This document is a Question and Answer (Q&A) regarding a Request for Information (RFI) for an Invitation for Bid (IFB) to Add Alter Building 208 at the 188th Wing, Fort Smith, Arkansas.
The key details are: The project involves renovating 14,193 SF of Building 208 and adding 3,000 SF, with a contract duration of 365 calendar days. The project is set aside for 100% Woman Owned Small Businesses and the NAICS code is 236220 with a $45,000,000 size standard. The magnitude of construction is between $5,000,000 and $10,000,000. The pre-bid conference and site visit are scheduled for 17 June 2024, and bids are due on 23 July 2024. The government will provide AutoCAD drawing files to the contractor. The contractor will need to relocate and reinstall existing furniture in the renovated building. Any abatement of hazardous materials will be handled as a contract modification. The contractor must have a separate Quality Control manager available within 12 hours when requested. There is no cost limitation for CLIN 0002.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subject: HKRZ222111 B208 ADD ALTER – RFI Q&A
Date: 25 June 2024
1. Please provide as-built documents for the existing building if available.
Response: As-Builts documents cannot be provided to potential bidders and subcontractors due to security concerns. Please provide specific questions that require more information for bidding purposes from what has been provided on the Construction Drawings and Specifications.
2. Please clarify if project is exempt from sales tax.
Response: The 188th Wing, AR ANG is a federal entity and exempt from sales tax.
3. Please clarify if project is on federal land and that there are no local city authorities having jurisdiction.
Response: The project is located on leased property that is owned by the Fort Smith Municipal Airport. However, the City of Fort Smith Building, Engineering, and Utility Departments do not have jurisdiction over construction of buildings and private utilities on the Base. Please note, however, that electric lines to a transformer/meter and all gas lines within the Base are public and fall under OG&E and AOG jurisdiction, respectively. Storm water runoff from construction soil disturbance falls under the Arkansas Department of Environmental (ADEQ) NPDES requirements.
4. Spec Section 01 11 00, Part 1.04D states “Upon completion of construction, the Contractor shall submit a copy of record drawings and update Contractor furnished AutoCAD drawing files (*.dwg) with As-Built information and digitally stamp these all of these drawings as “As- Built”.” Spec Section 01 11 00 Part 1.04E states “The Contractor shall perform an as-built geographic information survey (GIS) survey of all new or modified exterior construction and provide this information to the Government as specified in Section 01 33 00 SUBMITTAL PROCEDURES. Spec Section 01 14 19 Part 1.03.B.5.a states “Autocadd showing all utilities found using GPR.” Given that all this information is to be provided to the Government via AutoCAD drawing files, please confirm that the government will be providing the contract documents in electronic AutoCAD format to the Contractor.
Response: The Government will provide the Contractor with AutoCAD drawing files (*.dwg) to produce stamped “As Built” drawings and GIS Survey Data as required in the Specifications.
5. Spec Section 01 14 16 part 1.01.B states: “Contractor shall relocate occupant’s furniture and equipment to a temporary location designated by the Government prior to beginning work.
Any furniture or equipment directed by the Government to be left in the building shall be properly disposed of by the Contractor off base. Any furniture or equipment directed by the Government to be reused shall be stored by the Contractor and reinstalled as directed by the Government.” Could the Government please clarify what furniture is to be relocated to a temporary location (where is the temporary location), what furniture is to be disposed of and what furniture is to be stored. Also will contractor be responsible for reinstalling furniture in temporary location back in renovated building 208?
Response:
Phase 1: Medical – No existing Medical furniture will be disposed by the Contractor. All existing furniture will need to be relocated by the Contractor to Building 216 and/or a Conex
Container provided by the 188th. After the renovation of Medical side of Building 208 is completed, the Contractor will need to reinstall the office furniture.
Phase 2: Communications – No existing Communications furniture will be disposed by the Contractor. All existing furniture will need to be relocated by the Contractor to Building 450 and/or a Conex Container provided by the 188th. After the renovation of Communications side of Building 208 is completed, the Contractor will need to reinstall the office furniture.
6. Spec Section 01 14 19 Part 1.13 LEAD BASED PAINT (LBP) AND COATINGS CONTAINING LEAD – We understand that we are to do testing for LBP and coatings containing lead. Please clarify that any hazardous material found that requires special handling will be treated as a change order to the contract since we have no way of knowing at this time of any hazardous materials.
Response: We understand that you have no way of knowing at this time if there are any hazardous materials that will require special handling. Therefore, any required abatement of hazardous materials by the Contractor in accordance with federal, state, local and base laws/regulations will be treated as a contract modification. Please note, however, that the 188th Bioenvironmental Section is not aware of any LBP in Building 208. Testing for LBP only needs to occur in areas where paint would need to be scraped/removed to allow for welding or cutting of specific areas of existing structural members for demolition or new construction efforts. If any LBP is found and deemed hazardous, it shall be disposed of through CE Work Control.
7. Please clarify whether the Contractor’s Superintendent can perform the quality control and safety duties required by the contract documents.
Response: The Site Superintendent is required to be on site at all times that work is being performed. A separate Program Manager/Quality Control manager will be required to be appointed in writing and available to be on site within 12 hours of being requested to be on site for any matters requiring their attention.
8. What is the cost limitation for CLIN 0002?
Response: There is no statutory cost limitation for CLIN 0002.
9. Please release the hazardous materials report for building 208.
Response: No hazardous materials report exists for building 208 and no known hazardous materials are currently identified to be in the building.