This document contains a request for information log and related federal contract opportunity solicitation. The request for information log addresses 34 questions from potential offerors relating to clarifications on architectural drawings, specifications, and scope of work for a project providing renovations and additions to an existing fuel cell and corrosion control facility at Building 154. Clarifications provided include confirmation of finishes, equipment, and scope details. The related federal contract opportunity is solicitation number W50S8523B0004 to provide renovations and additions to Building 154 including reconfiguration of administrative spaces, new finishes and fixtures, replacement of storefronts and windows, and phased renovations to hangar bays. Exterior work includes demolition of fuel equipment and pavements as well as site utility and infrastructure upgrades including a new water storage tank and pumping station. The solicitation is issued by the Department of the Army Michigan Army National Guard.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI LOG W50S8523B0004
1. The Key on Drawing A-401 Enlarged Bathroom Plans lists SCD (Seat Cover Dispenser) and DCS (Diaper
Changing Station) but they are not shown on the plans. Please confirm these accessories are not required. (Architectural, Ref: A-401/102813)
a. Confirmed.
2. The Key on Drawing A-401 Enlarged Bathroom Plans lists both SD (soap dish) and LSD (liquid soap dispenser) but the specs call SD a soap dispenser and do not mention a soap dish. Also, in the elevations on drawing A-401, SD (soap dish) is called out but it looks like a soap dispenser. Please confirm whether we are to provide a soap dish or a liquid soap dispenser for the SD tag.
(Architectural, Ref: A-401/102813)
a. Items with the SD tag should be LSD. This will be updated in addendum 1.
3. CLIN 0002 on the Bid Schedule notes that this line item should include costs for the addition to Building B154. Is the intent for all interior work within the footprint of that addition to be priced in CLIN 0002 as well, rather than with the rest of the B154 renovation work priced in CLIN 0001?
(General, Ref: Bid Schedule)
a. . The intent of Line Item two is to capture the footprint of the building additions as being separate from the Bldg. Renovations. The type of funding for the building additions will be different than the type of for the building renovations if the contract is awarded.
4. CLIN 0002 on the Bid Schedule says to include costs for the addition at the NW corner of Building
154. Please confirm costs for the addition at the NE corner of Building 154 are to be included in this line item as well. (General, Ref: Bid Schedule)
a. . That is correct.
5. Please confirm the absence of PFAS and other soil contaminants and that the soil on site can be treated as "clean" soil. (Earthwork, Ref: Geotechnical Report)
a. See Environmental Relocation Guidance Memo dated 24 Oct 2018. PFAS analyte testing will be required for soil intended to be relocated on-base. Contractor is responsible for verifying the data provided in Geotechnical Report. The project site is NOT a documented IRP site.
6. Please provide a finish schedule for Building B158 indicating floor and ceiling finishes. (Architectural, Ref: A-102)
a. On drawing A-102 Keyed Note 4.705 indicates all interior surfaces are to receive paint (PT-1). The keyed note will be revised by addendum to say, “walls and exposed structure to receive paint (PT-1), the floor to be sealed concrete (SC-1), see A-601 for Arch finish schedule”.
7. Drawing A-002 lists several "FA" series drywall partition types but we could not locate any partitions with these tags on the drawings. Please confirm there are no "FA" series partitions on the project.
(Architectural, Ref: A-002)
a. Correct, Note A “Partitions shall be Type “MA8” unless otherwise noted.”
8. Keynote 4.181 shows up on Drawing A-121 but is missing from the Keyed Notes legend. Please provide a description for this keynote. (Architectural, Ref: A-121)
a. The Keyed Note 4.181 description is “FALL PROTECTION EQUIPMENT, REFERENCE STRUCTURAL
DRAWINGS”
9. The tank and concrete pad immediately west of the building are alternately referred to as a fuel equipment pad (C-101), an external solvent tank (A-101), and a jet fuel tank (P-131). Please confirm all of these drawings refer to the same tank, which is the existing jet fuel tank that is to be relocated from the north side of the building to the west side. (Plumbing, Ref: C-101, A-101, P-131)
a. The tank shall be labeled ‘Jet Fuel Tank’ per P-131. Drawings C-101 and A-101 will be updated via addendum 1 to match.
10. There are 3 general notes listed on Drawing A-602 that do not appear on the Door and Hardware Schedule. Please confirm these notes are not used. (Architectural, Ref: A-602)
a. These are general notes for the door schedule. Drawing A-602 will be updated via addendum 1 to identify those which are not used.
11. The current drawings dated December 16th, 2022, and specification section-283176 item- 2.12.3 on page-25, indicated to provide and install Textual Display Signs. Selfridge ANGB has on-site Monaco system that reports directly to SANG Fire Department. This project will be provided with a monitored Monaco System in lieu of the Textual Display Signs. Please clarify if the project will be required to provide & install Textual Display Signs.
a. The text signs will be removed based on feedback received from the government after the project went out for bid.
12. Per ASCE 7-16 code, an embedded shell tank design is prohibited. Section 33 16 15 , 2.1.3.1 states this is a concrete floor with embedded shell starter ring. Please advise. (Civil, Ref: 33 16 15, 2.1.3.1)
a. This RFI has been retracted.
13. Instead of a Glass-fused-to-steel tank, can a Fusion Bond Epoxy coated tank serve as an "equal" alternate? (Civil, Ref: C-508)
a. Glass-fused-to-steel tanks and fusion bonded epoxy coated tanks are manufactured differently and do not have the same long-term performance properties. They would not be considered as an equal alternative.
14. Spec 335610 describes work associated with an underground fuel tank. Drawing PD-101 only indicates relocating an existing 600 above grade tank. Please verify there is no underground fuel storage tank. (Plumbing-Fuel, Ref: 335610)
a. There is no underground fuel storage tank. Specification 33 56 10 will be updated in addendum 1.
15. Drawing P-131 shows 2" fuel supply and return piping. Please provide spec for both the interior and underground fuel piping system. (Plumbing-Fuel, Ref: P-131).
a. Specifications 22 00 00 and 33 56 10 will be modified in addendum 1 to include fuel piping materials.
16. There is no fuel transition sump shown for the underground fuel piping. We assume none is required.
Please verify. (Plumbing-Fuel, Ref: P-131).
a. No fuel transition sump is required.
17. The is nothing indicating a fuel leak detection system. We assume none is required. Please verify.
(Plumbing-Fuel, Ref: P-131).
a. No leak detection is required.
18. There is no fuel control system provided. We assume none is required. Please verify. (Plumbing-Fuel, Ref: P-131)
a. No fuel control system is required.
19. The current fire alarm MNS drawings dated December 16th, 2022 on sheet F-103 don’t indicate a LOC annunciator. The specification section-283176 item- 1.4.3 on page-4 requires providing a LOC annunciator. Please indicate if a LOC annunciator shall be provided per UFC 3-600-01,9-18.4.3.
a. The travel distance for the LOC is 200ft. Since the FMCP is located within 200ft of all parts of the building a dedicated LOC is not required since the FMCP has built in capabilities and is within 200ft.
20. Who will be providing the Qualified Fire Protection Engineer (QFPE)requirements under specification 283176 under items and sections, 1.3.2,1.4., 1.9, 3.1.
a. The contractor is responsible for hiring a QFPE to oversee the installation.
21. Johnson Controls Fire Protection, LP. has been involved with various fire life safety projects at Selfridge Air National Guard - for over twenty (20) years. In our past performances, we have standardized all initiating and notification circuits to be installed class B wiring. The specification section 283176 states to install all fire alarm simplex products are to be installed with class A wiring. Please clarify if the fire alarm devices shall be installed class A or B wiring.
a. Class A wiring is typically utilized for hangar projects, however, new language in UFC 3-600-01 makes it clear Class B is preferred. The drawings and specifications will be updated in addendum 1 to show Class B wiring.
22. Drawing F-103 does show 10 detectors, but that is for the triple coverage required for automatic release of a foam system per UFC 4-211-01. Sundown Policy Change 1 removed the foam and modified this coverage requirement to double coverage. Per spec, 28 31 76 § 3.3.6 Provide a sufficient number of optical flame detectors around the perimeter of the hangar bay, such that all portions of the hangar bay are within the range and cone-of-vision of at least two (2) detectors. Per spec 28 31 76 § 2.22 The detector manufacturer shall determine or approve the detector layout. Det-Tronics has determined that 8 detectors meet the double coverage specified. Please clarify if 8 flame detectors are sufficient for this project and meet the requirements of the specification 283176 and drawings dated December 16th, 2022.
a. The 10-detector layout was provided by the manufacturer during design to meet the Sundown Policy Change 1. If Detronics has provided an updated layout with 8 detectors it is acceptable.
23. Per the specification, section 283176, item 3.8.3 Intelligibility Tests with any CIS testing capabilities in relation to NFPA-72 intelligibility of an emergency communication system is considered acceptable.
Johnson Controls Fire Protection standards now accepts NFPA 72 voice intelligibility applies to all voice messages. Intelligibility measurements are not required in large open areas such as industrial work areas, warehouses, and aircraft servicing areas, garages, and similar facilities. Please clarify if CIS testing procedure will still be part of this scope of work.
a. Yes, CIS testing is still required throughout the facility by UFC 4-211-01 Section 3-6.20.3 and project specifications.
24. As per the attachment current DOD standards call out for ASCE 7-16 for design standards for tank design but in this solicitation, it is calling out for ASCE 7-10 which is from the earlier versions. Please let us know which code needs to be used for Tank design as we need to provide the shop drawings which needs to be signed by a PE.
a. The correct standard for wind loading is ASCE 7-16. Specification section 33 16 15 will be corrected in a forthcoming amendment.
25. Specification 102113 lists the toilet partitions as both overhead braced and ceiling hung. Drawing A- 401 shows only overhead braced partitions. Please verify if they are ceiling hung or overhead braced.
(Architectural, Ref: A-401/102113).
A. Partitions shall be overhead braced. Ceiling mounted should be excluded from the spec, paragraph 3.3.
26. Dwg F-102 general note 2 states to demo existing FP equipment. Please provide a demo drawing indicating the extent and location of FP equipment to be demolished. (Fire Protection, Ref: F-102).
A. It shall be the contractor’s responsibility to identify all the existing fire piping to be removed including existing sprinkler system and existing foam system.
27. Dwg F-102 does not indicate any FP piping to be demolished. Please provide drawing showing demo of existing FP piping. (Fire Protection, Ref: F-102)
A. It shall be the contractor’s responsibility to identify all the existing fire piping to be removed including existing sprinkler system and existing foam system.
28. There are no drawings indicating any ventilation or cooling work at Building 158. We assume none is required. Please verify. (HVAC).
A. There is a unit heater and ductless air system. Refer to M-103.
29. Drawing A-202, detail 3 shows a louver which is tagged as 4.207 (mech eqpt). We assume this is incorrect and that this appears to be an existing louver to be in-filled per A-102, keynote 4.108.
Please verify. (Architectural, Ref: A-202).
A. Refer to M-103.
30. Spec 263215, part 2.1.1 states the generator is 450kw. Drawing E702 shows the generator to be 400kw. We assume 400kw is correct. Please verify. (Electrical, Ref: 263215).
A. 400kW is correct. Specification will be updated in an addendum.
31. There are no security drawings or spec. We assume there is no security work. Please verify.
(Electrical, Ref: Div. 28).
A. Correct.
32. Div 40 includes a spec for process control. Drawing E402 does not show any process control wiring.
Please provide drawing indicating the process control conduit and wiring. (Electrical, Ref: Div. 40).
A. Level sensor conduit and cable requirements are defined in detail 8/E-402. Conduit and cable for thermocouple will be defined in an addendum.
33. Please provide status for network availability in the B158 Fire Pump House. Is there going to be a network drop in this building for contractor to connect to? If not, what is the closest location and would it be contractor's responsibility to pull a cable for access? (Civil – Water Tank)
A. OSP fiber will be provided to a rack in the electrical/comm room to provide network connectivity in B158.
Contractor will be able to connect to a data outlet adjacent to the telecommunications rack.
34. Are there any limitations to the Crane Boom height? (Civil)
A. Will require submitting form FAA 7460-1 for Temporary Construction.
35. Regarding the fire suppression tanks please confirm if 130mph wind gust load is required for any tank structure. Sometimes the building codes are for ”buildings” but not tanks
A. The correct Ultimate Wind Speed is Vult = 116 MPH.
36. Are there any specific forms or breakdowns required?
A. (GENERAL) The contract specifications list the necessary forms and breakdowns. These will be needed for many aspects of the construction project. Please review plans and specifications for full detail
37. (CIVIL) Will asphalt be completed in one mobilization?
A: Awarded contractor will submit for approval.
38. (CIVIL) - Will Concrete curbs be completed in one mobilization?
A: Awarded contractor will submit for approval
39. (GENERAL) - Are there any special security/safety protocols required – Excluding background checks, ID cards and on-site orientations?
A: Awarded contractor will be briefed on OPSEC and will adhere to OSHA, MIOSHA, EM825 as per the contract documents.
40. (FIRE PROTECTION) - Is the water tank part of the Fire Protection scope?
A. Water tank is part of the construction scope.
41. (FIRE PROTECTION) - Are there any other FP demo other than “making safe” for others?
A. See plans and specs
42. (FIRE PROTECTION)- Who is providing piping at the Water Storage Tank?
A. Awarded contractor will perform all requirements of the contract to include provision of the Water Storage Tank.
43. (ARCHITECTURAL) - What is the “Anti-Terrorism” glass spec? Additionally What is the Charge Type, Stand Off and Designed Blast Load (Peak Reflected Pressure/Impulse) required?
A. See drawings and specs
44. (STRUCTURAL) - What is the paint spec required the driven H Piles?
A. See drawings and specs
45. (STRUCTURAL) - Can the metal panels being installed to “match existing” be clarified? The specifications for 07 42 13 calls for Form-insulation Core Wall Panels, but this differs from what is in the drawings.
A. See drawings and specs and representational as built drawing. This drawing is for informational purposes only and is not incorporated into the plans and specs.