This document contains a pre-bid meeting agenda and presentation for a federal construction contract opportunity with the Michigan Army National Guard to renovate an aircraft fuel cell and corrosion control facility building at Selfridge Air National Guard Base. Key details include that the project requires renovations to the existing 17,650 square foot facility including new office spaces, hangar bay work in two phases, and site improvements. The construction work includes two additions totaling 1,325 square feet and utility upgrades. The opportunity is a firm fixed price contract valued between $10-25 million with a 480 calendar day performance period after notice to proceed. Sealed bids are due by the date specified and will be publicly opened and awarded to the responsible bidder with the most advantageous price.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Integrity – Excellence – Service
Selfridge ANG Base Pre-Bid Submission Meeting and Site Visit
• Project #VGLZ 162323: ADAL Fuel Cell and Corrosion Bldg. 154 4 May 2023
Agenda
• Admin Maters/Contact info
• Process for Questions and Answers (Requests for Information)
• Project Overview
• Notable Items
• Bid Schedule
• Sealed Bid Requirements and procedures for submission of bids
• Determination of Responsibility
• Small Business Subcontracting Plan
• Questions
Administrative Matters - Attendance Roster
• Ensure you sign the attendance roster
• We plan to post the roster and this power point presentation on https://sam.gov to facilitate communication amongst potential suppliers and subcontractors.
• No other site visits will be granted.
Contact Information
• Contracting Officer Mr. Jeremy Starrett jeremy.starrett.1@us.af.mil
• Contracting Specialist Mr. Steven Stocking steven.stocking@us.af.mil mailto:jeremy.starrett.1@us.af.mil mailto:steven.stocking@us.af.mil
Process for Questions and Answers
• Submit questions (aka Requests for Information) to Steven Stocking.
See Section 00100 for instructions.
• Questions and Answers will be posted on SAM.gov on a non attributional basis with solicitation at https://sam.gov
• Submit questions not later than the fifth working day prior to bid opening.
• Any changes to the drawings, specifications, etc. will be issued in the form of an amendment. However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment.
https://sam.gov/
Project Overview
• Title: ADAL Fuel Cell & Corrosion Control Bldg. 154
• Project #:VGLZ 162323
• Magnitude: $10M-$25M
• A firm fixed price contract will be awarded
• Performance Period: 480 calendar Days after issuance of Notice to Proceed.
• The Notice to Proceed will be issued after formal approval of payment and performance bonds.
Project Overview
Project requirements include:
• This project will provide a renovation to the facility, with small additions to the office area to provide enhanced support areas/offices. The first phase will renovate the east bay while maintaining operability of the west bay, with the second phase renovating the west bay after the east bay is operational.
• The exterior work for this project will include the demolition of the existing concrete containment area, Jet Fuel JP-8 equipment, landscape, asphalt and concrete pavement, and utilities, including sanitary sewer, water main, storm sewer, and electrical equipment
• Utility improvements include relocated sanitary sewer lines, relocated storm sewer mains, and a new fire protection water main line. A new oil-water separator will replace the existing system located near the northeast corner of the existing system. A new 54 ft tall/300,000-gallon prefabricated steel water storage tank and a pumping station will be built to supply water for fire suppression to future renovated and constructed Hangars 3, 4, and 5 and Building 154
Notable Items
Brand Name Requirements:
1. Automated Logic Corporation Direct Digital Controls
2. Simplex Fire Alarm Detection and Alarm with Mass Notification
3. Advantor Security System
4. Marshall Best Security (MBS) Corporation's YB series keys and core
Bid Schedule
• CLIN 0001 – SRM renovation H154
• CLIN 0002 – Minor Construction of a pump house (B158) and water tank will provide fire suppression to facility systems at B154, and Hangars 3, 4, and 5, and associated infrastructure to support these systems. Also,approximately 1325 SF of additional construction will be added to the existingB154, onto the NW corner of the building.
Statatory cost limitiation: not to exceed $2.0 Million
Sealed Bid Procedures
The following is a brief overview of the sealed bid requirements:
• BIDDERS ARE STRONLY CAUTIONED TO CAREFULLY READ THE
REQUIREMENTS OF THE SOLICIATION AND COMPLY ACCORDINGLY
REFER TO THE SOLICITATION AND FAR 14 FOR DETAILS.
• Public bid opening occurs. Prices are read to the public. There will be no discussion.
• Bidders must submit sealed bids to be opened at the time and place stated int the solicitation for the public opening of bids
• After bids are publicly opened an award will be made to that responsible bidder whose bid conforming to the IFB will be most advantageous to the Government considering only price and price related factors.
• The bid abstract will be certified and posted on SAM.gov as soon as practicable.
Bid Requirements
• SF 1442, (Blocks 14-20c)-Do not enter less than 120 days in block 17
• Section 00010. Bid Schedule—all items must be priced.
• IAW Clause 252.236-7008, Contract Prices-Bidding Schedules (Dec
1991) the prices shown in the bidding schedule must reflect ALL COSTS involved in performing the work, as described in the plans and specifications.
• Section 00600 Reps and Certs: In addition, the bidder must have entered current and complete data within the past year via the Online Representatives and Certifications at https://sam.gov
• Acknowledge all amendments issued on an SF 30 on page 2 of SF1442 and/or by providing signed SF 30s with bid.
• Bid Bond/Guarantee shall be 20% of the complete bid price and be issued the most recent edition of the SF 24 with a complete power of attorney.
http://www.sam.gov/
Bid Requirements-Bid Submission
• The bid opening will occur at the date and time specified on Block 13 of the SF 1442 at Selfridge Air National Guard Base, MI Bldg. 105
• Hand carried bids must be dropped off prior to the time established for the opening of bids. A Base access form must be generated for individuals attending the bid opening or to drop off bids.
• Mailed bids must be received at the location specified on block 7 prior to the time established for opening of bids.
• Mailing address:
USPFO MI 127 MISSION SUPPORT CONTRACTING
43200 MAPLE ST
SELFRIDGE ANGB MI 48045-5213
• Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304 and the clause at FAR 52.214-7
Determination of Responsibility
• IMPORTANT: REFER TO THE SOLICIATATION AND FAR
PART 9 FOR DETAILS
• To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.
Subcontracting Plan
• A Subcontracting Plan will be required of the apparent low bidder if they are a Large Business. The small business subcontracting plan will be requested by the Contracting Officer after the public bid opening. If required, Bidders shall prepare and submit their subcontracting plan in accordance with FAR Clause 52.219-9 Alt I and DFARS Clause 252.219-7003.
• The National Guard Bureau Subcontracting Goals for use in development of your plan are as follows: Small Business, 32%; Small Disadvantaged Business 5%; Woman-owned Small Business 6.9%; Service-Disabled Veteran Owned Business 4% and HUBZone 3%.
• Submit the Small Business Subcontracting Plan in a format to accommodate evaluation in accordance with AFARS 5119.705. In accordance with FAR 19.7, “The small business subcontracting Program” and FAR clause 52.219-9 (Small Business Subcontracting Plan), subcontracting plans shall be evaluated for acceptability by the contracting team using the criteria set forth in AFARS Appendix DD-Subcontracting Plan Evaluation Guide that can be found at https://www.acquisition.gov/content/regulations . Subcontracting goals shall be consistent with NGB goals unless non-consistency is well justified. Goals must be challenging but achievable. To be acceptable the plan must adequately address the required statutory elements.
https://www.acquisition.gov/content/regulations
Questions?
Questions will not be answered at the site visit. Please ensure that the Request for Information process is utilized.
| Selfridge ANG Base�Pre-Bid Submission Meeting and Site Visit |
| Agenda |
| Administrative Matters -�Attendance Roster |
| Contact Information |
| Process for Questions and Answers |
| Project Overview |
| Project Overview |
| Notable Items |
| Bid Schedule |
| Sealed Bid Procedures |
| Bid Requirements |
| Bid Requirements-Bid Submission |
| Determination of Responsibility |
| Subcontracting Plan |
| Questions? |