FAR-Part6-JA-May20 Locks 3Jun20.pdf

PDF 240 KB Posted

Attached to
182AW CONSTRUCTION MATOC - Y - CONSTRUCTION OF STRUCTURES AND FACILITIES - SOLICITATION
Solicitation number
W50S7T20R0001
Issued by

View the file

Other files

File Type Posted
W50S7T-20-R-0001 - Amendment 0005.pdf PDF
W50S7T-20-R-0001_Questions and Answers_as of 15 Jul 20 Final 2.pdf PDF
Attachment 6 - Addenda No 1 dated 14Jul20.pdf PDF
W50S7T-20-R-0001 - Amendment 0004.pdf PDF
Attachment 7 - Drawings E-301 and E-502 dated 10Jul20.pdf PDF
W50S7T-20-R-0001_Questions and Answers_as of 10 Jul 20 Final.pdf PDF
W50S7T-20-R-0001 - Amendment 0003.pdf PDF
W50S7T-20-R-0001 - Amendment 0002.pdf PDF
W50S7T-20-R-0001_Questions and Answers_as of 9 Jul 20.pdf PDF
W50S7T-20-R-0001_Questions and Answers_as of 7 Jul 20.pdf PDF
W50S7T-20-R-0001_Questions and Answers_as of 6 Jul 20.pdf PDF
PPC and Site Visit Sign In Sheets.pdf PDF
W50S7T-20-R-0001_Questions and Answers_as of 30 Jun 20.pdf PDF
MATOC Preproposal Conference Presentation Slides.pdf PDF
W50S7T-20-R-0001 - Amendment 0001.pdf PDF
Attachment 5 - 182d Airlift Wing Workplace Precautions to Combat the Spread of COVID-19 dated 17Jun20.pdf PDF
W50S7T-20-R-0001_Questions and Answers_as of 18 Jun 20.pdf PDF
EXHIBIT C - Reference Questionnaire Package.docx DOCX document
Attachment 1 - 01000 Special MATOC Contract Requirements.pdf PDF
W50S7T-20-R-0001 182AW Construction MATOC Solicitation.pdf PDF
EXHIBIT A - Performance Relevency Questionaire.docx DOCX document
EXHIBIT D - Proposal Form Seed Project - Repair Building 620.docx DOCX document
EXHIBIT B - Subcontractor Info and Consent Form.docx DOCX document
Attachment 2 - MATOC Master Specifications.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Control No: 182AW2001 Program/Equipment: 182AW Construction MATOC/ Seed Project: Repair Building 620/

Locks & Latches

Version – September 2018 FOR OFFICIAL USE ONLY

JUSTIFICATION REVIEW DOCUMENT

FAR PART 6 JUSTIFICATION AND APPROVAL FOR OTHER THAN

FULL AND OPEN COMPETITION

Program/Equipment: 1) Locks and latches, Manufacturer: Best, Product: Locks and Cores; 2) Exit Devices, Manufacturer: Schlage Everest Primos Full-size 6-pin interchangeable cores, Level 9G;

Authority: 10 U.S.C. 2304(c)(1) as implemented by FAR Part 6.302-1 -- Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements.

Amount: $ 4,500.00.

Prepared by: Benjamin B. Yeutson DSN: 724-5707 Contract Specialist Date: 3 June 2020 Email: benjamin.b.yeutson.mil@mail.mil

Contracting Officer: Melissa J. Grice DSN: 724-5204 Contracting Officer Date: 3 June 2020 Email: melissa.j.grice.mil@mail.mil

Technical: Austin T. Fiddes DSN: 724-5378 Deputy Base Civil Engineer Date: 3 June 2020 Email: austin.t.fiddes.civ@mail.mil

Requirements: Vincent J. Tripodi DSN: 724-5565 Base Civil Engineer Date: 3 June 2020 Email: vincent.j.tripodi.mil@mail.mil

Reviews: I have reviewed this justification and find it adequate to support other than full and open competition.

Program Manager:

Typed Name: Melissa J. Grice

DSN: 724-5707

Signature:

mailto:benjamin.b.yeutson.mil@mail.mil mailto:melissa.j.grice.mil@mail.mil mailto:austin.t.fiddes.civ@mail.mil mailto:vincent.j.tripodi.mil@mail.mil

FAR Part 6 Justification and Approval for Other than

Full and Open Competition

1. Contracting Activity: 182 MSG/MSC, 2416 S. Falcon Blvd, Peoria, IL.

2. Description of Action: The 182 Airlift Wing requests a firm fixed price construction contract with the successful 182AW Construction Multiple Award Task Order Contract (MATOC) Indefinite Delivery Indefinite Quantity Contractor. The Government projects award for September 2020 and fiscal year 2020, funds type Operations and Maintenance funds will be used. The estimated profit will be negotiated as part of the individual task order award.

3. Description of Supplies/Services: 1) Locks and latches, Manufacturer: Best, Product: Locks and Cores; 2) Exit Devices, Manufacturer: Schlage Everest Primos Full-size 6-pin interchangeable cores, Level 9G; Quantities of each item are listed within the solicitation W50S7T-20-R-0001, Attachment 3 – Seed Project Specifications Project No

JLQN152006.

4. Authority Cited: 10 U.S.C. 2304(c)(1), as implemented by FAR 6.302-1(a)(2) and 6.302-1(c), Only one responsible source and no other supplies or services will satisfy agency requirements, and brand name descriptions.

5. Reason for Authority Cited: As described at FAR 6.302-1(a)(2), when the supplies or services required by the agency are available only from one responsible source, or for DoD, NASA and the Coast Guard, from only one or a limited number of responsible sources, and no other types of supplies or services will satisfy agency requirements, full and open competition need not be provided for. As further described in FAR 6.302-1(c), an acquisition or portion of an acquisition that uses a brand-name description or other purchase description to specify a particular brand-name, product, or feature of a product, peculiar to one manufacturer does not provide for full and open competition, regardless of the number of sources solicited; and shall be justified and approved in accordance with FAR 6.303 and 6.304.

For the Locks, Latches, and exit devices, Civil Engineering and the Base Fire Personnel have agreed to a standardized keying system for all facilities’ locking mechanisms and have been in use effectively on all our facilities since the base contracted with BEST in 1992. The 182nd Airlift Wing uses this system along with controlled issuance, key control logs, building manager accountability, periodic inspections to comply with Air National Guard Instruction (ANGI) 32-1001 P2.2.25. The standardized key system allows for a master key to be available for each building. One master key for each building allows fire safety personnel to expeditiously clear rooms during emergency situations. The inclusion of a secondary key system would increase the time and costs associated with maintenance, training of maintenance personnel, and adjustment of emergency management plans and associated response times. The 182nd Airlift Wing has an internal master key system utilizing the Best 7-pin locking system. Other locking systems will decrease functionality of security and safety procedures.

6. Efforts to Obtain Competition: The Contracting Officer shall publish the notices required by FAR 5.201 as part of the solicitation and any bids or proposals received shall be considered.

a. Effective Competition: Effective competition will be achieved. There are currently no other manufacturers of the Best 7-pin locking system. However, BEST is sold by at least 12 different vendors on GSA and through open market sources for the 9K cylindrical locks. BEST cylindrical locks have also been provided by three different construction contractors on former contracts. Each of the other manufacturers have retail sellers on both GSA and in open market suppliers.

b. Subcontracting Competition: Subcontracting competition will be achieved by the prime contractor soliciting small businesses for all of the aforementioned requirements listed within section 3.

7. Actions to Increase Competition: There are currently a plethora of competition in contractors that sell each of the products listed within section 3 of this J&A. There is not currently any plans to further increase this competition.

8. Market Research: Market research was conducted through searches on GSA Advantage and previous construction contracts conducted at the 182nd Airlift Wing. The Civil Engineering Government Purchase Cardholder makes quarterly purchases of necessary supplies for the items noted within section 3 for every facility on the installation.

9. Interested Sources: K-D-L Hardware Supply Inc, 850 Poplar Place S, Seattle, WA 98144; Grainger, Inc., 100 Grainger Parkway A2C55, Lake Forest, IL 60045; The Office Group Inc., 372 Wythe Creek Rd Ste C, Poquoson, VA 23662-192; Wrigglesworth Enterprises, Inc., 3516 S College Rd, Wilmington, NC 28412-0912; Galaxie Defense Marketing Services, 5330 Napa St Ste A, San Diego, CA 92110-2613; WECsys LLC, 8825 Xylon Ave N, Brooklyn Park, MN 55445; SPS Industrial Inc., 3324 SE Gran Park Way, Stuart, FL 3499-390; SEVA Technical Services, 700 Mobjack Pl, Newport News, VA 23606; KPaul Properties LLC, 5616 W 74th Street, Indianapolis, IN 46278.

10. Other Facts: The government will provide a core at no cost to the contractor. The contractor is only responsible to provide a barrel capable of accepting the Best 7-pin locking core. A different system would require government personnel to receive training on how to incorporate a different master key system. In order to maintain the same level of response times for fire safety personnel, the remaining locks on base would be required to change over to the new master key system. The cost of making these changes would be cost prohibitive to completing this project.

Locks & Latches

Version – September 2018 FOR OFFICIAL USE ONLY

11. Technical Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.

Typed Name: Austin T. Fiddes Date:

Title: Deputy Base Civil Engineer Signature:

12. Requirements Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.

Typed Name: Vincent J. Tripodi Date:

Title: Base Civil Engineer Signature:

13. Fair and Reasonable Cost Determination: I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable. This determination will be based on price analysis when compared against the IGCE. Certified cost or pricing data is not required to support this function as all items have been determined to be available as a commercial item. Based on the sources sought submitted for the 182AW Construction MATOC, there is expected to be adequate price competition..

Typed Name: Benjamin B. Yeutson Date:

Title: Contracting Officer Signature:

14. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.

Typed Name: Melissa J. Grice Date:

Title: Contracting Officer Signature:

Locks & Latches

Version – September 2018 FOR OFFICIAL USE ONLY

Approval Based on the foregoing justification, I hereby approve the procurement of locks, latches and exit devices for the estimated amount of $4,500.00 on an other than full and open competition basis pursuant to the authority of 10 U.S.C.2304(c)(1), subject to availability of funds, and provided that the services or property herein described have otherwise been authorized for acquisition.

MELISSA. J. GRICE Date:

Contracting Officer Signature:

2020-06-03T14:44:08-0500
GRICE.MELISSA.JAYNE.1090815896
2020-06-04T08:32:34-0500
FIDDES.AUSTIN.T.1547901262
2020-06-04T07:45:37-0500
TRIPODI.VINCENT.JOSEPH.1256562266
2020-06-03T07:26:49-0500
YEUTSON.BENJAMIN.BARKMAN.1092174340
2020-06-03T14:44:35-0500
GRICE.MELISSA.JAYNE.1090815896
2020-06-03T14:45:15-0500
GRICE.MELISSA.JAYNE.1090815896

File details come from the government source that posted it. Updated .