FAKZ182351 Addendum No. 1 SIGNED.pdf

PDF 609 KB Posted

Attached to
F-35 Repair Fuel Cell, Bldg 1203
Solicitation number
W50S6N-22-B-0002
Issued by

About this file

This addendum modifies the plans and specifications for the F-35 Repair Fuel Cell project at Building 1203. It replaces the first floor electrical demolition plan drawing with a revised version dated April 29, 2022. The pre-bid conference for the solicitation will be held on April 26, 2022, and bids must be submitted by May 24, 2022 at the wing auditorium of Building 1502. In order to attend the site visit, attendees must submit their names via the EAL form to the listed Army and Air Force points of contact by the deadline.

View the file

Other files

File Type Posted
OF 1419A Pg 2 or 3.pdf PDF
OF 1419A Pg 3 or 3.pdf PDF
bid opening sign in sheet.pdf PDF
OF 1419 Pg 1 or 3.2.pdf PDF
RFI Responses 003.pdf PDF
Amendment 0005 SF-30.pdf PDF
W50S6N-22-B-0002 0005.pdf PDF
FAKZ182351 RFI Responses 002 SIGNED.pdf PDF
W50S6N-22-B-0002 0004.pdf PDF
FAKZ182351 RFI Responses 001 SIGNED.pdf PDF
J-A Brand Names.pdf PDF
Amendment 0004 SF-30.pdf PDF
FAKZ182351 Addendum No. 2 SIGNED.pdf PDF
B1203 Sign In Sheet.pdf PDF
W50S6N-22-B-0002 0003 SF-1442.pdf PDF
Amendment 3- SF-30.pdf PDF
Amendment 1.pdf PDF
SF-30 Amendment.pdf PDF
PreBid Bldg 1203.pptx PPTX presentation
1203 Pre-Bid Roster.pdf PDF
W50S6N-22-B-0002 Solicitation.pdf PDF
FAKZ182351 Type B-3 Drawings SIGNED.pdf PDF
EAL.pdf PDF
FAKZ182351 Type B-3 Specifications REVISED SIGNED.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 4 May 2022

To: Mr. Steve Shanks

Subject: ADDENDUM NO. 1

Project: F-35 – REPAIR FUEL CELL, BUILDING 1203

Job #: ANG# FAKZ182351 / SSL# 18073

From: David Donovan

The plans and Specifications for the F-35 – Repair Fuel Cell, Building 1203, dated 1 April 2022 are amended as follows. (Where there are conflicts between the plans and specifications and the addendum, this addendum shall govern).

Item No. 1: Refer to drawings. Delete drawing sheet E1.1 “First Floor Plan –

Electrical Demolition” and replace it with the attached drawing sheet E1.1 with a revised date of April 29, 2022.

End of Addendum #1

Sheet Number

Sheet Title

Project Title

M on tg om er y

D ot ha n W W W .S

SL

A R C H .C O M

(M ) 3

. 2

. 5

(D

) 3

. 7

. 5

Job Number

Date

Drawn By

Checked By

A

RC

H

IT

E

CT

U

RE

IN

TE

RI

O R

D E

SI

G

N

F3 5:

R E

PA

IR

F U

E L

CE

LL

B U

IL

D

IN

G

7T H

F

IG

H

TE

R W

IN

G

M O

N

TG

O M

E

RY

, A L

18073/FAKZ182351

1 APRIL 2021

JBG

JBG

Rev. Description Date

E1.1

FIRST FLOOR

PLAN -

ELECTRICAL

DEMOLITION

EWCUP

UP

A

TRAINING ROOM

FUEL TOOLS AND

EQUIPMENT

TANK MAINTENANCE

OFFICE 1

VEST.

LIBRARY/OFFICE 4

KITCHEN

LAUNDRY

CORRIDOR

PAINT BOOTH

STRIPPING ROOM

WASH ROOM

OFFICE 3

FIRE PROTECTION

MECH. ROOM

TOOL STORAGE

CO

RR

ID

O

R

CO

RR

ID

O

R

MEN

WOMEN

JAN

COMM

400 HZ

400 HZ 400 HZ

400 HZ

OFFICE 4

T

SCALE: 1/8"=1'-0"

FIRST FLOOR PLAN - ELECTRICAL DEMOLITION1

E1.1

SHEET NOTES:

1 1

1 1

56 T

PHASING NOTES:________________________________________________________________________________________________________ 1.

2.

3.

4.

5.

4-1-21

REMOVE EXISTING PAD MOUNTED TRANSFORMER AND RE-LOCATE TO SERVICE POINT OF BUILDING 1206. REMOVE EXISTING 750 KVA TRANSFORMER CURRENTLY SERVING BUILDING 1206 AND TURN OVER TO THE GOVERNMENT.

INSTALL EXISTING 500 KVA PAD MOUNTED TRANSFORMER RELOCATED FROM BUILDING 1203 AT SERVICE POINT OF BUILDING 1206. PROVIDE ALL MODIFICATIONS REQUIRED TO PAD AND CONDUCTORS AT BUILDING 1206 FOR A COMPLETE AND OPERATIONAL SYSTEM. PROVIDE NEW 1000 KVA PAD MOUNTED TRANSFORMER FOR BUILDING

1203 AS INDICATED ON DRAWING SHEET E3.3

1 1 ADD #1 4/29/22

2022-05-04T14:07:22-0500
David Donovan

File details come from the government source that posted it. Updated .