPHALT TO BE GROOVED NO EARLIER THAN 30 DAYS AFTER
ASPHALT PAVING TO IMPROVE SKID RESISTANCE AND REDUCE
HYDROPLANING POTENTIAL. REFER TO SHEET C505 FOR GROOVING
DETAILS.
FOR RUNWAY MARKINGS, DETAILS & NOTES, SEE SHEETS C500-C505.
CONTRACTOR IS REQUIRED TO COMPLETE MILLING AND ASPHALT
REPLACEMENT, TEMPORARY BRAVO RUNWAY MARKINGS AND RETURN
MARKINGS TO A TAXIWAY, AND TEMPORARY MARKING OF ASPHALT
SURFACES WITHIN THE DURATION SPECIFIED ON CSPP SHEETS G201
TO G203.
http://www.AECOM.com
27777 Franklin Road, Suite 2150 Southfield, MI 48034 United States
ST
OR
M M
AN
HO
LE
RI
M
.5
MA
TC
HL
IN
E
SH
EE
TS
C
3 & C
MA
TC
HL
IN
E
SH
EE
TS
C
2 & C
MA
TC
HL
IN
E
SH
EE
TS
C
1 & C
BM 6188
9.
.6
.7
.6
.7
.7
9.
.7
0+
1+
1+
579579
MA
TC
HL
IN
E
SH
EE
TS
C
2 & C
D C
D C
KC-I
8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50
PROP. 580.76 PROP. 580.75 PROP. 580.74 PROP. 580.72 PROP. 580.68 PROP. 580.74 PROP. 580.72 PROP. 580.73 PROP. 580.67 PROP. 580.63 PROP. 580.63 PROP. 580.64 PROP. 580.65 PROP. 580.62 PROP. 580.64 PROP. 580.66 PROP. 580.70 PROP. 580.72 PROP. 580.68 PROP. 580.67 PROP. 580.70
BM 6188
7.
7.
7.
8.
7.
7.
7.
8.
8.
8.
8.
8.
8.
9.
9.
9.
9.
9.
9.
9.
9.
0+
1+
2+
2+
MA
TC
HL
IN
E
SH
EE
T
C4
MA
TC
HL
IN
E
SH
EE
T
C4
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.7
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
MA
TC
HL
IN
E
SH
EE
T
C4
MA
TC
HL
IN
E
SH
EE
T
C4
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
LEGEND
UNDERDRAIN
STORM SEWER MANHOLES
SOIL BORING
BEACON
MATCHLINE
MILL EX. ASPHALT OVERLAY
ASPHALT
RUBBILIZED CONCRETE BASE
(RCB)
KC-X
RDM BASE
CEMENT STABILIZED BASE
(CSB)
C402
PROPOSED
SITE PLAN AND
PROFILE
STA. 8+25 - 18+25
PROPOSED 150' WIDE 6.25" OF
ASPHALT OVERLAY OVER
CSB/RCB (3 LIFTS)
RUNWAY: 150.0'
(OVERALL WIDTH)
SITE PLAN
STA. 8+25 - 18+25
PROFILE
STA. 8+25 - 13+00
PROFILE
STA. 13+00 - 18+25
RUNWAY CENTERLINE EXISTING & PROPOSED FINISH
GRADE PROFILE
RUNWAY CENTERLINE EXISTING & PROPOSED FINISH
GRADE PROFILE
Feet 0 100 200
N O
R T
H
50 1000
FEET
50 1000
FEET
PAVEMENT FAILURE
STA. 12+04.7
PAVEMENT FAILURE
STA. 11+74.4
ASPHALT SHOULDER
ASPHALT SHOULDER
FULL DEPTH REPAIR AREA NO. 3
STA. 11+51.9 - 12+27.2
FULL DEPTH REPAIR
AREA NO. 3 STA.
11+51.9 - 12+27.2
SEE SHEET C-701 FOR
TAXIWAY J DETAILSPROPOSED ASPHALT OVERLAY OVER
RIGID CONCRETE PAVEMENT
(VARIABLE DEPTH)
http://www.AECOM.com
27777 Franklin Road, Suite 2150 Southfield, MI 48034 United States P: 248 204 5900 F: 248 204 5901
REPAIR RUNWAY
NOTES:
PER SPEC 32 12 15.13 CONTRACTOR TO PLACE A TEST SECTION FOR
EACH JMF USED PRIOR TO FULL PRODUCTION.
RUNWAY ASPHALT TO BE GROOVED NO EARLIER THAN 30 DAYS AFTER
ASPHALT PAVING TO IMPROVE SKID RESISTANCE AND REDUCE
HYDROPLANING POTENTIAL. REFER TO SHEET C505 FOR GROOVING
DETAILS.
FOR RUNWAY MARKINGS, DETAILS & NOTES, SEE SHEETS C500-C505.
CONTRACTOR IS REQUIRED TO COMPLETE MILLING AND ASPHALT
REPLACEMENT, TEMPORARY BRAVO RUNWAY MARKINGS AND RETURN
MARKINGS TO A TAXIWAY, AND TEMPORARY MARKING OF ASPHALT
SURFACES WITHIN THE DURATION SPECIFIED ON CSPP SHEETS G201
TO G203.
SB-D
MA
TC
HL
IN
E
SH
EE
TS
C
3 & C
MA
TC
HL
IN
E
SH
EE
TS
C
2 & C
MA
TC
HL
IN
E
SH
EE
TS
C
3 & C
MA
TC
HL
IN
E
SH
EE
TS
C
4 & C
SB-F
18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50
PROP. 580.70 PROP. 580.66 PROP. 580.62 PROP. 580.69 PROP. 580.70 PROP. 580.68 PROP. 580.73 PROP. 580.77 PROP. 580.75 PROP. 580.71 PROP. 580.73 PROP. 580.75 PROP. 580.71 PROP. 580.68 PROP. 580.68 PROP. 580.69 PROP. 580.74 PROP. 580.74 PROP. 580.68 PROP. 580.68 PROP. 580.70 PROP. 580.71
MA
TC
HL
IN
E
SH
EE
T
C4
MA
TC
HL
IN
E
SH
EE
T
C4
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.7
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.7
EX
./P
R . 5
.6
MA
TC
HL
IN
E
SH
EE
T
C4
MA
TC
HL
IN
E
SH
EE
T
C4
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.7
EX
./P
R . 5
.7
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
EX
./P
R . 5
.6
LEGEND
UNDERDRAIN
STORM SEWER MANHOLES
SOIL BORING
BEACON
MATCHLINE
MILL EX. ASPHALT OVERLAY
ASPHALT
RUBBILIZED CONCRETE BASE
(RCB)
KC-X
CEMENT STABILIZED BASE
(CSB)
C403
PROPOSED
SITE PLAN AND
PROFILE
STA. 18+25 - 28+50
PROPOSED 150' WIDE 6.25" OF
ASPHALT OVERLAY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .