This document contains a request for information (RFI) log and related federal contract opportunity for renovations and additions to Building 154 at Selfridge Air National Guard Base.

The RFI log addresses questions from prospective bidders regarding specifications, drawings and requirements for the project. Issues addressed include required bathroom accessories, soap dispenser specifications, pricing separate additions and renovations work in the bid schedule, and clarifying references to relocating a jet fuel tank. The related federal contract opportunity is solicitation number W50S8523B0004 for renovations to the fuel cell and corrosion control facility including construction of two additions totaling 1,325 square feet, reconfiguration of existing space, site improvements including utility relocations and pavement replacement, and installation of a new 300,000 gallon water storage tank and pumping station to supply fire suppression to buildings. The opportunity is with the Department of the Army Michigan Army National Guard for renovations and upgrades to support aircraft operations at the base.

View the file

Other files

File Type Posted
W50S8523B0004 OF_1419 page 1.pdf PDF
OF_1419A page 2 of 2 W50S8524B0004.pdf PDF
Bid Opening sign in sheet W50S8523B0004.pdf PDF
VGLZ162323 B154 Addendum 02.pdf PDF
Amendment 5 W50S8523B0004.pdf PDF
W50S8523B0004 Request for Information Log pre bid as of 16 June 23.pdf PDF
RFI 45 answer 17 of 33 A7 Wall Section Details.pdf PDF
W50S8523B0004 Request for Information Log pre bid as of 14 June 23.pdf PDF
VGLZ162323 B154 Addendum 01.pdf PDF
Amendment 3 W50S8523B004.pdf PDF
Amendment 2 W50S8523B0004.pdf PDF
Bldg 154 Pre-Bid Conference_Site Visit.pdf PDF
4 May Pre bid Conference Sign in Sheet.pdf PDF
W50S8523B0004 Amendment 1.pdf PDF
VGLZ 162323- Brand Name Justification - Automated Logic (under SAT).pdf PDF
221216_Vol 1 of 4 Specifications_Selfridge ADAL B154_B3 Final HEF Mod.pdf PDF
VGLZ162323 - SOW - ADAL Fuel Cell and Corrosion Control.pdf PDF
127 SFS Vetted Form 2021.xlsx XLSX spreadsheet
VGLZ 162323- Brand Name Justification - Marshall_LOCKS.pdf PDF
VGLZ 162323- Brand Name Justification - Advantor (under SAT).pdf PDF
COMPLETE SET DRAWAINGS Project VGLZ162323 ADAL Fuel Cell and Corrosion.pdf PDF
221216_Vol 2 of 4 Specifications_Selfridge ADAL B154_B3 Final HEF Mod.pdf PDF
W50S8523B0004.pdf PDF
Source ID Docs SANGB MI.pdf PDF
221216_Vol 3 of 4 Specifications_Selfridge ADAL B154_B3 Final HEF Mod.pdf PDF
VGLZ162323 - Brand Name Justification - Simplex (Control No. 2023-01).pdf PDF
221216_Vol 4 of 4 Specifications_Selfridge ADAL B154_B3 Final HEF Mod.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI LOG W50S8523B0004

1. The Key on Drawing A-401 Enlarged Bathroom Plans lists SCD (Seat Cover Dispenser) and DCS (Diaper

Changing Station) but they are not shown on the plans. Please confirm these accessories are not required. (Architectural, Ref: A-401/102813)

a. Confirmed.

2. The Key on Drawing A-401 Enlarged Bathroom Plans lists both SD (soap dish) and LSD (liquid soap dispenser) but the specs call SD a soap dispenser and do not mention a soap dish. Also, in the elevations on drawing A-401, SD (soap dish) is called out but it looks like a soap dispenser. Please confirm whether we are to provide a soap dish or a liquid soap dispenser for the SD tag.

(Architectural, Ref: A-401/102813)

a. Items with the SD tag should be LSD. This will be updated in addendum 1.

3. CLIN 0002 on the Bid Schedule notes that this line item should include costs for the addition to Building B154. Is the intent for all interior work within the footprint of that addition to be priced in CLIN 0002 as well, rather than with the rest of the B154 renovation work priced in CLIN 0001?

(General, Ref: Bid Schedule)

a. The intent of Line Item two is to capture the footprint of the building additions as being separate from the Bldg. Renovations. The type of funding for the building additions will be different than the type of for the building renovations if the contract is awarded.

4. CLIN 0002 on the Bid Schedule says to include costs for the addition at the NW corner of Building

154. Please confirm costs for the addition at the NE corner of Building 154 are to be included in this line item as well. (General, Ref: Bid Schedule)

a. That is correct.

5. Please confirm the absence of PFAS and other soil contaminants and that the soil on site can be treated as "clean" soil. (Earthwork, Ref: Geotechnical Report)

a. See Environmental Relocation Guidance Memo dated 24 Oct 2018. PFAS analyte testing will be required for soil intended to be relocated on-base. Contractor is responsible for verifying the data provided in Geotechnical Report. The project site is NOT a documented IRP site.

6. Please provide a finish schedule for Building B158 indicating floor and ceiling finishes. (Architectural, Ref: A-102)

a. On drawing A-102 Keyed Note 4.705 indicates all interior surfaces are to receive paint (PT-1). The keyed note will be revised by addendum to say, “walls and exposed structure to receive paint (PT-1), the floor to be sealed concrete (SC-1), see A-601 for Arch finish schedule”.

7. Drawing A-002 lists several "FA" series drywall partition types but we could not locate any partitions with these tags on the drawings. Please confirm there are no "FA" series partitions on the project.

(Architectural, Ref: A-002)

a. Correct, Note A “Partitions shall be Type “MA8” unless otherwise noted.”

8. Keynote 4.181 shows up on Drawing A-121 but is missing from the Keyed Notes legend. Please provide a description for this keynote. (Architectural, Ref: A-121)

a. The Keyed Note 4.181 description is “FALL PROTECTION EQUIPMENT, REFERENCE STRUCTURAL

DRAWINGS”

9. The tank and concrete pad immediately west of the building are alternately referred to as a fuel equipment pad (C-101), an external solvent tank (A-101), and a jet fuel tank (P-131). Please confirm all of these drawings refer to the same tank, which is the existing jet fuel tank that is to be relocated from the north side of the building to the west side. (Plumbing, Ref: C-101, A-101, P-131)

a. The tank shall be labeled ‘Jet Fuel Tank’ per P-131. Drawings C-101 and A-101 will be updated via addendum 1 to match.

10. There are 3 general notes listed on Drawing A-602 that do not appear on the Door and Hardware Schedule. Please confirm these notes are not used. (Architectural, Ref: A-602)

a. These are general notes for the door schedule. Drawing A-602 will be updated via addendum 1 to identify those which are not used.

11. The current drawings dated December 16th, 2022, and specification section-283176 item- 2.12.3 on page-25, indicated to provide and install Textual Display Signs. Selfridge ANGB has on-site Monaco system that reports directly to SANG Fire Department. This project will be provided with a monitored Monaco System in lieu of the Textual Display Signs. Please clarify if the project will be required to provide & install Textual Display Signs.

a. The text signs will be removed based on feedback received from the government after the project went out for bid.

12. Per ASCE 7-16 code, an embedded shell tank design is prohibited. Section 33 16 15 , 2.1.3.1 states this is a concrete floor with embedded shell starter ring. Please advise. (Civil, Ref: 33 16 15, 2.1.3.1)

a. This RFI has been retracted.

13. Instead of a Glass-fused-to-steel tank, can a Fusion Bond Epoxy coated tank serve as an "equal" alternate? (Civil, Ref: C-508)

a. Glass-fused-to-steel tanks and fusion bonded epoxy coated tanks are manufactured differently and do not have the same long-term performance properties. They would not be considered as an equal alternative.

14. Spec 335610 describes work associated with an underground fuel tank. Drawing PD-101 only indicates relocating an existing 600 above grade tank. Please verify there is no underground fuel storage tank. (Plumbing-Fuel, Ref: 335610)

a. There is no underground fuel storage tank. Specification 33 56 10 will be updated in addendum 1.

15. Drawing P-131 shows 2" fuel supply and return piping. Please provide spec for both the interior and underground fuel piping system. (Plumbing-Fuel, Ref: P-131).

a. Specifications 22 00 00 and 33 56 10 will be modified in addendum 1 to include fuel piping materials.

16. There is no fuel transition sump shown for the underground fuel piping. We assume none is required.

Please verify. (Plumbing-Fuel, Ref: P-131).

a. No fuel transition sump is required.

17. The is nothing indicating a fuel leak detection system. We assume none is required. Please verify.

(Plumbing-Fuel, Ref: P-131).

a. No leak detection is required.

18. There is no fuel control system provided. We assume none is required. Please verify. (Plumbing-Fuel, Ref: P-131)

a. No fuel control system is required.

19. The current fire alarm MNS drawings dated December 16th, 2022 on sheet F-103 don’t indicate a LOC annunciator. The specification section-283176 item- 1.4.3 on page-4 requires providing a LOC annunciator. Please indicate if a LOC annunciator shall be provided per UFC 3-600-01,9-18.4.3.

a. The travel distance for the LOC is 200ft. Since the FMCP is located within 200ft of all parts of the building a dedicated LOC is not required since the FMCP has built in capabilities and is within 200ft.

20. Who will be providing the Qualified Fire Protection Engineer (QFPE)requirements under specification 283176 under items and sections, 1.3.2,1.4., 1.9, 3.1.

a. The contractor is responsible for hiring a QFPE to oversee the installation.

21. Johnson Controls Fire Protection, LP. has been involved with various fire life safety projects at Selfridge Air National Guard - for over twenty (20) years. In our past performances, we have standardized all initiating and notification circuits to be installed class B wiring. The specification section 283176 states to install all fire alarm simplex products are to be installed with class A wiring.

Please clarify if the fire alarm devices shall be installed class A or B wiring.

a. Class A wiring is typically utilized for hangar projects, however, new language in UFC 3-600-01 makes it clear Class B is preferred. The drawings and specifications will be updated in addendum 1 to show Class B wiring.

22. Drawing F-103 does show 10 detectors, but that is for the triple coverage required for automatic release of a foam system per UFC 4-211-01. Sundown Policy Change 1 removed the foam and modified this coverage requirement to double coverage. Per spec, 28 31 76 § 3.3.6 Provide a sufficient number of optical flame detectors around the perimeter of the hangar bay, such that all portions of the hangar bay are within the range and cone-of-vision of at least two (2) detectors. Per spec 28 31 76 § 2.22 The detector manufacturer shall determine or approve the detector layout. Det- Tronics has determined that 8 detectors meet the double coverage specified. Please clarify if 8 flame detectors are sufficient for this project and meet the requirements of the specification 283176 and drawings dated December 16th, 2022.

a. The 10 detector layout was provided by the manufacturer during design to meet the Sundown Policy Change 1. If Detronics has provided an updated layout with 8 detectors it is acceptable.

However, the latest Sundown Document removes the requirement for flame detection therefore it is recommended that the base remove the system since it has a high cost and is no longer required.

23. Per the specification, section 283176, item 3.8.3 Intelligibility Tests with any CIS testing capabilities in relation to NFPA-72 intelligibility of an emergency communication system is considered acceptable.

Johnson Controls Fire Protection standards now accepts NFPA 72 voice intelligibility applies to all voice messages. Intelligibility measurements are not required in large open areas such as industrial work areas, warehouses, and aircraft servicing areas, garages, and similar facilities. Please clarify if CIS testing procedure will still be part of this scope of work.

a. Yes, CIS testing is still required throughout the facility by UFC 4-211-01 Section 3-6.20.3 and project specifications.

24. As per the attachment current DOD standards call out for ASCE 7-16 for design standards for tank design but in this solicitation, it is calling out for ASCE 7-10 which is from the earlier versions. Please let us know which code needs to be used for Tank design as we need to provide the shop drawings which needs to be signed by a PE.

25. Specification 102113 lists the toilet partitions as both overhead braced and ceiling hung. Drawing A- 401 shows only overhead braced partitions. Please verify if they are ceiling hung or overhead braced.

(Architectural, Ref: A-401/102113).

A. Partitions shall be overhead braced. Ceiling mounted should be excluded from the spec, paragraph 3.3.

26. Dwg F-102 general note 2 states to demo existing FP equipment. Please provide a demo drawing indicating the extent and location of FP equipment to be demolished. (Fire Protection, Ref: F-102).

A.

27. Dwg F-102 does not indicate any FP piping to be demolished. Please provide drawing showing demo of existing FP piping. (Fire Protection, Ref: F-102)

28. There are no drawings indicating any ventilation or cooling work at Building 158. We assume none is required. Please verify. (HVAC).

A. There is a unit heater and ductless air system. Refer to M-103.

29. Drawing A-202, detail 3 shows a louver which is tagged as 4.207 (mech eqpt). We assume this is incorrect and that this appears to be an existing louver to be in-filled per A-102, keynote 4.108.

Please verify. (Architectural, Ref: A-202).

A. Refer to M-103.

30. Spec 263215, part 2.1.1 states the generator is 450kw. Drawing E702 shows the generator to be 400kw. We assume 400kw is correct. Please verify. (Electrical, Ref: 263215).

31. There are no security drawings or spec. We assume there is no security work. Please verify.

(Electrical, Ref: Div. 28).

A. Correct.

32. Div 40 includes a spec for process control. Drawing E402 does not show any process control wiring.

Please provide drawing indicating the process control conduit and wiring. (Electrical, Ref: Div. 40).

33. Please provide status for network availability in the B158 Fire Pump House. Is there going to be a network drop in this building for contractor to connect to? If not, what is the closest location and would it be contractor's responsibility to pull a cable for access? (Civil – Water Tank)

34. Are there any limitations to the Crane Boom height? (Civil)

A. Will require submitting form FAA 7460-1 for Temporary Construction.

35. Regarding the fire suppression tanks please confirm if 130mph wind gust load is required for any tank structure. Sometimes the building codes are for ”buildings” but not tanks