This addendum modifies the plans and specifications for the F-35 Repair Fuel Cell project at Building 1203. It replaces the first floor electrical demolition plan drawing with a revised version dated April 29, 2022. The pre-bid conference for the solicitation will be held on April 26, 2022, and bids must be submitted by May 24, 2022 at the wing auditorium of Building 1502. In order to attend the site visit, attendees must submit their names via the EAL form to the listed Army and Air Force points of contact by the deadline.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: 4 May 2022
To: Mr. Steve Shanks
Subject: ADDENDUM NO. 1
Project: F-35 – REPAIR FUEL CELL, BUILDING 1203
Job #: ANG# FAKZ182351 / SSL# 18073
From: David Donovan
The plans and Specifications for the F-35 – Repair Fuel Cell, Building 1203, dated 1 April 2022 are amended as follows. (Where there are conflicts between the plans and specifications and the addendum, this addendum shall govern).
Item No. 1: Refer to drawings. Delete drawing sheet E1.1 “First Floor Plan –
Electrical Demolition” and replace it with the attached drawing sheet E1.1 with a revised date of April 29, 2022.
End of Addendum #1
Sheet Number
Sheet Title
Project Title
M on tg om er y
D ot ha n W W W .S
SL
A R C H .C O M
(M ) 3
. 2
. 5
(D
) 3
. 7
. 5
Job Number
Date
Drawn By
Checked By
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
F3 5:
R E
PA
IR
F U
E L
CE
LL
B U
IL
D
IN
G
7T H
F
IG
H
TE
R W
IN
G
M O
N
TG
O M
E
RY
, A L
18073/FAKZ182351
1 APRIL 2021
JBG
JBG
Rev. Description Date
E1.1
FIRST FLOOR
PLAN -
ELECTRICAL
DEMOLITION
EWCUP
UP
A
TRAINING ROOM
FUEL TOOLS AND
EQUIPMENT
TANK MAINTENANCE
OFFICE 1
VEST.
LIBRARY/OFFICE 4
KITCHEN
LAUNDRY
CORRIDOR
PAINT BOOTH
STRIPPING ROOM
WASH ROOM
OFFICE 3
FIRE PROTECTION
MECH. ROOM
TOOL STORAGE
CO
RR
ID
O
R
CO
RR
ID
O
R
MEN
WOMEN
JAN
COMM
400 HZ
400 HZ 400 HZ
400 HZ
OFFICE 4
T
SCALE: 1/8"=1'-0"
FIRST FLOOR PLAN - ELECTRICAL DEMOLITION1
E1.1
SHEET NOTES:
1 1
1 1
56 T
PHASING NOTES:________________________________________________________________________________________________________ 1.
2.
3.
4.
5.
4-1-21
REMOVE EXISTING PAD MOUNTED TRANSFORMER AND RE-LOCATE TO SERVICE POINT OF BUILDING 1206. REMOVE EXISTING 750 KVA TRANSFORMER CURRENTLY SERVING BUILDING 1206 AND TURN OVER TO THE GOVERNMENT.
INSTALL EXISTING 500 KVA PAD MOUNTED TRANSFORMER RELOCATED FROM BUILDING 1203 AT SERVICE POINT OF BUILDING 1206. PROVIDE ALL MODIFICATIONS REQUIRED TO PAD AND CONDUCTORS AT BUILDING 1206 FOR A COMPLETE AND OPERATIONAL SYSTEM. PROVIDE NEW 1000 KVA PAD MOUNTED TRANSFORMER FOR BUILDING
1203 AS INDICATED ON DRAWING SHEET E3.3
1 1 ADD #1 4/29/22