W50S7T-20-R-0001_Questions and Answers_as of 10 Jul 20 Final.pdf

PDF 110 KB Posted

Attached to
182AW CONSTRUCTION MATOC - Y - CONSTRUCTION OF STRUCTURES AND FACILITIES - SOLICITATION
Solicitation number
W50S7T20R0001
Issued by

View the file

Other files

File Type Posted
W50S7T-20-R-0001 - Amendment 0005.pdf PDF
W50S7T-20-R-0001_Questions and Answers_as of 15 Jul 20 Final 2.pdf PDF
Attachment 6 - Addenda No 1 dated 14Jul20.pdf PDF
W50S7T-20-R-0001 - Amendment 0004.pdf PDF
Attachment 7 - Drawings E-301 and E-502 dated 10Jul20.pdf PDF
W50S7T-20-R-0001 - Amendment 0003.pdf PDF
W50S7T-20-R-0001 - Amendment 0002.pdf PDF
W50S7T-20-R-0001_Questions and Answers_as of 9 Jul 20.pdf PDF
W50S7T-20-R-0001_Questions and Answers_as of 7 Jul 20.pdf PDF
W50S7T-20-R-0001_Questions and Answers_as of 6 Jul 20.pdf PDF
PPC and Site Visit Sign In Sheets.pdf PDF
W50S7T-20-R-0001_Questions and Answers_as of 30 Jun 20.pdf PDF
MATOC Preproposal Conference Presentation Slides.pdf PDF
W50S7T-20-R-0001 - Amendment 0001.pdf PDF
Attachment 5 - 182d Airlift Wing Workplace Precautions to Combat the Spread of COVID-19 dated 17Jun20.pdf PDF
W50S7T-20-R-0001_Questions and Answers_as of 18 Jun 20.pdf PDF
EXHIBIT C - Reference Questionnaire Package.docx DOCX document
Attachment 1 - 01000 Special MATOC Contract Requirements.pdf PDF
W50S7T-20-R-0001 182AW Construction MATOC Solicitation.pdf PDF
EXHIBIT A - Performance Relevency Questionaire.docx DOCX document
FAR-Part6-JA-May20 Locks 3Jun20.pdf PDF
EXHIBIT D - Proposal Form Seed Project - Repair Building 620.docx DOCX document
EXHIBIT B - Subcontractor Info and Consent Form.docx DOCX document
Attachment 2 - MATOC Master Specifications.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number:W50S7T‐R‐0001 Project Title: Multiple Award Task Order Contract (MATOC) Seed Project: Repair Building 620 Project Number: JLQN152006 Current a/o 10 July 20

Questions and Answers

Number Spec Section Question Answer 1 N/A Regarding Subfactor 1 – Experience and Capability, the proposal is limited to

20 single pages. Is it the Government’s expectation that the response to Subfactor 1 will be close to 20 pages or is the requirement merely to highlight that it is not to exceed 20 pages? We are trying to determine how many pages to devote to each subfactor, as Subfactor 3 alone will take up 8 pages, thereby leaving only 2 pages for subfactors 2,4,5. Would the Government please provide a breakdown of how many pages to devote to each Subfactor?

Subfactor 1 - Experience and Capability is limited to a maximum of 20 pages total. It is up to each contractor how many pages they want to devote to each subfactor not to exceed the maximum. Subfactor 3 is not part of Subfactor 1. The maximum number of pages for each subfactor is listed within the solicitation under each subfactor.

2 N/A Regarding Subfactor 3. Specific Personnel, the requirement is to provide resumes of no more than 2 pages for each proposed key personnel or 8 pages total for Subfactor 3. In addition, we are to include a narrative of no more than two pages describing the experienced key personnel’s abilities.

Please confirm whether the narrative is meant to be WITHIN the resume’s 2 page limit, or is it in addition to the 2 page resume for each personnel (thereby making each resume be 4 pages).

Subfactor 3 - Specific Personnel is limited to a maximum of 8 pages total.

The narrative is inclusive of the maximum of 8 pages for Subfactor 3.

3 N/A Due to the recent spike of Covid-19 cases across the nation, will the pre-preposal conference be available by any form of streaming service? No. There is currently no streaming service of the preposal conference planned at this time.

4 N/A I would like to prepare a site visit/ walkthrough with our potential subcontractors on this project. Given the security protocols on the base, can we schedule this walktthrough on a date and time that would work for you?

Also, how much background information from each visitor prior to a pre-bid walkthrough.

A site visit is scheduled to be held directly after the prepreposal conference. There are no additional site visits planned. Please provide the background information requested within the solicitation to benjamin.yeutson@us.af.mil.

5 N/A Will there be a site visit for the seed project? If so, will it take place at the same time as the pre-proposal conference or does it need to be scheduled separately?

Yes. A site visit is scheduled to be held directly after the prepreposal conference. There are no additional site visits planned.

6 N/A Will the pre-proposal conference only take place in-person, or can we request an option to have a call-in line to the conference instead?

The prepreposal conference will only take place in‐person. There will not be an option to have a call‐in line to the conference at this time. Preproposal minutes will be uploaded to Beta.SAM.gov.

Project Number: JLQN152006 Current a/o 10 July 20

Questions and Answers

7 N/A There is no mention in the proposal submission requirements for Price, just for Schedule Methodology, but there is a Price form for the Seed Project within the attachments. Please clarify if pricing for the Seed Project is to be included in the Submission, and if so does it go in Volume 1 or Volume 2.

Please reference page 10, 15, and 16 of the solicitation for price proposal submission requirements. The pricing being provided is for the Seed Project and CMRA.

8 N/A Is there a safety protocol for COVID‐19 when accessing the 182nd Airlift Wing?

All personnel will comply with all COVID‐19 related CDC, State and Local Public Health recommendations. Please reference Amendment 001, Attachment 5 ‐ 182d Airlift Wing Workplace Precautions to Combat the Spread of COVID‐19 dated 17Jun20.

9 N/A Can you please verify that the delivery address for "hand carried proposals" is also the same address to be used if our proposals are being mailed?

The hand carried proposals and mailed proposals shall be sent to 2416 S.

Falcon Blvd, Peoria, IL 61607.

10 N/A Are there any other site visits planned for this solicitation? No.

11 N/A

It appears that the Volume naming instructions provided in the conference Powerpoint slides differs from those given in in the Amendment 1 file. Could you clarify which naming system we should follow? Follow the instructions within the solicitation and Amendment 1 file.

12 N/A Is there a cost for background checks? No.

13 N/A

Since this appears to be mostly just ceiling work, with the exception of a few new walls, in the areas with existing walls that have wall mounted occupancy sensors, is there an existing box, so we will just replace the wiring and device, or do we need to fish flex down the wall for the new occupancy sensor?

In most cases for wall mounted occupancy sensors they were located to where the existing light switches are located. It is anticipated that the existing conduit and box will be able to be re-used extend wiring to the new fixtures. If a case comes up where this is not the case the sensor could be adjusted to location of the existing switch unless there is an obstruction that would prevent it in which case flex would have to be fished.

Project Number: JLQN152006 Current a/o 10 July 20

Questions and Answers

14 ED-101/ E-201

ED-101 shows multiple ceiling devices being removed and reinstalled.

Occupancy sensors, emergency fixtures, speakers, etc. E-201, nor any other drawing, show these being reinstalled?

The removal storage and re-installation notes are all shown on ED-101.

The Reflected ceiling plans would be used to show the location of the re-installation. If the reflected ceiling plan does not show the device, they should be located in approximately the same location as they are currently.

The correct drawing reference should be A-104 for the reflected ceiling plan.

15 E-502, Note 2 Does the CAT 6 need to be in conduit? Is the building monitoring system located in the same room? It does not appear to be located on any drawings.

Assume this is in reference to the DMM being installed at MDP. The Cat 6 cable shall be run in conduit where exposed and can be run using j-hooks while above the ceiling. The cable should be routed to the IT room and terminated on the patch panel. From there the base can see it through the network from their monitoring system.

16 230713, Page 11

The only duct specified to insulated is the rectangular supply and outdoor air where it is exposed. Does the concealed rectangular/ round supply and outdoor air require external insulation?

Concealed rectangular / round supply an outdoor air ductwork does require external insulation. The requirement was unintentional left off of the insulation schedule in the specifications.

17 220719, Page 13

Piping that is exposed is specified to receive a PVC jacket. Does this mean exposed anywhere or exposed to the public only? For example is a PVC jacket required in the mobility room, arms vault, mechanical room or janitor closet? All exposed piping to receive PVC jacket to protect from damage.

18 N/A Does the condensate require insulation? If so, what type/ thickness is required?

Condensate piping to receive 1” mineral-fiber, preformed pipe insulation, Type I.

19 N/A

In the General Conditions there is mention of AT Level 1 training on terrorism which is required training for each worker at the site. We would like to have clarification on the length of time involved with this training. Is there any other training required specific to this site.

The training takes approximately 1 hour. There is no other training required at this time.

20 N/A

The drawings mention that the building may bepartially occupied during construction. Can you elaborate on about how many people will be in the building and can we complete loud demolition items during normal business hours.

The building will generally be unoccupied, however, there may be employees requiring access to materials not being relocated during the construction.

21 N/A Who is the current Fire Alarm Company servicing the building? Fire alarm is currently a Simplex system serviced by Johnson Controls.

Project Number: JLQN152006 Current a/o 10 July 20

Questions and Answers

22 ED-101

General notes talk about the Paging system and Intrusion Detection System.

When reinstalled, do these need to be reprogrammed? If so, who manages these systems for them?

The paging system is managed under two parts. The INWS system is managed by Federal Signal. The paging system is managed by the 182nd Airlift Wing. The Instrusion Detection System is managed by Advantor.

23 E-502 Is there a spec on the new Digital Meter Reader? I didn't see anything in the spec book.

Coordinate the new meter with the base to be uniform with their existing monitoring system. For bidding purposes utilize an EMON DMON D5 Series Smart Meter or an equivalent.

24 N/A Will site photos be allowed, or will the air national guard provide photos?

Site photos were allowed during the site visit. The Air National Guard will not be providing any photos.

25 23 21 13.33 3.3 B Where can the drilling log referenced in 23 21 13.33 3.3 B be obtained?

Existing drilling logs at this location are not known to be available.

Reference to drilling logs was not intended to remain in the specification.

26 N/A To what extent will the building be occupied during construction?

The building will generally be unoccupied, however, there may be employees requiring access to materials not being relocated during the construction.

27 A-100

Keynote #10 on A-100 states to assume 6" slab. Detail 2/A-101 shows patching for a 4" slab. Is the contractor to pour a 4" patch regardless of the slab thickness? If existing slab is 4" will any reinforcing be needed to construct the 8" CMU for Men 16 on the slab?

Receptacles will need to be provided for the rooms indicated as well as power for EWC-1 and the condensate pump. See attached sketch. Partial answer still pending.

E-301, EWC-1,P-

102, GWH-1

Is there to be a plan issued showing electrical receptacles and other power connections not shown on E-301? There does not appear to be any convenience receptacles in Breakroom 2, Women 13 or Men 16. There also does not appear to be power provided for EWC-1, or for the condensate pumps shown on P-102. Is GWH-1 to reuse the existing power supply? An Addendum will be issued.

29 N/A Please provide company that currently services/ handles base BAS system. Seimens Controls handles existing BAS.

30 N/A Is the cove heights required to be 4 inches or 6 inches high and what is the cove radius? 4 inches.

31 N/A If there is a required topcoat on this floor, is it required that it be UV resistant polyurethane? UV Resistance not required.

32 N/A

Is this floor coating system a solid color system or will there be decorative materials imbedded within the coating and cove base that would add to the material cost of the floor? For example vinyl flakes or quartz sand. Solid Color System.

Project Number: JLQN152006 Current a/o 10 July 20

Questions and Answers

33 N/A Is there a required minimum solids content?

4 manufacturers have been included in the specification. Alternate products have not been approved.

34 N/A

If there are multiple coatings and there is also a non-skid finish, to which coating do we add the non-skid additive to? The intermediate coat or the topcoat.

Slip resistance is to be provided per manufacturer’s recommendations, based on the approved products. See response to RFI item #33.

35 N/A

Is there a minimum testing performance standard to which coatings must meet or exceed? For example: Adhesion, Tensile strength, Imnpact, Hardness, and Abrasion. See response to RFI item #33.

36 N/A is the floor to have (1) 30 mils epoxy coating with no primer or polyurethane topcoat, or is it to have multiple coatings with a total nominal thickness of 30 mils minimum?

Number of coats as recommended by the manufacturer to provide minimum thickness of 30 mils.

37 N/A

I've noticed that the specs call out a slip resistance for a finish and yet later it calls out for a finish that is smooth level surface. Which finishe are we to provide? If it is a slip resistant finish what sieve of non-skid additive is requested? Different sizes cost different prices.

Slip resistance is required. “…smooth and level” refers to the general appearance of the applied product and the aesthetic quality of the application for consistent thickness.

38 N/A

Is the existing slab sufficient to support the new 12'H P1 Masonry walls?

There is currently no detail for a thickened footing or additional structural support.

A thickened slab of twice the new slab thickness and of width equal to twice the partition thickness will be required under new P1 partitions to be constructed in areas of slab replacement. See RFI item #27 for response regarding P1 partition in Men 16.

39 P-102 What is the piping to be used for the condensate off of the HP units on P-102?

JLQN152006 Narrative Page 12 under the Plumbing heading (which is page 16 of the PDF document). PVC.

40 N/A

Can you provide any additional information about the existing roof? Can you provide core sample data? If not, can a follow-up site visit be scheduled with access to the roof?

Reference Attachment 6 -8 that are now part of Amendment 0004 for information regarding the existing roof. Roof was tested by an outside, independent 3rd party and no asbestos was detected in the existing roof.

There will be no further site visits scheduled.

41 N/A Is the mechanical contractor required to obtain and pay for a Mechanical/ HVAC permit to be issued by the city or county on this project?

It is the Contractor's responsibility to determine what permits are required by contacting the city and county for the construction location.

42 N/A

If no permit required by the city or county will a permit be required by the DoD, etc.? Under Section 013543 Part 2 it references permits but does not state what permits are required or the fees if required for any such permits.

It is the Contractor's responsibility to determine what permits are required by contacting the city and county for the construction location.

43 N/A Will Builder's Risk Insurance be required by the General Contractor?

Insurance requirements are addressed within the solicitation. See FAR 52.228-5.

Project Number: JLQN152006 Current a/o 10 July 20

Questions and Answers

44 N/A There is no specification on the MDP make and model. Please clarify. Panel MDP is a Westinghouse POW.R.Line C PRL3

45 230523 3.3 & 3.4

1. There is no spec for valves 2-1/2” and larger in section 230523 3.3 General Duty Valves . Section 230523 3.4 references Polypropylene full port ball valves for 2-1/2” and larger. If the contractor is selecting the option to use Type L copper for the aboveground geothermal piping are polypropylene full port ball valves still desired or can flanged butterfly valves be used? Please provide a valve spec use in coppoer aboveground 2 1/2" and larger.

Butterfly valves are acceptable in the event that copper piping is used.

Addendum will be issued with the valve requirements.

46 230523 3.3 & 3.4

1. There is no spec for check valves 2-1/2” and larger in section 230523 3.3 General Duty Valves . Section 230523 3.4 references Polypropylene full port ball valves for 2-1/2” and larger but does not reference check valves. If the contractor is selecting the option to use Type L copper for the aboveground geothermal piping what are the desired flanged check valves to be used?

Please provide a check valve spec use in copper aboveground 2-1/2" and and larger.

Addendum will be issued with the check valve requirements for sizes 2-1/2" and larger.

47 N/A Do you anticipate the due date being extended at this time due to the amount of pending Q&As?

Yes. The proposal due date will be amended on 10 July 2020 to move the proposal due date to 22 July 2020 at 2 P.M. Central Standard Time.

48 N/A Will a SSHO and/ or a QCM be required for the seed project? Yes for both.

49 N/A If a SSHO and a QCM are required can the SSHO act as the QCM? No. Key personnel roles cannot be shared.

50 013543-3.6B

Asbestos is present onsite. See Section 02 08 00 for abatement procedures and disposal. Please provide Section 02 08 00. Is there a current asbestos survey? Will this contract include the cost of asbestos removal?

The section you are referring to is entitled "Unexpected Site Conditions." If asbestos is found during construction, then that would be considered a differing site condition. See Section 2.3 B Asbestos. "Asbestos will not be used or included in this project. There is a current asbestos survey and there was no asbestos found.

51 N/A Will there be an amendment that includes the addendum items? Yes.