ATTACHMENT 1 - SPECIFICATIONS.pdf

PDF 2 MB Posted

Attached to
IFB to Add Alter Building 208
Solicitation number
W50S6Q24B0001
Issued by

About this file

This document is an addendum to a bid solicitation for a construction project to renovate and add on to Building 208 at the 188th Wing, Fort Smith, Arkansas. The solicitation is for a firm fixed-price contract to provide all labor, materials, and equipment necessary for the 14,193 SF renovation and 3,000 SF addition, with a 365-calendar day period of performance. The project is set aside for 100% Woman Owned Small Businesses (WOSB) under NAICS code 236220 with a size standard of $45 million. The bid opening is scheduled for July 23, 2024, and a pre-bid conference will be held on June 17, 2024. The addendum provides revisions to various specification sections related to the construction work. It does not contain a Performance Work Statement or Statement of Objectives, but rather detailed technical requirements for the project.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building 208 Add/Alter & Reno 100% Final Design HKRZ 222111 Air National Guard Base A/E 2023-080 Fort Smith, Arkansas February 2024

ADDENDUM 001

00 91 01 - 1

SECTION 00 91 01

ADDENDUM 001

DATE: 05-15-2024

RE: BUILDING 208 ADD/ALTER & RENOVATION

Fort Smith, Arkansas

Project Number: HKRZ 222111 A/E Project Number: 2023-080

FROM: CROMWELL ARCHITECT ENGINEERS, INC.

1300 East 6th Street Little Rock, Arkansas 72202

TO: BIDDERS OF RECORD

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated 02-19-2024 as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification. Each item in Contract Documents complements each of the other Contract Documents. No sheet, section, or document is to be followed without referring to all sheets, sections, and parts of the Contract Documents.

This Addendum consists of the following Documents and Revisions.

CHANGES TO PROCUREMENT AND CONTRACTING REQUIREMENTS:

1: Insert (this) Section 00 91 01 - Addendum 001 issued with this Addendum.

CHANGES TO SPECIFICATIONS:

2: Insert the attached revised and/or new Sections issued with this Addendum.

Section Number and Title

01 63 00 - Substitutions and Product Options – REVISED

03 30 00 - Cast-in-Place Concrete – REVISED

04 20 01 - Masonry Veneer – REVISED

04 29 00 - Engineered Unit Masonry – REVISED

05 31 00 - Steel Decking – REVISED

06 10 00 - Rough Carpentry – REVISED

06 41 00 - Architectural Wood Casework – REVISED

07 13 00 - Sheet Waterproofing – REVISED

07 21 00 - Thermal Insulation – REVISED

07 21 19 - Foamed-In-Place Insulation – REVISED

07 25 00 - Weather Barriers – REVISED

00 91 01 - 2

07 52 00 - Modified Bituminous Membrane Roofing – REVISED

07 62 00 - Sheet Metal Flashing and Trim – REVISED

07 84 00 - Firestopping – REVISED

07 95 13 - Expansion Joint Cover Assemblies – REVISED

08 11 13 - Hollow Metal Doors and Frames – REVISED

08 14 16 - Flush Wood Doors – REVISED

08 31 00 - Access Doors and Panels – REVISED

08 33 23 - Overhead Coiling Doors – REVISED

08 43 13 - Aluminum-Framed Storefronts – REVISED

08 71 00 - Door Hardware – REVISED

08 80 00 - Glazing – REVISED

09 05 61 - Common Work Results for Flooring Preparation – REVISED

09 21 16 - Gypsum Board Assemblies – REVISED

09 51 00 - Acoustical Ceilings – REVISED

09 61 33 - Concrete Floor Sealer – REVISED

09 65 00 - Resilient Flooring – REVISED

09 68 13 - Tile Carpeting – REVISED

09 69 00 - Access Flooring – REVISED

09 90 00 - Painting and Coating – REVISED

10 14 00 - Signage – REVISED

10 22 39 - Folding Panel Partitions – REVISED

10 26 00 - Wall and Corner Guards – REVISED

10 44 00 - Fire Protection Specialties – REVISED

12 36 00 - Countertops – REVISED

21 05 00 - Common Work Results for Fire Suppression – REVISED

21 05 23 - General-Duty Valves for Water-Based Fire-Suppression Piping – REVISED

21 05 53 - Identification for Fire Suppression Piping and Equipment – REVISED

21 11 00 - Facility Fire-Suppression Water-Service Piping – REVISED

21 13 00 - Fire-Suppression Sprinkler Systems – REVISED

22 10 05 - Plumbing Piping – REVISED

22 10 06 - Plumbing Piping Specialties – REVISED

22 30 00 - Plumbing Equipment – REVISED

22 40 00 - Plumbing Fixtures – REVISED

23 05 10 - Basic HVAC Requirements – REVISED

23 05 13 - Common Motor Requirements for HVAC Equipment – REVISED

23 05 48 - Vibration and Seismic Controls for HVAC – REVISED

23 05 53 - Identification for HVAC Piping and Equipment – REVISED

00 91 01 - 3

23 05 93 - Testing, Adjusting, and Balancing for HVAC – REVISED

23 07 13 - Duct Insulation – REVISED

23 07 19 - HVAC Piping Insulation – REVISED

23 09 13 - Instrumentation and Control Devices for HVAC – REVISED

23 09 23 - Direct-Digital Control System for HVAC – REVISED

23 21 13 - Hydronic Piping – REVISED

23 23 00 - Refrigerant Piping – REVISED

23 33 00 - Air Duct Accessories – REVISED

23 37 00 - Air Outlets and Inlets – REVISED

23 81 24 - Computer Room Air Conditioners - Floor Mounted – REVISED

23 81 29 - Variable Refrigerant Flow HVAC Systems – REVISED

26 09 13.13 - Electrical Power Management System – REVISED

26 27 01 - Electrical Service Entrance – REVISED

28 10 00 - Access Control – NEW

28 46 00 - Fire Detection and Alarm – REVISED

CHANGES TO DRAWINGS:

3: Replace the attached revised Drawings issued with this Addendum:

Sheet Number and Title

G-002 INDEX OF DRAWINGS

S-102 ROOF FRAMING PLAN

S-304 FOUNDATION SECTIONS AND DETAILS

S-501 ROOF FRAMING SECTIONS AND DETAILS

A-302 WALL SECTIONS

A-303 EXTERIOR WALL SECTIONS

A-304 WALL SECTIONS

A-404 MILLWORK DETAILS

A-405 MILLWORK DETAILS

A-501 PARTITION TYPES

A-502 SECTIONAL DETAILS

A-503 DOOR AND WINDOW DETAILS

A-504 ROOF DETAILS

A-602 ROOM FINISH SCHEDULE, NOTES, AND LEGENDS

A-701 INTERIOR AND FRAMING DETAILS

A-703 EXTERIOR DETAILS

A-802 SIGNAGE DETAILS

00 91 01 - 4

FA001 FIRE ALARM LEGEND AND NOTES

FA501 FIRE ALARM DETAILS

FX401 FIRE PROTECTION ENLARGED PLANS

FX501 FIRE PROTECTION DETAILS

P-601 PLUMBING SCHEDULES AND DETAILS

MH102 ROOF MECHANICAL PLAN

MH401 ENLARGED MECHANICAL PLANS

MH402 ENLARGED MECHANICAL PLANS

MP401 ENLARGED MECHANICAL PIPING PLANS

MP402 ENLARGED MECHANICAL PIPING PLANS

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-701 MECHANICAL CONTROLS

M-702 MECHANICAL CONTROLS

M-901 MECHANICAL ISOMETRIC

EL101 LIGHTING PLAN

EP101 POWER PLAN

E-401 ENLARGED ELECTRICAL PLANS

E-503 ELECTRICAL DETAILS

E-504 ELECTRICAL DETAILS

E-602 ELECTRICAL SCHEDULES

END OF SECTION

SUBSTITUTIONS AND PRODUCT OPTIONS 01 63 00 - 1

SECTION 01 63 00 – SUBSTITUTIONS AND PRODUCT OPTIONS

PART 1 - GENERAL

1.01 BRAND NAMES

"Brand Names" are specified in several places throughout the specifications. The use of specific "names" is intended only to define type, quality, size, and other salient features required. Therefore, all brand name items listed are to be interpreted as "or approved equal" unless specifically noted otherwise.

1.02 PROPOSED SUBSTITUTIONS

The burden of ascertaining product/performance equality of proposed substitutions from those items specified is to be borne by the Contractor. Product substitutions will be accepted for review, and potential acceptance, by the Contracting Officer. If data provided by the Contractor is deemed inadequate to make a determination as to the equality of the proposed substitute, without additional research by the Government, it will be rejected. Approval by the Contracting Officer shall not relieve the Contractor from responsibility for any errors or omissions, nor from responsibility for complying with the requirements of this contract, except with respect to variations described and approved by the Contracting Officer.

1.03 EXACT PRODUCT SPECIFIED

If exact products are specified in the construction drawings or construction specifications, and the Contractor intends to use those same products in the construction work, submittal requirements in Schedule of Material Submittals and the technical specifications for catalog cuts, manufacturer's literature, and samples are waived. The Contractor shall provide a list of products that fall into this "intended use of exact product specified" category along with the manufacturer's installation/application instruction, for each product on the list. This list and manufacturer's installation application instructions shall be provided within twenty (20) days after the Notice-to-Proceed for review and approval by the Contracting Officer. Note that this will not take the place or affect the requirement for operations and maintenance (O&M) manuals.

1.01 PRODUCT OPTIONS

Provide products that comply with the Contract Documents, are undamaged and, unless otherwise indicated, are new at time of installation. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a complete installation and indicated use and effect. Descriptive, performance, and reference standard requirements in the Specifications establish salient characteristics of products.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

This page was intentionally left blank for duplex printing.

Fort Smith, Arkansas February 2024

Cast-in-Place Concrete

ADDENDUM 001 03 30 00 - 1

SECTION 03 30 00

CAST-IN-PLACE CONCRETE

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Concrete formwork.

B. Floors and slabs on grade.

C. Concrete foundation walls.

D. Concrete footings, grade beams, foundation walls and site retaining walls.

E. Joint devices associated with concrete work.

F. Post-installed anchors G. Concrete curing.

1.02 RELATED REQUIREMENTS

A. Section 01 45 33 - Code-Required Special Inspections and Procedures: Code required special tests and inspections.

B. Section 03 20 00 - Concrete Reinforcing.

C. Section 07 92 00 - Joint Sealants: Products and installation for sealants and joint fillers for saw cut joints and isolation joints in slabs.

D. Section 09 05 61 - Common Work Results for Flooring Preparation: Remediation of slabs with excessive moisture or pH.

1.03 REFERENCE STANDARDS

A. ACI 117 - Specifications for Tolerances for Concrete Construction and Materials; 2010 (Reapproved 2015).

B. ACI 211.1 - Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete; 1991 (Reapproved 2009).

C. ACI 301 - Specifications for Structural Concrete; 2016.

D. ACI 302.1R - Guide to Concrete Floor and Slab Construction; 2015.

E. ACI 304R - Guide for Measuring, Mixing, Transporting, and Placing Concrete; 2000

(Reapproved 2009).

F. ACI 305R - Guide to Hot Weather Concreting; 2010.

G. ACI 306R - Guide to Cold Weather Concreting; 2016.

H. ACI 308R - Guide to External Curing of Concrete; 2016.

I. ACI 318 - Building Code Requirements for Structural Concrete; 2019, with Errata (2021).

J. ACI 347R - Guide to Formwork for Concrete; 2014, with Errata (2017).

K. ACI 355.2 - Qualification of Post-Installed Mechanical Anchors in Concrete and Commentary;

American Concrete Institute; 2007 L. ACI 355.4 - Qualification of Post-Installed Adhesive Anchors in Concrete and Commentary;

American Concrete Institute; 2011 M. ASTM C138/C138M - Standard Test Method for Density (Unit Weight), Yield, and Air Content

(Gravimetric) of Concrete; 2017a.

N. ASTM C172/C172M - Standard Practice for Sampling Freshly Mixed Concrete; 2017.

O. ASTM C31/C31M - Standard Practice for Making and Curing Concrete Test Specimens in the

Field; 2021a.

P. ASTM C33/C33M - Standard Specification for Concrete Aggregates; 2018.

Fort Smith, Arkansas February 2024

Cast-in-Place Concrete

ADDENDUM 001 03 30 00 - 2

Q. ASTM C39/C39M - Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens; 2021.

R. ASTM C94/C94M - Standard Specification for Ready-Mixed Concrete; 2021b.

S. ASTM C109/C109M - Standard Test Method for Compressive Strength of Hydraulic Cement

Mortars (Using 2-in. or [50 mm] Cube Specimens); 2021.

T. ASTM C138/C138M - Standard Test Method for Density (Unit Weight), Yield, and Air Content

(Gravimetric) of Concrete; 2017.

U. ASTM C143/C143M - Standard Test Method for Slump of Hydraulic-Cement Concrete; 2020.

V. ASTM C150/C150M - Standard Specification for Portland Cement; 2021.

W. ASTM C171 - Standard Specification for Sheet Materials for Curing Concrete; 2016.

X. ASTM C172/C172M - Standard Practice for Sampling Freshly Mixed Concrete; 2017.

Y. ASTM C231/C231M - Standard Test Method for Air Content of Freshly Mixed Concrete by the

Pressure Method; 2014.

Z. ASTM C260/C260M - Standard Specification for Air-Entraining Admixtures for Concrete; 2010a

(Reapproved 2016).

AA. ASTM C494/C494M - Standard Specification for Chemical Admixtures for Concrete; 2019.

AB. ASTM C618 - Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete; 2019.

AC. ASTM C881/C881M - Standard Specification for Epoxy-Resin-Base Bonding Systems for

Concrete; 2020a.

AD. ASTM C1059/C1059M - Standard Specification for Latex Agents for Bonding Fresh to

Hardened Concrete; 2021.

AE. ASTM C1064/C1064M - Standard Test Method for Temperature of Freshly Mixed

Hydraulic-Cement Concrete; 2012.

AF. ASTM C1107/C1107M - Standard Specification for Packaged Dry, Hydraulic-Cement Grout

(Nonshrink); 2017.

AG. ASTM C1315 - Standard Specification for Liquid Membrane-Forming Compounds Having

Special Properties for Curing and Sealing Concrete; 2019.

AH. ASTM D1751 - Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types); 2018.

AI. ASTM E154/E154M - Standard Test Methods for Water Vapor Retarders Used in Contact with

Earth Under Concrete Slabs, on Walls, or as Ground Cover; 2008a, with Editorial Revision (2013).

AJ. ASTM C 1602/C1602M - Standard Specification for Mixing Water Used in the Production of Hydraulic Cement Concrete; 2012

AK. ASTM E1643 - Standard Practice for Selection, Design, Installation and Inspection of Water Vapor Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs; 2018a.

AL. ASTM E1745 - Standard Specification for Plastic Water Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs; 2017.

AM. COE CRD-C 572 - Corps of Engineers Specifications for Polyvinylchloride Waterstop; 1974.

AN. NSF 61 - Drinking Water System Components - Health Effects; 2020.

AO. NSF 372 - Drinking Water System Components - Lead Content; 2020.

1.04 ADMINISTRATIVE REQUIREMENTS

A. Preinstallation Meeting: Convene one week before starting work of this section. At least the following shall be in attendace at the meeting: Contractor's superintendant, testing agency responsible for concrete mix design, ready mix concrete manufacturer, concrete subcontractor, Fort Smith, Arkansas February 2024

Cast-in-Place Concrete

ADDENDUM 001 03 30 00 - 3

floor finishing subcontractor, independent testing agency, special inspector, architect engineer construction administrator, and the structural engineer of record.

1.05 SUBMITTALS

A. See Section 01 33 00 - Submittal Procedures for submittal procedures.

B. Product Data: Submit manufacturers' data on manufactured products showing compliance with specified requirements and installation instructions.

1. For curing compounds, provide data on method of removal in the event of incompatibility with floor covering adhesives.

C. Mix Design: Submit proposed concrete mix designs.

1. Indicate proposed mix designs complies with requirements of ACI 301, Section 4 - Concrete Mixtures.

2. Submit mix design for each concrete mix including test results documenting average compressive strength in accordance with ACI 301. Submit alternate design mixtures when characteristics of materials, project conditions, weather, test results, or other circumstances warrant adjustments. Include manufacturer's data for admixtures included in the mix. Include suppliers data and tests for aggregates and cementitious materials including portland cement, fly ash, and ground granulated blast-furnace slag as applicable.

a. Indicate amounts of mixing water to be withheld for later addition at Project site.

D. Samples: Submit samples of underslab vapor retarder to be used.

E. Test Reports: Submit report for each test or series of tests specified.

F. Manufacturer's Installation Instructions: For concrete accessories, indicate installation procedures and interface required with adjacent construction.

G. Project Record Documents: Accurately record actual locations of embedded utilities and components that will be concealed from view upon completion of concrete work.

H. Concrete delivery ticket: Submit a sample concrete delivery ticket in accordance with the requirements of ANSI/ASTM C94-03a "Standard Specification for Ready-Mix Concrete."

I. Concrete test results: Submit copies of all concrete test results signed by the testing laboratory.

J. Concrete Installers and Finishers Qualifications: Submit documentation for ACI certification for concrete flatwork finishers.

K. Testing Agency Qualifications: Submit qualifications for testing laboratory including certification for field testing technicians and laboratory testing technicians.

1.06 QUALITY ASSURANCE

A. Perform work of this section in accordance with ACI 301 and ACI 318.

1. Maintain at least one copy of each document on site.

B. Follow recommendations of ACI 305R when concreting during hot weather.

C. Follow recommendations of ACI 306R when concreting during cold weather.

D. Testing Agency Qualifications: an independent testing and inspection lab, acceptable to the

Architect/Engineer, shall perform specified tests and inspections. The testing lab shall be qualified according to ASTM C 1077 and ASTM E 329 for testing indicated.

1. Personnel conducting field tests shall be qualified as ACI Concrete Field Testing

Technician, Grade 1, according to ACI CP-01 or an equivalent certification program.

2. Personnel performing laboratory tests shall be ACI-certified Concrete Strength Testing

Technician and Concrete Laboratory Testing Technician - Grade I. Testing Agency laboratory supervisor shall be an ACI-certified Concrete Laboratory Testing Technician - Grade II.

E. Concrete Installers and Finishers Qualifications: Concrete flatwork shall be performed utilizing high quality techniques conforming to American Concrete Institute Standards in ACI Publication

Fort Smith, Arkansas February 2024

Cast-in-Place Concrete

ADDENDUM 001 03 30 00 - 4

CP-10, Concrete Flatwork Technician and Flatwork Finisher, and ACI Publication CCS-1, Concrete Craftsman Series, Slabs on Grade.

1. All concrete placing and finishing shall be performed by a crew lead by at least one ACI certified Flatwork Finisher or ACI certified Technician.

2. All concrete placing and finishing shall be performed by a crew lead by at least two personnel both of whom are an ACI certified Flatwork Finisher or an ACI certified Technician.

F. Concrete Manufacturer: Furnish concrete from a plant complying with the requirements of ASTM C94, Sections 8 & 9 with a current certificate from the National Ready Mixed Concrete Association.

G. Mix Design Engineer: Licensed to practice engineering in the state where the project is located with a minimum of 3 years experience in preparing concrete mix designs.

H. Cooperate with the Testing Agency and any special inspectors and provide them with free access to the work.

I. The testing agency shall verify the correct concrete mix design is being provided at the ready mix plant prior to going to the job site.

J. For floor slabs, verify concrete admixtures and sealants used are compatible with the applicable designated floor coverings and adhesives.

1.07 WARRANTY

A. See Section 01 78 00 - Closeout Submittals for additional warranty requirements.

PART 2 PRODUCTS

2.01 FORMWORK

A. Formwork Design and Construction: Comply with guidelines of ACI 347R to provide formwork that will produce concrete complying with tolerances of ACI 117.

B. Form Materials: Contractor's choice of standard products with sufficient strength to withstand hydrostatic head without distortion in excess of permitted tolerances.

1. Form Facing for Exposed Finish Concrete: Contractor's choice of materials that will provide smooth, stain-free final appearance.

2. Earth Cuts: Do not use earth cuts as forms for vertical surfaces. Natural rock formations that maintain a stable vertical edge may be used as side forms.

3. Form Coating: Release agent that will not adversely affect concrete or interfere with application of coatings.

4. Form Ties: Cone snap type that will leave no metal within 1-1/2 inches of concrete surface.

5. Carton/Void Forms: Corrugated paper void form materials and accessories to properly create a temporary support for the placement of structural concrete over expansive soils.

The void form composition must be of biodegradable corrugated paper material with a moisture resistant exterior, and having an interior fabrication of a uniform, cellular configuration, structurally sufficient to support weight of plastic concrete and other superimposed loads.

a. All products must be capable of sustaining the vertical and/or lateral loads applied until they become self-supporting, while maintaining full void depths as indicated on drawings. The void form strength must be capable of sustaining an average working load for concrete heights as indicated on drawings based on manufacturer's recommendations.

b. The upper portion of each drilled pier must be properly formed and contained to the designated diameter, and must be correctly voided at the intersection with grade beams or structural slabs by using a pre-manufactured, non-field cut, sealed void form with curved, radial, vertical edge adjacent to pier.

c. Where supports for reinforcing steel are placed directly on void forms, protective cover sheets/boards must be placed over void forms to distribute working load, bridge small gaps, and protect void material from puncture and other damage during concrete placement.

d. Void forms that are exposed after concrete formwork is removed must be shielded with a HDPE backfill retainer to prevent the migration of backfill material into the voided area.

e. Products:

1) SureVoid Products; www.surevoid.com

2) VoidForm International; www.voidform.com

3) Substitutions: See Section 01 63 00 - Substitutions and Product Options.

2.02 REINFORCEMENT MATERIALS

A. Comply with requirements of Section 03 20 00 - Concrete Reinforcing.

2.03 CONCRETE MATERIALS

A. Cement: ASTM C150/C150M, Type I - Normal Portland type.

1. Acquire cement for entire project from same source.

B. Fine and Coarse Aggregates: ASTM C 33, Class 3M.

1. Provide aggregates from a single source with documented service record data of at least 10 years' satisfactory service in similar applications and service conditions using similar aggregates and cementitious materials. Stockpile aggregates in a manner that will prevent segregation or contamination with other materials or other size aggregates. Alkali-Silica Reactive (ASR) aggregates are not allowed.

C. Fly Ash: ASTM C618, Class C or F.

D. Water: Potable, clean and not detrimental to concrete, conforming to ASTM C 1602/C1602M.

2.04 ADMIXTURES

A. Chemical Admixture: Do not use chemicals that will result in soluble chloride ions in excess of

0.1 percent by weight of cement.

1. Manufacturers:

a. Euclid.

b. Sika.

c. WR Grace.

d. BASF Masterbuilders.

e. Substitutions: See Section 01 63 00 - Substitutions and Product Options.

B. Do not use chemicals that will result in soluble chloride ions in excess of 0.1 percent by weight of cement.

B. C.Air Entrainment Admixture: ASTM C260/C260M.

C. D.High Range Water Reducing and Retarding Admixture: ASTM C494/C494M Type G.

D. E.High Range Water Reducing Admixture: ASTM C494/C494M Type F.

E. F.Water Reducing and Accelerating Admixture: ASTM C494/C494M Type E.

F. G.Water Reducing and Retarding Admixture: ASTM C494/C494M Type D.

G. H.Accelerating Admixture: ASTM C494/C494M Type C.

H. I.Retarding Admixture: ASTM C494/C494M Type B.

I. J.Water Reducing Admixture: ASTM C494/C494M Type A.

J. K.Store admixtures to avoid contamination, evaporation, or damage. Protect liquids from freezing or other adverse temperatures. Agitate all admixtures used in form of suspension or non stable solutions prior to use. Follow manufacturer's directions.

Fort Smith, Arkansas February 2024

Cast-in-Place Concrete

ADDENDUM 001 03 30 00 - 6

2.05 ACCESSORY MATERIALS

A. Underslab Vapor Retarder: Complying with ASTM E1745, Class A; with a water vapor permeance ratings of 0.04 01 perms or less when tested in accordance with ASTM E 154 E1745 Section 7.1, and stated by manufacturer as suitable for installation in contact with soil or granular fill under concrete slabs. The use of single ply polyethylene is prohibited.

1. Thickness: 15 mils minimum.

2. 1.Accessory Products: Vapor retarder manufacturer's recommended tape, adhesive, mastic, prefabricated boots, etc., for sealing seams and penetrations.

a. Where void forms are used, use tape which also mechanically bonds the vapor retarder to the bottom of the concrete slab, per the manufacturer's instructions.

2. Products:

a. ISI Building Products; Viper VaporCheck II 15-mil (Class A): www.isibp.com/#sle.

b. Stego Industries, LLC ; Stego Wrap Vapor Barrier (15-mil):

www.stegoindustries.com.

c. W. R. Meadows, Inc; PERMINATOR Class A - 15 mils (0.38 mm):

www.wrmeadows.com/#sle.

d. Raven Industries; VaporBlock VB15: www.vaporblock.com

e. Substitutions: See Section 01 63 00 - Substitutions and Product Options.

B. Non-Shrink Cementitious Grout: Premixed compound consisting of non-metallic aggregate, cement, water reducing and plasticizing agents.

1. Grout: Comply with ASTM C1107/C1107M.

2. Minimum Compressive Strength at 28 Days, ASTM C109/C109M: 7,000 pounds per square inch.

3. Flowable Products:

a. Five Star Products, Inc ; Five Star Fluid Grout 100: www.fivestarproducts.com/#sle.

b. US MIX Co.; US Spec MP Grout: www.usspec.com .

c. BASF Corporation - Construction Systems; MasterFlow 928:

www.buildingsystems.basf.com.

d. Substitutions: See Section 01 63 00 - Substitutions and Product Options.

4. Low-Slump, Dry Pack Products:

a. Five Star Products, Inc ; Five Star Grout: www.fivestarproducts.com/#sle.

b. US MIX Co.; US Spec MP Grout: www.usspec.com .

c. BASF Corporation - Construction Systems; MasterFlow 100:

www.buildingsystems.basf.com.

d. Substitutions: See Section 01 63 00 - Substitutions and Product Options.

C. Capillary Water Barrier/Granular Fill: Clean mixture of crushed stone or crushed or uncrushed gravel; ASTM D 448, Size 57, with 100 percent passing a 1-1/2 inch sieve and 0 to 5 percent passing a No. 8 sieve.

D. Dovetail Anchor Slots: Hot-dip galvanized steel sheet not less than 0.0336 inch thick, with bent tab anchors. Temporarily fill or cover face opening of slots to prevent intrusion of concrete or debris.

E. Post-Installed Anchors

1. Mechanical Anchors: Tested and qualified for use in accordance with ACI 355.2 and

ICC-ES AC193 for cracked and uncracked concrete recognition. Acceptable products include:

a. SIMPSON STRONG-TIE "TITEN-HD" and "TITEN HD ROD HANGER" (ICC-ES

ESR-2713)

b. SIMPSON STRONG-TIE "STAINLESS STEEL TITEN-HD" (IAPMO UES ER-493)

c. SIMPSON STRONG-TIE "STRONG-BOLT 2" (ICC-ES ESR-3037)

d. HILTI "KWIK HUS-EZ" and "KWIK HUS-EZ I" SCREW ANCHOR (ICC-ES

ESR-3027)

e. HILTI "KWIK BOLT-TZ" EXPANSION ANCHOR (ICC-ES ESR 1917)

Fort Smith, Arkansas February 2024

Cast-in-Place Concrete

ADDENDUM 001 03 30 00 - 7

f. HILTI "HDA UNDERCUT" (ICC-ES ESR-1546)

g. HILTI "HSL-3" EXPANSION ANCHOR (ICC-ES ESR-1545)

h. DEWALT "POWER-STUD+ SD1" (ICC-ES ESR-2818)

i. DEWALT "POWER-STUD+ SD2, SD4 or SD6" (ICC-ES ESR-2502)

j. DEWALT "SCREW-BOLT+" (ICC-ES ESR-3989)

k. DEWALT CCU+ (ICC-ES ESR 4810)

l. DEWALT SNAKE+ (ICC-ES ESR 2272)

m. DEWALT MINI UNDERCUT+ (ICC-ES ESR 3912)

n. DEWALT HANGER-MATE+(ICC-ES ESR 3889)

2. Adhesive Anchors: Tested and qualified for use in accordance with ACI 355.4 and ICC-ES AC308 for cracked and uncracked concrete recognition. Acceptable products include:

a. SIMPSON STRONG-TIE "SET-3G" (ICC-ES ESR-4057)

b. SIMPSON STRONG-TIE "AT-XP" (IAPMO UES ER-263)

c. HILTI "HIT-HY 200 SAFESET FAST CURE" (ICC-ES ESR-3187)

d. HILTI "HIT-RE 500-SD SLOW CURE" (ICC-ES ESR-2322)

e. DEWALT "AC200+" (ICC-ES ESR-4027)

f. DEWALT "PURE 110+" (ICC-ES ESR-3928)

a. g. Steel anchor element shall be Hilti HAS-E, ASTM F1554 Grade

36, in accordance with ASTM F1554 Grade 36, or ASTM A193, Grade B6, B8, or B8M continuously threaded rod.

3. Substitution requests for products other than those specified shall be submitted by the Contractor to the Architect Engineer along with calculations that are prepared and sealed by a registered professional engineer licensed in the State in which the project is located.

The calculations shall demonstrate that the substituted product is capable of achieving the pertinent equivalent performance values (minimum) of the specified product using the appropriate design procedures and/or standard(s) as required by the building code.

F. Steel-Reinforced Plastic Trowel Blades for use at Decorative Exposed Surfaces.

1. Manufacturers:

a. Wagman Metal Products; Poly Pro reinforced trowel blades;

www.wagmanmetal.com/#sle.

b. Substitutions: See Section 01 63 00 - Substitutions and Product Options.

2.06 BONDING AND JOINTING PRODUCTS

A. Latex Bonding Agent: Non-redispersable acrylic latex, complying with ASTM C1059/C1059M, Type II.

B. Epoxy Bonding System:

1. Complying with ASTM C881/C881M and of Type required for specific application.

C. PVC Waterstops: Complying with COE CRD-C 572.

1. Configuration: For applications where exterior final grade is less than 4'-0" above the base of the wall, provide a minimum 4 inch wide waterstop. Where final grade is greater than 4'-0" above the base of the wall, provided a minimum 6 inch wide waterstop.

2. Products:

a. BoMetals, Inc ; RCB-4316 / RCB-6316: www.bometals.com/#sle.

b. Sika; Greenstreak 701 / 703.

c. Substitutions: See Section 01 63 00 - Substitutions and Product Options.

D. Hydrophilic Waterstops: Rectangular or trapezoidal strips manufactured from butyl rubber with sodium bentonite or other hydrophilic polymers, complying with NSF 61 and NSF 372.

1. Configuration: For concrete elements less than 8 inches in width, provide 3/4 inch by 3/8 inch continuous strips. For concrete elements 8 inches and greater in width, provide a minimum 3/4 inch by 3/4 inch continuous strip.

2. Products:

Fort Smith, Arkansas February 2024

Cast-in-Place Concrete

ADDENDUM 001 03 30 00 - 8

a. TREMCO Superstop

b. W. R. Meadows Waterstop EC

c. CETCO Waterstop-RX

d. Sika Swellstop

e. Substitutions: See Section 01 63 00 - Substitutions and Product Options.

E. Reglets: Formed steel sheet, galvanized, with temporary filler to prevent concrete intrusion during placement.

1. Size: As indicated on drawings.

F. Slab Isolation Joint Filler: 1/2 inch thick, height equal to slab thickness, with removable top section that will form 1/2 inch deep sealant pocket after removal.

1. Material: ASTM D1751, cellulose fiber.

G. Slab Contraction Joint Device: Preformed rigid plastic linear strip intended for pressing into wet concrete to provide straight route for shrinkage cracking.

1. Products:

a. W. R. Meadows, Inc ; Speed-E-Joint: www.wrmeadows.com/#sle.

b. Substitutions: See Section 01 63 00 - Substitutions and Product Options.

H. Slab Construction Joint Devices: Combination keyed joint form and screed, galvanized steel, with rectangular or round knockout holes for conduit or rebar to pass through joint form at 6 inches on center; ribbed steel stakes for setting.

1. Provide removable or non-removable plastic cap based on slab exposure, floor finish and manufacturer's recommendations. Removable plastic caps shall form a minimum 3/8" wide bd 1/2" deep void for sealant.

2. Height: To suit slab thickness.

I. Sealant and Primer: As specified in Section 07 92 00 - Joint Sealants.

J. Semirigid Joint Filler: Two-component, semirigid, 100 percent solids, epoxy resin with a Type A shore durometer hardness of 80 or aromatic polyurea with a Type A shore durometer hardness range of 90 to 95, according to ASTM D 2240.

2.07 CURING MATERIALS

A. Evaporation Reducer: Liquid thin-film-forming compound that reduces rapid moisture loss caused by high temperature, low humidity, and high winds; intended for application immediately after concrete placement.

1. Products:

a. Dayton Superior Corporation ; AquaFilm: www.daytonsuperior.com/#sle.

b. Euclid Chemical Company ; EUCOBAR: www.euclidchemical.com/#sle.

c. SpecChem, LLC; SpecFilm Concentrate or SpecFilm: www.specchemllc.com/#sle.

d. W. R. Meadows, Inc ; Evapre or Evapre-RTU: www.wrmeadows.com/#sle.

e. Substitutions: See Section 01 63 00 - Substitutions and Product Options.

B. Curing Compound, Naturally Dissipating: Clear, water-based, liquid membrane-forming compound; complying with ASTM C309.

1. Application: Use only at slabs scheduled to receive stain.

2. Product dissipates within 4 to 6 weeks.

3. Verify compatibility with final finish.

C. Curing and Sealing Compound, High Gloss: Liquid, membrane-forming, clear, non-yellowing acrylic; complying with ASTM C1315 Type 1 Class A.

1. Application: Use at concrete slabs exposed in final construction but not scheduled to receive polishing or stain and not subject to wheel traffic such as forklifts or pallet jacks.

2. A minimum of 2 coats are required. The first coat for curing and the second coat for sealing after all construction debris is removed.

3. Vehicle: Solvent-based.

4. Solids by Mass: 25 percent, minimum.

5. VOC Content: Ozone Transport Commission (OTC) compliant.

Fort Smith, Arkansas February 2024

Cast-in-Place Concrete

ADDENDUM 001 03 30 00 - 9

D. Penetrating Liquid floor Treatment: Clear, chemically reactive, waterborne solution of inorganic silicate or siliconate materials and proprietary components; odorless; colorless; that penetrates, hardens, and densifies concrete surfaces.

1. Application: Use at concrete slabs exposed in final construction and subject to wheel traffic such as forklifts or pallet jacks.

2. Manufacturers:

a. Conspec Marketing & Manufacturing Co; Intraseal

b. Curecrete Distribution Inc.; Ashford Formula

c. Euclid Chemical Company; Euco Diamond Hard

d. L&M Construction Chemicals, Inc.; Seal Hard

e. Meadows, W.R., Inc.; Liqui-Hard

f. Nox-Crete Products Group, Kinsman Corporation; Duranox

g. US Mix Products Company; Industraseal

h. BASF Corporation - Construction Systems; MasterKure HD 200 WB

D. E.Moisture-Retaining Sheet: ASTM C171.

1. Regular curing paper, white curing paper, clear polyethylene, white polyethylene, or white burlap-polyethylene sheet.

E. F.Water: Potable, not detrimental to concrete.

2.08 CONCRETE MIX DESIGN

A. Proportioning Normal Weight Concrete: Comply with ACI 211.1 recommendations.

B. Concrete Strength: Establish required average strength for each type of concrete on the basis of field experience or trial mixtures, as specified in ACI 301.

1. For trial mixtures method, employ independent testing agency for preparing and reporting proposed mix designs.

2. Test reports verifying the concrete strength must be submitted with mix designs for approval.

C. Admixtures: Add acceptable admixtures as recommended in ACI 211.1 and at rates recommended or required by manufacturer.

D. For floor slabs, verify components of mix design are compatible with the flooring materials and adhesives.

E. Normal Weight Concrete:

1. Water-Cement Ratio: As indicated in Concrete Mixture Schedule.

2. Air Content, when determined in accordance with ASTM C231: As indicated in Concrete

Mixture Schedule for mixes where Air-entrainment is required.

3. Maximum Slump: As indicated in Concrete Mixture Schedule before the addition of any water reducing admixture, but no more than 8 inches after the addition of any water reducing admixture. Higher slumps may be acceptable in self consolidating concrete or flowing concrete applications with the approval of the Architect Engineer.

4. Maximum Aggregate Size: As indicated in Concrete Mixture Schedule.

5. Fly Ash Content: Fly Ash shall not be used in concrete for slabs. Maximum 25 percent of cementitious materials by weight for other concrete.

6. Water-Cement Ratio: As indicated in Concrete Mixture Schedule.

7. Maximum Aggregate Size: [].

2.09 MIXING

A. Transit Mixers: Comply with ASTM C94/C94M.

B. Adding Water: If concrete arrives on-site with slump less than suitable for placement, do not add water that exceeds the maximum water-cement ratio or exceeds the maximum permissible slump.

C. Mixing Time: Mix and place concrete within 1 1/2 hours of initial batching of the concrete. When the air temperature is between 85 and 90 degrees F reduce the maximum time between

Fort Smith, Arkansas February 2024

Cast-in-Place Concrete

ADDENDUM 001 03 30 00 - 10

batching and placing the concrete to 75 minutes. When the air temperature is above 90 degrees F reduce the batching and placing time to 60 minutes. Longer mix times may be possible with the use of appropriate admixtures but only with written approval of admixture manufacturer(s) and Architect/Engineer.

D. Addition of Water at Job Site: Unless the delivery ticket states the amount of water that can be added without exceeding the design water cement ratio and the slump of the mix, water cannot be added at the job site. Addition of water above the design water/cement ratio shall be cause for rejection of the concrete.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify lines, levels, and dimensions before proceeding with work of this section.

3.02 PREPARATION

A. Formwork: Comply with requirements of ACI 301. Design and fabricate forms to support all applied loads until concrete is cured, and for easy removal without damage to concrete.

B. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete. Chamfer exterior corners and edges of permanently exposed concrete. Comply with Division 1 requirements for certified wood used for formwork and disposal of construction waste.

C. Verify that forms are clean and free of rust before applying release agent.

1. Where as-cast finishes are required do not use materials on the face of the form that will impart a stain to the concrete. Where the finished surface is required to be coated, the material applied to the form surfaces shall be compatible with the type of coating to be used.

D. Void Form System Placement: Store void forms and accessories in accordance with manufacturer's recommendations. Prepare ground surface on an even plane. There should be no capillary break below the void form unless otherwise directed by the designing engineer or architect. Assemble knockdown (K.D.) products as recommended by manufacturer to develop designed strengths. Install void forms and accessories in accordance with manufacturer's recommendations. Use end caps to seal exposed ends. Use seam pads to cover joints to prevent concrete intrusion. Place a layer of protective cover board over void forms as necessary to distribute working load, bridge small gaps, and protect them from puncture and other damage during concrete placement. Protect void forms from moisture, and replace wet or damaged pieces before placing concrete. Immediately protect exposed void forms after concrete formwork has been stripped with an HDPE retainer to keep backfill material from migrating into the voided area. The retainer should be installed per the manufacturer's recommendations. Maintain moisture and humidity levels beneath concrete structure.

E. Coordinate placement of embedded items with erection of concrete formwork and placement of form accessories.

F. Where new concrete is to be bonded to previously placed concrete, prepare existing surface by cleaning and applying bonding agent in according to bonding agent manufacturer's instructions.

1. Use epoxy bonding system for bonding to damp surfaces, for structural load-bearing applications, and where curing under humid conditions is required.

2. Use latex bonding agent only for non-load-bearing applications.

G. Interior Slabs: Install vapor retarder under interior slabs per ASTM E 1643 and the manufacturer's written instructions. Lap joints minimum 6 inches. Seal joints, seams and penetrations watertight with manufacturer's recommended products and follow manufacturer's written instructions. Use manufacturer's recommended pipe boot and tape to seal vapor retarder to all pipes, conduits, and other elements that penetrate slabs-on-grade. Repair damaged vapor retarder before covering per manufacturer's instructions. Where slab is poured over void forms, mechanically bond the vapor retarder to the undeside of the slab with textured tape per manufacturer's instructions.

Fort Smith, Arkansas February 2024

Cast-in-Place Concrete

ADDENDUM 001 03 30 00 - 11

1. Extend vapor retarder over footings and seal to foundation wall, grade beam, or slab at an elevation consistent with the top of the slab or terminate at impediments such as water stops or dowels. Seal around penetrations such as utilities and columns in order to create a monolithic membrane between the surface of the slab and moisture sources below the slab as well as at the slab perimeter.

2. Vapor Retarder Over Granular Fill: Install compactible granular fill before placing vapor retarder as indicated on drawings. Do not use sand.

3.03 PLACING CONCRETE

A. Do not add water to concrete during delivery at Project site unless amount that can be added without exceeding the water/cement ratio is stated on the delivery ticket. If water is allowed to be added it must be introduced and mixed inside the transit mixer drum for 5 minutes or 70 revolutions before the concrete leaves the truck.

B. Place concrete in accordance with ACI 304R.

1. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams or planes of weakness. If a section cannot be placed continuously, provide construction joints as indicated. Deposit concrete to avoid segregation. Consolidate placed concrete with mechanical vibrating equipment according to ACI 301. Do not use vibrators to transport concrete inside of forms.

C. Place concrete for floor slabs in accordance with ACI 302.1R.

1. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits of construction joints, until placement of a panel of section is complete. Consolidate concrete during placement operations so concrete is thoroughly worked around reinforcement and other embedded items and into corners.

D. Notify Architect Engineer not less than 24 hours prior to commencement of placement operations.

E. Maintain records of concrete placement. Record date, location, quantity, air temperature, and test samples taken.

F. Ensure reinforcement, inserts, waterstops, embedded parts, and formed construction joint devices will not be disturbed during concrete placement.

G. Place concrete continuously without construction (cold) joints wherever possible; where construction joints are necessary, before next placement prepare joint surface by removing laitance and exposing the sand and sound surface mortar, by sandblasting or high-pressure water jetting.

H. Finish floors level and flat, unless otherwise indicated, within the tolerances specified below.

I. Cold Weather: When the temperature is below 40 degrees F maintain concrete temperature between 50 and 70 degrees F for the required curing period. Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen subgrade or on subgrade containing frozen materials. Do not use calcium chloride, salt, or other materials containing antifreeze agents. Do not use chemical accelerators unless approved by the Architect/Engineer and included in the mix designs. Follow recommendations of ACI 306R.

J. Hot Weather: When the temperature is over 85 degrees F, maintain the concrete below 90 degrees F at the time of placement. Make arrangements for installation of windbreaks, shading, fog spraying, sprinkling, ponding, or other protective measures to protect the concrete. Fog spray forms, steel reinforcement, and subgrade just before placing concrete. Keep the subgrade uniformly moist without standing water, soft spots, or dry areas. Follow recommendations of ACI 305R.

3.04 SLAB JOINTING

A. Locate joints as indicated on drawings.

B. Anchor joint fillers and devices to prevent movement during concrete placement.

Fort Smith, Arkansas February 2024

Cast-in-Place Concrete

ADDENDUM 001 03 30 00 - 12

C. Isolation Joints: Use preformed joint filler with removable top section for joint sealant, total height equal to thickness of slab, set flush with top of slab.

1. Install wherever necessary to separate slab from other building members, including columns, walls, equipment foundations, footings, stairs, manholes, sumps, and drains.

D. Load Transfer Construction and Contraction Joints: Install load transfer devices as indicated;

saw cut joint at surface as indicated for contraction joints.

1. Form weakened-plane contraction joints in layout indicated. Provide keyed joints at construction joints and where indicated. Other joints may be keyed joints or sawn joints.

E. Saw Cut Contraction Joints: Saw cut joints before concrete begins to cool, within 4 to 12 hours after placing; use 3/16 inch thick blade and cut at least 1 inch deep but not less than one quarter (1/4) the depth of the slab.

1. Saw joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut joints in concrete when cutting action will not tear, abrade, or otherwise damage surface and before concrete develops random contraction cracks.

F. Construction Joints: Where not otherwise indicated, use metal combination screed and key form, with removable top section for joint sealant. Install per manufacturer's recommendations.

3.05 FLOOR FLATNESS AND LEVELNESS TOLERANCES

A. Maximum Variation of Surface Flatness:

1. Exposed Concrete Floors: 1/4 inch in 10 feet.

2. Under Seamless Resilient Flooring: 1/4 inch in 10 feet.

3. Under Carpeting: 1/4 inch in 10 feet.

B. Correct the slab surface if tolerances are less than specified.

C. Correct defects by grinding or by removal and replacement of the defective work. Areas requiring corrective work will be identified. Re-measure corrected areas by the same process.

3.06 JOINTS - OTHER THAN SLABS

A. General: Construction joints true to line with faces perpendicular to surface plane of concrete.

B. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect/Engineer.

1. Place joints perpendicular to main reinforcement. Continue reinforcement across construction joints, unless otherwise indicated. Do not continue reinforcement through sides of strip placements of floors and slabs.

2. Form keyed joints as indicated.

3. Locate joints for beams, slabs, joists, and girders in the middle third of spans.

4. Locate horizontal joints in walls and columns at underside of floors, slabs, beams, and girders and at the top of footings or floor slabs.

5. Space vertical joints in walls as indicated or at 20 foot maximum on center if not indicated.

6. Use a bonding agent at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces.

3.07 WATERSTOPS

A. Flexible Waterstops: Install in construction joints and at other joints where indicated to form a continuous diaphragm. Install in longest lengths practical. Support and protect waterstops during progress of the work. Field fabricate joints in waterstops according to manufacturer's written instructions.

B. Self-Expanding Strip Waterstops: Install in construction joints and at other locations indicated, according to manufacturer's instructions, adhesive bonding, mechanically fastening, and firmly pressing into place. Install in longest lengths practical.

3.08 CONCRETE FINISHING

A. Repair surface defects, including tie holes, immediately after removing formwork.

Fort Smith, Arkansas February 2024

Cast-in-Place Concrete

ADDENDUM 001 03 30 00 - 13

B. Unexposed Form Finish: Rub down or chip off fins or other raised areas 1/4 inch or more in height.

C. Exposed Form Finish: Rub down or chip off and smooth fins or other raised areas 1/4 inch or more in height. Provide finish as follows:

1. Smooth Rubbed Finish: Wet concrete and rub with carborundum brick or other abrasive, not more than 24 hours after form removal.

D. Concrete Slabs: Finish to requirements of ACI 302.1R, and as follows:

1. Surfaces to Receive Thick Floor Coverings: "Wood float" as described in ACI 302.1R;

thick floor coverings include quarry tile, ceramic tile, and Portland cement terrazzo with full bed setting system.

2. Surfaces to Receive Thin Floor Coverings: "Light steel-troweled" as described in ACI 302.1R; thin floor coverings include carpeting, resilient flooring, seamless flooring, thin set quarry tile, and thin set ceramic tile.

3. Decorative Exposed Surfaces: "Normal steel-troweled" as described in ACI 302.1R; use steel-reinforced plastic trowel blades instead of steel blades to avoid black-burnish marks;

decorative exposed surfaces include surfaces to be stained or dyed, pigmented concrete, surfaces to be polished, and all other slab surfaces.

4. Other Surfaces to Be Left Exposed: Trowel as described in ACI 302.1R, minimizing burnish marks and other appearance defects.

E. In areas with floor drains, unless noted otherwise, maintain floor elevation at walls; pitch surfaces uniformly to drains as indicated on drawings.

3.09 CURING AND PROTECTION

A. Comply with requirements of ACI 308R. Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury.

B. Maintain concrete with minimal moisture loss at relatively constant temperature for period necessary for hydration of cement and hardening of concrete.

1. Normal concrete: Not less than seven days.

C. Formed Surfaces: Cure by moist curing with forms in place for full curing period.

D. Slabs scheduled to receive Adhesive-Applied Flooring or other moisture sensitive flooring: Slab shall be cured by being covered with moisture retaining sheets (curing paper, polyethylene, or a combination of the two) for 3 to 7 days. Slabs shall not be cured by adding water. Curing compounds are not allowed.

1. Floor slabs shall meet the requirements of Section 090561 prior to installation of floor coverings.

E. Slabs scheduled to receive stain: Curing shall be accomplished by damp curing, sheet curing, or a dissipating curing compound compatible with the stain system.

F. Slabs on grade exposed in final construction, not subject to wheel traffic (such as forklifts or pallet jacks) and not scheduled to receive stain: Curing shall be by a curing and sealing compound.

1. Curing and sealing compound: Apply uniformly to floors and slabs in a continuous operation by power spray or roller according to manufacturer's written instructions.

Recoat areas subjected to heavy rainfall within three hours after initial application. Repeat process 24 hours later and apply a second coat. Maintain continuity of coating and repair damage during the curing period. Clean the top of the slab and provide a final coat to seal the slab before the final acceptance by the owner.

G. Slabs on grade exposed in final construction and subject to wheel traffic (such as forklifts or pallet jacks): The floor shall…

This is the start of the file's text. The full file is on GovTribe.