This document is a phasing plan for a construction project to renovate and add on to Building 208 at the 188th Wing, Fort Smith, Arkansas.

The solicitation is for a firm fixed-price contract to provide all necessary services, labor, materials, and equipment to renovate 14,193 SF of Building 208 and add an additional 3,000 SF. The contract duration is 365 calendar days after notice to proceed. This project is set aside 100% for Woman Owned Small Businesses (WOSB) under NAICS code 236220 with a small business size standard of $45 million. The magnitude of construction is between $5-10 million. The pre-bid conference and site visit are scheduled for June 17, 2024, and bids are due July 23, 2024. The solicitation includes FAR clauses related to limitations on subcontracting.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLAN LEGEND:

PHASE 2

PHASE 1

TO REMAIN OPERATIONAL AT ALL

TIMES DURING CONSTRUCTION

GENERAL NOTES:

1. ALL LIFE SAFETY PROVISIONS SHALL REMAIN IN OPERATION AT ALL TIMES THROUGH THE DURATION OF CONSTRUCTION. CONTRACTOR TO KEEP ALL EXITS AND EMERGENCY EGRESS LIGHTING OPERABLE DURING

CONSTRUCTION. ALL OCCUPIED SPACES MUST HAVE 2 MEANS OF EGRESS AT ALL TIMES.

2. CONTRACTOR TO PROVIDE DUST BARRIERS AT ALL DOORS AND OPENINGS BETWEEN CONSTRUCTION AND OCCUPIED SPACES. DUST BARRIERS SHALL COMPLY WITH NFPA 241 PARAGRAPH 4.13.1.3, WHICH REQUIRES FABRIC OR PLASTIC FILMS SHALL MEET THE REQUIREMENTS OF TEST METHOD 2 IN NFPA 701.

3. ELECTRICAL, LIGHTING, HVAC & PLUMBING TO REMAIN OPERABLE FOR ALL OCCUPIED SPACES DURING

CONSTRUCTION.

4. WOMEN'S RESTROOM AND MEN'S RESTROOM SHALL REMAIN OPERATIONAL THROUGHOUT CONSTRUCTION.

5. CONTRACTOR TO PROVIDE ADVANCE NOTICE TO THE BASE PM 30 DAYS (MIN.) PRIOR TO ANY CONSTRUCTION. CONTRACTOR TO COORDINATE AVAILABILITY OF WHEN CONSTRUCTION CAN TAKE PLACE (WORK AFTER HOURS IS POSSIBLE AND WILL NEED TO BE COORDINATED). CONTRACTOR SHALL PROVIDE

WEEKLY UPDATES ON THE STATUS OF THE CONSTRUCTION.

6. THE CONTRACTOR SHALL SUBMIT TO THE PROJECT MANAGER A DETAILED SCHEDULE FOR APPROVAL PRIOR

TO THE START OF CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADEQUATE

COMMUNICATION IN ADVANCE OF ANY CONSTRUCTION IN THE BUILDING.

7. CONTRACTOR SHALL MAINTAIN AT LEAST ONE FIRE EXTINGUISHER IN EACH AREA AT ALL TIMES.

8. CONTRACTOR TO NOTIFY CONTRACTING OFFICER MINIMUM OF TWO (2) WEEKS IN ADVANCE OF THE

PROPOSED COMPLETION DATE FOR EACH PHASE.

9. ALL OCCUPIED SPACES THAT ARE COMPLETED OR HAVE NOT BEEN STARTED SHALL HAVE HEAT, AIR CONDITIONING, POWER, LIGHTING, DATA/PHONE SERVICES AND FIRE PROTECTION PROVIDED AT ALL TIMES.

PRE-COMMISSIONING (TEST) OF UNITS ON THE ROOF.

EXISTING

VENDING

EXISTING

JAN.

EXISTING

RADIO OPERATOR

SUPPORT

EXISTING

RADIO OPS

EXISTING

OPS. OFFFICER

EXISTING

ADMINISTRATION

OFFICE

EXISTING

CDRS. OFFICE

EXISTING

STORAGE

EXISTING

OFFICE

EXISTING

CLASSROOM

EXISTING

COMM. CTR.

(VAULT)

EXISTING

SHREDDER

ROOM

EXISTING

COMMUNICATION

OFFICE

156EXISTING

CRYPTO/RADIO

MAINT.

EXISTING

MOBILE RAD.

MAINTANENCE

EXISTING

ADMIN.

EXISTING

RECEPTION &

WAITING

103EXISTING

PHARMACY

EXISTING

EXAM ROOM #3

EXISTING

DR. OFFICE

EXISTING

EXAM ROOM #2

EXISTING

FLT. SURG.

EXISTING

EXAM ROOM #1

EXISTING

COMMANDER

EXISTING

LAB

EXISTING

RADIOLOGY

EXISTING

DENT. EXAM.

EXISTING

HEAD NURSE

EXISTING

WT. CONTROL

EXISTING

IMMUN.

EXISTING

LAB

EXISTING

LIGHT ROOM

EXISTING

DENT. OFF.

EXISTING

DARK ROOM

EXISTING

EKG

EXISTING

AUDIOMETRY

EXISTING

LAB

STORAGE.

EXISTING

JAN.

EXISTING

SENIOR HEALTH

TECH

EXISTING

BREAKROOM

EXISTING

TRAINING

EXISTING

ADMIN

EXISTING

DISATER PREP

EXISTING

ENVIRONMENTAL

HEALTH

EXISTING

LAB

EXISTING

VETERINARIAN

EXISTING

OPTOMETRIST

EXISTING

OPTOMETRY

EXISTING

MED. MALTS.

EXISTING

VESTIBULE

EXISTING

VESTIBULE

EXISTING

MENS TLT

EXISTING

VENDING

EXISTING

LOUNGE

ENTRY

CORRIDOR

EXISTING

MECHANICAL

EXISTING

ELECTRICAL

EXISTING

MOBILITY STORAGE

138 EXISTING

TEL MAINTENANCE

EXISTING

GUARD POST

SERVER

WORKSPACE

BASE DATA CENTER

COMM STORAGE

WORKSPACE

VESTIBULE

KMI OFFICE

FULL TIME

PROVIDER'S

OFFICE

CASE MANAGER'S

OFFICE

CASE MANAGER'S

OFFICE

CASE MANAGER'S

OFFICE

MULTI MEDIA

AUDIOLOGY

SOUND BOOTH

EXAM ROOM 1

EXAM ROOM 2

EXAM ROOM 3

EXAM ROOM 4

MEDICAL BREAK

ROOM

DENTAL XRAY &

EXAM ROOM

DENTAL OFFICES

WAITING LOBBY

VITALS/EKG/PFT

128OPTOMETRY

OPTOMETRIST

TECH

RECEPTION

129COMMS CLOSET

CORRIDOR

CSS

FIRST SERGEANT'S

OFFICE

NURSE'S OFFICE

MEDICS OFFICE

COMMANDER'S

OFFICE

MAO OFFICE

SEL OFFICE

CUBICLE AREA

IMMUNIZATIONS &

LAB OFFICE

ENTRY CORRIDOR

EXISTING MENS

TLT.

EXISTING LOUNGE

EXISTING WOMENS

TLT.

KMI OFFICE

VESTIBULE

SERVER

WORKSPACE

BASE DATA

CENTER

WORKBENCH AREA

EXISTING TEL

MAINTENANCE

EXISTING MECH.

FIRE RISER ROOM

EXISTING

ELECTRICAL

EXISTING

VENDING

EXISTING

JAN.

COMM STORAGE

EXISTING

RADIO OPERATOR

SUPPORT

EXISTING

RADIO OPS

EXISTING

OPS. OFFFICER

EXISTING

ADMINISTRATION

OFFICE

EXISTING

CDRS. OFFICE

EXISTING

STORAGE

EXISTING

OFFICE

EXISTING

CLASSROOM

EXISTING

COMM. CTR.

(VAULT)

EXISTING

SHREDDER

ROOM

EXISTING

COMMUNICATION

OFFICE

EXISTING

CRYPTO/RADIO

MAINT.

EXISTING

MOBILE RAD.

MAINTANENCE

CORRIDOR

PHASING SEQUENCE

PHASE 1:

THE FOLLOWING WORK SHALL HAPPEN CONCURRENTLY:

1. DEMOLITION AND CONSTRUCTION OF THE MEDICAL FACILITY.

2. EXTERIOR CONSTRUCTION OF THE BUILDING ADDITION TO THE COMMUNICATIONS

WING, INCLUDING BLOCKING-IN THE EXISTING WINDOW OPENINGS AND CREATING ALL

NEW OPENINGS IN THE EXISTING EXTERIOR WALL. THE COMMUNICATIONS WING SHALL

REMAIN OPERATIONAL UNTIL THE NEW ADDITION HAS BEEN COMPLETED AND IS FULLY

OPERATIONAL.

THE FOLLOWING SPACES SHALL REMAIN OPERATIONAL THROUGH THIS PHASE OF

CONSTRUCTION. THE CONTRACTOR SHALL ENSURE THAT ALL SYSTEMS AND UTILITIES

SERVING THESE SPACES ARE MAINTAINED OPERATIONAL AT ALL TIMES DURING THIS

PHASE OF CONSTRUCTION.

-132 EXIST. MEN'S TOILET RM.

-133 EXIST. LOUNGE

-134 EXIST. WOMEN'S TOILET RM.

-135 EXIST. MECHANICAL RM.

-137 EXIST. ELECTRICAL RM

-139 EXIST. TELECOM MAINTENANCE RM.

PHASE 2:

PRIOR TO ANY DEMOLITION WORK TEMPORARY RESTROOMS SHALL BE PROVIDED.

DEMOLITION OF THE EXISTING COMMUNICATIONS SPACE CAN START AFTER THE

OCCUPANTS OF THE EXISTING COMMUNICATION WING HAVE RELOCATED TO THE NEW

COMMUNICATION WING ADDITION. THE DEMOLITION OF THE EXISTING JANITORS CLOSET

AND A PORTION OF THE WALL OF THE EXISTING ENTRANCE REQUIRED TO BUILD THE NEW

JANITORS CLOSET AND THE NEW DRINKING FOUNTAINS SHALL TAKE PLACE DURING THIS

PHASE ALSO, INCLUDING THE REMOVAL OF THE CEILING OF THE EXISTING TOILET

ROOMS. A NEW FRAMED GYPSUM BOARD WALL AND DOOR SHALL BE CONSTRUCTED

INSIDE THE EXISTING TELECOM MAINTENANCE ROOM 139. THIS TELECOM ROOM SHALL

REMAIN OPERATIONAL DURING THE DEMOLITION AND CONSTRUCTION OF THE EXISTING

COMMUNICATIONS WING SPACE. ALL MODIFICATIONS IN THE MECHANICAL ROOMS AND

ELECTRICAL ROOM SHALL TAKE PLACE DURING THIS PHASE OF CONSTRUCTION.

(THE CONTRACTOR WILL HAVE TO PLACE TEMPORARY WALL IN THOSE AREAS THAT ARE

REQUIRED TO REMAIN IN OPERATION DURING CONSTRUCTION BUT STATED TO HAVE

WALLS REMOVED.)

Project Number:

Designed By: Approved By:

Drafted By: Date:

Scale:

HKRZ222111

F o rt S m it h A rk an sa s

R E

V

D E

S C

R

IP

T

IO

N B

Y D

A T

E

8t h W in g

A rk an sa s

A ir

N at io na l G ua rd th C iv il E n gi n ee r S q u ad ro n

L ei gh A v e, F o rt

S m it h

A

R

P ho ne : 4

-5

3-

G U

R R

I M

A T

U T

E P

A

S

W th

C o u rt

S u it e

M ia m i F lo ri d a

T

F w w w .g u rr im a tu te .c o m

A R

C H

IT

E

C T

C R

O M

W E

L L

A R

C H

IT

E

C T

S E

N G

IN

E

E R

S

E a s t th

S tr e e t

L it tl e R o c k A

R

T w w w .c ro m w e ll.

c o m

E N

G

IN

E E

R

P R

IM

E

C O

N T

R A

C T

H O

L D

E R

B U

IL

D

IN

G

A

D D

/A L

T E

R

R E

N O

V A

T

IO

N

As indicated

AD103

02/19/24

GMPA J.M., D.G.

M.C., J.K.

P H

A S

I N

G P

L A

N

0 8' 16' 24'

SCALE: 3/32" = 1'-0"1

PHASE 1 PLAN

SCALE: 3/32" = 1'-0"2

PHASE 2 PLAN

N

0 8' 16' 24' N

A d d e n d u m

/0

/2

Sheets
AD103 - PHASING PLAN
G-002 - INDEX OF DRAWINGS
2024-06-07T14:51:57-0400
Jose G Matute

File details come from the government source that posted it. Updated .