This document includes a statement of work and solicitation for a paint booth and installation services. The New Hampshire Army National Guard requires a paint booth under CLIN 0001 and installation services under CLIN 0002 to meet the stated requirement. Quotes are due by the date specified in the solicitation. The solicitation number is W508S8A-20-Q-0005 and is set aside 100% for small business. A site visit is recommended and will be held the week of June 8, 2020 at Pease Air National Guard Base in Newington, New Hampshire. The government intends to evaluate offers and award without discussions to the responsible offeror whose quote is most advantageous based on past performance, technical approach, and price. The selected contractor must comply with the provided provisions and clauses.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX B – SUMMARY OF AVAILABLE UTILITIES WITHIN HANGAR 253
Revised 6/25/2020, all changes in RED
Provided at Rm 129 1 ½ inch gas line @ north wall 1 inch Compressed Air/Tool Lines at east and west walls ¾ inch domestic cold water supply pipe at west wall of Rm 129 Floor Drain located at north/center of room for potential Eye Wash/Shower drain Electrical service (all located along west wall):
• Panel HP-2 (480/277V 3Ph/4Wire, 200A main circuit breaker) o 15A 3-pole previously for Blast Booth Claim System (3HP) (Unused) o 15A 3-pole previously for Blast Booth Dry Honer (2HP) (Unused) o 20A 1-pole spare o 20A 3-pole spare
• Panel HP-4 (480/277V 3Ph/4Wire, 150A main circuit breaker) o 60A 3-pole previously for Despatch Oven Rm 129 (Unused) o 25A 3-pole spare o 25A 3-pole spare
• Panel LP-2 (208/120V)
• Panel LP-2A (208/120V)
Fire sprinkler system w/ drain/test valve located in the southeast corner of Rm 129 (capacity calculation needed for Paint Booth requirement)
• Surrounding Room Fire Suppression/Alarms – HC-2 coverage provided, 0.2GPM/SQFT @ Design Area of 2,500SF
Provided Elsewhere in Bldg 253 Electrical capacity at Panel RDP-1 (480/277V 3Ph/4Wire) in Room 147 of Bldg 253, depicted as Room B on drawing AE-101:
• 70A 3-pole for Blast Booth Exhaust Fan (20HP) planned at Rm 120 (Circuit breaker installed/wiring not installed)
• 100A 3-pole spare
• 70A 3-pole for Paint Booth Exhaust Fan (20HP) planned at Rm 120 (Circuit breaker installed/wiring not installed)
Compressed Air-Breathing Air (closest breathing air supply is at CTK Rm 123 or at Mechanical Mezzanine above and west of Room 129)