FAKZ182351 RFI Responses 002 SIGNED.pdf

PDF 168 KB Posted

Attached to
F-35 Repair Fuel Cell, Bldg 1203
Solicitation number
W50S6N-22-B-0002
Issued by

About this file

This document contains responses to a request for information regarding a federal contract opportunity to repair a fuel cell at Building 1203. The responses clarify that the existing floor coating is intended to remain, and the floor needs only light cleaning to install new striping. Addendum No. 2 should be referenced for product specifications and details regarding hazard area striping and a perimeter security stripe. The related federal contract opportunity notice provides information on attending the pre-bid conference on April 26th, 2022 and submitting bids by May 24th, 2022 for the fuel cell repair work at the specified location. The solicitation was issued by the Department of the Army Alabama Army National Guard.

View the file

Other files

File Type Posted
OF 1419A Pg 2 or 3.pdf PDF
OF 1419A Pg 3 or 3.pdf PDF
bid opening sign in sheet.pdf PDF
OF 1419 Pg 1 or 3.2.pdf PDF
RFI Responses 003.pdf PDF
Amendment 0005 SF-30.pdf PDF
W50S6N-22-B-0002 0005.pdf PDF
W50S6N-22-B-0002 0004.pdf PDF
FAKZ182351 RFI Responses 001 SIGNED.pdf PDF
J-A Brand Names.pdf PDF
Amendment 0004 SF-30.pdf PDF
FAKZ182351 Addendum No. 2 SIGNED.pdf PDF
B1203 Sign In Sheet.pdf PDF
W50S6N-22-B-0002 0003 SF-1442.pdf PDF
Amendment 3- SF-30.pdf PDF
Amendment 1.pdf PDF
SF-30 Amendment.pdf PDF
FAKZ182351 Addendum No. 1 SIGNED.pdf PDF
PreBid Bldg 1203.pptx PPTX presentation
1203 Pre-Bid Roster.pdf PDF
W50S6N-22-B-0002 Solicitation.pdf PDF
FAKZ182351 Type B-3 Drawings SIGNED.pdf PDF
EAL.pdf PDF
FAKZ182351 Type B-3 Specifications REVISED SIGNED.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 31 May 2022

To: CMSgt. William Hall

Subject: RESPONSES TO RFI #002

Project: F-35 – REPAIR FUEL CELL, BUILDING 1203

Job #: ANG# FAKZ182351 / SSL# 18073

From: David Donovan

1) Question: Note 7 on A2.1 indicates the floor is to be cleaned, existing striping to be removed. Please clarify level of floor cleaning required for this work? Is existing coating to be removed?

Response: Existing coating is intended to remain. Floor to be cleaned as required to install new striping indicated. Clean entire floor area, not just areas to receive new or refreshed striping using method recommended by striping manufacturer for proper installation of new striping.

2) Question: Request for Specification on what product spec they would like used on the line striping?

Response: Refer to Addendum No. 2.

3) Question: There was mention of the hanger door "Danger Area" to be "refreshed".

4) Question: There was also mention of a need for a red stripe around the perimeter of the hangers for a security identifier. If that is the case, please define width and location around perimeter striping.

End of Response to RFI #002

2022-05-31T08:34:32-0500