B632_Addendum_1_Narrative_20260811.pdf
PDF 109 KB Posted
- Attached to
- Repair B632, Fire Suppression and Hangar Door
- Solicitation number
- W50S7T26BA004
About this file
This is an addendum to specifications and drawings for the 182nd Airlift Wing, Peoria Air National Guard Building 632 Repair of Fire Suppression and Hangar Doors contract, issued August 7, 2026.
The addendum makes multiple specification revisions across several sections. In Section 05 12 00, two ASTM references (F1136/F1136M and F2833) are deleted. Section 05 50 13 undergoes substantial revisions, including deletion of seven welding and aluminum-related standards (AA DAF45, AWS D1.2/D1.2M, ASTM B26/B26M, B108/B108M, B209/B209M, B221, B221M), complete removal of welder qualification requirements, deletion of aluminum alloy product specifications, removal of aluminum surface treatment paragraphs, and deletion of the second sentence in the Dissimilar Metals section. Similar aluminum and welding-related deletions apply to Section 05 50 33. Section 08 34 16.20 removes requirements for belt/wire rope system specifications and backup door operation procedures. Section 26 32 15 changes the engine-generator frequency parameter from 50 Hz to 60 Hz. New requirements are added to Section 26 36 23 for a camlock docking station assembly supporting full-capacity portable load bank testing at 1200A, 480V, 3-phase, with NEMA 4X stainless steel pad-mounted enclosure, shunt trip circuit breaker, female camlock configuration, and specified outlet configurations. Section 28 31 70 removes audible notification appliance and horn requirements while revising visual notification appliances to reference "Fire" instead of "Alert." Revised drawings effective August 8, 2026 accompany this addendum covering fire alarm, electrical, and related building systems.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The Power of Commitment
12607256 | B632 Addendum 1 Narrative 1
182ND AIRLIFT WING, PEORIA AIR NATIONAL GUARD
BUILDING 632 REPAIR OF FIRE SUPPRESSION AND HANGAR DOORS
Addendum 1
August 7, 2026
Change Change Format
Specifications
Revise Paragraph Section 05 12 00
1.1 References
Delete “ASTM F1136/F1136M”
Delete “ASTM F2833”
Revise Paragraph Section 05 50 13
1.1 References
Delete “AA DAF45”
Delete “AWS D1.2/D1.2M”
Delete “ASTM B26/B26M”
Delete “ASTM B108/B108M”
Delete “ASTM B209/B209M”
Delete “ASTM B221”
Delete “ASTM B221M”
Revise Paragraph Section 05 50 13
1.3.b Qualification of Welders
Delete paragraph in its entirety.
Revise Paragraph Section 05 50 13
2.1.9 Aluminum Alloy Products
Delete paragraph in its entirety.
Revise Paragraph Section 05 50 13
2.2.6 Aluminum Surfaces
Delete paragraph in its entirety including subparagraphs 2.2.6.1 and
2.2.6.2
Revise Paragraph Section 05 50 13
3.6 Dissimilar Metals
12607256 | B632 Addendum 1 Narrative 2
Delete second sentence in its entirety.
Revise Paragraph Section 05 50 33
1.1 References
Delete “AA DAF45”
Delete “ASTM B26/B26M”
Delete “ASTM B108/B108M”
Delete “ASTM B209/B209M”
Delete “ASTM B221”
Revise Paragraph Section 05 50 33
2.2.5 Aluminum Alloy Products
Delete paragraph in its entirety.
Revise Paragraph Section 05 50 33
2.3.6 Aluminum Surfaces
Delete paragraph in its entirety including subparagraphs 2.3.6.1 and
2.3.6.2
Revise Paragraph Section 05 50 33
3.5.1 Dissimilar Metals
Delete second sentence in its entirety.
Revise Paragraph Section 08 34 16.20
2.3.2 Belt/Wire Rope System
Delete second paragraph in its entirety.
Revise Paragraph Section 08 34 16.20
2.9.3 Backup Door Operation
Delete paragraph in its entirety.
Revise Paragraph Section 26 32 15
2.1.1 Engine-Generator Parameter Schedule
Under Frequency, replace “50 Hz” with “60 Hz”
New Paragraph Section 26 36 23
1.2 Submittals
Insert “Camlock Docking Station Drawings; G” under SD-02 Shop
Drawings
New Paragraph Section 26 36 23
Insert
12607256 | B632 Addendum 1 Narrative 3
“2.6 Camlock Docking Station for Portable Load Bank Test
2.6.1 Provide camlock docking station assembly to allow for full capacity portable load bank generator test under all operating conditions and connection for temporary source.
2.6.2 The docking station connection point shall be mechanically interlocked or otherwise designed to prevent inadvertent energization during load bank connection, and shall comply with NFPA 70, NFPA 70E, and UFC 3-540-01 requirements for safe temporary equipment connection and maintenance access.
2.6.3 Provide docking station assembly rated for the full generator output capacity with following parameters:
a. 1200A at 480 V, 3 phase 4 wires.
b. Enclosure – Pad mounted, NEMA 4X Stainless Steel.
c. Shunt trip circuit breaker on load bank connection with LSIA and ERMS.
d. Camlock configuration – Female type. Verify with final user prior to placing the order
e. Two-wire auto start.
f. Battery charger outlet, 120V, 20A, GFI protected.
g. Convenience outlet, 120V, 20A, GFI protected.
h. Block heater outlet, 120V, 30A L5-30.
i. Strip heater and thermostat.”
New Paragraph Section 26 36 23
Insert
“3.5 3.5 CAMLOCK DOCKING STATION
Install camlock docking station on the concrete pad.
a. Demonstrate functionality of the manual transfer switch and circuit breaker while load bank is connected to the camlocks.
b. Test strip heater and convenience outlet while the generator is running.”
Delete Paragraph Section 28 31 70
2.10.1 Audible Notification Appliances
Delete this paragraph in its entirety.
Delete Paragraph Section 28 31 70
2.10.1.1 Horns
Delete this paragraph in its entirety.
Revise Paragraph Section 28 31 70
2.10.2 Visual Notification Appliances
In the second sentence replace “Alert” with “Fire”.
12607256 | B632 Addendum 1 Narrative 4
Change Change Format
Drawings
Revise Drawing The following drawings are revised as of August 8, 2026:
Sheet No:
G-001 Cover Sheet
FA-001 Fire Alarm Symbols, Legend, Abbreviations and Notes
FA-111 Floor Plan
FA-401 Enlarged Plans & Sections
FA-601 Fire Alarm Matrix & Riser Diagram
FX-111 Floor Plan
E-001 Reference Sheet – Electrical
E-111 Power Plan
E-113 Partial Site Plan
E-501 Partial Single Line Diagram
These revised drawings accompany this Addendum