Bldg 154 Pre-Bid Conference_Site Visit.pdf

PDF 298 KB Posted

Attached to
VGLZ 162323: ADAL Fuel Cell & Corrosion Control, Bldg. 154
Solicitation number
W50S8523B0004
Issued by

About this file

This document contains a pre-bid meeting agenda and presentation for a federal construction contract opportunity with the Michigan Army National Guard to renovate an aircraft fuel cell and corrosion control facility building at Selfridge Air National Guard Base. Key details include that the project requires renovations to the existing 17,650 square foot facility including new office spaces, hangar bay work in two phases, and site improvements. The construction work includes two additions totaling 1,325 square feet and utility upgrades. The opportunity is a firm fixed price contract valued between $10-25 million with a 480 calendar day performance period after notice to proceed. Sealed bids are due by the date specified and will be publicly opened and awarded to the responsible bidder with the most advantageous price.

View the file

Other files

File Type Posted
W50S8523B0004 OF_1419 page 1.pdf PDF
OF_1419A page 2 of 2 W50S8524B0004.pdf PDF
Bid Opening sign in sheet W50S8523B0004.pdf PDF
VGLZ162323 B154 Addendum 02.pdf PDF
Amendment 5 W50S8523B0004.pdf PDF
W50S8523B0004 Request for Information Log pre bid as of 16 June 23.pdf PDF
RFI 45 answer 17 of 33 A7 Wall Section Details.pdf PDF
W50S8523B0004 Request for Information Log pre bid as of 14 June 23.pdf PDF
VGLZ162323 B154 Addendum 01.pdf PDF
RFI LOG pre bid W50S8523B0004 ADAL Bldg 154.pdf PDF
Amendment 3 W50S8523B004.pdf PDF
Amendment 2 W50S8523B0004.pdf PDF
4 May Pre bid Conference Sign in Sheet.pdf PDF
W50S8523B0004 Amendment 1.pdf PDF
VGLZ 162323- Brand Name Justification - Automated Logic (under SAT).pdf PDF
221216_Vol 1 of 4 Specifications_Selfridge ADAL B154_B3 Final HEF Mod.pdf PDF
VGLZ162323 - SOW - ADAL Fuel Cell and Corrosion Control.pdf PDF
127 SFS Vetted Form 2021.xlsx XLSX spreadsheet
VGLZ 162323- Brand Name Justification - Marshall_LOCKS.pdf PDF
VGLZ 162323- Brand Name Justification - Advantor (under SAT).pdf PDF
COMPLETE SET DRAWAINGS Project VGLZ162323 ADAL Fuel Cell and Corrosion.pdf PDF
221216_Vol 2 of 4 Specifications_Selfridge ADAL B154_B3 Final HEF Mod.pdf PDF
W50S8523B0004.pdf PDF
Source ID Docs SANGB MI.pdf PDF
221216_Vol 3 of 4 Specifications_Selfridge ADAL B154_B3 Final HEF Mod.pdf PDF
VGLZ162323 - Brand Name Justification - Simplex (Control No. 2023-01).pdf PDF
221216_Vol 4 of 4 Specifications_Selfridge ADAL B154_B3 Final HEF Mod.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Integrity – Excellence – Service

Selfridge ANG Base Pre-Bid Submission Meeting and Site Visit

• Project #VGLZ 162323: ADAL Fuel Cell and Corrosion Bldg. 154 4 May 2023

Agenda

• Admin Maters/Contact info

• Process for Questions and Answers (Requests for Information)

• Project Overview

• Notable Items

• Bid Schedule

• Sealed Bid Requirements and procedures for submission of bids

• Determination of Responsibility

• Small Business Subcontracting Plan

• Questions

Administrative Matters - Attendance Roster

• Ensure you sign the attendance roster

• We plan to post the roster and this power point presentation on https://sam.gov to facilitate communication amongst potential suppliers and subcontractors.

• No other site visits will be granted.

Contact Information

• Contracting Officer Mr. Jeremy Starrett jeremy.starrett.1@us.af.mil

• Contracting Specialist Mr. Steven Stocking steven.stocking@us.af.mil mailto:jeremy.starrett.1@us.af.mil mailto:steven.stocking@us.af.mil

Process for Questions and Answers

• Submit questions (aka Requests for Information) to Steven Stocking.

See Section 00100 for instructions.

• Questions and Answers will be posted on SAM.gov on a non attributional basis with solicitation at https://sam.gov

• Submit questions not later than the fifth working day prior to bid opening.

• Any changes to the drawings, specifications, etc. will be issued in the form of an amendment. However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment.

https://sam.gov/

Project Overview

• Title: ADAL Fuel Cell & Corrosion Control Bldg. 154

• Project #:VGLZ 162323

• Magnitude: $10M-$25M

• A firm fixed price contract will be awarded

• Performance Period: 480 calendar Days after issuance of Notice to Proceed.

• The Notice to Proceed will be issued after formal approval of payment and performance bonds.

Project Overview

Project requirements include:

• This project will provide a renovation to the facility, with small additions to the office area to provide enhanced support areas/offices. The first phase will renovate the east bay while maintaining operability of the west bay, with the second phase renovating the west bay after the east bay is operational.

• The exterior work for this project will include the demolition of the existing concrete containment area, Jet Fuel JP-8 equipment, landscape, asphalt and concrete pavement, and utilities, including sanitary sewer, water main, storm sewer, and electrical equipment

• Utility improvements include relocated sanitary sewer lines, relocated storm sewer mains, and a new fire protection water main line. A new oil-water separator will replace the existing system located near the northeast corner of the existing system. A new 54 ft tall/300,000-gallon prefabricated steel water storage tank and a pumping station will be built to supply water for fire suppression to future renovated and constructed Hangars 3, 4, and 5 and Building 154

Notable Items

Brand Name Requirements:

1. Automated Logic Corporation Direct Digital Controls

2. Simplex Fire Alarm Detection and Alarm with Mass Notification

3. Advantor Security System

4. Marshall Best Security (MBS) Corporation's YB series keys and core

Bid Schedule

• CLIN 0001 – SRM renovation H154

• CLIN 0002 – Minor Construction of a pump house (B158) and water tank will provide fire suppression to facility systems at B154, and Hangars 3, 4, and 5, and associated infrastructure to support these systems. Also,approximately 1325 SF of additional construction will be added to the existingB154, onto the NW corner of the building.

Statatory cost limitiation: not to exceed $2.0 Million

Sealed Bid Procedures

The following is a brief overview of the sealed bid requirements:

• BIDDERS ARE STRONLY CAUTIONED TO CAREFULLY READ THE

REQUIREMENTS OF THE SOLICIATION AND COMPLY ACCORDINGLY

REFER TO THE SOLICITATION AND FAR 14 FOR DETAILS.

• Public bid opening occurs. Prices are read to the public. There will be no discussion.

• Bidders must submit sealed bids to be opened at the time and place stated int the solicitation for the public opening of bids

• After bids are publicly opened an award will be made to that responsible bidder whose bid conforming to the IFB will be most advantageous to the Government considering only price and price related factors.

• The bid abstract will be certified and posted on SAM.gov as soon as practicable.

Bid Requirements

• SF 1442, (Blocks 14-20c)-Do not enter less than 120 days in block 17

• Section 00010. Bid Schedule—all items must be priced.

• IAW Clause 252.236-7008, Contract Prices-Bidding Schedules (Dec

1991) the prices shown in the bidding schedule must reflect ALL COSTS involved in performing the work, as described in the plans and specifications.

• Section 00600 Reps and Certs: In addition, the bidder must have entered current and complete data within the past year via the Online Representatives and Certifications at https://sam.gov

• Acknowledge all amendments issued on an SF 30 on page 2 of SF1442 and/or by providing signed SF 30s with bid.

• Bid Bond/Guarantee shall be 20% of the complete bid price and be issued the most recent edition of the SF 24 with a complete power of attorney.

http://www.sam.gov/

Bid Requirements-Bid Submission

• The bid opening will occur at the date and time specified on Block 13 of the SF 1442 at Selfridge Air National Guard Base, MI Bldg. 105

• Hand carried bids must be dropped off prior to the time established for the opening of bids. A Base access form must be generated for individuals attending the bid opening or to drop off bids.

• Mailed bids must be received at the location specified on block 7 prior to the time established for opening of bids.

• Mailing address:

USPFO MI 127 MISSION SUPPORT CONTRACTING

43200 MAPLE ST

SELFRIDGE ANGB MI 48045-5213

• Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304 and the clause at FAR 52.214-7

Determination of Responsibility

• IMPORTANT: REFER TO THE SOLICIATATION AND FAR

PART 9 FOR DETAILS

• To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.

Subcontracting Plan

• A Subcontracting Plan will be required of the apparent low bidder if they are a Large Business. The small business subcontracting plan will be requested by the Contracting Officer after the public bid opening. If required, Bidders shall prepare and submit their subcontracting plan in accordance with FAR Clause 52.219-9 Alt I and DFARS Clause 252.219-7003.

• The National Guard Bureau Subcontracting Goals for use in development of your plan are as follows: Small Business, 32%; Small Disadvantaged Business 5%; Woman-owned Small Business 6.9%; Service-Disabled Veteran Owned Business 4% and HUBZone 3%.

• Submit the Small Business Subcontracting Plan in a format to accommodate evaluation in accordance with AFARS 5119.705. In accordance with FAR 19.7, “The small business subcontracting Program” and FAR clause 52.219-9 (Small Business Subcontracting Plan), subcontracting plans shall be evaluated for acceptability by the contracting team using the criteria set forth in AFARS Appendix DD-Subcontracting Plan Evaluation Guide that can be found at https://www.acquisition.gov/content/regulations . Subcontracting goals shall be consistent with NGB goals unless non-consistency is well justified. Goals must be challenging but achievable. To be acceptable the plan must adequately address the required statutory elements.

https://www.acquisition.gov/content/regulations

Questions?

Questions will not be answered at the site visit. Please ensure that the Request for Information process is utilized.

Selfridge ANG Base�Pre-Bid Submission Meeting and Site Visit
Agenda
Administrative Matters -�Attendance Roster
Contact Information
Process for Questions and Answers
Project Overview
Project Overview
Notable Items
Bid Schedule
Sealed Bid Procedures
Bid Requirements
Bid Requirements-Bid Submission
Determination of Responsibility
Subcontracting Plan
Questions?