This is a Storm Water and Erosion Control Certificate form for March Air Reserve Base, California. The certificate is a mandatory requirement for all construction, repair, renovation, and service contracts on the base that will disturb paved or unpaved areas, use base roadways to haul construction materials, or use paved surfaces for material storage. The form requires certification by a qualified person responsible for project planning and must be approved by the Chief Environmental Flight (452 MSG/CEV) before work can commence. The certificate must be attached to March ARB Form 103 Work/Dig Permit.

The form establishes a tiered compliance framework based on disturbance area size. Projects disturbing less than one acre require a Water Pollution Control Plan (WPCP) or Best Management Practices (BMP) plan; small linear utility projects between one and five acres must obtain a General Permit from either the Santa Ana Regional Water Quality Control Board (Tier I) or State Water Resources Control Board (Tier II) with a Storm Water Pollution Prevention Plan (SWPPP); projects exceeding one acre or part of common development plans exceeding one acre must obtain a California NPDES General Construction Permit and submit a Notice of Intent (NOI) with required fees to the State Water Resources Control Board. All contractors and subcontractors must comply with the Environmental Protection Guide Specification (EPGS), federal Clean Water Act requirements, California Porter Cologne Water Act, and Air Force Instruction AFI 32-7041. Penalties for noncompliance begin at $5,000 for permit violations and $1,000 per day for various requirements. The certificate requires documentation of disturbed area calculations, site plans showing drainage infrastructure and BMPs, and signed certification by responsible officials or qualified storm water professionals, along with supporting attachments including project drawings and relevant permits.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STORM WATER AND EROSION CONTROL CERTIFICATE

March Air Reserve Base, California

Form Ver 4 JAN 19 1 of 3

Yes No (Go to Step 6) 4. Is the Area disturbed over 1 acre?

5. Is an ESCP or WPCP Attached? Yes No

a. The ESCP, WPCP, or SWPPP if required identifies the type and location of erosion and sediment controls/Best Management Practices (BMPs) to be provided to manage and control storm water runoff while the construction activity is taking place. Guidance on the preparation of the ESCP is found in the Environmental Protection Guide Specification.

Purpose and Need for Certificate:

March Air Reserve Base (ARB) Environmental Management Flight (452 MSG/CEV) requires all construction on March ARB that will disturb the paved or unpaved areas of March ARB to include use of March ARB roadways to haul dirt or other construction materials or paved surfaces to store materials to have a Storm Water and Erosion Control Certificate signed by a person responsible for the preparation of the certificate.

Depending upon the area disturbed, this may need to be a certified person, as stated below. The Certificate must be approved by the Chief Environmental Flight or designated person and attached to a March ARB form 103 Work/Dig Permit.

All repair, renovation, construction and service contracts must have the local March ARB, Environmental Protection Guide Specification (EPGS), modified for that project and approved by 452 MSG/CEV, contained within the contract Statement of Work or Performance Work Statement and all contractors and sub-contractors must be required to meet the specification. Self-help or military performed projects must also meet the requirements of the EPGS. These specifications require the contractor to adhere to the requirements of Federal, State, local and March rules and regulations.

This mandatory requirement is an effort to prevent violations of the Federal Clean Water Act, as amended, the California Porter Cologne Water Act as amended 2018, the California Storm Water Enforcement Act of 1998 contained within the Portage Cologne Water Act, local ordinances, and US Department of Defense and US Air Force Instructions to include AFI 32-7041, WATER QUALITY COMPLIANCE. Tenants and non-452 AMW units are responsible for any and all fines and penalties for noncompliance with environmental regulations.

Penalties, as established in the California law, begin at $5,000 for violations of not having a permit and $1,000 for various requirements such as not filing an annual report, per day or deficiency. By completing this certificate and ensuring compliance with the above laws, the likelihood of a violation is reduced. This Certificate will accompany the March form 103, Base Work/Dig Permit Application and be approved and signed before 452 MSG/CEV will concur on the form 103.

A site plan [contained in the Erosion and Sediment Control Plan (ESCP), Water Pollution Control Plan (WPCP) or Storm Water Pollution Prevention Plan (SWPPP)] of the proposed project must be attached to this application. The plan must show nearby storm sewers and drains to which any dirt or debris might flow if unimpeded, locations of any digging required, to include depth, width and length of each dig, limits of any lay-down areas and haul roads used to move dirt or debris, a description of Best Management Practices (BMP) (e.g. gravel bag location at storm drains.) to be used during the dig to prevent the flow of dirt and debris in the event of a rain from reaching the storm sewer system, and means of preventing dust from entering the air (e.g.

wetting or covering the dirt piles, or vehicles, cleaning of wheels, etc.).

The Proponent must also attach a calculation of the each area and total area to be disturbed to include any lay-down areas, roadways or access ways to be created, etc. The calculation must show the area of each separate dig area.

Instructions for Completion of Certificate:Please follow below instructions, answer questions and complete the appropriate information based on those answers. Any questions should be directed to Ms. Dung (Yung) Nguyen at 951-655-5065.

1. Enter the disturbed Area: The calculation must be made by a qualified person in accordance with the State Water Board criteria.

2. Is this a small linear utility project (>1 acre<5 acres)? Yes No (go to Page 2)

3. Is a General Permit from either the Santa Ana Regional Water Quality Control Board (SARWQCB) for a Tier I Project or from the State Water Resources Control Board (SWRCB) for a Tier II Project based on "Water Discharge Requirements For Discharges of Storm Water Runoff Associated with Small Linear Underground/Overhead Construction Projects" attached?

Yes No

STORM WATER CONTROL CERTIFICATE

Form Ver 4 JAN 19 2 of 3

Yes No 6. Is a SWPPP attached?

a. Guidance on the preparation of the SWPPP is found in the Environmental Protection Specification. The SWPPP must be approved by 452d MSG/CEV (if disturbance is > 1 acre) prior to the commencement of land disturbance. The Project Proponent/Subordinate Project Unit must submit a Notice of Intent (NOI) with the appropriate fee to the State Water Resources Control Board (SWRCB) for the current NPDES General Construction Permit at http:// www.waterboards.ca.gov/stormwtr/construction.html after approval by 452 MSG/CEV.

b. A qualified storm water professional must prepare and oversee the implementation of the SWPPP. Guidance on the preparation of the SWPPP can also be found in the most recent version of the California Storm Water Best Management Practice Handbook – Construction.

Assistance with the design of BMPs can be found in the most recent version of the Riverside County Storm Water Quality Best Management Practice Design Handbook.

Regardless of the size of the construction project and the amount of land disturbance, if there is a potential for discharge of polluting substances to the March ARB storm water drainage system, actions must be taken to prevent these substances from entering the drainage system. Spills or sediment that enters the March ARB storm water drainage system can cause violations of the Base’s permits and create problems in drainage channels, Canyon Lake, and Lake Elsinore downstream of the Base, making the Base and the activity at fault, liable for fines and penalties.

7. The attached certificate must be signed by the responsible official of the entity that funded the work or a person certified to sign an ESCP or SWPPP based on California law.

STORM WATER CONTROL CERTIFICATE

Form Ver 4 JAN 19 3 of 3

CERTIFICATION

[Unit/Company Name], have 1. We, determined that this Project:

will involve the disturbance of [Project Title] acre(s) of soil (quantity obtained through accumulation of areas disturbed]. Documentation to support this determination is ATTACHED TO THIS CERTIFICATE AND PROVIDED WITH THE PROJECT WORK DRAWINGS [List appropriate Drawings/Documents]:

2. Select ONE option—a, b, c, or d BELOW for the Project Site:

a. The construction site soil disturbance area is less than one acre and does not require a NPDES storm water construction permit. The activities associated with the work at this site WILL BE OR

HAVE BEEN evaluated for their potential to contaminate storm water or the storm water system. The activities also do not involve Small LUPs (> 1 Acre<5 Acre). As necessary, BMPs and pollution prevention efforts appropriate for this size and type of project will be implemented in accordance with the construction Permit or the MS4 General Permit. Attach a project-specific Water Pollution Control Plan (WPCP)/a BMP Plan with narrative and graphics.

b. Activities at the construction site for this Project will not change the original line and grade, hydraulic capacity, or purpose of the facility site. Small LUPs are not involved. This Project does not require a NPDES General Construction Permit. If necessary, appropriate BMPs and pollution prevention controls will be implemented in accordance with the construction Permit or the MS4 General Permit.Attach a project-specific Water Pollution Control Plan (WPCP)/a BMP Plan.

c. The Project is a Small LUP involving some type of underground or overhead conveyance utilities and associated appurtenances resulting in one acre or more but less than five acres of soil disturbance. A Waste Discharge Requirements for Discharges of Storm Water Runoff Associated with Small Linear Underground/Overhead Construction Projects General Permit from either the SARWQCB (Tier I) or the SWRCB (Tier II) and a SWPPP is required.

d. The construction site is greater than one acre, part of a common development plan exceeding one acre, or a Small Linear Underground/Overhead Project that disturbs one acre or more that requires a NPDES Storm Water General Construction Permit.

1)The appropriate General Construction Permit number is:

2)A NOI and a Project SWPPP to comply with the provisions of the General

Construction Permit and the March ARB Environmental Protection Specification must be developed. As of this date:

A. The SWPPP and the NOI still need to be prepared and filed; OR ] has been issued [provide a B. The permit [WDID# copy of the permit to the March ARB 452D MSG/CEV]; OR C. The SWPPP and the NOI have been prepared and submitted to the days before groundbreaking is scheduled to SWRCB and the March ARB 452D MSG/CEV commence.

I certify that the information submitted in association with this certificate and in the future associated with storm water management was (and will be) prepared by qualified personnel, and is to the best of my knowledge true, accurate, and complete.

PRINT NAME TITLE

SIGNATURE PHONE DATE

START DATE END DATE

Attachment to Digging Permit SWECC

Dig Permit Title/Number:________________________________________________________________

1. The total land disturbance is _______________________ SqFt. See Sheet(s): _______________

2. The total impervious area before land disturbance is ________________________ SqFt

3. The total impervious area after land disturbance is __________________________ SqFt

4. Does the disturbance area drain to a storm water conveyance system? (Select YES or NO).

Describe_______________________________________________________________________

5. Description of each drainage management area (DMA) (1):

Description of the type, location, and O/M plan for the post-construction structural Best Management Practice (BMP) for the DMA 1, if any

See Sheet(s): ___________________________________________________________________

6. Description of each drainage management area (DMA) (2):

Description of the type, location, and O/M plan for the post-construction structural Best Management Practice (BMP) for the DMA 2, if any

See Sheet(s): ___________________________________________________________________

7. Description of each drainage management area (DMA) (3):

Description of the type, location, and O/M plan for the post-construction structural Best Management Practice (BMP) for the DMA 3, if any

See Sheet(s): ___________________________________________________________________

8. For land disturbance activity of one acre or more, attached proof of having coverage under the California CGP or approved waiver.

9. For land disturbance area between 2500 SqFt and one acre, show how the action does not have an adverse impact (by showing a zero net effect between pre- and post- water quality and volume).

See Sheet(s):

10. Additional Comments, if any:

Complete By: ________________________________________ Date: _____________________

Acres:
Yes LU: Off
No LU: Off
yes tier I or II: Off
No Tier I or II: Off
Yes greater 1 acre: Off
No > 1 acre: Off
Yes ESCP Attached: Off
No ESCP: Off
Yes SWPPP: Off
No SWPPP: Off
<1 Acre: Off
b: Off
c: Off
d: Off
GCP #:
Date form:
WDID #:
SWPPP NOI Submitted: Off
Permit Issued: Off
no SWPPP NOI Yet: Off
CO Name:
Project Name:
Project name 2:
acres disturbed:
Drawing 1:
Drawing 2:
Drawing 3:
Drawing 4:
Days to GB:
Name Person Signing:
Title Person Signing:
Phoone Person Signing:
Date Signing:
Check Box1: Off
Check Box2: Off
Est Start Date:
Est End Date:
Dig Permit Title:
# Square Feet of disturbed area:
# Square Feet of Impervious Area:
Description of disturbed area and drainage destination:
Sheet # and Title:
complete date:
first, last name, title:
Sheet #(s) and Title(s):
Description of disturbed area and structural BMP O/M and location:
Text20:
Text21:
Text1: The project plan, calculation, design, and information comply with the all water pollution standards listed below.
Check Box3: Off
Text4: EISA 437 (attached hydrology report, pre- and post development drainage management plan)
Text5: California General Construction NPDES Permit (current) (attached proof of permit WDID # and PRDs) at https://www.waterboards.ca.gov/water_issues/programs/stormwater/construction/general_permit_reissuance.html
Check Box6: Off
Check Box7: Off
Text8: California General Municipal NPDES Permit (current) (attached WPCP)
Check Box9: Off
Text10: California General Industrial NPDES Permit (current) (attached BMP plan)
Check Box11: Off
Text12: Others ______________________ (i.e. Nutrient CASQA BMP Handbook, Riverside County FCD Manual, Santa Ana WQMP, etc)
Text13: Post construction BMP O&M manual, if any permanent BMP is installed
Check Box14: Off
Text15: 1. https://www.waterboards.ca.gov/water_issues/programs/stormwater/construction/docs/2022-0057-dwq-with-attachments/cgp2022_att_d2.pdf

File details come from the government source that posted it. Updated .