Paint Booth SOW - Appendix F - Hazardous Materials Building Inspection KC-46A Fuel Cell Hangar B253_JUN_26_2020.pdf

PDF 5 MB Posted

Attached to
Paint Booth- W508S8A -20-Q-0005
Solicitation number
W508SA
Issued by

About this file

This document is a combined synopsis/solicitation issued by the New Hampshire Army National Guard seeking quotes for the supply and installation of a paint booth at Pease Air National Guard Base in Newington, New Hampshire. The solicitation requires quotes for the supply of one paint booth (CLIN 0001) and installation services (CLIN 0002) by June 26, 2020. The statement of work provides details on the requirement for the paint booth. Quotes are to be submitted electronically with pricing, past performance information, and a response demonstrating how the vendor can meet the technical requirements and installation plan. The requirement is set aside entirely for small businesses. The selected vendor must comply with standard federal provisions and clauses including those related to representations and certifications, prohibited contracting activities, and other federal requirements.

View the file

Other files

File Type Posted
RFI Tracker Ver_4_Final_RFI_21___JULY_1_2020.pdf PDF
52.212-3 Offeror Representations and Certifications-Commercial Items. _JUN_26_2020.pdf PDF
Paint Booth SOW - Appendix G - Asbestos Test Report_Corr Metal Siding B253_JUn_26_2020.pdf PDF
Paint Booth SOW - Appendix A - Hangar 253 Building Plans (Abridged Set for Paint Booth Installation)_v4_Addendum_JUN_26_2020.pdf PDF
Paint Booth SOW - Appendix H - Compressed Air Piping Specifications B253_JUN_26_2020.pdf PDF
Paint Booth SOW - Appendix B - Summary of Available Utilities within Hangar 253_v2_Addendum_JUN_26_2020.pdf PDF
Paint Booth Statement of Work Final_RFI Addendum_JUN_26_2020.pdf PDF
Paint Booth SOW - Appendix A1 - Hangar 253 Building Plans (Supplemental Drawings for Addendum)_JUN_26_2020.pdf PDF
RFI Tracker Ver_3_Final_Comments_JUN_26_2020.pdf PDF
Sign in Sheet_JUNE_10_2020.pdf PDF
Site Visit Info_Paint Booth_Wed_June_10_2020.docx DOCX document
Paint Booth SOW - Appendix A - Hangar 253 Building Plans (Abridged Set for Paint Booth Installation)_v3.pdf PDF
Paint Booth SOW - Appendix B - Summary of Available Utilities within Hangar 253.pdf PDF
Paint Booth Statement of Work 12MAR20.pdf PDF
Paint Booth SOW - Appendix E - FP Hydraulic Calc Revisions 11.30.2018 [Submittal]_Abridged.pdf PDF
Paint Booth SOW - Appendix C - NHDES Air Permit Application.doc DOC document
Paint Booth SOW - Appendix E - FP Hydraulic Calc Revisions 11.30.2018 [Submittal].pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Asbestos Containing Materials, Lead-Based Paint, and Hazardous Materials Building Inspection K-46A Fuel Cell Hangar, Building 253 Pease Air National Guard Base Newington, New Hampshire

Submitted to:

National Guard Bureau

March 3, 2014 d M r

Tetra Tech

Table of Contents

1.0 Introduction

2.0 Building Description

3.0 Description of Suspect Asbestos Containing Materials, Sampling, and Analysis

3.1 Regulatory Background

3.2 Previous Inspection Reports

3.3 Observations and Sample Analysis

3.4 Results

3.4.1 Asbestos Containing Materials

4.0 Recommendations

5.0 Lead-Based Paint

5.1 Regulatory Background

5.2 Observations and Sample Analysis

5.3 Recommendations

6.0 PCB and DEHP Containing Equipment

6.1 Regulatory Background

6.2 PCB and DEHP Containing Equipment – Observations

6.3 Results and Recommendations

7.0 Other Hazardous Materials – Observations and Recommendations

7.1 Mercury-Containing Devices

7.2 Refrigerants

7.3 Oil-Containing Equipment

7.4 Additional Universal Waste and Regulated Non-Hazardous Materials

8.0 Limitations

Tetra Tech

List of Tables Table 1 Suspect Asbestos Containing Materials

Table 2 Asbestos Containing Materials

Table 3 Non-asbestos Containing Materials

Table 4 Results of Paint Chip Sampling

Table 5 Summary of Hazardous Materials

List of Figures Figure 1 Site Location Map

Figure 2 Limit of Hazardous Materials Inspection Plan

List of Appendices Appendix A Limitations

Appendix B Asbestos Inspector Certification

Appendix C Laboratory Certificates of Analysis

1.0 Introduction

At the request of National Guard Bureau, Tetra Tech, Inc. (Tetra Tech) has conducted an Asbestos Containing Materials, Lead-Based Paint, and Hazardous Building Materials Inspection of portions of the KC-46A Fuel Cell Hangar located at Pease Air National Guard Base in Newington, New Hampshire. The investigation included an inspection to identify asbestos containing materials, an evaluation of potential lead-based paints, and an evaluation of certain other hazardous materials present at the property which may require special handling and disposal prior to renovation or demolition.

The asbestos inspection was conducted in accordance with the National Emissions Standards for Hazardous Air Pollutants (NESHAP) Code of Federal Regulations title 40, part 61 (40 CFR 61).

2.0 Building Description

The following is a description of the Site building

The Fuel Cell Hangar, Building 253 located at Pease Air National Guard Base is constructed on a slab on grade foundation. The building consists mostly of the large open hangar area with a section of offices and a mezzanine. The structure consists of steel trusses supported by steel columns and transfer trusses. The roof of the hangar consists of corrugated metal panels with caulking between the panels at the seams. The south end of the hangar contains large track mounted hangar doors consisting of metal corrugated siding with fiberglass and foam insulation. A portion of the exterior roof and siding will be impacted during the proposed renovation with all track mounted hangar doors being removed.

A Site Location Map is included as Figure 1.

3.0 Description of Suspect Asbestos Containing Materials, Sampling, and Analysis

3.1 Regulatory Background

Regulations related to asbestos exposure and/or release has been promulgated by the United States Environmental Protection Agency (EPA), and U.S. Occupational Safety and Health Administration

(OSHA).

OSHA asbestos regulations are designed to safeguard the health of workers who may be exposed to asbestos in connection with their jobs, including asbestos abatement, construction activities, and building maintenance. OSHA requires that asbestos containing materials (ACM) be removed or appropriately abated before disturbance in the course of maintenance, renovation, or demolition work, and specifies that thermal system insulation, surfacing materials and floor tile installed before 1980 must be presumed to be ACM unless appropriate inspection, sampling and analysis prove otherwise.

EPA regulates ACM associated with renovation, demolition, and abatement projects in accordance with the NESHAP regulation (40 CFR 61). This regulation, developed for the protection of public health, requires that buildings be inspected for ACM prior to any renovation/demolition project, and that all affected friable ACM and affected non-friable ACM which is damaged or likely to be made friable by renovation/demolition activities be removed or abated prior to the renovation or demolition.

EPA’s Asbestos Hazard Emergency Response Act (AHERA, 40 CFR 763) includes requirements for training and accreditation of asbestos workers and consultants, and procedures for sample collection and analysis.

3.2 Previous Inspection Reports

The New Hampshire Air National Guard provided a summary of asbestos containing materials identified in Building 253. The following asbestos containing materials were identified:

Fitting Insulation on Hot Water Supply Lines

Pipe Insulation on Hot Water Supply Lines

Floor Tile Mastic

2’ x 4’ Ceiling Tile

The mezzanine level is to be demolished to accommodate the new construction. According to information available from the Air National Guard, the asbestos containing pipe insulation and fittings are located in the mezzanine. We assume approximately 200 linear feet of pipe insulation and approximately 50 fittings may be impacted by the proposed demolition and renovation work. The floor tile mastic and 2’ x 4’ ceiling tiles do not appear to be impacted by the proposed demolition and renovation. However, should renovation plans change such that these materials are impacted, they must be abated as described in Section 4.0.

The original building design plans dated November 13, 1952 indicate that cement asbestos board was used on the interior side of steel siding used on the original hangar doors. We understand the hangar doors will be reused as part of this project. If they are removed and reinstalled without dismantling or damaging the asbestos cement board, abatement will not be necessary.

3.3 Observations and Sample Analysis

An EPA AHERA accredited Asbestos Inspector observed the Site building on December 5 and 20, 2013. Tetra Tech’s inspector identified suspect ACM in Site building and grouped them according to type and physical appearance. Each material was assessed for friability. A material is considered friable if it can be crushed or pulverized by hand pressure, in accordance with the definition of friable materials set forth in NESHAP.

The inspector determined the number of bulk samples to be collected for each suspect material based on the type and the quantity of the material, following the sampling guidelines in the Asbestos Hazard Emergency Response Act (AHERA), 40 CFR 763.86. In general, a minimum of three bulk samples for each type of surfacing material, a minimum of three bulk samples for each type of thermal system insulation, and sufficient bulk samples to determine asbestos content for each miscellaneous material are required. Examples of surfacing material include ceiling plaster and wall plaster. Examples of thermal system insulation include pipe and duct insulation and boiler breeching. Examples of miscellaneous materials include roofing materials and floor tiles.

Bulk samples were collected by the Asbestos Inspector using tools appropriate for the type of suspect material. Suspect material was sprayed with water prior to sampling to avoid the creation of dust during sampling. Bulk samples were placed in sealable bags for delivery to the laboratory. All sampling equipment was decontaminated between samples. Samples were submitted to EMSL Analytical, Inc. of Woburn, Massachusetts for asbestos analysis. All samples were analyzed by Polarized Light Microscopy (PLM) EPA-600/R-93/116.

Laboratory analysis reports are included in Appendix C. In accordance with NESHAP, suspect ACM is considered asbestos containing if it contains greater than 1% asbestos. Table 1 lists the suspect asbestos containing materials identified during the inspection of the Site building.

Tech collected a total of 26 samples of suspect ACM according to the sampling protocol presented above. The results of the sampling and analysis are presented in Section 3.4.

3.4 Results

Asbestos containing materials were identified on the interior, exterior, and roof of the subject building located at KC-46A Fuel Cell Hangar. The material descriptions, locations, and approximate quantity are listed in Table 2 of this report. The sections below provide a summary of asbestos containing materials identified at the Site building.

3.4.1 Asbestos Containing Materials

Gray Roof Caulking

Gray Siding Caulking

During Tetra Tech’s evaluation, asbestos containing gray caulking was observed on the exterior roof of the building. The asbestos containing gray caulking is seen between the sections of metal corrugated roof deck to seal/adhesive the two segments together. We estimate approximately 28,980 square feet of corrugated roof panels that include the asbestos containing gray roof caulking at their seams. If the existing roof is to be maintained, abatement of this material would not be required.

During Tetra Tech’s evaluation, asbestos containing gray caulking was observed on the small portions of original corrugated siding located just below the roof deck. The asbestos containing gray caulking is seen between the sections of metal corrugated siding to seal/adhesive the two segments together. We estimate approximately 1,400 square feet of panels that include the asbestos containing gray roof caulking are present at this location.

Approximate quantities of identified asbestos containing materials are included in Table 2. Suspect asbestos containing materials found to be non-asbestos containing are listed in Table 3.

4.0 Recommendations

In accordance with EPA regulations, all friable ACM, or materials potentially made friable by demolition or renovation activities, must be removed from the building by a licensed asbestos abatement contractor prior to demolition or renovation.

Federal NESHAP regulations distinguish between asbestos containing materials which are likely to release asbestos fibers to the atmosphere when disturbed (friable) and those that are unlikely to do so (non-friable). All friable asbestos containing materials are federally regulated asbestos containing materials (RACM) and must be properly abated prior to demolition or renovation activities. NESHAP designates two categories of non-friable ACM; Category I non-friable ACM and Category II non-friable ACM. Category I includes packings, gaskets, resilient floor coverings and asphalt roofing.

According to NESHAP, Category I non-friable ACM is not RACM unless it has become friable or has been subjected to sanding, cutting, grinding, or abrading. Category II non-friable ACM includes non-friable ACM that is not Category I non-friable ACM. Transite board is an example of Category II non-friable ACM. Category II non-friable ACM is a RACM if it has a high probability of becoming crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition.

Tetra Tech recommends that the identified ACM that would be disturbed during the course of renovation activities be removed from the building in accordance with the NESHAP regulation (40 CFR 61) prior to the start of renovation. We recommend that the owner contract with an asbestos project monitoring firm to conduct project monitoring during the abatement and to conduct clearance air monitoring at the completion of abatement. During renovation, the work should be should be observed for suspect material that may have been inaccessible during the inspection.

Non-asbestos containing materials are listed in Table 3. Analytical results are included in Appendix C.

5.0 Lead-Based Paint

5.1 Regulatory Background

The OSHA worker protection rule has established a permissible exposure limit (PEL) of 0.050 milligrams per cubic meter (mg/m3) and an action level of 0.030 mg/m3 for airborne lead. The Resource Conservation and Recovery Act (RCRA) regulates wastes containing lead as hazardous wastes if the leachable lead in the waste exceeds 5 milligrams per liter (mg/l) in the extract by Toxicity Characteristic Leachate Procedure (TCLP).

The United States Department of Housing and Urban Development (HUD) has established a threshold for in-place paint of 0.5% lead or 1.0 milligrams per centimeter squared (mg/cm2), above which paint is considered lead-containing. Although HUD guidelines are only directly applicable to residential buildings, the threshold is useful as a guideline for identifying potential exposure and waste disposal issues in other buildings.

5.2 Observations and Sample Analysis

Tetra Tech surveyed representative areas of the Site building for the presence of lead-based paint on December 20, 2013. Tetra Tech collected paint chips samples from painted interior and exterior building surfaces for analysis by Atomic Absorption Spectroscopy (AAS). The purpose of the investigation is to assist in planning for laboratory analysis of certain building components prior to demolition, disposal, or reuse. The presence of any amount of lead requires that a renovation contractor satisfy the requirements of OSHA and RCRA as described above.

Tetra Tech collected six (6) paint chip samples for laboratory analysis at KC-46A Fuel Cell Hangar.

Three of the six samples analyzed for lead content had lead concentrations ranging 0.02 to 0.43 percent by weight. These concentrations are relatively low and would not be considered lead based paint in residential settings. The remaining three samples had lead concentrations ranging from 23 to 130 percent by weight. These samples were collected from orange and orange/gray mix painted metal hangar doors, and the tan painted structural steel beams. The painted surfaces observed at the site were seen to be in good to poor condition with some portions having significant flaking and wear.

Table 4 presents the results of the paint chip survey.

5.3 Recommendations

As described above, the concentration of lead detected in paint exceeds the HUD threshold in three samples. However, the presence of lead in any concentration means that the requirements of OSHA and RCRA apply. We recommend that the owner make the information provided in this report available to the contractor for consideration in planning for worker protection during the demolition and waste disposal. Waste containing lead generated during demolition activities should be analyzed for lead by the Toxicity Characteristic Leachate Procedure (TCLP) prior to disposal. A waste is considered hazardous waste under RCRA if the leachable lead concentration exceeds 5.0 mg/l by TCLP. Lead containing paint on steel building components to be recycled can be recycled with the steel without analysis by TCLP.

Where steel components must be torch cut, ground, or drilled to accommodate the new design, lead paint should be abated from locations of impact. Alternatively, a combination of training, personnel protective equipment, and engineering controls could be employed to manage the lead paint issues.

Although steel components can be recycled without removing lead paint, care must be taken to prevent a release of lead to the environment, and to comply with OSHA worker protection requirements.

We note that this evaluation was conducted to assist with planned renovations, and is not a comprehensive lead risk assessment.

6.0 PCB and DEHP Containing Equipment

6.1 Regulatory Background

Production, use and disposal of Polychlorinated Biphenyls (PCBs) are regulated by EPA under the Toxic Substance Control Act (TSCA) 40 CFR 761. Waste PCBs and PCB-containing equipment require disposal as hazardous waste per 310 CMR 30.00 and 40 CFR 761.

PCBs were generally not used in equipment such as light ballasts manufactured after 1978. Recent light ballasts typically contain di (2-ethylhexyl) phthalate (DEHP) instead of PCBs. DEHP is less toxic than PCBs and is not regulated by TSCA. However, it is listed as a hazardous material under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA or Superfund).

Therefore, recently installed non-PCB light ballasts to be impacted by the renovation should be recycled rather than disposed.

6.2 PCB and DEHP Containing Equipment – Observations

The building was lit with a combination of incandescent and fluorescent lighting fixtures. Fluorescent light ballasts may contain PCBs in capacitor oil and other components, although fixtures manufactured after 1978 are often labeled “Non-PCB.” Because the light fixtures were live at the time of the evaluation, they could not be disassembled and inspected. Recent light fixtures are assumed to contain DEHP. Original light fixtures may contain PCBs.

KC-46A Fuel Cell Hangar contains ballasts from the following:

4-foot fluorescent light fixtures, Approximate quantities are listed in Table 5.

6.3 Results and Recommendations

Fluorescent light ballasts manufactured before 1978 may contain PCBs in capacitor oil and other components. Non-PCB containing ballasts typically contain DEHP. Based on our observations and site history, we expect the building contains both DEHP containing and PCB containing ballasts.

Fluorescent light fixtures should be examined upon removal to determine if the ballasts are PCB or DEHP containing. All ballasts to be removed as part of the renovation should be removed and recycled in accordance with applicable regulations. DEHP containing ballasts are not regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA). However, DEHP is listed as a “hazardous substance” under CERCLA. We recommend the ballasts be sent to a recycling facility equipped to handle DEHP. PCB-containing and DEHP-containing ballasts should be transported in a manner which adheres to the hazardous material transportation requirements of the United States Department of Transportation (DOT) 49 Code of Federal Regulations 172. These regulations include requirements for shipping papers, package marking, labeling, and transport vehicle placarding.

7.0 Other Hazardous Materials – Observations and Recommendations Following is a description of other hazardous materials identified during the evaluation. Approximate quantities of hazardous materials requiring special handling or disposal are listed in Table 5.

7.1 Mercury-Containing Devices

Fluorescent light tubes and thermostats often contain mercury, and therefore require disposal as universal waste per EPA regulations 40 CFR 273 and New Hampshire Department of Environmental Services (DES) regulations Env-Hw 1101-1114.

The KC-46A Fuel Cell Hangar contains fluorescent light bulbs from the following:

4-foot, 8 bulb, fluorescent light fixtures, The fluorescent tubes must be disposed of in accordance with 40 CFR 273, NHDES Env-Hw 1101- 1114, and other applicable regulations. These regulations include requirements for generation, storage, collection, transport, treatment, disposal, use, reuse, and recycling of universal waste.

7.2 Refrigerants

Refrigerants were not identified at KC-46A Fuel Cell Hangar. If refrigerant containing equipment is encountered during renovation, the refrigerants should be recovered by a qualified contractor prior to disposal in accordance with US Environmental Protection Agency (EPA) regulations. Contractors must use refrigerant recovery equipment that has been registered with the US EPA. If recovered refrigerants are to be reused, they must be recovered by a Contractor certified per the requirements of Section 608 of the Clean Air Act.

7.3 Oil-Containing Equipment

In many cases petroleum containing equipment requires special handling and disposal prior to demolition. No oil-fired boilers, fuel storage tanks, or oil containing drums were observed during the evaluation of the building.

Small quantities of miscellaneous petroleum products associated with building operations may require special handling and disposal. Tetra Tech recommends these products be used as intended by the manufacturer. Should the disposal of any of these petroleum products be required, disposal should be conducted by a qualified environmental services contractor. A qualified environmental services contractor shall have sufficient equipment and supplies (such as vacuum trucks, drum vacs, drums, sorbent materials, personnel protective equipment) to collect and recover petroleum products from equipment. A qualified contractor shall provide workers trained in accordance with the OSHA Hazardous Waste Operator and Emergency Response (HAZWOPER) Standard 29 CFR 1910.120.

7.4 Additional Universal Waste and Regulated Non-Hazardous Materials

Items such as batteries associated with emergency lighting, exit signs and smoke detectors should be properly disposed.

A small quantity of fire extinguishers was observed in the Site building. Older fire extinguishers may contain carbon tetrachloride or Halon and should be disposed of at a proper facility. Additionally, these devices may be under pressure and require care in their removal.

Universal waste and other regulated waste materials observed by Tetra Tech are listed in Table 5. Tetra Tech recommends the proper disposal of universal waste and all other waste in accordance with local, state and federal regulations prior to renovation activities. We recommend an environmental services contractor familiar with these requirements be engaged to package, remove, and dispose of waste materials. Materials such as cleaners, paints, and solvents are not waste materials if they can be used as intended by the manufacturer.

8.0 Limitations

This report is subject to the standard limitations outlined in Appendix A and the specific limitations presented in this Section. This investigation and report have been prepared on behalf of and for the exclusive use of the National Guard Bureau. This report and the findings contained herein shall not be disseminated, in whole or in part, to any other party, nor used by any other party in whole or in part without the prior written consent of Tetra Tech.

Tetra Tech evaluated building materials in areas of the building which were proposed for renovation.

Tetra Tech recommends the renovation design be reviewed for potential impact to existing building materials. Materials to be impacted by the proposed renovation that were not included in this assessment should be evaluated prior to final design of the asbestos abatement work.

While Tetra Tech made every effort to identify suspect asbestos containing materials during the inspection, it is possible additional suspect asbestos containing materials will be encountered during renovation. If suspect asbestos containing materials not listed in Table 1 of this report are encountered during renovation, they should be assumed to be asbestos containing until they are sampled and analyzed.

This report documents a partial asbestos inspection conducted in accordance with NESHAP. This report is not a project specification and should not be used as a bidding document. At your request, Tetra Tech can prepare an asbestos abatement specification for bidding purposes.

Inspection and destructive sampling were limited within building spaces that are occupied and currently in use.

P:\19705\127-19705-14001\DOCS\REPORTS\15_ASBESTOS INSPECTION\KC-46A FUEL CELL_ASB_HAZMATERIAL_2014-03-28 REV 1.DOCX

Ta bl e

-S us pe ct

As be st os

C on ta in in g

M at er ia ls Id en tif ie d at K

C -4

6A Fu el C el lH an ga r, Pe as e

Ai rN at io na lG ua rd

B as e, Po rt sm ou th

,N H

Ye llo w /G re en

In su la tio n P

3-

-A

H an ga r

Th in

La ye rS pr ay ed on La rg e

H an ga rD oo rs

Ye llo w /G re en

In su la tio n P

3-

-B

H an ga r

Th in

La ye rS pr ay ed on La rg e

H an ga rD oo rs

Ye llo w /G re en

In su la tio n P

3-

-C

H an ga r

Th in

La ye rS pr ay ed on La rg e

H an ga rD oo rs

Bl ac k C au lk in g

P2

-0 2-

A H an ga r Ar ou nd

Bo lts on La rg e

H an ge rD oo rs

Bl ac k C au lk in g

P2

-0 2-

B H an ga r Ar ou nd

Bo lts on La rg e

H an ge rD oo rs

Fi be rg la ss In su la tio n

P

3-

-A H an ga r In su la tio n in th e in te rio ro ft he La rg e

H an ga rD oo rs

Fi be rg la ss In su la tio n

P2

-0 3-

B H an ga r In su la tio n in th e in te rio ro ft he La rg e

H an ga rD oo rs

G re en In su la tio n

P

3-

-A H an ga r In su la tio n in th e in te rio ro ft he La rg e

H an ga rD oo rs

G re en In su la tio n

P

3-

-B H an ga r In su la tio n in th e in te rio ro ft he La rg e

H an ga rD oo rs

Ye llo w /G ra y

In su la tio n P2

-1

-A

Ex te rio rR oo f

In su la tio n U nd er

Ve rti ca lC or ru ga te d R oo fS ec tio ns Ye llo w

/G ra y In su la tio n

P2

-1

-B Ex te rio rR oo f In su la tio n

U nd er Ve rti ca lC or ru ga te d

R oo fS ec tio ns

G ra y C au lk in g

P2

-1

-A Ex te rio rR oo f Se al in g H or iz on ta lC or ru ga te d

R oo fS ec tio ns

G ra y C au lk in g

P2

-1

-B Ex te rio rR oo f Se al in g H or iz on ta lC or ru ga te d

R oo fS ec tio ns

G ra y C au lk in g

P2

-1

-C E xt er io rR oo f

Se al in g

H or iz on ta lC or ru ga te d R oo fS ec tio ns W hi te

C oa tin g

P

3-

3- A

E xt er io rR oo f C or ru ga te d R oo fC oa tin g W hi te

C oa tin g

P

3-

3- B

E xt er io rR oo f C or ru ga te d R oo fC oa tin g W hi te

C oa tin g

P

3-

3- C

E xt er io rR oo f C or ru ga te d R oo fC oa tin g G ra y

Ve nt

C au lk in g P2

-1

-A

E xt er io r Ar ou nd

V en til at io n

D uc ts on

S ou th En d of

B ui ld in g G ra y

Ve nt

C au lk in g P2

-1

-B

Ex te rio r

Ar ou nd Ve nt ila tio n

D uc ts on

S ou th En d of

B ui ld in g Li gh tG ra y

C au lk in g P2

-1

-A

Ex te rio r

Ar ou nd Li gh tF ix tu re s on So ut h

E nd of Bu ild in g Li gh tG ra y

C au lk in g P2

-1

-B

E xt er io r Ar ou nd

Li gh tF ix tu re s on

So ut h E nd of

Bu ild in g

Fi be rg la ss In su la tio n

P

3-

6- A

H an ga r

Th er m al

Pi pe

In su la tio n Al on g

P er im et er of

La rg e H an ga rD oo r Fi be rg la ss

In su la tio n P2

-1

-B

H an ga r

Th er m al

Pi pe

In su la tio n Al on g

Pe rim et er of La rg e

H an ga rD oo r

Fi be rg la ss In su la tio n

P

3-

6- C

H an ga r

Th er m al

Pi pe

In su la tio n Al on g

Pe rim et er of La rg e

H an ga rD oo r

C le ar C au lk in g

P2

-1

-A H an ga r S ea lin g M et al

Pa tc h on

La rg e H an ga rD oo r C le ar

C au lk in g P2

-1

-B

H an ga r

S ea lin g

M et al Pa tc h on La rg e

H an ga rD oo r

G ra y C au lk in g

P2

-1

-A H an ga r Se al in g V er tic al C or ru ga te d R oo fS ec tio ns

M at er ia lD es cr ip tio n

M at er ia lN um be r

Lo ca tio n

B ui ld in g Se ct io n e

-A sb es to s C on ta in in g M at er ia ls to be

Im pa ct ed by R en ov at io n at

K C

-4 6A

M ai nt en an ce

H an ga r, Pe as e Ai rN at io na lG ua rd B as e, Po rt sm ou th ,N

H

Pi pe

In su la tio n N

A H an ga r So ut hw es tC or ne r

LF

Pi pe

Fi tti ng In su la tio n

N A

H an ga r

So ut hw es tC or ne r

EA

As be st os

C em en tB oa rd

N A

H an ga rD oo rs

H an ga rD oo rs

As su m ed

9, SF

As be st os

C on te nt w

t) Q ua nt ity U ni t

M at er ia lN um be r

B ui ld in g Se ct io n Lo ca tio n

SF

M at er ia lD es cr ip tio n

G ra y C au lk in g

P2

-1

-A ,P

3-

2-

B, P2

-1

-C

Ex te rio rR oo f

Se al in g

H or iz on ta lC or ru ga te d R oo fS ec tio ns

,9

SF

G ra y

C au lk in g P2

-1

H an ga r Se al in g Sm al lP or tio n of

C or ru ga te d

Si di ng Se ct io ns Lo ca te d Be lo w th e

R oo fD ec k As su m ed 1, e

-N on

-A sb es to s C on ta in in g M at er ia ls

Id en tif ie d at

K C

-4 6A

Fu el

C el lH an ga r, Pe as e Ai rN at io na lG ua rd B as e, Po rt sm ou th ,N

H

Y el lo w

/G re en In su la tio n

P

3-

-A H an ge r Th in La ye rS pr ay ed on

La rg e H an ge rD oo rs B la ck

C au lk in g P

3-

-A

H an ge r

A ro un d

Bo lts on La rg e

H an ge rD oo rs

Fi be rg la ss In su la tio n

P

3-

-A H an ge r In su la tio n in th e in te rio ro ft he La rg e

H an ge rD oo rs

G re en In su la tio n

P2

-0 4-

A H an ge r In su la tio n in th e in te rio ro ft he La rg e

H an ge rD oo rs

Y el lo w

/G ra y In su la tio n

P2

-1

-A Ex te rio rR oo f In su la tio n

U nd er Ve rti ca lC or ru ga te d

R oo fS ec tio ns

W hi te C oa tin g P

3-

3-

A Ex te rio rR oo f C or ru ga te d R oo fC oa tin g G ra y

V en tC au lk in g P

3-

4-

A E xt er io r

A ro un d

V en til at io n

D uc ts on

La rg e H an ge rD oo r Li gh tG ra y

C au lk in g P

3-

5-

A E xt er io r

A ro un d

Li gh tF ix tu re s on

La rg e H an ge rD oo r Fi be rg la ss

In su la tio n P

3-

6-

A H an ge r Th er m al P ip e

In su la tio n Al on g

Pe rim et er of La rg e

H an ge rD oo r

C le ar C au lk in g

P

3-

7- A

H an ge r

S ea lin g

M et al P at ch on La rg e

H an ge rD oo r

M at er ia lD es cr ip tio n

M at er ia lN um be r

B ui ld in g Lo ca tio n

M at er ia lN um be r

B ui ld in g Se ct io n D es cr ip tio n Le ad C on te nt w t)

P-

H an ge r O ra ng e on

M et al La rg e

H an ga rD oo rs

P-

H an ge r

G ra y on

M et al La rg e

H an ga rD oo rs

0.

P-

H an ge r G ra y/

O ra ng e

M ix on M et al

La rg e H an ga rD oo rs

P-

H an ge r R ed on

Fi re

Su pp re sa nt Pi pi ng

0.

P-

H an ge r Ye llo w

St rip pi ng on C on cr et e

Fl oo r 0.

P-

H an ge r

Ta n on St ru ct ur al

St ee lB ea m s

Ta bl e

-R es ul ts of Pa in tC hi p

Sa m pl in g at

K C

-4 6A

Fu el

C el lH an ga r, Pe as e Ai rN at io na lG ua rd B as e, Po rt sm ou th ,N

H

Po te nt ia lly

PC

B or

DE

HP

Co nt ai ni ng Eq ui pm en t

B al la st s fro m 4-fo ot

,8 -b ul b flu or es ce nt lig ht fix tu re s

M er cu ry

-c on ta in in g

De vi ce s

B ul bs fro m 4-fo ot

,8 -b ul b flu or es ce nt lig ht fix tu re s

O th er

Fi re ex tin gu is he r

M at er ia lD es cr ip tio n

Es tim at ed

Q ua nt ity

Ta bl e

-S um m ar y of

Ha za rd ou s M at er ia ls

Id en tif ie d at

KC

-4

6A Fu el Ce ll Ha ng ar

,P ea se Ai rN at io na lG ua rd Ba se ,P or ts m ou th ,N

H

Appendix A

Limitations

Tetra Tech Rizzo

Appendix A: Limitations

1. The observations described in this report were made under the conditions stated therein. The conclusions presented in the report were based solely upon the services described therein, and not on scientific tasks or procedures beyond the scope of described services or the time and budgetary constraints imposed by Client. The work described in this report was carried out in accordance with the Terms and Conditions in our contract.

2. Observations were made of the Site and of structures on the Site as indicated within the report. Where access to portions of the Site or to structures on the Site was unavailable or limited, Tetra Tech Rizzo renders no opinion as to the presence asbestos-containing material in that portion of the Site or structure. In addition, Tetra Tech Rizzo renders no opinion as to the presence of asbestos-containing material where direct observation of the interior walls, floor, or ceiling of a structure on a Site was obstructed by objects or coverings on or over these surfaces.

3. It is ENGINEER's understanding that the purpose of this report is to assess the physical characteristics of the subject Site with respect to the presence of asbestos-containing material. This stated purpose has been a significant factor in determining the scope and level of services provided for in the Agreement. Should the purpose for which the Report is to be used or the proposed use of the site(s) change, this Report is no longer valid and use of this Report by CLIENT or others without ENGINEER's review and written authorization shall be at the user's sole risk. Should ENGINEER be required to review the Report after its date of submission, ENGINEER shall be entitled to additional compensation at then existing rates or such other terms as agreed between ENGINEER and the CLIENT.

4. Except as noted within the text of the report, no quantitative laboratory testing was performed as part of the investigation. Where such analyses have been conducted by an outside laboratory, Tetra Tech Rizzo has relied upon the data provided and has not conducted an independent evaluation of the reliability of these data.

5. This Report was prepared for the exclusive use of the CLIENT.

6. The observations and conclusions described in this Report are based solely on the Scope of Services provided pursuant to the Agreement. ENGINEER has not performed any additional observations, investigations, studies, or testing not specifically stated therein. ENGINEER shall not be liable for the existence of any condition, the discovery of which required the performance of services not authorized under the Agreement.

7. ENGINEER has endeavored to perform its services based upon engineering practices accepted at the time they were performed. ENGINEER makes no other representations, express or implied, regarding the information, data, analysis, calculations, and conclusions contained herein.

Appendix B

Asbestos Inspector Certification

Appendix C

Certificates of Analysis

EMSL Analytical, Inc.

7 Constitution Way, Suite 107, Woburn, MA 01801 Phone/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com bostonlab@emsl.com

131305257 CustomerID: TTRZ78 CustomerPO:

ProjectID:

EMSL Order:

Attn: Matt Madden Tetra Tech, Inc.

PO Box 9005 Framingham, MA

Received: 12/09/13 8:48 AM

127-19705-14001 / Pease ANGB

Fax: (508) 903-2001 Phone: (508) 903-2000

Project:

12/12/2013Analysis Date:

12/5/2013Collected:

Sample Description Appearance % Type AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

P254-01-A

131305257-0001

Between Horizontal Corrugated Roof Sections - Caulking

Tan Non-Fibrous Homogeneous

Chrysotile5%Non-fibrous (other)95%

P254-01-B

131305257-0002

Between Horizontal Corrugated Roof Sections - Caulking

Tan Non-Fibrous Homogeneous

Chrysotile5%Non-fibrous (other)95%

P254-01-C

131305257-0003

Between Horizontal Corrugated Roof Sections - Caulking

Tan Non-Fibrous Homogeneous

Chrysotile5%Non-fibrous (other)95%

P254-02-A

131305257-0004

- Fiberglass Insulation

Tan None Detected Fibrous Homogeneous

Glass95% Non-fibrous (other)5%

P254-02-B

131305257-0005

- Fiberglass Insulation

Tan None Detected Fibrous Homogeneous

Glass95% Non-fibrous (other)5%

P254-03-A

131305257-0006

Under Edge Flashing - Black Foam

Gray None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-03-B

131305257-0007

Under Edge Flashing - Black Foam

Gray None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-03-C

131305257-0008

Under Edge Flashing - Black Foam

Gray None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

1Test Report PLM-7.28.9 Printed: 12/12/2013 2:11:38 PM

Steve Grise, Laboratory Manager or other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1% Samples analyzed by EMSL Analytical, Inc. Woburn, MA NVLAP Lab Code 101147-0, CT PH-0315, MA AA000188, RI AAL-107T3 and VT AL357102

Initial report from 12/12/2013 14:11:38

Kevin Pine (33) Sean Ryan (24)

Phone/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com bostonlab@emsl.com

131305257 CustomerID: TTRZ78 CustomerPO:

ProjectID:

EMSL Order:

Attn: Matt Madden Tetra Tech, Inc.

PO Box 9005 Framingham, MA

Received: 12/09/13 8:48 AM

127-19705-14001 / Pease ANGB

Fax: (508) 903-2001 Phone: (508) 903-2000

Project:

12/12/2013Analysis Date:

12/5/2013Collected:

Sample Description Appearance % Type AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

P254-04-A

131305257-0009

- Black Washer Caulking

Gray None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-04-B

131305257-0010

- Black Washer Caulking

Gray None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-05-A

131305257-0011

Around Bolts - Grey Caulking

Gray None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-05-B

131305257-0012

Around Bolts - Grey Caulking

Gray None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-05-C

131305257-0013

Around Bolts - Grey Caulking

Gray None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-06-A

131305257-0014

Between Vertical Corrugated Roof Sections - Caulking

Brown Non-Fibrous Homogeneous

Chrysotile2%Non-fibrous (other)98%

P254-06-B

131305257-0015

Between Vertical Corrugated Roof Sections - Caulking

Brown Non-Fibrous Homogeneous

Chrysotile2%Non-fibrous (other)98%

P254-06-C

131305257-0016

Between Vertical Corrugated Roof Sections - Caulking

Tan Non-Fibrous Homogeneous

Chrysotile2%Non-fibrous (other)98%

2Test Report PLM-7.28.9 Printed: 12/12/2013 2:11:38 PM

Steve Grise, Laboratory Manager or other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1% Samples analyzed by EMSL Analytical, Inc. Woburn, MA NVLAP Lab Code 101147-0, CT PH-0315, MA AA000188, RI AAL-107T3 and VT AL357102

Initial report from 12/12/2013 14:11:38

Kevin Pine (33)

Phone/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com bostonlab@emsl.com

131305257 CustomerID: TTRZ78 CustomerPO:

ProjectID:

EMSL Order:

Attn: Matt Madden Tetra Tech, Inc.

PO Box 9005 Framingham, MA

Received: 12/09/13 8:48 AM

127-19705-14001 / Pease ANGB

Fax: (508) 903-2001 Phone: (508) 903-2000

Project:

12/12/2013Analysis Date:

12/5/2013Collected:

Sample Description Appearance % Type AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

P254-07-A

131305257-0017

- White Fiberglass Insulation Coating

Tan/White None Detected Fibrous Homogeneous

Cellulose10% Glass5%

Non-fibrous (other)85%

P254-08-A

131305257-0018

Roof - Black Seam Caulking

Black None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-09-A

131305257-0019

Roof - Rubber Membrane

Black None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-10-A

131305257-0020

Floor - Yellow Seam Caulking

Yellow None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-10-B

131305257-0021

Floor - Yellow Seam Caulking

Yellow None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-11-A

131305257-0022

Pump House Vent - Caulking

Gray None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-11-B

131305257-0023

Pump House Vent - Caulking

Gray None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-12-A

131305257-0024

Pump House Floor - Seam Insulation

Brown None Detected Fibrous Homogeneous

Cellulose80% Non-fibrous (other)20%

3Test Report PLM-7.28.9 Printed: 12/12/2013 2:11:38 PM

Steve Grise, Laboratory Manager or other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1% Samples analyzed by EMSL Analytical, Inc. Woburn, MA NVLAP Lab Code 101147-0, CT PH-0315, MA AA000188, RI AAL-107T3 and VT AL357102

Initial report from 12/12/2013 14:11:38

Kevin Pine (33)

Phone/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com bostonlab@emsl.com

131305257 CustomerID: TTRZ78 CustomerPO:

ProjectID:

EMSL Order:

Attn: Matt Madden Tetra Tech, Inc.

PO Box 9005 Framingham, MA

Received: 12/09/13 8:48 AM

127-19705-14001 / Pease ANGB

Fax: (508) 903-2001 Phone: (508) 903-2000

Project:

12/12/2013Analysis Date:

12/5/2013Collected:

Sample Description Appearance % Type AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

P254-12-B

131305257-0025

Pump House Floor - Seam Insulation

Brown None Detected Fibrous Homogeneous

Cellulose80% Non-fibrous (other)20%

P254-13-A

131305257-0026

- Fiberglass Thermal Pipe Insulation

Silver/Yellow None Detected Non-Fibrous Homogeneous

Glass90% Non-fibrous (other)10%

P254-13-B

131305257-0027

- Fiberglass Thermal Pipe Insulation

Yellow None Detected Fibrous Homogeneous

Glass90% Non-fibrous (other)10%

P254-15-A

131305257-0028

Sand Blast Room - Sheetrock Walls

White None Detected Fibrous Homogeneous

Glass2% Non-fibrous (other)98%

P254-15-B

131305257-0029

Sand Blast Room - Sheetrock Walls

Brown/White/Pink None Detected Fibrous Homogeneous

Cellulose80% Glass2%

Non-fibrous (other)18%

P254-16-A

131305257-0030

Interior Door - Silver Caulking

Silver None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-16-B

131305257-0031

Interior Door - Silver Caulking

Silver None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-14-A

131305257-0032

Interior Door - Brown Caulking

Brown None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

4Test Report PLM-7.28.9 Printed: 12/12/2013 2:11:38 PM

Steve Grise, Laboratory Manager or other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1% Samples analyzed by EMSL Analytical, Inc. Woburn, MA NVLAP Lab Code 101147-0, CT PH-0315, MA AA000188, RI AAL-107T3 and VT AL357102

Initial report from 12/12/2013 14:11:38

Kevin Pine (33)

Phone/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com bostonlab@emsl.com

131305257 CustomerID: TTRZ78 CustomerPO:

ProjectID:

EMSL Order:

Attn: Matt Madden Tetra Tech, Inc.

PO Box 9005 Framingham, MA

Received: 12/09/13 8:48 AM

127-19705-14001 / Pease ANGB

Fax: (508) 903-2001 Phone: (508) 903-2000

Project:

12/12/2013Analysis Date:

12/5/2013Collected:

Sample Description Appearance % Type AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

P254-14-B

131305257-0033

Interior Door - Brown Caulking

Brown None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-17-A

131305257-0034

Interior Door - White Caulking

White None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-17-B

131305257-0035

Interior Door - White Caulking

White None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-18-A

131305257-0036

- Long Sheetrock Wall

White None Detected Non-Fibrous Homogeneous

Glass2% Non-fibrous (other)98%

P254-18-B

131305257-0037

- Long Sheetrock Wall

White None Detected Non-Fibrous Homogeneous

Glass2% Non-fibrous (other)98%

P254-19-A

131305257-0038

Exterior Door - Brown Caulking

Brown None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-19-B

131305257-0039

Exterior Door - Brown Caulking

Brown None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-20-A

131305257-0040

Exterior Door - Off White Caulking

White None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

5Test Report PLM-7.28.9 Printed: 12/12/2013 2:11:38 PM

Steve Grise, Laboratory Manager or other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1% Samples analyzed by EMSL Analytical, Inc. Woburn, MA NVLAP Lab Code 101147-0, CT PH-0315, MA AA000188, RI AAL-107T3 and VT AL357102

Initial report from 12/12/2013 14:11:38

Kevin Pine (33)

Phone/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com bostonlab@emsl.com

131305257 CustomerID: TTRZ78 CustomerPO:

ProjectID:

EMSL Order:

Attn: Matt Madden Tetra Tech, Inc.

PO Box 9005 Framingham, MA

Received: 12/09/13 8:48 AM

127-19705-14001 / Pease ANGB

Fax: (508) 903-2001 Phone: (508) 903-2000

Project:

12/12/2013Analysis Date:

12/5/2013Collected:

Sample Description Appearance % Type AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

P254-20-B

131305257-0041

Exterior Door - Off White Caulking

White None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-21-A

131305257-0042

Exterior Garage Door - Off White Caulking

White None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-21-B

131305257-0043

Exterior Garage Door - Off White Caulking

White None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-22-A

131305257-0044

Exterior Door - Pink Caulking

Brown Non-Fibrous Homogeneous

Chrysotile2%Non-fibrous (other)98%

P254-22-B

131305257-0045

Exterior Door - Pink Caulking

Brown/Gray Non-Fibrous Homogeneous

Chrysotile2%Non-fibrous (other)98%

P254-23-A

131305257-0046

Exterior Patch - Clear Caulking

Clear None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-23-B

131305257-0047

Exterior Patch - Clear Caulking

Clear None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P254-24-A

131305257-0048

Roof - White Coating

White None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

6Test Report PLM-7.28.9 Printed: 12/12/2013 2:11:38 PM

Steve Grise, Laboratory Manager or other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1% Samples analyzed by EMSL Analytical, Inc. Woburn, MA NVLAP Lab Code 101147-0, CT PH-0315, MA AA000188, RI AAL-107T3 and VT AL357102

Initial report from 12/12/2013 14:11:38

Kevin Pine (33)

Phone/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com bostonlab@emsl.com

131305257 CustomerID: TTRZ78 CustomerPO:

ProjectID:

EMSL Order:

Attn: Matt Madden Tetra Tech, Inc.

PO Box 9005 Framingham, MA

Received: 12/09/13 8:48 AM

127-19705-14001 / Pease ANGB

Fax: (508) 903-2001 Phone: (508) 903-2000

Project:

12/12/2013Analysis Date:

12/5/2013Collected:

Sample Description Appearance % Type AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

P253-01-A

131305257-0049

- Yellow/Green Spray On Insulation

Green None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P253-01-B

131305257-0050

- Yellow/Green Spray On Insulation

Green None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P253-01-C

131305257-0051

- Yellow/Green Spray On Insulation

Green None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

P253-02-A

13…